Attachment 2 - WEDGE
PDF 2 MB Posted
- Attached to
- USCGC WEDGE & BARGE DS FY20
- Solicitation number
- 70Z08520QP4501700
About this file
Attachment 2 - Specification WEDGE & BARGE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CGC_WEDGE_&_BARGE_DS_-_Amendment_0001.pdf | ||
| Attachment_5_Request_for_Clarifications.doc | DOC document | |
| CGC WEDGE & BARGE Combined Synopsis Solicitation.doc | DOC document | |
| Attachment 1 Schedule B - WEDGE | XLS spreadsheet | |
| Attachment 6 - WEDGE DS FY20 JOTFOC - Allied Crane Work Item Level Above signed.jpg | JPG image | |
| Attachment_3__Past_Performance_Information_Form.doc | DOC document | |
| Attachment_ 4_ USCG_Ombudsman_Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC WEDGE (WLR 75307)
USCG 90B BARGE (90012)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2020
Developed By: LT Alessandra Twomey
(Rev-0, 19 June 2019)
USCGC WEDGE (WLR-75D) DOCKSIDE AVAILABILITY FY2020
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................... vii Consolidated List of Critical Inspection Items .......................................................................................... viii Principal Characteristics - Tender ................................................................................................................ ix Principal Characteristics - Barge ................................................................................................................... x General Requirements WORK ITEM 1: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean WORK ITEM 2: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean WORK ITEM 3: Boiler Exhaust Stack Uptakes, Commercial Clean WORK ITEM 4: Vent Ducts (Engine And Motor Room All), Commercial Cleaning WORK ITEM 5: Vent Ducts (Galley and Pantry Room All), Commercial Cleaning WORK ITEM 6: Vent Ducts (Laundry Exhaust), Commercial Cleaning WORK ITEM 7: Vent Ducts (All Other), Commercial Cleaning WORK ITEM 8: Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift -
Tender WORK ITEM 9: Hull Fittings (Mooring and Towing), Inspect and Test - Tender WORK ITEM 10: Spuds, Overhaul - Tender WORK ITEM 11: Spud Winch, Inspect & Service - Tender WORK ITEM 12: Sewage Holding Tank(s), Clean and Inspect - Tender WORK ITEM 13: Grey Water Piping, Clean And Flush WORK ITEM 14: Sewage Piping, Clean And Flush WORK ITEM 15: Tanks (Sewage Holding), Preserve “Partial” - Tender WORK ITEM 16: Temporary Services, Provide – Tender and Barge WORK ITEM 17: Boiler Exhaust Stack Uptakes, Commercial Clean WORK ITEM 18: Barge, Diesel Engine Exhaust Piping, Commercial Clean WORK ITEM 19: Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift -
Barge WORK ITEM 20: Hull Fittings (Mooring and Towing), Inspect and Test - Barge WORK ITEM 21: Capstan, Inspect and Service - Barge WORK ITEM 22: Spuds, Overhaul - Barge WORK ITEM 23: Spud Winch, Inspect & Service - Barge WORK ITEM 24: Boat Boom, Inspect and Service – Barge WORK ITEM 25: Buoy and Cargo Crane, Inspect and Service - Barge WORK ITEM 26: Head Wire Winch, Inspect & Service WORK ITEM 27: Tail Wire Winch, Inspect & Service WORK ITEM 28: Chill Water Piping Insulation, Renew WORK ITEM 29: Compressed Air System Piping and Valves, Renew WORK ITEM 30: Vent Fans and Motors, Overhaul WORK ITEM 31: Sewage Tank Vent Piping, Renew WORK ITEM 32: Crews Shower Repair iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 130 CGB71-77 85-001, Rev B, General Arrangement – Main Deck Plan
Coast Guard Drawing 75D WAGL 2602-1, Rev-, Spud Housing Assembly And Details
Coast Guard Drawing 75D WAGL 4000-006, Rev B, Machinery Arrangement Mods to Suit 80MDDCD
SSDG
Coast Guard Drawing 75D WAGL 4000-007, Rev B, Machinery Arrangement Mods to Suit IF 1312
MDE
Coast Guard Drawing 75D WAGL 4103-025, Rev -, Exhaust Piping Mods to Suit IF 1312 MDE
Coast Guard Drawing 75D WAGL 4103-028, Rev B, Exhaust Piping Mods to Suit IRESS (WEDGE)
Coast Guard Drawing 75D WAGL 4103-031, Rev -, Diagram – Exhaust Systems
Coast Guard Drawing 75D WAGL 4901-001, Rev B, Compressed Air Flow Diagram
Coast Guard Drawing 75D-WAGL 103-3, Rev -, Booklet of Gen Plans (75307)
Coast Guard Drawing 75D-WAGL 3801-1, Rev B, Vent Heating & A/C (75306-75307)
Coast Guard Drawing 75D-WAGL 103-4, Rev D, General Arrangement Main Deck & Hold (75306-
75307)
Coast Guard Drawing 75D-WAGL 103-7, Rev D, Outboard Profile and Inboard Profile (75306-75307)
Coast Guard Drawing 75D-WAGL 3801-1, Rev B, Vent Heating & A/C (75306-75307)
Coast Guard Drawing 75D-WAGL 4804-2, Rev_, Fresh Water & Waste Piping Plan (75306-75307)
Coast Guard Drawing 75D-WAGL 4804-3, Rev_, Fresh Water & Waste Piping Sections (75306-75307)
Coast Guard Drawing 75D-WAGL 4808-3, Rev A, Marine Sanitation Device Secondary Drainage
System Alterations (75306-75307)
Coast Guard Drawing 75D-WAGL 4901-1, Rev B, Compressed Air Flow Diagram (75306-75307)
Coast Guard Drawing 75D-WAGL 4901-2, Rev -, Compressed Air Piping Plan (75306-75307)
Coast Guard Drawing 75D-WAGL 4901-9, Rev -, Compressed Air Mods to Suit If 1312 MDE (WEDGE)
Coast Guard Drawing 90 CGB 0103-1, Rev 1, Outboard Profile and Deck Arrangement
Coast Guard Drawing 90B CGB 2602-4, Rev A, USCG Barge 90012 Spud Extension And Strengthening
Details
Coast Guard Drawing 90B CGB 4901-001, Rev -, Air Piping System
Coast Guard Drawing 90B CGB 5200-1, Rev -, Air Supply, Stacks, & Exhaust Piping
Coast Guard Drawing 90B-CGB 5200-1, Rev -, Air Supply, Stacks, & Exhaust Piping
Coast Guard Drawing 90-CGB 2002-003, Rev -, 90-Ft Barge Derrick v (Rev-0)
Coast Guard Drawing 90B CGB 0103-008, CGB 90012 Booklet of General Plans
Coast Guard Drawing 90B CGB 1201-001, Rev 2, Deck Fitting Plan for 90’ x 24’ x 6’-6” Sp Barge
Coast Guard Drawing 75 WLIC-123-002, Sewage Tank
Coast Guard Fleet Drawing FL 2602-10, Rev R, Spud Arrangements and Details
Coast Guard Fleet Drawing FL-1112-18, Rev -, HU40 Series Spud Winch Foundation
Coast Guard Drawing 75D WAGL 1201-001, Rev A, Towing Knees & Towing Bitt (75306-75307)
Coast Guard Drawing 75D WAGL 1201-002, Rev B, Closed Chocks & Fairleader in Bulwark (75306-
75307)
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Technical Publication (TP) 1797, SWBS 582, Section A, Nov 2009, Capstan
Coast Guard Technical Publication (TP) 3174, Section A, Air Winch, Mooring and Spud - Model HU
Series
Coast Guard Technical Publication (TP) 3364, SWBS 589, May 1998. Marine Crane, Model TK 20-50, Section A (Service Manual) and Section B (Parts)
Coast Guard Technical Publication (TP) 3914, 04-APR-03, Air Compressor - Series Qr-25
Coast Guard Technical Publication (TP) 4958, Section A, Amendment 1; Mar 2011, Utility Air Winch
Model HU-40 Series
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General
Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC
Electrical Motors
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard
Electrical Cable Test
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2012, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean
Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary
Services
OTHER REFERENCES
American Society for Testing and Materials (ASTM) International F1508, 2016, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services
American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded, and
Welding End vi (Rev-0)
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D3951, 2015, Standard Practice for Commercial Packaging
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component
Adhesives (An)
ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal
Insulation for Piping and Machinery
Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment
DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems
International Standard Organization (ISO) 2953, 2000, Mechanical Vibration, Balancing Machines, Description and Evaluation
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2011 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe
Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough
Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning vii (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
11 Y HU-40 Pneumatic
Winch**
NSN: 3950-01-566-3921 1 ea. $19,025.00
23 Y HU-40 Pneumatic
Winch**
NSN: 3950-01-566-3921 1 ea. $19,025.00
25 N Pin Allied PN: 28147 1 ea. $1,562.00
25 N Bushing Allied PN: 53768 4 ea. $201.00
25 N Bushing Allied PN: 14199 4 ea. $250.00
25 N Bearing, Needle Allied PN: 10520 2 ea. $200.00
25 N Bearing, Inner Race Allied PN: 10521 2 ea. $53.00
25 N Sheave, Pin
Assembly
Allied PN: 21805 2 ea. $403.00
25 N Pin Allied PN: 28148 4 ea. $380.00
25 N Pin Assembly Allied PN: 29110 1 ea. $1082.00
25 N O-Ring Allied PN: 203840 4 ea. $182.00
25 N Wear Ring (Puck) Allied PN: 10868 4 ea. $80.00
25 Y Hydraulic Pump** NSN: 4320-01-F12-2758
PN: 27803
1 ea. $3,400.00
25 Y Sheave Allied PN: 13624 NSN:
2040-01-F12-3043
2 ea. $1022.49
25 Y Swing Drive** PN: 23827 NSN: 3010-01-
F12-3044
2 ea. $9,584.83
25 Y Control Valve** Allied PN: 27771 NSN:
4820-01-F12-2755
1 ea. $5,350.94
25 Y Luff Cylinder** Allied PN: 27829 NSN:
3040-01-F12-2760
1 ea. $13,816.55
25 Y Jib Cylinder** Allied PN: 27830 NSN:
2815-01-F12-2789
1 ea. $15,199.62
25 Y Allied Extension
Cylinder**
Allied PN: 27831 NSN:
2530-01-F12-3042
1 ea. $11,947.67
25 Y Winch, Hydraulic NSN: 3950-01-663-1549
PN: CH165A-25120-01-1
1 ea. $13,000.00
25 Y Wire Rope, 3/4”, 250’, 6x36 RRL
NSN: 4010-01-647-1654 1 ea. $615.00
26 Y HU Pneumatic
Winch**
NSN: 3950-00-368-5253 1 ea. $19,025.00
27 Y HU Pneumatic
Winch**
NSN: 3950-00-368-5253 1 ea. $19,025.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter viii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
23 Capstan, Inspect and Service - Barge
26 Boat Boom (Gen), Level 2 Inspect and Repair – Barge
27 Buoy and Cargo Crane, Inspect and Service - Barge ix (Rev-0)
PRINCIPAL CHARACTERISTICS - TENDER
75’ WLR (D-CLASS: CGC WEDGE), INLAND BUOY TENDER
PHYSICAL
Length overall 75' 0"
Depth 7' 7-3/4"
Maximum beam 22' 0"
Height of highest projection 32' 0"
Full load draft 4' 4” LCF Draft
Full load displacement 141.31 Long Tons SW
Shore tie voltage requirements 440 V / 100 A
Frame spacing 1' 0"
MACHINERY
Number of propellers 2
Number of blades 5
Diameter of propeller 44"
Pitch 50" fixed
RPM 480
x (Rev-0)
PRINCIPAL CHARACTERISTICS - BARGE
90' CGB (B-CLASS: 90012, 90013), BARGE
PHYSICAL
Length overall 90' 0"
Depth 6' 6"
Maximum beam 24' 7"
Full load draft 4’6”
Full load displacement 181 Long Tons
Shore tie voltage requirements 440 V / 100 A
11 (Rev-0)
00000_0618_FLT
REC_00000_FLT_Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast
Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied
Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for
Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
12 (Rev-0)
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with
COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings
(listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in
Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec
0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is SQG.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES
SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
13 (Rev-0)
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering
Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental
Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with
Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental
Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast
Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing
Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or
90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec
14 (Rev-0)
6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, "For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope," to
"For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope."
3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from "DYFORM-18, 6X19 AND 6X37 IWRC RRL," to "
DYFORM-18, 6X19 AND 6X36 IWRC RRL"
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
15 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum;
and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
16 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE &
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
17 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT
QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
18 (Rev-0)
19 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO SEPARATE
SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading
(mils)
Mean Reading (mils) IAW ASTM DD4417).
20 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
21 (Rev-0)
22 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATCH
INDUCTIO
N TIME
COATING SYSTEM SEQUENCE
(PRIMER/TOUCHUP/3RD COAT,
ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING (BMR)
Required, If Magnetic Pull-Off (Type
I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS, CONVENTIONAL
SPRAY, ROLLED)
AVERAGE DFT
23 (Rev-0)
25901_0617_FLT
REC_25901_FLT_75D WLR 75307 CGC WEDGE) (0416)
WORK ITEM 1: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the Main Diesel Engine
(MDE) exhaust piping system, including the associated stack uptakes.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 75D WAGL 4000-007, Rev B, Machinery Arrangement Mods to Suit IF
1312 MDE
Coast Guard Drawing 75D WAGL 4103-025, Rev -, Exhaust Piping Mods to Suit IF 1312 MDE
Coast Guard Drawing 75D WAGL 4103-031, Rev -, Diagram – Exhaust Systems
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health
Standards for Shipyard Employment
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
24 (Rev-0)
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Access covers
Exhaust stack
MDE
Piping
Pipe insulation
Vent ducting
Wiring
Exhaust pipe expansion joints
Exhaust insulation blankets
3.2 Staging or scaffolding, netting. The Contractor shall erect suitable staging or scaffolding in accordance with 29 CFR 1915, Subpart E (Scaffolds, Ladders and Other Working Surfaces) to facilitate work, as required.
3.2.1 Rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.
3.3 Work plan. The Contractor shall develop and submit, to the COR, a plan for collecting and disposing of waste extracted during cleaning process. Ensure that the proposed plan shall detail how and where exhaust piping will be disconnected, how entire length of exhaust piping will be divided/sectioned for cleaning, and precautions to protect the MDE. The Contractor shall perform this work upon receiving
Coast Guard approval of the plan.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.4 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of the exhaust stack system, to demonstrate existing operational condition. Submit a CFR.
3.5 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping and stack uptakes to the MDE, shown on Coast Guard Drawings 75D WAGL 4000-007, 75D WAGL 4103-025, and 75D
WAGL 4103-031, to a condition free from soot, tar, and any other foreign matter as follows:
25 (Rev-0)
3.5.1 Disconnect the exhaust piping as necessary to facilitate cleaning.
3.5.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel. Clean all adjacent stack uptake surfaces. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.
3.5.3 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming.
Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.
3.5.4 Reassemble exhaust piping; renew all disturbed flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all disturbed fasteners.
3.6 Inspection and report. The Contractor shall perform a visual inspection of the following components;
submit a CFR:
Exhaust stack access hatches, including all associated studs and nuts.
All cleaned exhaust stack surfaces.
All exhaust expansion joints, including associated bolts.
3.6.1 Following cleaning of the interior of each exhaust pipe system, the Contractor shall demonstrate completeness of the cleaning process to the Coast Guard Inspector, showing that the entire length of exhaust piping has been satisfactorily cleaned according to the work plan.
3.7 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.8 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the exhaust stack system to be in satisfactory operating condition. Submit a CFR
4. NOTES
This section is not applicable to this work item.
26 (Rev-0)
25902_0617_FLT
REC_25902_FLT_75D WLR 75307 CGC WEDGE) (0416)
WORK ITEM 2: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the port and starboard ship service ship service diesel generator (SSDG) exhaust piping system, including the associated stack uptakes.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 75D WAGL 4000-006, Rev B, Machinery Arrangement Mods to Suit
80MDDCD SSDG
Coast Guard Drawing 75D WAGL 4000-007, Rev B, Machinery Arrangement Mods to Suit IF
1312 MDE
Coast Guard Drawing 75D WAGL 4103-028, Rev B, Exhaust Piping Mods to Suit IRESS
(WEDGE)
Coast Guard Drawing 75D WAGL 4103-031, Rev -, Diagram – Exhaust Systems
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health
Standards for Shipyard Employment
3. REQUIREMENTS
27 (Rev-0)
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Access covers
Exhaust stack
SSDG
Vent ducting
Wiring
Exhaust pipe expansion joints
Exhaust insulation blankets
3.2 Staging or scaffolding. The Contractor shall erect suitable staging or scaffolding in accordance with
29 CFR 1915, Subpart E (Scaffolds, Ladders and Other Working Surfaces) to facilitate work, as required.
3.3 Safety precaution. The Contractor shall rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.
3.3.1 Temporary safety railing. To promote safety, the Contractor shall limit existing safety railing removals to an area where new safety railing can be installed during the same workday. During periods when not actively working on new safety railing, secure any gaps between existing safety railing with a substantial temporary lifeline arrangement similar to that currently installed on the vessel. Remove and dispose of all temporary lifelines upon completion of work.
3.4 Work plan. The Contractor shall develop and submit to the COR, a plan for collecting and disposing of waste extracted during cleaning process. Ensure that the proposed plan shall detail how and where exhaust piping will be disconnected, how entire length of exhaust piping will be divided/sectioned for cleaning, and precautions to protect the SSDG. The Contractor shall perform this work upon receiving
Coast Guard approval of the plan.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.5 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of the exhaust piping system, to demonstrate existing operational condition. Submit a CFR.
28 (Rev-0)
3.6 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping and stack uptakes to the SSDG, shown on Coast Guard Drawing(s) 75D WAGL 4000-006, , 75D WAGL 4000-007, 75D
WAGL 4103-028, and 75D WAGL 4103-031, to a condition free from soot, tar, and any other foreign matter as follows:
3.6.1 Disconnect the exhaust piping as necessary to facilitate cleaning.
3.6.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel. Clean all adjacent stack uptake surfaces. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.
3.6.3 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming.
Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.
3.6.4 Reassemble exhaust piping; renew all disturbed flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all disturbed fasteners.
3.7 Inspection and report. The Contractor shall perform a visual inspection of the following components;
submit a CFR:
Exhaust stack access hatches, including all associated studs and nuts.
All cleaned exhaust stack surfaces.
All exhaust expansion joints, including associated bolts.
3.7.1 Following cleaning of the interior of each exhaust pipe system, the Contractor shall demonstrate completeness of the cleaning process to the Coast Guard Inspector, showing that the entire length of exhaust piping has been satisfactorily cleaned according to the work plan.
3.8 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.9 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the exhaust piping system to be in satisfactory operating condition. Submit a CFR
29 (Rev-0)
25903_0617_FLT
REC_25903_FLT_75D WLR 75307 CGC WEDGE) (0416)
WORK ITEM 3: Boiler Exhaust Stack Uptakes, Commercial Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the Boiler exhaust stack uptakes.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 75D WAGL 4000-006, Rev B, Machinery Arrangement Mods to Suit
80MDDCD SSDG
Coast Guard Drawing 75D WAGL 4000-007, Rev B, Machinery Arrangement Mods to Suit IF
1312 MDE
Coast Guard Drawing 75D WAGL 4103-028, Rev B, Exhaust Piping Mods to Suit IRESS
(WEDGE)
Coast Guard Drawing 75D WAGL 4103-031, Rev -, Diagram – Exhaust Systems
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
30 (Rev-0)
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Access covers.
Exhaust stack.
Boiler.
Exhaust pipe expansion joints.
Exhaust insulation blankets.
3.1.5 Safety precaution. The Contractor shall rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.
3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard
Personnel perform an initial operational test of the exhaust stack system, to demonstrate existing operational condition. Submit a CFR.
3.3 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping to the Boiler, shown on Coast Guard Drawing(s) 75D WAGL 4000-006, , 75D WAGL 4000-007, 75D WAGL 4103-028, and
75D WAGL 4103-031, to a condition free from soot, tar, and any other foreign matter as follows:
3.3.1 Disconnect the exhaust piping as necessary to facilitate cleaning.
3.3.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.
3.3.3 Upon completion of cleaning, do the following:
3.3.3.1 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming.
Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.
3.3.3.2 Reassemble exhaust piping; renew all disturbed flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all disturbed fasteners.
3.4 Inspection and report. The Contractor shall perform a visual inspection of the following components;
submit a CFR:
Exhaust stack access hatches, including all associated studs and nuts.
All cleaned exhaust stack surfaces.
31 (Rev-0)
All exhaust expansion joints, including associated bolts.
3.4.1 Following cleaning of the interior of each uptake, the Contractor shall demonstrate completeness of the cleaning process to the Coast Guard Inspector, showing that the entire length of uptake has been satisfactorily cleaned according to the work plan.
3.5 Touch-up preservation, general. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std
Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
3.6 Operational test – post repairs. After completion of work, the Contractor shall, in the presence of the
Coast Guard Inspector, thoroughly test and prove of the exhaust stack system to be satisfactory operating condition. Submit a CFR.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
32 (Rev-0)
51200_0617_FLT
REC_51200_FLT_75 WLR (‘D’ Class: CGC WEDGE 75307 only) (0309)
WORK ITEM 4: Vent Ducts (Engine And Motor Room All), Commercial Cleaning
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the designated shipboard ventilation systems.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean
Shipboard Ventilation Systems
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
33 (Rev-0)
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.3.1 Install filter medium at the terminal ends of all supply vent ducting to prevent any residual foreign mater from blowing into the engine room spaces.
3.1.4 Interferences. The Contractor shall handle…