Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
DARRYL PERSON, Contracting Officer
The purpose of this amendment is to incorporate changes described on page 2 of 2.
As a result, the solicitation due date has changed to 26 May 2021 by 2:00 PM ET.
COMMANDING OFFICER (COB2)
DOL-931
300 EAST MAIN STREET, SUITE 965
NORFOLK, VA 23510-9113
ATTN: Sherylan Spears/ (757) 628-4128 Email: Sherylan.Spears@uscg.mil
70Z08421QAA152000
1 1
05/12/2021
04/01/2021
AA152000 – AMENDMENT 0003
1. Table of Contents: Section D, Attachment 3 – Verbiage changed from “Call Sheet” to “Worklist”
2. Page 21, Section 2.2 – Period of Performance has changed to extend anticipated start date to July
3. Page 21, Section 2.3 – Replaced KO to COR
4. Page 22, Section 4.5 – Additional verbiage inserted
5. Page 26, Section 7.1 – Verbiage changed from “Call Sheet” to “Worklist”
6. Page 26, Section 7.2.1 – Verbiage changed from “Call Sheet” to “Worklist”
7. Page 26, Section 7.3 – Section name has changed to “Worklist”. Additional verbiage added
8. Page 27, Section 7.4 – Inserted
9. Page 27, Section 7.5 – Estimated Quantity Items moved here
10. Page 27, Section 7.6 – Inserted
11. Page 27, Section 7.6.1 – Additional verbiage inserted
12. Page 28, Section 7.6.2 – Additional verbiage inserted
13. Page 28, Section 7.6.3 – Additional verbiage inserted
14. Page 28, Section 7.6.4 – Additional verbiage inserted
15. Page 28, Section 7.6.5 – Additional verbiage inserted
16. Page 28, Section 7.3.6 – “Dryer Vent” removed
17. Page 28, Section 7.6.6 – Additional verbiage inserted
18. Page 28, Section 7.6.7 – Additional verbiage inserted
19. Page 28, Section 7.6.8 – Additional verbiage inserted
20. Page 28, Section 7.6.9 – Additional verbiage inserted
21. Page 28, Section 7.6.10 – Additional verbiage inserted
22. Page 28, Section 7.6.11 – Additional verbiage inserted
23. Page 29, Section 7.7 – “Services” inserted
24. Page 29, Section 7.7.1 – Additional verbiage inserted
25. Page 29, Section 7.7.2 – Additional verbiage inserted
26. Page 29, Section 7.7.3 – “Janitorial” section moved here
27. Page 31, Section 7.7.4 – “Bathtub/Shower Refinishing” section moved here
28. Page 31, Section 7.7.5 – “Painting” section moved here
29. Page 31, Section 7.7.5.1 – “Interior Painting” section moved here
30. Page 32, Section 7.7.5.2 – “Exterior Painting” section moved here
31. Page 32, Section 7.7.6 – “Hardwood Floors” section moved here
32. Page 32, Section 7.7.7 – “Electrical Repair Service” verbiage inserted
33. Page 32, Section 7.7.8 – “Plumbing Repair Service” verbiage inserted
34. Page 32, Section 7.7.9 – “Furnace Repair Service” verbiage inserted
35. Page 32, Section 7.7.10 – “Water Heater Repair Service” verbiage inserted
36. Page 33, Section 7.7.11 – “Pressure Washing” section moved here
37. Page 33, Section 7.7.12 – “Exterior Cleaning Service” verbiage inserted
38. Page 33, Section 7.7.13 – “Dryer Vent Inspection/Maintenance” inserted
39. Page 33, Section 7.8 – “Minor Repair Items” inserted
40. Page 33, Section 7.8.1 – “Outside Minor Repair Items” inserted
41. Page 33, Section 7.8.2 – “Basement Minor Repair Items” inserted
42. Page 33, Section 7.8.3 – “Hallway Minor Repair Items” inserted
43. Page 34, Section 7.8.4 – “Kitchen Minor Repair Items” inserted
44. Page 34, Section 7.8.5 – “Living Room/Dining Room Minor Repair Items” inserted
45. Page 34, Section 7.8.6 – “Bathroom Minor Repair Items” inserted
46. Page 34, Section 7.8.7 – “Bedroom Minor Repair Items” inserted
47. Page 34, Section 7.8.8 – “Other Minor Repair Items” inserted
48. Page 34, Section 7.9 – “Installations/Replacements” inserted
49. Page 34, Section 7.3.15 – “Replace Toilet Seat and Shower Bar” removed
50. Page 34, Section 7.4 – “Major Maintenance Items” removed
51. Page 35, Section 7.4.3 – “Bathroom Vanity” removed
52. Page 35, Section 7.4.4 – “Tub and Shower” removed
53. Page 35, 7.4.4.2 – “Bathroom Tub/Shower Surround Refinishing” removed
54. Page 37, Section 7.9.10 – Additional verbiage inserted
55. Page 45, Section 15.4 – Table updated
56. Page 47, Section D.17 – Updated
57. Page 48, Appendix 1 – Updated
58. Page 52, Section 6.0 – Table updated