HALIBUT (WPB 87) DD FQ2 SCP 23ER1_BLANK.xls
XLS spreadsheet 57 KB Posted
- Attached to
- USCGC HALIBUT DRY DOCK FY 23 Federal contract opportunity
- Solicitation number
- 70Z08023QPBPL0002
About this file
This document contains a pricing schedule for dry dock repairs and maintenance to the USCGC HALIBUT (WPB-87) from March 14, 2023 to May 16, 2023. The schedule lists over 30 line items of work to be performed including hull plating repairs and preservation, tank cleaning, deck preservation, propulsion system and rudder renewals, cathodic protection installation, and dry docking services. Labor rates and cost estimates are provided for various shipyard trades. The associated solicitation seeks bids for the dry dock availability of the HALIBUT to be conducted at the contractor's ship repair facility according to the attached specification, schedule of services, and solicitation synopsis. The Department of Homeland Security Coast Guard is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 00003 (1-9-2023).pdf | ||
| HALIBUT_Foreseeable Cost.xls | XLS spreadsheet | |
| Amendment 00002 (1-9-2023).pdf | ||
| Amendment 00001 (1-5-2023).pdf | ||
| HALIBUT (WPB 87) DD FQ2 SCP 23R1.pdf | ||
| HABLIBUT Solicitation for drydock repairs 70Z08023QPBPL0002.pdf | ||
| HALIBUT_Schedule of services_Blank.xls | XLS spreadsheet | |
| HALIBUT_Specification_R0.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC HALIBUT (WPB-87) DRYDOCK AVAILABILITY FY2023 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (Side Scan), Ultrasonic Testing | JOB | $0.00 | ||
| D-002 | Ultrasonic Thickness Measurements, Perform | JOB | $0.00 | ||
| D-003 | U/W Body, Preserve, 100 percent | JOB | $0.00 | ||
| D-004 | Hull Plating Freeboard, Preserve, 100 Percent | JOB | $0.00 | ||
| D-005 | Tank, Dirty Oil, Clean and Inspect | JOB | $0.00 | ||
| D-006 | Tank, Oily Water, Clean and Inspect | JOB | $0.00 | ||
| D-007 | Tanks, MP Fuel Service, Clean and Inspect | JOB | $0.00 | ||
| D-008 | Decks, Exterior (Main Deck), Preserve | JOB | $0.00 | ||
| D-009 | Capastic Fairing, Depth Sounder, Renew | JOB | $0.00 | ||
| D-010 | Mast, Preserve (“100%”) – Contractor Interference Removal | JOB | $0.00 | ||
| O-011 | Main Engine/Reduction Gear, Realign | JOB | $0.00 | ||
| D-012 | Intermediate Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | $0.00 | ||
| D-013 | Aft Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | $0.00 | ||
| O-014 | Intermediate Bearing Carriers, Renew | JOB | $0.00 | ||
| O-015 | Aft Bearing Carriers, Renew | JOB | $0.00 | ||
| D-016 | Propulsion Shafts, Renew | JOB | $0.00 | ||
| D-017 | Stern Tube Interior Surfaces, Preserve, 100 Percent | JOB | $0.00 | ||
| D-018 | Propellers, Renew | JOB | $0.00 | ||
| D-019 | Fathometer Transducer, Renew | JOB | $0.00 | ||
| D-020 | Speed Log, Skin Valve, Renew | JOB | $0.00 | ||
| D-021 | Sea Water System, Perform Maintenance | JOB | $0.00 | ||
| D-022 | Rudder Assemblies, Renew | JOB | $0.00 | ||
| O-023 | RHIB Notch Skid Pad Stud(s), Renew | JOB | $0.00 | ||
| D-024 | Stern Launch Door, Remove, Inspect and Reinstall | JOB | $0.00 | ||
| D-025 | Cathodic Protection/Zinc Anodes, Renew | JOB | $0.00 | ||
| D-026 | Superstructure, Preserve, 100% | JOB | $0.00 | ||
| D-027 | Drydock | JOB | $0.00 | ||
| D-028 | Temporary Services, Provide - Cutter | JOB | $0.00 | ||
| D-029 | Sea Trial Performance, Support, Provide | JOB | $0.00 | ||
| D-030 | Frames, Forepeak, Renew | JOB | $0.00 | ||
| D-031 | Tow Rail, Renew | JOB | $0.00 | ||
| D-032 | Critical Coated Surface(s), Preserve | JOB | $0.00 | ||
| D-033 | Interior Deck Covering System And Jointer Deck, Renew | JOB | $0.00 | ||
| D-034 | 24VDC Distribution System, Upgrade | JOB | $0.00 | ||
| D-035 | Fire Main Bleed Line, Modify | JOB | $0.00 | ||
| O-00A | Composite Labor Rate | Hour | 450 | $0.00 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(01/05/2023)
Rev-1 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate