About this file

This document contains a pricing schedule for dry dock repairs and maintenance to the USCGC HALIBUT (WPB-87) from March 14, 2023 to May 16, 2023. The schedule lists over 30 line items of work to be performed including hull plating repairs and preservation, tank cleaning, deck preservation, propulsion system and rudder renewals, cathodic protection installation, and dry docking services. Labor rates and cost estimates are provided for various shipyard trades. The associated solicitation seeks bids for the dry dock availability of the HALIBUT to be conducted at the contractor's ship repair facility according to the attached specification, schedule of services, and solicitation synopsis. The Department of Homeland Security Coast Guard is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to USCGC HALIBUT DRY DOCK FY 23, newest first.
File Type Posted
Amendment 00003 (1-9-2023).pdf PDF
HALIBUT_Foreseeable Cost.xls XLS spreadsheet
Amendment 00002 (1-9-2023).pdf PDF
Amendment 00001 (1-5-2023).pdf PDF
HALIBUT (WPB 87) DD FQ2 SCP 23R1.pdf PDF
HABLIBUT Solicitation for drydock repairs 70Z08023QPBPL0002.pdf PDF
HALIBUT_Schedule of services_Blank.xls XLS spreadsheet
HALIBUT_Specification_R0.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC HALIBUT (WPB-87) DRYDOCK AVAILABILITY FY2023
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull Plating (Side Scan), Ultrasonic TestingJOB$0.00
D-002Ultrasonic Thickness Measurements, PerformJOB$0.00
D-003U/W Body, Preserve, 100 percentJOB$0.00
D-004Hull Plating Freeboard, Preserve, 100 PercentJOB$0.00
D-005Tank, Dirty Oil, Clean and InspectJOB$0.00
D-006Tank, Oily Water, Clean and InspectJOB$0.00
D-007Tanks, MP Fuel Service, Clean and InspectJOB$0.00
D-008Decks, Exterior (Main Deck), PreserveJOB$0.00
D-009Capastic Fairing, Depth Sounder, RenewJOB$0.00
D-010Mast, Preserve (“100%”) – Contractor Interference RemovalJOB$0.00
O-011Main Engine/Reduction Gear, RealignJOB$0.00
D-012Intermediate Water-Lubricated Propulsion Shaft Bearings, RenewJOB$0.00
D-013Aft Water-Lubricated Propulsion Shaft Bearings, RenewJOB$0.00
O-014Intermediate Bearing Carriers, RenewJOB$0.00
O-015Aft Bearing Carriers, RenewJOB$0.00
D-016Propulsion Shafts, RenewJOB$0.00
D-017Stern Tube Interior Surfaces, Preserve, 100 PercentJOB$0.00
D-018Propellers, RenewJOB$0.00
D-019Fathometer Transducer, RenewJOB$0.00
D-020Speed Log, Skin Valve, RenewJOB$0.00
D-021Sea Water System, Perform MaintenanceJOB$0.00
D-022Rudder Assemblies, RenewJOB$0.00
O-023RHIB Notch Skid Pad Stud(s), RenewJOB$0.00
D-024Stern Launch Door, Remove, Inspect and ReinstallJOB$0.00
D-025Cathodic Protection/Zinc Anodes, RenewJOB$0.00
D-026Superstructure, Preserve, 100%JOB$0.00
D-027DrydockJOB$0.00
D-028Temporary Services, Provide - CutterJOB$0.00
D-029Sea Trial Performance, Support, ProvideJOB$0.00
D-030Frames, Forepeak, RenewJOB$0.00
D-031Tow Rail, RenewJOB$0.00
D-032Critical Coated Surface(s), PreserveJOB$0.00
D-033Interior Deck Covering System And Jointer Deck, RenewJOB$0.00
D-03424VDC Distribution System, UpgradeJOB$0.00
D-035Fire Main Bleed Line, ModifyJOB$0.00
O-00AComposite Labor RateHour450$0.00
D-00BGFP ReportNSPEANSP
O-00ZLaydaysDay5$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(01/05/2023)

Rev-1 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .