Attachment 1 Schedule of Services SEA DOG (WPB 87) DD.xls
XLS spreadsheet 58 KB Posted
- Attached to
- USCGC SEA DOG DD FY20
- Solicitation number
- 70Z080-20-Q-PV102000
About this file
This document includes an attachment schedule of services and pricing schedule for the USCGC SEA DOG's drydock availability in fiscal year 2020, as well as the related solicitation information. The schedule lists over thirty separate tasks required for maintenance and repair of the cutter, such as structural analysis, tank cleaning, hull preservation, propeller renewal, rudder assembly renewal, and modification or replacement of various systems. Pricing is to be provided by interested contractors for each line item. The solicitation was issued by the Department of Homeland Security United States Coast Guard for the drydocking and maintenance availability, as specified in the attached schedule of services and technical specification. The opportunity involves planned maintenance and repairs to systems aboard the USCGC SEA DOG to support operations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: CONTRACTOR'S NAME HERE | ||||||
| USCGC SEA DOG (WPB-87) DRYDOCK AVAILABILITY FY2020 | ||||||
| RFQ: 70Z080-20-Q-PV102000 | ||||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE | Funding |
| D-001 | Structural Analysis, 3D Laser Scan, Perform | JOB | 1 | $ - 0 | 80 | |
| O-002 | Ultrasonic Thickness Measurements, Perform | JOB | 1 | $ - 0 | 80 | |
| D-003 | U/W Body, Preserve (100%) | JOB | 1 | $ - 0 | 80 | |
| D-004 | Hull Plating Freeboard, Preserve “100%” | JOB | 1 | $ - 0 | 80 | |
| D-005 | Tank, Dirty Oil, Clean and Inspect | JOB | 1 | $ - 0 | 80 | |
| D-006 | Tank, Oily Water, Clean and Inspect | JOB | 1 | $ - 0 | 80 | |
| D-007 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | $ - 0 | 80 | |
| D-008 | Decks, Exterior (Main Deck), Preserve | JOB | 1 | $ - 0 | 80 | |
| O-009 | Capastic Fairing, Depth Sounder, Renew | JOB | 1 | $ - 0 | 80 | |
| O-010 | Main Engine/Reduction Gear, Realign | JOB | 1 | $ - 0 | 80 | |
| D-011 | Intermediate Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | $ - 0 | 80 | |
| D-012 | Aft Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | $ - 0 | 80 | |
| O-013 | Intermediate Bearing Carriers, Renew | JOB | 1 | $ - 0 | 80 | |
| O-014 | Aft Bearing Carriers, Renew | JOB | 1 | $ - 0 | 80 | |
| D-015 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | $ - 0 | 80 | |
| D-016 | Propellers, Renew | JOB | 1 | $ - 0 | 80 | |
| D-017 | Speed Log, Skin Valve, Renew | JOB | 1 | $ - 0 | 80 | |
| D-018 | Sea Water System, Perform Maintenance | JOB | 1 | $ - 0 | 80 | |
| D-019 | Rudder Assemblies, Renew | JOB | 1 | $ - 0 | 80 | |
| D-020 | Stern Launch Door, Remove, Inspect and Reinstall | JOB | 1 | $ - 0 | 80 | |
| D-021 | Superstructure, Preserve “100%” | JOB | 1 | $ - 0 | 80 | |
| D-022 | Cathodic Protection/Zinc Anodes, Renew | JOB | 1 | $ - 0 | 80 | |
| D-023 | Drydock | JOB | 1 | $ - 0 | 80 | |
| D-024 | Temporary Services, Provide - Cutter | JOB | 1 | $ - 0 | 80 | |
| D-025 | Sea Trial Performance, Support, Provide | JOB | 1 | $ - 0 | 80 | |
| D-026 | Fathometer Transducer, Renew | JOB | 1 | $ - 0 | 80 | |
| D-027 | HVAC 2-Stage Intake Separator, Modify | JOB | 1 | $ - 0 | 80 | |
| D-028 | Oily Water Separator, Remove | JOB | 1 | $ - 0 | 80 | |
| D-029 | Propulsion Shafts and Shaft Seals, Renew | JOB | 1 | $ - 0 | 80 | |
| D-030 | Sewage System (Toilet), Modify | JOB | 1 | $ - 0 | 80 | |
| D-031 | Seawater Cooling Piping/Valves, Renew | JOB | 1 | $ - 0 | 80 | |
| D-032 | Alignment Bolt, Main Diesel Engine, Renew | JOB | 1 | $ - 0 | 80 | |
| D-033 | Critical Coated Surfaces, Preserve | JOB | 1 | $ - 0 | 80 | |
| D-034 | Foundation Brackets, Hot Water Heater, Renew | JOB | 1 | $ - 0 | 80 | |
| D-035 | Bilge Piping System, Forepeak, Renew | JOB | 1 | $ - 0 | 80 | |
| D-036 | Main Mast, Modify | JOB | 1 | $ - 0 | 80 | |
| D-037 | Hull Plating (Side Scan), Ultrasonic Testing | JOB | 1 | $ - 0 | 80 | |
| D-038 | Mast, Preserve (“100%”) – Contractor Interference Removal | JOB | 1 | $ - 0 | 80 | |
| D-039 | Bilge Surfaces (Engine Room), Preserve Partial | JOB | 1 | $ - 0 | 80 | |
| Total Price of Definite Items | $0.00 | |||||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 | |||||
| Composite Labor Rate | Hourly Rate | |||||
| Laydays | Daily Rate | |||||
| Temporary Services, Provide - Cutter | Daily Rate |
&C
Page &P of &N&RAttachment (1)
FORESEEABLES
| FORESEEABLE COST WORKSHEET | ||
| USCGC SEA DOG FY20 DD | 70Z080-20-Q-PV102000 | |
| Contractor's Name: | ||
| The contractor shall fill-in all yellow labeled boxes below to determine their foreseeable costs. Please read all notes and headers of sections for instructions in completing this worksheet. | ||
| DISTANCE FACTORS FOR: USCGC HAWKSBILL, 100 Lighthouse Avenue, Monterey, CA 93940 | ||
| NAUTICAL MILES BASED ON ROUND-TRIP (TO AND FROM) | ||
| NUMBER OF DAYS OF AVAILABILITY | 60 | |
| (1) Port Engineer Transportation: AIR TRAVEL | ||
| (Applicable if > 50 miles from 1050 USS GEORGIA AVE, Kings Bay, GA 31547 (PE's desk location) | ||
| A. Number of CG Representatives from NESU: | A= | 1 |
| B. The number of round trips between the contractor's facility and NESU | B= | 1 |
| C. A multiplied by B: | AxB=C= | 1 |
| D. Travel cost per trip: | D= | |
| E. C multiplied by D =E, if >50 miles from NESU otherwise N/A. | E= | $0.00 |
| (2) Port Engineer Transportation: CAR TRAVEL | ||
| A. Number of CG Representatives from NESU: | A= | 1 |
| B. Number of Driving miles Round-trip between the COR office and contractors facility: | B= | 0 |
| C. Travel cost per driving mile (rate at $0.58 per mile) | $0.580 | $0.00 |
| (3) PER DIEM: (Applicable >50 miles CREW + PE) | ||
| A. Number of Ship's Crew & Port Engineer | A= | 11 |
| B. Total number of day(s) in drydock. | B= | 60 |
| C. Per diem cost at place of performance, per day: (if < 50 miles, enter "0" for all below) | C= | $0.00 |
| C.1.1. Enter Lodging Daily Per Diem Rate for Jan | ||
| C.1.2. Enter Lodging Daily Per Diem Rate for Feb | ||
| C.1.3. Enter Lodging Daily Per Diem Rate for Mar | ||
| C.2.1. Enter Meals & Incidentals Total Daily Rate for Jan | ||
| C.2.1.1. Enter Meals & Incidentals First Day of Travel Daily Rate for Jan | ||
| C.2.2. Enter Meals & Incidentals Rate for Feb | ||
| C.2.3. Enter Meals & Incidentals Rate for Mar | ||
| C.2.3.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate for Mar | ||
| D. Ax B= C: (if >50 miles from NESU) | AxB=C= | $0.00 |
| (4) PER DIEM: (Applicable >50 miles Contracting Officer Travel & Per Diem. KO location is Norfolk, VA 23510) | ||
| A. Number of KO authorized travel: | A= | 1 |
| B. Total number of KO travel days: | B= | 3 |
| C. Transportation cost for KO travel | C= | |
| D. Per diem cost at place of performance, per day | D= | $0.00 |
| D.1.1. Enter Lodging Per Diem Rate for Jan | ||
| D.2.1. Enter Meals & Incidentals Total Daily Rate for Jan | ||
| D.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate for Jan | ||
| E. A [(B*D) + C] = | E= | $0.00 |
| (5) CUTTER COST Operation Factors: | ||
| A. Round Trip Nautical Miles from the vessels pier to the contractors facility: | A= | 0 |
| B. Cutter Cost Factor Per Nautical Mile: | B= | $27.41 |
| C. A multiplied by B= C | C= | $0.00 |
| (6) FAMILY SEPARATION ALLOWANCES (FSA) Applicable if > 50 miles from Homeport - for crew with dependents only (Daily Rate $8.33). If less than 50 miles enter 0 for A below. | ||
| A. Number of Personnel entitled to Family Separation Allowance: | A= | 11 |
| B. Number of Days for Availability minus 30 days if availability is greather than 30 days: | B= | 30 |
| C. A multiplied by B = C (Daily FSA rate of $8.33) | C= | $2,748.90 |
| GRAND TOTAL | ||
| 1. PE/COR Transportation (AIRFARE) | $0.00 | |
| 2. PE/COR Transportation (CAR) | $0.00 | |
| 3. Per Diem for Crew and PE/COR | $0.00 | |
| 4. Cutter Cost Operations Factors | $0.00 | |
| 5. Family Separation Allowance | $2,748.90 | |
| Total Cost of Distance Factors: | $2,748.90 | |
| Total Contractor Quoted/Proposal Price: | $0.00 | |
| TOTAL EVALUATED QUOTE/PRICE | $2,748.90 |
Contractor enters name here Contractor shall utilize: https://nauticalcharts.noaa.gov/publications/docs/distances.pdf Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do.
Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 driving miles from the PE's homeport OR (2) Enter "0" if their dry dock is less than 150 driving miles from the PE's homeport.
Contractor will enter either (1) "0" if their dry dock is located less than 50 miles or more than 150 miles from the PE's homeport or (2) the total number of round trip driving miles if the contractor is located between 51 to 149 miles from PE's homeport.
Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates based on the location of their facility.
Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do. Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 miles from the KO's location in Norfolk, VA 23510 or (2) Enter "0" if their dry dock is less than 150 miles from the PE's homeport.
Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates Do Not Change this cell unless Drydock is less than 50 driving miles from Homeport. Then enter 0.
File details come from the government source that posted it. Updated .