Request for Proposals Solicitation Number 70Z08019R21051B00
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE FOR FILING AGENCY PROTESTS
United States Coast Guard Ombudsman Program
It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the Government Accountability Office (GAO).
Interested parties are encouraged to seek resolution of their concerns within the USCG as an
Alternative Dispute Resolution (ADR) forum rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest.
Informal Forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable
Contracting Officer. If the Contracting Officer is unable to satisfy their concerns, interested parties are encouraged to contact the U.S. Coast Guard Ombudsman for Agency Protests. Under this informal process the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting
Officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an Independent
Review is available by the Ombudsman. The protester may file a formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program.
Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for reasons of unusual and compelling urgency or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103(d) (2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. To be timely protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program shall be submitted electronically to OPAP@uscg.mil and the
Contracting Officer or by hand delivery to the Contracting Officer.
The Ombudsman Hotline telephone number is 202.372.3695.
https://www.acquisition.gov/far/index.html mailto:OPAP@uscg.mil
70Z08019R21051B00
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
2119409B4500AG046
2. CONTRACT NO.
3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER
5. SOLICITATION NUMBER
6. SOLICITATION
ISSUE DATE
10/26/2018
7. FOR
SOLICITATION
INFORMATION
CALL:
a. NAME
Ms. Christina Ayers
b. TELEPHONE NUMBER (no collect calls)
410-762-6382
8. OFFER DUE DATE/
LOCAL TIME
11/16/2018
4:30PM EST
9. ISSUED BY CODE Z50100
U.S. Coast Guard (USCG)
Surface Forces Logistics Center (SFLC)
CPD 1 MEC
707 E Ordnance Road, Suite 410
Baltimore, MD 21226
10. THIS ACQUISITION IS
UNRESTRICTED OR SET ASIDE % FOR:
SMALL BUSINESS ECONOMICALLY DISADVANTAGED
HUBZONE SMALL BUSINESS WOMAN OWNED SMALL BUSINESS
SERVICE DISABLED VETERAN- (EDWOSB)
OWNED SMALL BUSINESS 8 (a)
WOMAN OWNED NAICS: 332999
SMALL BUSINESS (WOSB) SIZE STANDARD: 750 Emp
ELIGIBLE UNDER WOSB PROGRAM
11. DELIVERY FOR FOB
DESTINATION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT
TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER DPAS (15
CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE Z52000
USCG, SFLC
2401 Hawkins Point Road
Receiving Section, Bldg. 88
16. ADMINISTERED BY CODE
Same as block 9
17a. CONTRACTOR/ CAGE CODE FACILITY
OFFEROR CODE
TELEPHONE NO:
FAX NO:
18a. PAYMENT WILL BE MADE BY CODE Z52000
See SF1449 Continuation Sheet
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH
ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
IS CHECKED SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
This solicitation is for procurement of Escher-Wyss Controllable Pitch Propeller (CPP) hubs, the overhaul of Escher-Wyss CPP hubs, and the purchase of stock parts for use during overhauls as per the Schedule of Supplies/Services and Statements of Work. This is a firm-fixed price Indefinite Delivery Requirements contract for a base year and four one year option periods.
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
Funding will be obligated via delivery orders
26. TOTAL AWARD AMOUNT (FOR GOVT USE ONLY)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 5.212-3 & 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT
ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4, FAR 42.212-5 IS ATTACHED. ADDENDA ARE ARE NOT
ATTACHED.
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND
RETURN 1 COPIES TO ISSUING OFFICE. CONTRACTOR AGREES
TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE
IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REFERENCE
OFFER DATED . YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS
ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SINGATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER
31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (Rev.2/2012)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA – FAR (48 CFR) 53.212
TABLE OF CONTENTS
DESCRIPTION PAGE(S)
Notice for Filing Agency Protests
Standard Form 1449
Table of Contents
Addendum to Standard Form 1449:
Blocks 19 – 26, Schedule of Supplies/Services
Block 15, Deliveries, Packaging and Marking
Contract Administration Data
Special Contract Requirements
6 - 20
21 - 25
26-28
Addendum to FAR Clause 52.212-4, Contract Terms and
Conditions – Commercial Items
30-35
FAR Clause 52.212-5, Contract Terms and Conditions Required to
Implement Statutes or Executive Orders – Commercial Items
36-43
Addendum to FAR Clause 52.212-1, Instructions to Offerors –
Commercial Items
Addendum to FAR Clause 52.212-2 Evaluation – Commercial
Items (Oct 2014)
FAR Clause 52.212-3 – Offeror Representations and Certifications
– Commercial Items
46-64
ATTACHMENTS:
Attachment # Document Title
1 Specification P-245-0154 Rev 3 CLIN X001 and X002
2 Specification R-245-0155 Rev. F CLINs X003 and X004
3 Long-Lead Time Stock Parts CLIN X005
4 Contingency Parts
ADDENDUM TO STANDARD FORM 1449
TYPE OF CONTRACT
This is a Requirements-Type Contract with one (1) Base Year and four (4) Option Years. A
Requirements Type Contract is defined in FAR Clause 52.216-21 (Oct 1995).
PERIOD OF PERFORMANCE
The base contract shall be for one year after award of contract, with the Government reserving the option to extend for four one year option years. The period of performance will begin on the date of contract award and end one year afterward; each subsequent option year, if exercised, will begin one day after the end of the previous contract year and end one year thereafter.
FUNDING
Each delivery order will be individually funded.
ORDERING
a. Supplies and services will be ordered by the issuance of individual delivery and task orders. Refer to FAR Clause 52.216-18 Ordering, page 32.
b. Any supplies or services to be furnished under this contract shall be ordered by issuance of delivery or task orders by a Contracting Officer from the following activities:
a. U.S. Coast Guard – Surface Forces Logistics Center
WMEC Product Line, C&P1
707 E. Ordnance Road
b. U.S. Coast Guard, Surface Forces Logistics Center
WMEC Product Line, C&P1
300 E. Main Street
Norfolk, VA 23510
c. All delivery orders issued hereunder are subject to the terms and conditions of this contract which shall control in the event of conflict with any task order.
d. The Contractor shall fill delivery orders in the same sequence in which they are received, unless otherwise instructed by the Contracting Officer.
OPTIONS
Each Option extending the term of this Contract, if exercised, shall be for a period of one year from the effective date of each Option and shall be issued in accordance with FAR 52.217-9
Option to Extend the Term of the Contract (Mar 2000).
This Request for Proposal is issued, in accordance with FAR Part 12, Commercial Items in conjunction with FAR Part 15, Contract Negotiations as a sole source procurement. The contract format is in accordance with FAR 12.303, Contract Format for the Acquisition of Commercial
Items. For questions concerning this solicitation contact Ms. Christina Ayers, Contract
Specialist at 410-762-6382 or via email at Christina.L.Ayers@uscg.mil.
Contractors Cage Code: _________________________
Contractors Duns Number: _______________________
Contractors Tax Identification Number: _____________________________ mailto:Christina.L.Ayers@uscg.mil
Schedule of Supplies/Services
BASE YEAR
CLIN DESCRIPTION EST
QTY
UNIT UNIT PRICE TOTAL PRICE
0001 Manufacture of Left Hand (LH)
Controllable Pitch Propeller (CPP) hub in accordance with Specification
P-245-0154 Rev 3
2010-01-119-5469
P/N 901-WMEC-245-003LH
EA
0002 Manufacture of Right Hand (RH) CPP hub in accordance with Specification
P-245-0154 Rev 3
2010-01-118-8538
P/N 901-WMEC-245-003RH
2 EA $____________ $___________
0003 Overhaul of LH CPP hub in accordance with Specification R-245-0155 Rev. F
0003A Disassembly and Receiving/Pre-Repair
Inspection Reports in accordance with section 3.3 of R-245-0155 Rev. F
0003B Overhaul, inspection (including Final
Acceptance Operational Inspection
Report), testing and preservation/packaging/marking of LH hub, in accordance with sections 3, 4 and
5 of R-245-0155 Rev. F (unit price shall include mandatory parts total cost*)
0003C Labor, material and equipment required for Contractor to return Beyond
Economic Repair (BER) LH hub in accordance with Sections 3.3.1 and 4.8 of
R-245-0155 Rev F
1 EA $____________ $___________
Overhaul of RH CPP hub in accordance with Specification R-245-0155 Rev. F
BASE YEAR TOTAL $___________________________
Mandatory Replacement Parts, LH Hub NSN 2010-01-119-5469
Description Part Number Unit Price Quantity Per
Overhaul Total
Packing, Preformed OR 434-15, SET $___________ 1 $___________
O-Ring OR 445-5 NSP 4 NSP
O-Ring OR 3-12 $___________ 4 $___________
O-Ring OR 42-5 NSP 4 NSP
O-Ring O R39-6 NSP 1 NSP
O-Ring OR 28.2-3.5 $___________ 4 $___________
O-Ring OR 215-7 NSP 1 NSP
O-Ring OR 650-7 NSP 1 NSP
O-Ring OR 594-10 NSP 1 NSP
O-Ring OR 55-5 NSP 1 NSP
New Shipping
Container
Hub , $___________ 1 $___________
*TOTAL $___________
0004A Disassembly and Receiving/Pre-Repair
0004B Overhaul, inspection (including Final
Acceptance Operational Inspection
Report), testing and preservation/packaging/marking of RH hub, in accordance with sections 3, 4 and include mandatory parts total cost**)
0004C Labor, material and equipment required for Contractor to return BER RH hub in accordance with Sections 3.3.1 and 4.8 of
Long-lead time stock parts (see
Attachment 3 for individual prices***)
Mandatory Replacement Parts, RH Hub NSN 2010-01-118-8538
Qty Per
Overhaul Total
Packing, Preformed OR 434-15, SET $___________ 1 $___________
O-Ring OR 445-5 NSP 4 NSP
O-Ring OR 3-12 $___________ 4 $___________
O-Ring OR 42-5 NSP 4 NSP
O-Ring O R39-6 NSP 1 NSP
O-Ring OR 28.2-3.5 $___________ 4 $___________
O-Ring OR 215-7 NSP 1 NSP
O-Ring OR 650-7 NSP 1 NSP
O-Ring OR 594-10 NSP 1 NSP
O-Ring OR 55-5 NSP 1 NSP
New Shipping
Container
Hub , **TOTAL $___________
FIRST OPTION YEAR
CLIN DESCRIPTION EST
QTY
UNIT UNIT PRICE TOTAL PRICE
1001 Manufacture of LH CPP hub in accordance with Specification
P-245-0154 Rev 3
1002 Manufacture of RH CPP hub in accordance with Specification
P-245-0154 Rev 3
0 EA $____________ $___________
1003 Overhaul of LH CPP hub in accordance with Specification R-245-0155 Rev. F
1003A Disassembly and Receiving/Pre-Repair
1003B Overhaul, inspection (including Final
Acceptance Operational Inspection
Report), testing and preservation/packaging/marking of LH hub, in accordance with sections 3, 4 and
1003C Labor, material and equipment required for Contractor to return BER LH hub in accordance with Sections 3.3.1 and 4.8 of
1004A Disassembly and Receiving/Pre-Repair
1004B Overhaul, inspection (including Final
Acceptance Operational Inspection
FIRST OPTION YEAR TOTAL $___________________________
Overhaul Total
Packing, Preformed OR 434-15, SET $___________ 1 $___________
O-Ring OR 445-5 NSP 4 NSP
O-Ring OR 3-12 $___________ 4 $___________
O-Ring OR 42-5 NSP 4 NSP
O-Ring O R39-6 NSP 1 NSP
O-Ring OR 28.2-3.5 $___________ 4 $___________
O-Ring OR 215-7 NSP 1 NSP
O-Ring OR 650-7 NSP 1 NSP
O-Ring OR 594-10 NSP 1 NSP
O-Ring OR 55-5 NSP 1 NSP
New Shipping
Container
Hub , Report), testing and preservation/packaging/marking of RH hub, in accordance with sections 3, 4 and
1004C Labor, material and equipment required for Contractor to return BER RH hub in accordance with Sections 3.3.1 and 4.8 of
Overhaul Total
Packing, Preformed OR 434-15, SET $___________ 1 $___________
O-Ring OR 445-5 NSP 4 NSP
O-Ring OR 3-12 $___________ 4 $___________
O-Ring OR 42-5 NSP 4 NSP
O-Ring O R39-6 NSP 1 NSP
O-Ring OR 28.2-3.5 $___________ 4 $___________
O-Ring OR 215-7 NSP 1 NSP
O-Ring OR 650-7 NSP 1 NSP
O-Ring OR 594-10 NSP 1 NSP
O-Ring OR 55-5 NSP 1 NSP
New Shipping
Container
Hub , SECOND OPTION YEAR
QTY
UNIT UNIT PRICE TOTAL PRICE
2001 Manufacture of LH CPP hub in accordance with Specification
P-245-0154 Rev 3
2002 Manufacture of RH CPP hub in accordance with Specification
P-245-0154 Rev 3
2003 Overhaul of LH CPP hub in accordance with Specification R-245-0155 Rev. F
2003A Disassembly and Receiving/Pre-Repair
2003B Overhaul, inspection (including Final
Acceptance Operational Inspection
Report), testing and preservation/packaging/marking of LH hub, in accordance with sections 3, 4 and
2003C Labor, material and equipment required for Contractor to return BER LH hub in accordance with Sections 3.3.1 and 4.8 of
2004A Disassembly and Receiving/Pre-Repair
2004B Overhaul, inspection (including Final
SECON OPTION YEAR TOTAL $___________________________
Overhaul Total
Packing, Preformed OR 434-15, SET $___________ 1 $___________
O-Ring OR 445-5 NSP 4 NSP
O-Ring OR 3-12 $___________ 4 $___________
O-Ring OR 42-5 NSP 4 NSP
O-Ring O R39-6 NSP 1 NSP
O-Ring OR 28.2-3.5 $___________ 4 $___________
O-Ring OR 215-7 NSP 1 NSP
O-Ring OR 650-7 NSP 1 NSP
O-Ring OR 594-10 NSP 1 NSP
O-Ring OR 55-5 NSP 1 NSP
New Shipping
Container
Hub , Report), testing and preservation/packaging/marking of RH hub, in accordance with sections 3, 4 and
2004C Labor, material and equipment required for Contractor to return BER RH hub in accordance with Sections 3.3.1 and 4.8 of
Overhaul Total
Packing, Preformed OR 434-15, SET $___________ 1 $___________
O-Ring OR 445-5 NSP 4 NSP
O-Ring OR 3-12 $___________ 4 $___________
O-Ring OR 42-5 NSP 4 NSP
O-Ring O R39-6 NSP 1 NSP
O-Ring OR 28.2-3.5 $___________ 4 $___________
O-Ring OR 215-7 NSP 1 NSP
O-Ring OR 650-7 NSP 1 NSP
O-Ring OR 594-10 NSP 1 NSP
O-Ring OR 55-5 NSP 1 NSP
New Shipping
Container
Hub , THIRD OPTION YEAR
QTY
UNIT UNIT PRICE TOTAL PRICE
3001 Manufacture of LH CPP hub in accordance with Specification
P-245-0154 Rev 3
3002 Manufacture of RH CPP hub in accordance with Specification
P-245-0154 Rev 3
3003 Overhaul of LH CPP hub in accordance with Specification R-245-0155 Rev. F
3003A Disassembly and Receiving/Pre-Repair
3003B Overhaul, inspection (including Final
Acceptance Operational Inspection
Report), testing and preservation/packaging/marking of LH hub, in accordance with sections 3, 4 and
3003C Labor, material and equipment required for Contractor to return BER LH hub in accordance with Sections 3.3.1 and 4.8 of
3004A Disassembly and Receiving/Pre-Repair
THIRD OPTION YEAR TOTAL $___________________________
Overhaul Total
Packing, Preformed OR 434-15, SET $___________ 1 $___________
O-Ring OR 445-5 NSP 4 NSP
O-Ring OR 3-12 $___________ 4 $___________
O-Ring OR 42-5 NSP 4 NSP
O-Ring O R39-6 NSP 1 NSP
O-Ring OR 28.2-3.5 $___________ 4 $___________
O-Ring OR 215-7 NSP 1 NSP
O-Ring OR 650-7 NSP 1 NSP
O-Ring OR 594-10 NSP 1 NSP
O-Ring OR 55-5 NSP 1 NSP
New Shipping
Container
Hub , 3004B Overhaul, inspection (including Final
Report), testing and preservation/packaging/marking of RH hub, in accordance with sections 3, 4 and
3004C Labor, material and equipment required for Contractor to return BER RH hub in accordance with Sections 3.3.1 and 4.8 of
Overhaul Total
Packing, Preformed OR 434-15, SET $___________ 1 $___________
O-Ring OR 445-5 NSP 4 NSP
O-Ring OR 3-12 $___________ 4 $___________
O-Ring OR 42-5 NSP 4 NSP
O-Ring O R39-6 NSP 1 NSP
O-Ring OR 28.2-3.5 $___________ 4 $___________
O-Ring OR 215-7 NSP 1 NSP
O-Ring OR 650-7 NSP 1 NSP
O-Ring OR 594-10 NSP 1 NSP
O-Ring OR 55-5 NSP 1 NSP
New Shipping
Container
Hub , FOURTH OPTION YEAR
QTY
UNIT UNIT PRICE TOTAL PRICE
4001 Manufacture of LH CPP hub in accordance with Specification
P-245-0154 Rev 3
4002 Manufacture of RH CPP hub in accordance with Specification
P-245-0154 Rev 3
4003 Overhaul of LH CPP hub in accordance with Specification R-245-0155 Rev. F
4003A Disassembly and Receiving/Pre-Repair
4003B Overhaul, inspection (including Final
Acceptance Operational Inspection
Report), testing and preservation/packaging/marking of LH hub, in accordance with sections 3, 4 and
4003C Labor, material and equipment required for Contractor to return BER LH hub in accordance with Sections 3.3.1 and 4.8 of
4004A Disassembly and Receiving/Pre-Repair
FOURTH OPTION YEAR TOTAL $___________________________
Overhaul Total
Packing, Preformed OR 434-15, SET $___________ 1 $___________
O-Ring OR 445-5 NSP 4 NSP
O-Ring OR 3-12 $___________ 4 $___________
O-Ring OR 42-5 NSP 4 NSP
O-Ring O R39-6 NSP 1 NSP
O-Ring OR 28.2-3.5 $___________ 4 $___________
O-Ring OR 215-7 NSP 1 NSP
O-Ring OR 650-7 NSP 1 NSP
O-Ring OR 594-10 NSP 1 NSP
O-Ring OR 55-5 NSP 1 NSP
New Shipping
Container
Hub , 4004B Overhaul, inspection (including Final
Report), testing and preservation/packaging/marking of RH hub, in accordance with sections 3, 4 and
4004C Labor, material and equipment required for Contractor to return BER RH hub in accordance with Sections 3.3.1 and 4.8 of
Overhaul Total
Packing, Preformed OR 434-15, SET $___________ 1 $___________
O-Ring OR 445-5 NSP 4 NSP
O-Ring OR 3-12 $___________ 4 $___________
O-Ring OR 42-5 NSP 4 NSP
O-Ring O R39-6 NSP 1 NSP
O-Ring OR 28.2-3.5 $___________ 4 $___________
O-Ring OR 215-7 NSP 1 NSP
O-Ring OR 650-7 NSP 1 NSP
O-Ring OR 594-10 NSP 1 NSP
O-Ring OR 55-5 NSP 1 NSP
New Shipping
Container
Hub , BASE AND ALL OPTION YEARS TOTAL $___________________
DELIVERIES, PACKAGING, MARKING
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This Contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at http://farsite.hill.af.mil/VFFARA.HTM.
Number Title Date
52.242-17 Government Delay of Work Apr 1984
52.246-2 Inspection of Supplies - Fixed Price Aug 1996
52.247-34 F.O.B Destination Nov 1991
52.247-55 Government-Furnished Property Jun 2003
PRESERVATION, PACKAGING, & MARKING
See Attachment 1, Specification P-245-0154 Rev 3 CLIN X001 and X002, and Attachment 2, Specification R-245-0155 Rev. F CLINs X003 and X004.
PACKING LIST
All material shipped or delivered to the U.S. Coast Guard Surface Forces Logistics Center under this Contract must be accompanied by an itemized packing list that cites the proper contract and delivery order number. Each packing unit shall have a list of all items contained in that unit, and duplicate list shall be affixed in a conspicuous place, to the outside of the package, in a waterproof envelope.
PLACE OF DELIVERY:
USCG Surface Forces Logistics Center (SFLC)
RECEIVING ROOM, BLDG 88
2401 Hawkins Point Road
Baltimore, MD 21226-5000
**All deliveries are to be made Monday through Friday between the hours of 7:00 A.M.
and 1:00 P.M., EST. **
INSPECTION AND ACCEPTANCE (DESTINATION)
Inspection and acceptance of the supplies and/or services to be furnished hereunder shall be made at destination by the receiving activity. Acceptance will be contingent upon the representative’s verification of no damage in transit, correctness, and completeness of order and contractor’s conformance to preservation, packing and marking requirements.
INSPECTION (ORIGIN)
The contractor must contact the Contracting Officer 10 days prior to any inspections testing, or balancing required to schedule a Quality Assurance Inspection at the contractor’s facility. The inspections and tests required herein are the minimum necessary and are not intended to replace any controls, examinations or tests normally employed by the contractor to assure the quality of the product. Approval at origin by a Coast Guard Quality Assurance Representative does not guarantee final acceptance at destination.
CONTRACTING OFFICER’S AUTHORITY
No oral or written statement of any person other than the Contracting Officer will in any manner or degree modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof.
DELIVERY/PERFORMANCE
Delivery of supplies will be in accordance with Attachment 1, Specification P-245-0154 Rev 3
CLIN X001 and X002, and Attachment 2, Specification R-245-0155 Rev. F CLINs X003 and
X004.
DELIVERY ORDERS
Delivery orders will be issued on an as needed basis for parts, overhauls, and purchases of new hubs associated with this contract. Orders may be mailed, issued orally, by facsimile, or by email.
FAR 52.211-8 TIME OF DELIVERY (JUN 1997)(Alt. I Apr 1984)
a) The Government requires delivery to be made according to the following schedule:
Required Delivery Schedule
CLIN* Description Completion
X001 Manufacture of LH CPP hub – Final Acceptance
Operational Inspection/Test Report
180 calendar days after receipt of order
X002 Manufacture of RH CPP hub - Final Acceptance
Operational Inspection/Test Report
180 calendar days after receipt of order
X003 Overhaul of LH CPP hub N/A
X003A
Receiving Report Five (5) calendar days after receipt of CPP hub
Pre-Repair Inspection Report Thirty (30) calendar days after receipt of CPP hub
X003B Final Acceptance Operational Inspection Report
Forty-five (45) calendar days after authorization to proceed with overhaul
X003C
Labor, material and equipment required for
Contractor to return Beyond Economic Repair (BER)
LH hub
Thirty (30) calendar days after determining hub
BER
X004 Overhaul of RH CPP N/A
X004A
Receiving Report Five (5) calendar days after receipt of CPP hub
Pre-Repair Inspection Report Thirty (30) calendar days after receipt of CPP hub
X004B Final Acceptance Operational Inspection Report
Forty-five (45) calendar days after authorization to proceed with overhaul
X004C Labor, material and equipment required for
Contractor to return BER RH hub
Thirty (30) calendar days after determining hub
BER
X005 Long-lead time stock parts See Attachment 3
*Includes Base and all corresponding Option Year CLIN’s
Note: Definitive quantities shall be included on each individual delivery order.
The Government will equally evaluate, with regards to time of delivery, an offer that proposes delivery of each CLIN within the required delivery period. Offers that propose delivery that will not clearly fall within the required delivery period specified above may be found unacceptable and may be rejected. The Government reserves the right to award under the required delivery schedule or the proposed delivery schedule when an offeror provides an earlier delivery schedule than required above. If an offeror proposes no other delivery schedule, then the above schedule shall apply.
Offerors Proposed Delivery Schedule
CLIN* Description Completion
X001 Manufacture of LH CPP hub – Final Acceptance
Operational Inspection/Test Report
______ calendar days after receipt of order
X002 Manufacture of RH CPP hub - Final Acceptance
Operational Inspection/Test Report
______ calendar days after receipt of order
X003 Overhaul of LH CPP hub N/A
X003A
Receiving Report ______ calendar days after receipt of CPP hub
Pre-Repair Inspection Report ______ calendar days after receipt of CPP hub
X003B Final Acceptance Operational Inspection Report
_______ calendar days after authorization to proceed with overhaul
X003C
Labor, material and equipment required for
Contractor to return Beyond Economic Repair (BER)
LH hub
_______ calendar days after determining hub
BER
X004 Overhaul of RH CPP N/A
X004A
Receiving Report ______ calendar days after receipt of CPP hub
Pre-Repair Inspection Reports ______ calendar days after receipt of CPP hub
X004B Final Acceptance Operational Inspection Report
______ calendar days after authorization to proceed with overhaul
X004C Labor, material and equipment required for
Contractor to return BER RH hub
______ calendar days after determining hub
BER
X005 Long-lead time stock parts See Attachment 3
*Includes Base and all corresponding Option Year CLIN’s
(b) Attention is directed to the Contract Award provision of the Solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractor’s date of receipt of the contract or notice of award by adding: 1) five calendar days for delivery of the award through the ordinary mails, or 2) one working day if the Solicitation states that the contract or notice of award will be transmitted electronically. The term “working day” excludes weekends and Federal Holidays. If, as so computed, the offered delivery date is later than the required delivery date, therefore may be determined unacceptable and may be rejected.
CONTRACT ADMINISTRATION DATA
CONTRACT ADMINISTRATION/ADDRESS OF CORRESPONDENCE
The contract administrator, located at the U.S. Coast Guard, SFLC, MEC Product Line, 707 E.
Ordnance Road, Baltimore, MD 21226-5000 shall be:
Christina Ayers, Contract Specialist, (410) 762-6382, Christina.L.Ayers@uscg.mil
All correspondence, except as otherwise specified, shall be delivered to the following address:
U.S. Coast Guard, Surface Forces Logistics Center
WMEC Product Line, C&P1
Attn: Christina Ayers, Contract Specialist
707 E. Ordnance Road
Baltimore, MD 21226-5000
M/F: Contract Number: (to be furnished at award)
Delivery Order Number: (to be furnished at award of each delivery order)
Or submitted via email to: Christina.L.Ayers@uscg.mil
PLACE OF DELIVERY - REPORTS
All written reports and plans shall be delivered to the Contract Administrator at the following address:
U.S. Coast Guard, SFLC
WMEC Product Line, C&P1
Attn: Christina Ayers, Contract Specialist
707 E. Ordnance Road
Baltimore, MD 21226-5000
M/F: Contract Number: (to be furnished at award)
Delivery Order Number: (to be furnished at award of each delivery order)
Or submitted electronically to: Christina.L.Ayers@uscg.mil
UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT PERSONNEL
(a) The Contractor shall not accept any instructions issued by any person employed by the
U.S. Government or otherwise other than the Contracting Officer or the Contracting
Officer’s Representative acting within the limits of his/her authority. A Contracting
Officer’s Representative shall be designated in writing to the Contractor and shall set forth the scope of their authority.
(b) No information, other than that which may be contained in an authorized amendment to this purchase instrument duly issued by the Contracting Officer, which may be received from any person employed by the Government or otherwise will be considered as grounds for deviation from any stipulations of the purchase instruments or referenced drawings, or specifications contained herein.
GOVERNMENT REPRESENTATIVES
(a) The Government may upon contract award or thereafter name representatives with titles such as Contracting Officer’s Representative (COR); the COR shall be responsible for answering all technical questions and concerns related to the resulting contract. If appointed, the COR will be named in writing by the Contracting Officer. The letter of appointment will indicate the individuals, titles, and stipulate rights, responsibilities, and limitations of their appointment.
(b) In any event, no such named individual has the authority to issue any direction either technical or otherwise, which constitutes a change to the terms, conditions, price, or delivery schedule of the Contract. ONLY the Contracting Officer is authorized to alter the Contract in any manner.
INVOICING REQUIREMENTS – FIRM FIXED PRICE CONTRACTS
(a) All information set forth in FAR Clause 52.212-4(g) must be included in an invoice for it to constitute a proper invoice.
(b) An original invoice shall be submitted to the following designated payment office and a copy sent to the Contract Administrator: FIN-SMB-YARDTEAM@USCG.MIL.
RESPONSIBLE OFFICIAL(S) WHO CAN RECEIVE NOTIFICATION OF AN
IMPROPER INVOICE
For use in the event your firm receives a contract as a result of this Solicitation, designate below the responsible official(s) who can receive notification of an improper invoice and answer any questions regarding the invoice.
NAME: ____________________________, TITLE:___________________________
TELEPHONE: ____________________, EMAIL: _________________________________
WITHHOLDING PAYMENT FOR NONDELIVERY OF MATERIALS/SERVICES
(a) If materials or services, or any part thereof, are not delivered within the time specified by this Contract or are deficient upon delivery, the Contracting Officer shall unilaterally, at his/her discretion, withhold from each invoice a percentage of the Contract price in accordance with the following table:
(b) When Total Contract Price is: Percentage to be Withheld is:
mailto:FIN-SMB-YARDTEAM@USCG.MIL
Less than $250,000 10%
$250,000 to $1,000,000 5%
Over $1,000,000 2%
(c) The withholding of any sums pursuant to this clause shall not be construed as, or constitute in any manner, a waiver by the Government of the Contractor’s obligation to furnish the data required under this Contract. In the event the Contractor fails to furnish these items, the Government shall have those rights and remedies provided by law and pursuant to this Contract in addition to, not in lieu of, the sum withheld in accordance with this clause.
CONTRACTOR PERFORMANCE ASSESSMENT REPORT SYSTEM (CPARS)
(a) GENERAL: The U.S. Coast Guard Surface Forces Logistic Center (SFLC) will monitor and evaluate the successful offeror’s past performance of this contract and prepare a
Contractor Performance Assessment Report System (CPARS) in accordance with FAR
Part 42.15. All information contained in this assessment may be used, within the limitations of FAR 42.15, by the government for future source selections and in accordance with FAR 15.304, when past performance is an evaluation factor for award.
(b) NOTIFICATION: Upon completion of the contract, the contractor will be notified of the assessment. The contractor will be allowed 30 days to respond to the SLFC’s assessment of its performance entered into CPARS. The contractor’s response, if any, will be made part of CPARS report.
(c) INFORMATION: Information included in the CPARS may include, but is not limited to, the contractor’s record of conforming to contract requirements and to standards of good workmanship; the contractor’s record of forecasting and controlling costs; the contractor’s adherence to contract schedules, including the administrative aspects of performance; the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction; the contractor’s record of integrity and business ethics, and generally, the contractor’s business-like concern for the interest of the customer.
(d) RELEASE OF DATA: CPARS information is considered business sensitive and will not be released except: (1) to other Federal procurement activities which request it; (2) when
SFLC must release pursuant to a Freedom of Information Act (FOIA) request; or (3) when prior written consent is requested and obtained from the contractor.
SPECIAL CONTRACT REQUIREMENTS
REQUIRED STANDARD OF WORKMANSHIP
Unless otherwise specifically provided in the resulting Contract, the quality of all supplies and services rendered hereunder shall conform to the highest standards in the relevant profession, trade, or field of endeavor. All supplies and services shall be rendered or supervised directly by individuals fully qualified in the relevant profession, trade, or field, and holding any licenses required by law.
STANDARD COMMERCIAL WARRANTY
If the items or services required in the Contract resulting from this Solicitation are customarily warranted in the trade by a standard commercial warranty, such warranty shall be incorporated into the resulting Contract and thereby provided to the Government at no additional cost. Any standard commercial warranty provided shall be identical to the standard commercial warranty normally offered by the Contractor to the Contractor’s most favored customer.
Offerors are requested to state the terms and conditions of their standard commercial warranty in the space provided below or attach a copy of the warranty terms with their offer.
If the contractor’s organization, as standard practice in the sale of these items issues a certificate of warranty setting forth the terms and conditions of their Standard Commercial Warranty, any contract resulting from this solicitation shall require the contractor submit to the Contracting
Officer, upon delivery of these items, said certificate.
Government Furnished Property
The following Government property will be sent to the contractor on an as needed basis for inspection, overhaul, and testing.
Part Number Item Description QTY Estimated
Cost ($) / Unit
901-WMEC-245-003LH Left hand (LH) 270’ CPP Hub 1 $717,600.00
904-WMEC-245-003RH Right hand (RH) 270’ CPP Hub 1 $717,600.00
FEDERAL ACQUISITION REGULATION (FAR) 52.212-4, CONTRACT TERMS AND
CONDITIONS – COMMERCIAL ITEMS (Jan 2017)
(Incorporated by Reference)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:
http://www.acquisition.gov/far/index.html.
Number Title
FAR 52.203-3 Gratuities (Apr 1984)
FAR 52.203-17
Contractor Employee Whistleblower Rights and Requirement to Inform
Employees of Whistleblower Rights (Sep 2013)(DHS-USCG FAR
Deviation 14-01)
FAR 52.204-4 Printed or Copied Double-sided on Recycled Paper (May 2011)
FAR 52.204-7 System for Award Management Registration (Jul 2013)
FAR 52.217-5 Evaluation of Options (Jul 1990)
FAR 52.225-25
Prohibition on Contracting with Entities Engaging in Certain Activities or
Transactions Relating to Iran-Representation and Certification (Oct 2015)
FAR 52.232-40
Providing Accelerated Payment to Small Business Subcontractors
(Dec 2013)(DHS FAR Deviation 17-01)
FAR 52.242-13 Bankruptcy (Jul 1995)
FAR 52.242-15 Stop Work Order (Aug 1989)
FAR 52.245-1 Government Property (Jan 2017)
HSAR 3052.212-70 Contract Terms and Conditions Applicable to DHS Acquisition of
Commercial Items (Sep 2012)
The Contractor agrees to comply with any provision or clause that is incorporated herein by reference to implement agency policy applicable to acquisition of commercial items or components. The provision or clause in effect based on the applicable regulation cited on the date the solicitation is issued applies unless otherwise stated herein. The following provisions and clauses are incorporated by reference:
Name Title
HSAR 3052.203-70 Instructions for Contractor Disclosure of Violations (Sep 2012)
HSAR 3052.204-71 Contractor Employee Access
HSAR 3052.205-70 Advertisement, Publicizing Awards and Releases (Sep 2012)
HSAR 3052.242-72 Contracting Officer’s Technical Representative (Dec 2003)
HSAR 3052.247-72 F.o.B. Destination Only http://www.acquisition.gov/far/index.html
FAR 52.204-1 APPROVAL TO CONTRACT (DEC 1989)
This contract is subject to the written approval of the Chief of the Contracting Office, Surface
Forces Logistics Command and shall not be binding until so approved.
FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (Jul 2013)
(a) Definitions. As used in this provision—
“Administrative proceeding” means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission
Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed
Services Board of Contract Appeals Proceedings). This includes administrative proceeding at the
Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
“Federal contracts and grants with total value greater than $10,000,000” means—
(1) The total value of all current, active contracts and grants, including all priced options;
and
(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).
“Principal” means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager;
head of a division or business segment; and similar positions).
(b) The offeror [_] has [_] does not have current active Federal contracts and grants with total value greater than $10,000,000.
(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:
(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:
(i) In a criminal proceeding, a conviction.
(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.
(iii) In an administrative proceeding, a finding of fault and liability that results in—
(A) The payment of a monetary fine or penalty of $5,000 or more; or
(B) The payment of a reimbursement, restitution, or damages in excess of
$100,000.
(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.
(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for
Award Management database via https://www.acquisition.gov (see 52.204-7).
FAR 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a single Requirements type contract resulting from this solicitation.
FAR 52.216-18 ORDERING (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from date of award through 60 months thereafter providing all options are exercised.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail. Orders may be issued electronically (email or fax), urgent requirements may be issued orally.
FAR 52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $20.00, the Government is not obligated to purchase, nor is the
Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor— https://www.acquisition.gov/
(1) Any order for a single item in excess $1,000,000.00;
(2) Any order for a combination of items in excess of $1,000,000.00; or
(3) A series of orders from the same ordering office within 30 calendar days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-
21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 calendar days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
FAR 52.216-21 REQUIREMENTS (OCT 1995)
(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government’s requirements do not result in orders in the quantities described as
“estimated” or “maximum” in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The
Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the
Government activity or activities specified in the Schedule.
(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.
(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.
(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period;
provided, that the Contractor shall not be required to make any deliveries under this contract after 6 months.
FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within thirty (30) days of contract expiration; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires.
The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of the resulting contract, including the exercise of any options under this clause, shall not exceed five (5) years.
FAR 52.233-2 SERVICE OF PROTEST (Sept 2006)
(a) Protests, as defined in section 31.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government
Accountability Office (GAO), shall be served on the Contracting Officer by obtaining written and dated acknowledgment of receipt from Christina.L.Ayers@uscg.mil.
Address: USCG Surface Forces Logistics Center
Attn: Christina Ayers
Contracting & Procurement Division 1
707 E Ordnance Road
Baltimore, MD 21226-5000
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
Contracting Officer’s Representative (COR)
a. The Contracting Officer will designate an individual as the primary Contracting Officer’s
Representative (COR) for the resulting contract.
To be identified at contract award
b. In the absence of the primary COR, all responsibilities and functions assigned to the COR shall be the responsibility of the alternate COR acting on behalf of the primary COR. The
Contracting Officer hereby appoints the following individual as the alternate COR:
To be identified at contract award
c. The COR will act as the Contracting Officer’s representative for technical matters (only), providing technical direction and discussion as necessary with respect to the performance work statement, monitoring the progress and quality of the contractor performance.
The COR is not a Contracting Officer and does not have authority to take any action, either directly or indirectly, that would change pricing, quantity, quality, place of performance, delivery schedule, personal services, or any other terms and conditions of the contract, or to direct the accomplishment of effort which goes beyond the scope of the performance work statement in the contract.
d. It is emphasized that only a Contracting Officer has the authority to modify the terms of the contract, therefore, in no event will any understanding, agreement, modification, change order, or other matter deviating from the terms of the basic contract between the contractor and any other person effective or binding on the Government. When/if, in the opinion of the contractor, an effort outside the existing scope of the contract is requested, the contractor shall promptly notify the Contracting Officer in writing. No action shall be taken by the contractor (under such direction) unless the Contracting Officer has issued a contractual change or otherwise resolved the issue.
FAR 52.212-5 – CONTRACT TERMS AND CONDITIONS REQUIRED TO
IMPLEMENT STATUTES OR EXECUTIVE ORDERS – COMMERCIAL ITEMS (Aug
2018)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (Jan 2017)
(2) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
(3) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553). (Aug 1996)
(4) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Pub. L. 108-77, 108-78).
(19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting
Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
(1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with
Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
(2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct…
This is the start of the file's text. The full file is on GovTribe.