USCGC_ALLIGATOR_Specification_Rev-0.pdf
PDF 2 MB Posted
- Attached to
- DOCKSIDE REPAIRS FOR THE CGC ALLIGATOR
- Solicitation number
- 70Z080-19-Q-P4553500
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Alligator_Schedule_of_Services_Blank.xls | XLS spreadsheet | |
| ALLIGATOR__Combined_Synopsis_Solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC ALLIGATOR (WPB 87372)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2019
Developed By: Paul R Dalton
(Rev-0, 03 Dec 2018)
USCGC ALLIGATOR (WPB-87) DOCKSIDE AVAILABILITY FY2019
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. vi Consolidated List of Critical Inspection Items ........................................................................................... vii Principal Characteristics ............................................................................................................................ viii General Requirements WORK ITEM 1: Grey Water Piping, Clean And Flush WORK ITEM 2: Interior Deck Covering Systems, Renew WORK ITEM 3: HVAC System, Repair WORK ITEM 4: Fire Alarm Control Panel, Replace WORK ITEM 5: HVAC 2-Stage Intake Separator, Modify WORK ITEM 6: Sewage System (Toilet), Modify WORK ITEM 7: Stuffing Tube, Renew WORK ITEM 8: Structure, Interior, Inspect and Preserve iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 87 WPB 113-001, Rev J, Deck Construction Plan
Coast Guard Drawing 87 WPB 113-002, Rev B, Galley/Messdeck Bilge Access
Coast Guard Drawing 87 WPB 131-001, Rev J, Deck Construction Plan
Coast Guard Drawing 87 WPB 151-001, Rev L, Superstructure Details
Coast Guard Drawing 87 WPB 186-001, Rev -, Foundations for Install of Jets Vacuum System
Coast Guard Drawing 87 WPB 252-002, Rev N, Alarm and Monitoring System
Coast Guard Drawing 87 WPB 302-003, Rev -, Jets Vacuum Toilet Electrical Details
Coast Guard Drawing 87 WPB 436-001, Rev C, Fire Detection System
Coast Guard Drawing 87 WPB 514-001, Rev M, HVAC Duct & Piping Systems
Coast Guard Drawing 87 WPB 514-004, Rev -, Mods to HVAC Intake Duct
Coast Guard Drawing 87 WPB 526-001, Rev J, Scuppers & Deck Drains Piping
Coast Guard Drawing 87 WPB 593-001, Rev K, Sewage Piping
Coast Guard Drawing 87 WPB 593-004, Rev A, Sewage System Modifications Jets Vacuum System
Coast Guard Drawing 87 WPB 621-001, Rev J, Joiner Work Details
Coast Guard Drawing 87 WPB 634-001, Rev C, Deck Covering & Details
Coast Guard Drawing 87 WPB 635-001, Rev C, Linings and Insulation Plan & Details
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 4562, Heating, Ventilation, and Air Conditioning (HVAC) System 87’ WPB Class Vessels
Coast Guard Technical Publication (TP) 9051, SWBS 436, Mar 2016, Fire Alarm Control Panel NFS- 320/E/C & LCD2-80, Multiple Class Cutters
Coast Guard Technical Publication (TP), 9115, Jets Vacuum Sewage System, 2016
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes v (Rev-0)
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior Deck Covering Systems
OTHER REFERENCES
ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems
MIL-D-16791, Jan 1993, Detergents, General Purpose (Liquid, Nonionic)
MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric vi (Draft-2)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
4 N Fire Alarm Control
Panel NSN: 6320-01-F18-5529 1 ea. 2,185.00
4 N Battery, 12 Volt, 12
AH
NSN: 6140-01-529-4234 2 ea. 151.95
7 N Sewage installation kit: Jets 610SS
Toilets, Vacuum Pump, controller and
Vacuum Accumulator
NSN: 4510-01-F16-4844
PN: CUSTVU15-TO610
1 ea. $13,957
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter vii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item
Title
SEWAGE SYSTEM (TOILET), MODIFY
8 STRUCTURE, INTERIOR, INSPECT AND PRESERVE
viii (Rev-0)
PRINCIPAL CHARACTERISTICS
87' WPB
PHYSICAL
Length overall 87' Length between perpendiculars 81' 7" Depth 10' 11" Maximum beam 19.4' Draft, mean to design waterline 5' 9" Height of highest projection 50.2' Full load displacement 93.5 long tons Minimum operating displacement 83.9 long tons Displacement, light ship 77.9 long tons Framing Longitudinal Bulkheads Four watertight bulkheads located below the Main Deck Anchor 40 lb Fortress with 480 ft. 3 strand 5/8" dia. Line stayset
HULL
Hull/main weatherdeck material ABS Grade AH 36 Superstructure 5086 Aluminum
MACHINERY
Main propulsion Two MTU 8V396TE94, sequential turbo-charged diesels Reduction gears Two ZF Type BW 255 Propulsion shaft Two AQUAMET 22, 101.6mm Shaft diameter 4" Shaft seal Two John Crane mechanical seals Shaft bearing, intermediate Thordon Elastomeric Bearing Shaft bearing, aft Thordon Elastomeric Bearing Number of propellers 2 Number of blades 5 Diameter of propeller 1040mm Pitch 1230 mm fixed Shaft RPM 828 Rudders Two 316L Stainless Steel Ship's service generators Two Man Model D08241F01 diesel with Stanford 60KW Generator
TANK CAPACITIES
3-9-1-f (fuel oil) 1402 gal 3-9-2-f (fuel oil) 1402 gal 3-12-2-f (waste oil) 86 gal 3-12-1-f (oily water) 86 gal 3-7-0-q (sewage collection) 352 gal 3-7-1-q (grey water) 52 gal 3-12-1-w (fresh water) 200 gal 3-12-2-w (fresh water) 200 gal
9 (Rev-0)
00000_0618_FLT
REC_00000_FLT_Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the
10 (Rev-0) scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project.
Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is Small Quantity Generator.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer
11 (Rev-0) of petroleum products in containers 55 gallons or greater.
National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws.
Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.
12 (Rev-0)
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154.
Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with
PCL.”
3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph
3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, "For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope," to "For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope."
3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from "DYFORM-18, 6X19 AND 6X37 IWRC RRL," to " DYFORM-18, 6X19 AND 6X36 IWRC RRL"
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
13 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK
ITEM #
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.
threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
14 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER
COAT, BARRIER COAT, TOP
COAT, ETC…)
LOCATION (FRAME
& DECK, RELATION
TO EQUIPMENT,
ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFAC
E
AMBIEN
T
ΔT
| DP -
SURFACE
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
15 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE
MANUFACTURER:
ABRASIVE SIEVE
SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN
AREA IS DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH
SECTION.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15
READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
16 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE
MANUFACTURER:
ABRASIVE SIEVE
SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA
IS DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
17 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY
(MICROSIEMENS/CM)
18 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME
REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE
ADJUSTMENTS
AFTER ADJUSTMENTS
AVG.
3 BEFORE
ADJUSTMENTS
3 BEFORE
ADJUSTMENTS
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
19 (Rev-0)
59320_0618_FLT
REC_59320_FLT_87’ WPB (ALL) (0318)
WORK ITEM 1: Grey Water Piping, Clean And Flush
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the grey water piping system.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 87 WPB 526-001, Rev J, Scuppers & Deck Drains Piping
Coast Guard Drawing 87 WPB 593-001, Rev K, Sewage Piping
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
20 (Rev-0)
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Grey water pumps
Valves
3.2 Contamination prevention. The Contractor shall take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.
3.3 Personnel qualification. The Contractor shall ensure that personnel accomplishing this work are qualified and experienced in operating the pressurized water system and handling the chemicals. For each operator/cleaning technician, submit documentation of applicable experience and training obtained within the last twelve months along with the Cleaning Plan (see paragraph 3.5.2 (Plan Submittal)).
3.4 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.5 Piping hydrojet cleaning. The Contractor shall perform the following work:
3.5.1 The Contractor shall clean and flush approximately 160 linear feet of grey water system piping (including condensate drain lines), shown on Coast Guard Drawing 87 WPB 526-001 and 87 WPB 593- 001.
3.5.2 Prior to commencing work, coordinate with the Coast Guard Inspector. Determine required down times for affected piping system. Determine the feasibility/need for the piping system to be split to minimize system down time.
3.5.3 With the aid of ship’s force, split the plumbing drain system fore and aft by closing isolation valves in the drainage system. Work on only one section of the plumbing drain system at a time to allow use of toilet and shower facilities in the other section of the system by the ship’s duty section.
3.5.4 Using the referenced Coast Guard drawings as guidance, hydro blast the internal surfaces of all of the plumbing drain piping. Hydro blast pressure shall be at least 2500 psig at the discharge nozzle in all piping to ensure removal of all salts and scale from piping internal surfaces.
3.5.4.1 Ship’s force will provide an assistant to the Contractor to show the Contractor the location of clean-out connections within the plumbing drain system.
3.5.4.2 Open each of the clean out connections as required to clean and hydro blast all of the internal piping within the system. Catch any fluid that drains from the clean out connections when it is opened and clean up any spills using bleach to disinfect the spill after cleaning.
3.5.4.3 It may be necessary for the Contractor to install additional clean-out connections to access all portions of the plumbing drain system. If additional clean-out connections are needed, a separate
21 (Rev-0) specification item in this specification package shall be authorized to install additional clean-out connections.
3.5.4.4 Hydro blast cleaning water may be collected in the ship’s sewage system and disposed of via the ship’s sewage shore tie connections.
3.5.5 Clean until all of the following conditions are met:
All visible calcium carbonate deposits, solid deposits and build-up are removed from pipe walls.
Discharge water from the piping being cleaned is free of all visible scale and deposits.
3.5.5.1 Inspect the piping interior using a borescope in the presence of the COR, to verify that all solid deposits visible to the unmagnified eye have been removed. Continue the cleaning process until all visible solid deposits are removed from the pipe walls.
3.5.6 In the event that hydro-blasting alone does not clean piping to required conditions, Contractor shall use chemical cleaning methods.
3.5.6.1 Ensure that chemical cleaners do not damage the environment, heat exchanger or the vessel.
3.5.6.2 Submit the written plan for chemical cleaning to the COR for approval. The procedure shall include products to be used, safety precautions, disposal requirements, sequence of events, etc.
CAUTION
Submit a MSDS to the COR for all chemicals proposed for use.
3.5.6.3 Chemical cleaning waste water disposal. Dispose of all cleaning fluids and debris in accordance with all applicable Federal, state, and local regulations. Remove all unused chemicals from USCG property immediately upon completion of work item. Do not drain any fluids (including fresh water) into any space, bilge, or exterior location.
Sequence of each location that ensures all piping sections will be cleaned and all foreign debris removed.
3.6 Pumps and valves. The Contractor shall replace system tank valve(s) with temporary spool piece(s).
Visually inspect system pumps and valve(s); and submit a CFR. Upon completion of work, reinstall the removed tank valve(s) with new gaskets.
3.7 Gasket renewal. The Contractor shall reinstall all removed valves and fittings with new gasket material conforming to applicable referenced drawings.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.8 Operational test – post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
3.8.1 Leak test. After all system components are reinstalled, the Contractor shall test all disturbed piping for leaks, as follows, and submit a CFR:
Plug all system openings (except the highest) and fill system with water to the point of
22 (Rev-0) overflow. Ensure that the water level does not go down (without adding any water) for sufficient time to inspect the entire system (no less than 15 minutes).
Closely monitor the system for leaks. Repair all leaks detected.
Repeat test and inspection until no leaks are detected.
4. NOTES
This section is not applicable to this work item.
23 (Rev-0)
Sxx_xxxxx_63401_MWS_0614_87372
WORK ITEM 2: Interior Deck Covering Systems, Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the deck covering systems designated below. If an “X” appears beside the location, that area is designated for renewal. If an “X” does not appear beside the location then that area is NOT designated for renewal.
LOCATION COVERING DESCRIPTION
X
BERTHING (1-8-1-L)
Steel Deck Area: ~26 Sqft (Note: Interferences may include:
cove base molding, furniture, joiner panels, bulkheads)
Carpeting (paragraph 3.1.2 below)
Color: Blue Renew Underlayment: No
X
BERTHING (1-8-2-L)
Steel Deck Area: ~26 Sqft (Note: Interferences may include:
cove base molding, furniture, joiner panels, bulkheads)
Carpeting (paragraph 3.1.2 below)
Color: Blue Renew Underlayment: No
X
HEAD (1-10-2-L)
Steel Deck Area: ~15 sqft (Note: Interferences may include: --
Cosmetic Polymeric Epoxy Resin (para 3.2.1 below)
Color: Starlight Blue Renew Underlayment: As Required
SHOWER (1-10-1-L)
Area: ~12 sqft Steel Deck (Note: Interferences may include:
NOn)
Cosmetic Polymeric Epoxy Resin (para 3.2.1 below)
Color: --- Renew Underlayment: -
OFFICE (1-10-0-Q)
Area: ~--- sqft Steel Deck (Note: Interferences may include: --
Laminate Deck (para 3.4 below)
BERTHING (2-2-0-L)
Steel Deck Area: ~59 Sqft (Note: Interferences may include:
cove base molding, furniture, joiner panels, bulkheads)
Carpeting (paragraph 3.1.2 below)
Color: -
24 (Rev-0)
X
HEAD (2-5-2-L)
Area: ~12 sqft Aluminum Joiner Deck (Note: Interferences may include:
joiner panels, false bulkheads, toilet, furniture, wiring, ducting, doors, bilge access, latches, trim, cove base)
Cosmetic Polymeric Epoxy Resin (para 3.2.1 below)
Color: Starlight Blue Renew Underlayment: As required
SHOWER (2-5-1-L)
Area: ~9 sqft Steel Deck (Note: Interferences may include all shower bulkheads, drain, etc.)
Cosmetic Polymeric Epoxy Resin (para 3.2.1 below)
BERTHING (2-6-2-L)
Aluminum Joiner Deck Area: ~--- Sqft (Note: Interferences may include:
cove base molding, furniture, wiring, ducting, joiner panels, bulkheads)
Carpeting (paragraph 3.1.2 below)
BERTHING (2-6-1-L)
Area: ~--- Sqft (Note: Interferences may include:
cove base molding, furniture, ducting, wiring, joiner panels, bulkheads)
Carpeting (paragraph 3.1.2 below)
PASSAGE (2-5-0-L)
Area: ~40 Sqft (Note: Interferences may include:
joiner panels, toilet, wiring, furniture, ducting, doors, bilge access, latches, trim, cove base)
Cosmetic Polymeric Epoxy Resin (para 3.2.1 below)
MESS DECK & GALLEY (2-9-2-
Q, 2-9-1-Q) Aluminum Joiner Deck Area: ~175 Sqft (Note: Interferences may include:
joiner panels, toilet, furniture, wiring, ducting, doors, bilge access, latches, trim, cove base)
Cosmetic Polymeric Epoxy Resin (para 3.2.1 below)
Color: - Renew Underlayment: -
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 87 WPB 634-001, Rev C, Deck Covering & Details
25 (Rev-0)
Coast Guard Drawing 87 WPB 113-001, Rev J, Deck Construction Plan
Coast Guard Drawing 87 WPB 113-002, Rev B, Galley/Messdeck Bilge Access
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior Deck Covering Systems
OTHER REFERENCES
MIL-D-16791, Jan 1993, Detergents, General Purpose (Liquid, Nonionic)
MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences listed in paragraph 1.1 in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Deck covering renewal. The Contractor shall renew the deck covering systems in the space or spaces specified in paragraph 1.1 above, as specified below. Renew the associated underlayment as indicated in paragraph 1.1.
3.2.1 Cosmetic polymeric epoxy resin. Where this covering is specified in paragraph 1.1 above, renew deck covering material (i.e. remove existing covering system, prepare and paint, then apply deck covering material, etc.) , including any associated cove base, using Cosmetic Polymeric Epoxy Resin, Type III (One-Step Epoxy System), in accordance with appendix A of SFLC Std Spec 6341.
26 (Rev-0)
3.2.2 Carpeting. Where this covering is specified in paragraph 1.1 above, renew deck covering material (i.e. remove existing covering system, prepare and paint, then apply deck covering material, etc.), using Carpeting in accordance with appendix E of SFLC Std Spec 6341.
3.3 Epoxy flake system. The Contractor shall reseal, versus completely renew, the deck areas specified.
Sand down the existing deck covering to the color layer to remove all discolorations and damage.
Reapply color coat to obtain uniform color. Reapply sealers. Renew pc 7 of Coast Guard Drawing 87 WPB 634-001 (slip-resistant treads) where disturbed.
CAUTION
Epoxy flake system is resealed over delicate joiner deck. Do not damage joiner deck during removal of top layer of existing deck material.
To minimize impact on cutter weight & moment, do not add excessive deck covering material, beyond what was removed. Make new deck covering thickness as close as practicable original, pre-resealed thickness.
3.4 Laminate deck. Where this covering is specified in paragraph 1.1 above, the Contractor shall refer to Coast Guard Drawing 87 WPB 601-001. Renew the deck covering in the ship’s office (1-10-0-Q) in accordance with Coast Guard Drawing 87 WPB 634-001. Inspect deck plate beneath, determine any required repairs. Submit CFR. Compass rose is NOT to be reinstalled.
27 (Rev-0)
S16_003_51001_MWS_0316_87372
WORK ITEM 3: HVAC System, Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to repair the HVAC system.
1.2 Government-furnished property.
None.
1.3 List of Repairs. If an “X” appears beside the repair item listed below then that item IS designated for completion. If an “X” DOES NOT appear beside the repair item listed below then that item IS NOT designated for completion:
HVAC SYSTEM REPAIR ITEMS
Renew Refrigerant. Renew all refrigerant.
Renew the cooling section assembly (evaporator coil, etc). Interferences in way of work may include ladders, hand-rails, false bulkheads, lighting fixtures, electrical and fire alarm fixtures. Remove and dispose of existing cooling section, which is a component in the air handler unit (AHU). Install new Government-furnished (see 1.3) cooling section. Drill mounting bolt holes into new cooling section, template location from existing. Renew all associated/disturbed fasteners.
Renew Air Handler Inlet/Filter Section. Renew the “Inlet/Filter Section” (see section 9.3 of TP-4562, sheet 1 of that section) of the Air Handling Unit. Renew the associated bag filter. Renew all disturbed fasteners.
Renew flex coupling. Interferences in way of work may include ductwork, probes, hearter coils, false bulkhead, lighting, wiring, ladder and door. Renew the flexible coupling in the fan section of the air handling unit (AHU).
Renew HVAC air intake box( Contractor to provide materials & fabricate). Interferences in the way of work include joiner bulkhead panels, piping of the cooling plant and Cooling Coil.
Renew compressor. Interferences in way of work may include, instrument panel, overhead, piping, electrical fixture. Remove and dispose of existing compressor, which is a component in the cooling plant. Install new compressor.
X Renew filter/drier (Contractor to provide). Interferences in way of work may include piping. Remove and dispose of existing filter/drier which is a component of the cooling plant. Install new filter/dryer.
Renew sight glass (Contractor to provide). Interferences in way of work may include piping. Remove and dispose of existing sight glass which is a component of the cooling plant. Install new sight glass.
Renew compressor supply & discharge stop valves and switches. Interferences in way of work include piping. Remove and dispose of existing compressor supply and discharge stop valves which are a component of the cooling plant. Install new compressor supply and discharge stop valves.
Renew King Valve. Interferences in way of work may include piping and compressor. Remove and dispose of existing king valve, which is a component of the cooling plant. Install new king valve.
Renew water regulating valve. Interferences in way of work may include piping and condenser.
28 (Rev-0)
Remove and dispose of existing water regulating valve, which is a component of the cooling plant.
Install new water regulating valve.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 87 WPB 514-001, Rev M, HVAC Duct & Piping Systems
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 4562, Heating, Ventilation, and Air Conditioning (HVAC) System 87’ WPB Class Vessels
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
29 (Rev-0)
Lagging
Ductwork
3.1.5 Personnel qualification. The Contractor shall ensure that all personnel servicing Air Conditioning and Refrigeration (AC&R) equipment that uses CFC or HCFC refrigerant hold a current Environmental Protection Agency (EPA) Technician Certification, Type IV (Universal Certification), and meet all State and local regulations and licensing requirements.
3.1.6 Refrigerant draining and recovery. When draining of refrigerant is required to perform a task described herein, the Contractor shall drain, recover and dispose of all existing refrigerant from the vessel's AC unit into a suitable external container in accordance with all Federal, state and local environmental regulations.
3.1.7 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (performed by Coast Guard personnel) of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR describing any additional repairs that may be required.
3.2 Repairs. The Contractor shall complete the repairs designated in paragraph 1.3 (List of Repairs), above. Refer to Coast Guard Drawing 87 WPB 514-001 and TP-4562 for guidance.
3.3 Post-repair testing. The Contractor shall perform the following tests, as they apply to the designated repairs, and submit a CFR documenting satisfactory results of all post repair testing.
3.3.1 Hydrostatic test. After completion of all repairs to pressure containing components, the Contractor shall hydrostatically test all new and disturbed welded or brazed piping and components in accordance with SFLC Std Spec 0740, Appendix C, “Hydrostatic Test”. Be aware that no leakage or permanent deformation of pressure-containing parts is permissible.
3.3.2 Leak test. After restoring the system to normal operating condition, the Contractor shall perform a tightness test on all pressure containing mechanical (i.e. threaded, bolted, etc.) joints that have been disturbed during the performance of work, verifying no leakage at normal operating pressure.
3.3.3 Groom system. Prior to operational testing, the Contractor shall adjust system components to ensure normal system operation. (e.g. balance duct work, adjust water regulating valve, etc.).
3.3.4 Operational test – post repairs. After completion of all work, the Contractor shall witness an operational test (by Coast Guard personnel) of all items or shipboard devices that have been disturbed, used, repaired, altered, or installed, to prove that they are in satisfactory operating condition.
3.4 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs).
30 (Rev-0)
4.1 Equipment operation. Coast Guard personnel will operate all shipboard machinery and equipment during all tests.
31 (Rev-0)
TCTO_TN3010.1_4360_LNM_0618_87WPB
WORK ITEM 4: Fire Alarm Control Panel, Replace
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to replace existing Autopulse IQ-301 with the Notifier NFS-320 Fire Alarm Control Panel (FACP).
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
N Fire Alarm Control Panel NSN: 6320-01-F18-5529 1 ea. 2,185.00 N Battery, 12 Volt, 12 AH NSN: 6140-01-529-4234 2 ea. 151.95
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 87 WPB 436-001, Rev C, Fire Detection System
Coast Guard Drawing 87 WPB 252-002, Rev N, Alarm and Monitoring System
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 9051, SWBS 436, Mar 2016, Fire Alarm Control Panel NFS-320/E/C & LCD2-80, Multiple Class Cutters
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, And Installation
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
32 (Rev-0)
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
None.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Sheathing
Bulkhead insulation
Electrical wiring
3.1.5 Tech Rep. The Contractor shall provide the services of a Qualified Technical Representative who is familiar with the Notifier NFS-320 Fire Alarm Control Panel to accomplish the following on site:
Program the newly installed panel FACP to interface with all indicating and all initiating devices currently installed.
Assist with the installation of the FACP.
3.1.5.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their résumé.
3.1.5.2 Submit the name and résumé of the Tech Rep to the COR at the Arrival Conference.
3.2 Fire Alarm Control Panel (FACP), replace. “The Contractor shall perform the following:
3.2.1 Electrical work. Accomplish all electrical work in accordance with SFLC Std Spec 3042, and test cables in accordance with SFLC Std Spec 3041. Utilize the existing wire ways for new cable runs as much as possible.
3.2.1.1 Electrical wiring, power, initiating & indicating circuits.