Attachment_1,_Specification,_MOHAWK_(WMEC_913)_DD.pdf
PDF 3 MB Posted
- Attached to
- DRYDOCK REPAIRS CGC MOHAWK (WMEC 913) Federal contract opportunity
- Solicitation number
- 70Z080-18-Q-P45B6900
About this file
Attachment (1), Specification, P45B6900, CGC MOHAWK
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A00005,_P45B6900,_CGC_MOHAWK_DD.pdf | ||
| A00004,_P45B6900,_CGC_MOHAWK_DD.pdf | ||
| P45B6900,_QUESTIONS_AND_RESPONSES,_dtd_May_1,_2018.pdf | ||
| A00003,_P45B6900,_CGC_MOHAWK_DD.pdf | ||
| P45B6900,_QUESTIONS_AND_RESPONSES,_dtd_April_30.pdf | ||
| A00002,_Solicitation_70Z08018QP45B7000,_CGC_MOHAWK_DDL.pdf | ||
| A00002,_P45B6900,_CGC_MOHAWK_DD.pdf | ||
| A00001,_P45B6900,_Q&R,_CGC_MOHAWK_DD,_dtd_April_19.pdf | ||
| Attachment_3,_P45B6900,_Past_Performance_Questionnaire.pdf | ||
| Solicitation_70Z08018QP45B7000,_CGC_MOHAWK_DDL.pdf | ||
| Attachment_2,_Schedule_of_Supplies_&_Svc,_MOHAWK_(WMEC_913)_DD.xls | XLS spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC MOHAWK (WMEC 913)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2018
Developed By: Donald D Deibler (Rev-4, 27 March 2018)
Solicitation 70Z080-18-Q-P45B6900
Page 1 of 181 Attachment (1) ii (Rev-4)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. ix Consolidated List of Critical Inspection Items ........................................................................................... xii Principal Characteristics ............................................................................................................................ xiii General Requirements WORK ITEM 1: Hull Plating (U/W Body), Inspect WORK ITEM 2: Hull Plating (U/W Body), Ultrasonic Testing WORK ITEM 3: U/W Body, Preserve (100%) WORK ITEM 4: Appendages (U/W), Leak Test WORK ITEM 5: Propulsion Shaft Fairwaters and Rope Guards, Inspect WORK ITEM 6: Appendages (U/W) - Internal, Preserve WORK ITEM 7: Voids (Non-Accessible), Leak Test WORK ITEM 8: Voids (Non-Accessible), Internal Surfaces, Preserve WORK ITEM 9: Propulsion Shafting, Strain Gage Alignment, Inspect WORK ITEM 10: Propulsion Shafting; Remove, Inspect, and Reinstall WORK ITEM 11: Propulsion Intermediate Shaft(s); Remove, Inspect, and Reinstall WORK ITEM 12: Propulsion Shaft Coating, Renew WORK ITEM 13: Propulsion Shafting, Straighten WORK ITEM 14: Propulsion Shaft Seal (Mech & Inflat) Assemblies, Inspect, Repair or Renew WORK ITEM 15: Propeller Shaft Sleeve(s), Renew WORK ITEM 16: Propulsion Shafting, Optical Or Laser Alignment Check WORK ITEM 17: Propulsion Shaft Bearings (External), Renew WORK ITEM 18: Propulsion Shaft Bearing Housings (External), Inspect WORK ITEM 19: Controllable Pitch Propeller Hubs, Remove, Inspect and Reinstall WORK ITEM 20: Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box, Inspect and Service ... 70 WORK ITEM 21: Propeller Blades, Inspect WORK ITEM 22: Fathometer Transducer, Renew WORK ITEM 23: Removed WORK ITEM 24: Sea Valves and Waster Pieces, Overhaul or Renew WORK ITEM 25: Sea Strainers - Duplex (All Sizes), Overhaul WORK ITEM 26: Sea Strainers - Simplex (All Sizes), Clean and Inspect WORK ITEM 27: Rudder Stock Bearings, Check Clearances WORK ITEM 28: Rudder Assembly; Remove, Inspect and Reinstall WORK ITEM 29: Removed WORK ITEM 30: Fin Stabilizers (Bearings, Packing, Stock/Blade), Repair Or Renew WORK ITEM 31: Hull Plating Freeboard, Preserve – Partial WORK ITEM 32: Superstructure, Preserve “Partial” WORK ITEM 33: Cathodic Protection / Zinc Anodes, Renew WORK ITEM 34: Drydock WORK ITEM 35: Temporary Services, Provide - Cutter WORK ITEM 36: Ballast Tank Manhole Rings, Renew WORK ITEM 37: Overhead Bridge Plating, Renew WORK ITEM 38: Aux Machinery Room Longitudinal, Renew WORK ITEM 39: Oily Waste Holding Tank Striker Plate, Renew WORK ITEM 40: Propulsion Shaft Fairwater, Fabricate and Renew WORK ITEM 41: Bilges, Preserve WORK ITEM 42: Diesel Exhaust System Water Trap, Renew WORK ITEM 43: Stern Tube Interior Surfaces, Preserve 100% WORK ITEM 44: Deep Water Sounder, Remove (WMEC-270-17-028) WORK ITEM 45: Doppler Speed Log, Replace (WMEC-270-17-027)
USCGC MOHAWK (WMEC 913)
DRYDOCK AVAILABILITY FY2018 Solicitation 70Z080-18-Q-P45B6900
Page 2 of 181 Attachment (1) iii (Rev-4)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
12 Feb 2018 2 42 Added work item 42
12 Feb 2018 2 43 Added work item 43
3 Mar 2018 3 GFE List Updated GFE list
3 Mar 2018 3 CIR List Updated CIR list
3 Mar 2018 3 29 Removed work item 29 same as work item 30
27 Mar 2018 4 23 Removed work item 23
27 Mar 2018 4 44 Added work item 44
27 Mar 2018 4 45 Added work item 45
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
USCGC MOHAWK (WMEC 913)
Page 3 of 181 Attachment (1) iv (Rev-4)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 243-2, Rev F; Stern Tubes, Strut Brng & Seal – A&D
Coast Guard Drawing 901 WMEC 562-004, Rev E, A & B Class Rudder Assembly
Coast Guard Drawing 901 WMEC 562-005, Rev G, A & B Class Rudder Stock And Steering Gear A & D
Coast Guard Drawing 901 WMEC 562-005, Rev J, Rudder Stock And Steering Gear A & D
Coast Guard Drawing 901 WMEC 565-005, Rev -, Fin Stabilizer Hydraulic System Diagram
Coast Guard Drawing 901 WMEC 565-031, Rev C, Fin Shaft Assembly, w/ Sleeve Fitted NSN 3040-01- 104-5121
Coast Guard Drawing 901 WMEC 801-009, Rev H, Outboard Profile
Coast Guard Drawing 905 WMEC 114-003, Rev B, Shaft Fairwaters & Rope Guards
Coast Guard Drawing 905 WMEC 111-001, Rev D, Shell Expansion Fwd 101
Coast Guard Drawing 905 WMEC 111-001, Rev E, Shell Expansion Fwd 101
Coast Guard Drawing 905 WMEC 111-002, Rev E, Shell Exp Aft 182
Coast Guard Drawing 905 WMEC 111-002, Rev F, Shell Exp Aft 182
Coast Guard Drawing 905 WMEC 111-003, Rev E, Shell Exp FR 101-182
Coast Guard Drawing 905 WMEC 111-003, Rev F, Shell Exp Fr 101-182
Coast Guard Drawing 905 WMEC 113-003, Rev F, Tank Top Pltg & Framing Fr 101-182
Coast Guard Drawing 905 WMEC 114-001, Rev D, Skeg
Coast Guard Drawing 905 WMEC 114-001, Rev D, Skeg
Coast Guard Drawing 905 WMEC 114-002, Rev C, Bilge Keels
Coast Guard Drawing 905 WMEC 114-003, Rev B, Shaft Fairwaters & Rope Guards
Coast Guard Drawing 905 WMEC 114-004, Rev A, Spray Rail Arrgt & Dets
Coast Guard Drawing 905 WMEC 114-004, Rev A, Spray Rail Arrgt & Dets.
Coast Guard Drawing 905 WMEC 116-004, Rev C, Bottom Long Frwk Fwd 101
Coast Guard Drawing 905 WMEC 154-001, Rev G, Pilothouse Level & Top
Coast Guard Drawing 905 WMEC 184-010, Rev E, Transducer Foundations & Shell Mods
Coast Guard Drawing 905 WMEC 243-001, Rev B, Shafting Arrangement
Coast Guard Drawing 905 WMEC 243-002, Rev E, Stern Tubes Strut Brg and Seal Arr and Det
Coast Guard Drawing 905 WMEC 243-002, Rev F, 270 Ft WMEC Stern Tubes Strut Brg and Seal – A & D
Coast Guard Drawing 905 WMEC 243-002, Rev F, Stern Tubes Strut Brng & Seal – A&D
Coast Guard Drawing 905 WMEC 243-003, Rev-, Shaft Removal Arr
USCGC MOHAWK (WMEC 913)
Solicitation 70Z080-18-Q-P45B6900
Page 4 of 181 Attachment (1)
DRYDOCK AVAILABILITY FY2018
v (Rev-4)
Coast Guard Drawing 905 WMEC 243-003, Rev-, Shaft Removal Arrangement
Coast Guard Drawing 905 WMEC 243-006, Rev B, General Arrangement 12.125” Dia. Shaft Type MA Water Lub., Inboard Stern Tube Seal
Coast Guard Drawing 905 WMEC 243-007, Rev A, CPP Shaft Coupling Assemblies
Coast Guard Drawing 905 WMEC 243-008, Rev B, Shaft & Rudder Removal Pad eye A & D
Coast Guard Drawing 905 WMEC 243-012, Rev A, Controllable Pitch Propeller Shaft Details
Coast Guard Drawing 905 WMEC 243-012, Rev A, CPP Shafting Details
Coast Guard Drawing 905 WMEC 243-1, Rev B, Shafting Arrangement
Coast Guard Drawing 905 WMEC 243-10, Rev A, Gen Arr Blkhd Stuffing Box
Coast Guard Drawing 905 WMEC 243-10, Rev A, Gen Arrangement Bulkhead Stuffing Box
Coast Guard Drawing 905 WMEC 243-12, Rev A, CPP Shaft Details
Coast Guard Drawing 905 WMEC 243-2, Rev E, Stern Tubes Strut Brg and Seal – A&D
Coast Guard Drawing 905 WMEC 243-6, Rev B, General Arrangement 12.125” Dia. Shaft Type MA Water Lub., Inboard Stern Tube Seal
Coast Guard Drawing 905 WMEC 245-001, Rev H, CPCH Prop Hyd Sys Diagram
Coast Guard Drawing 905 WMEC 245-003, Rev C, Controllable Pitch Propeller Propeller Hub Assy
Coast Guard Drawing 905 WMEC 245-004, Rev A, Controllable Pitch Propeller Blade & Palm
Coast Guard Drawing 905 WMEC 245-007, Rev C, Controllable Pitch Propeller Special Tools
Coast Guard Drawing 905 WMEC 245-008, Rev B, Controllable Pitch Propeller Actuating Unit 300.3
GN
Coast Guard Drawing 905 WMEC 245-009, Rev C, CPCH Prop Hyd Sys Power Plant A & D
Coast Guard Drawing 905 WMEC 256-001, Rev U, Main and Auxiliary Water Cooling Diagrams
Coast Guard Drawing 905 WMEC 256-001, Rev V, & Auxiliary Salt Water Cooling System Diagrams
Coast Guard Drawing 905 WMEC 256-001, Rev V, Main and Auxiliary Water Cooling Diagrams
Coast Guard Drawing 905 WMEC 256-002, Rev J, Eng Rm Sw Cooling Sys A & D
Coast Guard Drawing 905 WMEC 256-004, Rev D, AMS SW Cooling Sys A & D
Coast Guard Drawing 905 WMEC 256-004, Rev E, AMS SW Cooling Sys A & D
Coast Guard Drawing 905 WMEC 259-001, Rev D, Diesel Exhaust System Diagram
Coast Guard Drawing 905 WMEC 259-002, Rev C, Diesel Exhaust System Arrangement and Details
Coast Guard Drawing 905 WMEC 501-002, Rev C, Aux Mchry Sp No 2 Arrangement
Coast Guard Drawing 905 WMEC 506-001, Rev H, Overflow Air Escape and Sounding Tube Systems Diagram
Coast Guard Drawing 905 WMEC 506-003, Rev E, Ovfl AE & ST A&D Aft 103
Coast Guard Drawing 905 WMEC 508-001, Rev C, Pipe & Mchry Insul. Schedule
Coast Guard Drawing 905 WMEC 562-001, Rev G, Rudder
Coast Guard Drawing 905 WMEC 565-007, Rev H, Fin Stabilizer Mchry Installation A&D
Coast Guard Drawing 905 WMEC 635-001, Rev F, Hull Thermal & Acoustic Insulation A/D
Coast Guard Drawing 905 WMEC 801-003, Rev G, General Arrangement 02/Pilothouse & Above
Coast Guard Drawing 905 WMEC 801-007, Rev E, General Arrangement Hold
Coast Guard Drawing 905 WMEC 801-008, Rev C, General Arrangement Double Bottom
Coast Guard Drawing 905 WMEC 801-009, Rev G, Outboard Profile
Coast Guard Drawing 905 WMEC 801-009, Rev J, Outboard Profile
USCGC MOHAWK (WMEC 913)
Solicitation 70Z080-18-Q-P45B6900
Page 5 of 181 Attachment (1) vi (Rev-4)
Coast Guard Drawing 905 WMEC 801-040, Rev F, Docking Plan
Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly
Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem
Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters
NAVSEA Drawing 803-2145807, Rev C, Propulsion Shafting And Components
NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 2816, Oct 2012, Manufacturer’s Instruction Book-SWBS Group(s) 242-244, SWBS 243, Section B, Stern Tube Seal, Mechanical
Coast Guard Technical Publication (TP) 2817, Jul 2007, Manufacturer’s Instruction Book - SWBS Group(s) 242-244, 270’ WMEC “B” Class Cutters, SWBS 245, Section A, Technical Manual for the Controllable-Pitch Propeller
Coast Guard Technical Publication (TP) 2817, Mar 2016, Manufacturer’s Instruction Book - SWBS Group(s) 242-244, 270’ WMEC “B” Class Cutters, SWBS 245, Section A, Technical Manual for the Controllable-Pitch Propeller
Coast Guard Technical Publication (TP) 2817, Mar 2016, Manufacturer’s Instruction Book-SWBS Group(s) 245, Section A, Controllable Pitch Propeller System
Coast Guard Technical Publication (TP) 2835, Sep 2011, Manufacturer’s Instruction Book - SWBS Group(s) 561-562, 270’ WMEC “B” Class Cutters
Coast Guard Technical Publication (TP) 2837, Jul 2016, Manufacturer’s Instruction Book, SWBS Group(s) 565, 270’ WMEC “B” Class Cutters, SWBS 565, Section C, Fin Machinery and Hydraulics Subsystems
Coast Guard Technical Publication (TP) 4656, Oct 2005, Dual Axis Doppler Sonar Speed Log, MK II - Model DSN-450
Coast Guard Technical Publication (TP) 5454, Nov 2013, Technical Manual for Type MA Mechanical Stern Tube Seal
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC Electrical Motors
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary Services
USCGC MOHAWK (WMEC 913)
Solicitation 70Z080-18-Q-P45B6900
Page 6 of 181 Attachment (1) vii (Rev-4)
OTHER REFERENCES
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
ASTM International (ASTM) D4174, Re-approved 2010, Standard Practice for Cleaning, Flushing, and Purification of Petroleum Fluid Hydraulic Systems
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An)
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust- Petrolatum
Commercial Item Descriptions (CID) A-A-59316, Nov 2003 Abrasive Materials for Blasting
Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
International Organization for Standardization (ISO) 4406, 2017, Hydraulic Fluid Power – Fluids – Method for Coding the Level of Contamination by Solid Particles – Third Edition
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application
MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cutback, Cold-Application
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application
MIL-PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-STD-1687, Sep 1994, Thermal Spray Process for Naval Ship Machinery Application
MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting
MIL-STD-2199A(SH), July 2010, Covering for Waterborne Main Propulsion Shafting on U.S. Naval Surface Ships and Submarines
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA- PRO-160, Jan 2006, Chapter 16, Cofferdams
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA- PRO-160, Jan 2011, Chapter 16, Cofferdams
ODOM Echotrac DF3200 MKII, Rev 2, Technical Manual
USCGC MOHAWK (WMEC 913)
Solicitation 70Z080-18-Q-P45B6900
Page 7 of 181 Attachment (1) viii (Rev-4)
Raytheon V850 Color Echosounder, 2nd Edition, Mar 1993, Operation Manual
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Metal Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE), 2007, Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating
USCGC MOHAWK (WMEC 913)
Solicitation 70Z080-18-Q-P45B6900
Page 8 of 181 Attachment (1) ix (Rev-4)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
10 Y **Propeller shaft NSN: 2010-01-135-7065 2 ea. 228,600.00 11 Y **Intermediate Shaft NSN: 2010-01-365-3908 2 ea. 10,000.00 11 N **Stern tube bearing NSN: 3120-01-189-1949 2 ea. 3,000.00 14 N Overhaul kit NSN: 5330-01-527-0959 2 ea. 12,894.00 14 N **Stern tube split seal NSN: 5330-01-359-5555 4 ea. 7,763.86
15 N Stern tube sleeve NSN: 2010-01-345-2315 1 ea.
15 N Propeller Strut sleeve NSN: 2010-01-340-5362 1 ea.
15 N Intermediate Strut sleeve NSN: 2010-01-345-2314 1 ea.
15 N Seal sleeve NSN: 2010-01-340-6083 1 ea.
17 N Intermediate Strut
Bearing NSN: 3120-01-189-1087 2 ea. 3,875.00
17 Y Propeller Strut Bearing
NSN: 3120-01-189-1088 2 ea. 6,317.00
19 N Hub installation kit NSN: 2010-01-470-3258 2 ea. 215.00 19 Y **Left hand hub assembly NSN: 2010-01-119-5469 1 ea. 304,313.00
19 Y **Right hand hub assembly
NSN: 2010-01-118-8538 1 ea. 304,313.00
19 N ***CPP Tool Kit N/A 1 set 20,000.00 19 N *"Special tools" (see
4.2 (Government-loaned installation tools))
N/A 1 set 1,000.00
20 N O.D. Box Inspection Kit
NSN: 3010-01470-3519 2 ea. 330.00
20 N Filter NSN: 4330-01-177-4069 12 ea. 92.00 20 Y **Oil Feed Bushing NSN: 3120-12-329-5287 2 ea. 4,811.00 20 N **Ball Bearing NSN: 3110-00-156-6745 2 pr. 46.00 20 N **Bearing Bushing NSN: 2010-01-469-8639 2 ea. 450.00 20 N **Bearing Bushing NSN: 3120-12-198-7607 8 ea. 559.00 20 N **Spool valve assembly NSN: 4820-01-513-2509 2 ea. 100.00
21 N Hub installation kit NSN: 2010-01-470-3258 2 ea. 215.00 21 Y **Left hand hub assembly NSN: 2010-01-119-5469 1 ea. 304,313.00
21 Y **Right hand hub assembly
NSN: 2010-01-118-8538 1 ea. 304,313.00
USCGC MOHAWK (WMEC 913)
Page 9 of 181 Attachment (1) x (Rev-4)
21 N ***CPP Tool Kit N/A 1 set 20,000.00 21 N *"Special tools" (see
4.2 (Government-loaned installation tools))
N/A 1 set 1,000.00
22 N *** Fathometer transducer, shallow water, 50-200 kHz
(Airmar Technology SS505) (without adapter plate)
NSN: 5845-01-470-2500 1 ea. 346.83
23 Y *** Fathometer Transducer, deep water, 12 kHz
(ODOM
Hydrographic Inc.)
NSN: 5845-01-460-9969 1 ea. 14,530.00
27 N **Rudder Stock Sleeve
NSN: 2040-01-F91-0187 2 ea. 4,269.00
27 N **Thordon Lower Bearing (SXL 20.7"
X 17.5" X 14)
PN: F546150102 NSN:
3120-20-006-6640
2 ea. 1,500.00
27 N **Major Overhaul Kit for Rudder Stock
Seal
NSN: 5330-01-527-0778 2 ea. 1,000.00
28 Y **Rudder Assembly NSN: 2040-01-486-0550 2 ea. 182,000.00 28 N **Upper Bearing NSN: 3110-01-121-8032 2 ea. 3,910.00 28 N **Rudder Stock
Sleeve NSN: 2040-01-F91-0187 2 ea. 4,269.00
28 N John Crane Seal kit NSN: 5330-01-527-0778 2 ea. 5,955.00 28 N **Thordon Lower
Bearing (SXL 20.7" X 17.5" X 14)
PN: F546150102 2 ea. 1,000.00
30 N Seal PN: 1856959-3 (Sperry Marine) = 17855H1L5
NSN: 5330-01-625-6617
4 ea. 152.00
30 N O-Rings PN: MS9021-381 NSN:
5331-00-763-2637
4 ea. 3.00
30 N Packing NSN: 5330-00-902-5505 2 Roll 177.00 30 N Packing NSN: 5330-00-527-7496 16 FT 5.00 30 N Thordon Bearing Set
Assembly
PN: TG-13886 OPTION 3
NSN: 3110-01-599-8155
2 ea. 6,200.00
30 N Inflatable Seal NSN: 5330-01-103-6518 2 ea. 689.00 30 Y **Roller Bearing NSN: 3110-00-155-9065 2 ea. 1,800.00 30 N Preformed packing NSN: 5331-01-306-4879 2 ea. 15.00 30 N O-ring PN: MS9021-359 NSN:
5331-00-435-0431 2 ea, 90.00
30 N O-ring PN: MS9021-377 NSN:
5331-01-129-0629
2 ea. 156.00
30 N Seal, Plain PN: 1856959-2 (Sperry Marine) = 17444H1L5
4 ea. 60.00
USCGC MOHAWK (WMEC 913)
Page 10 of 181 Attachment (1) xi (Rev-4)
NSN: 5331-01-625-4197
30 N **Seal Retainer NSN: 5330-01-382-7103 2 ea. 228.00 30 N Lantern Rings NSN: 4320-01-377-2106 2 ea. 1,167.00 30 N **Seal Housing NSN: 5330-01-382-9160 2 ea. 1,622.00 30 N **Tiller pin NSN: 5315-01-419-1523 4 ea. 1,000.00 30 N **Hydraulic Cylinder NSN: 3040-01-103-6565 4 ea. 4,426.57 30 Y **Fin Stock with sleeves NSN: 3040-01-104-5121 2 ea. 16,109.00
30 Y **Threaded-end rod PN: 1857336 2 ea. 400.00 30 Y *Fin Removal Tools NSN: 5180-01-F10-1826 1 set 15,000.00 34 Y *Transducer Cover
Plate N/A 4 ea. 50.00
45 N Display Unit, DS60 PN: DS600 1 ea 1,200.00
45 N Distribution Unit, DS60
PN: DS610 1 ea 1,200.00
45 N Transceiver Unit, DS60 PN: DS620 1 ea 800.00
45 N Transducer w/30M Cable
PN: DS630-30 1 ea 200.00
45 N Gate Valve, DS60 PN: DS661 1 ea 300.00
45 N Hull ring N/A 1 ea 350.00 *Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
USCGC MOHAWK (WMEC 913)
Page 11 of 181 Attachment (1) xii (Rev-4)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item
Title
2 Hull Plating (U/W Body), Ultrasonic Testing
3 U/W Body, Preserve (100%)
4 Appendages (U/W), Leak Test
7 Voids (Non-Accessible), Leak Test
10 Propulsion Shafting; Remove, Inspect, and Reinstall
11 Propulsion Intermediate Shaft(s); Remove, Inspect, and Reinstall
Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or Renew
16 Propulsion Shafting, Optical Or Laser Alignment Check
17 Propulsion Shaft Bearings (External), Renew
20 Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box, Inspect and Service
21 Propeller Blades, Inspect
25 Sea Strainers - Duplex (All Sizes), Overhaul
26 Sea Strainers - Simplex (All Sizes), Clean and Inspect
29 Rudder Stock Bearings, Check Clearances
28 Rudder Assembly; Remove, Inspect and Reinstall
30 Fin Stabilizers (Bearings, Packing, Stock/Blade), Repair Or Renew
41 Bilges, Preserve
USCGC MOHAWK (WMEC 913)
Page 12 of 181 Attachment (1) xiii (Rev-4)
PRINCIPAL CHARACTERISTICS
270' WMEC (B-CLASS)
PHYSICAL
Length overall 270' 0" Length between perpendiculars 255' 0" Beam molded 38' 0" Depth molded, main deck amidships, 01 level amidships
23' 7" 31' 4"
Full load displacement 1,886 long tons Draft, full load to baseline amidships 14' 2" Highest projection above baseline
*height approximated ≈ 110' 0"
Shore tie voltage requirements 2 cables, 400A / 450V, 3 phase Frame spacing 1' 0"
MACHINERY
Main propulsion 2 ALCO Model 18-251-F Diesel Engines, 3,650 BHP each Ship’s service generators 2 Caterpillar Model D-398-TA Diesel-driven KATO 6P6-1350 Generators. 475
KW each @ 0.8 power factor, 450VAC, 3 phase, 60 cycle
Emergency generators Caterpillar Model D-348-TA Diesel-driven KATO 4P4-1900. 475KW @ 0.8 power factor, 450VAC, 3 phase, 60 cycle
Number of propellers 2 Propeller diameter 9' 0" Number of blades, each 4 Pitch Controllable Shaft RPM 260 Shaft diameter 10.55" at exit of hull Anchor & chain Two 4,000 lb Navy Stockless Anchors, 8 shots of chain each
TANK CAPACITIES
Diesel fuel total (95%) 79,950 gal.
JP-5 total (95%) 19,626 gal.
Potable water total (100%) 8,553 gal.
Hydraulic & lube oil total (95%) 2,561 gal.
USCGC MOHAWK (WMEC 913)
Page 13 of 181 Attachment (1)
1 (Rev-4)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
USCGC MOHAWK (WMEC 913)
Page 14 of 181 Attachment (1)
2 (Rev-4)
3.2 Contractor-provided fire extinguishers. The Contractor shall provide portable fire extinguishers.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.4.1 HY-130 material substitution. The Contractor shall be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B- Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 shall be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY- 130.
3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive testing/inspection (NDT/NDI) in accordance with NAVSEA TP 1688. The Contractor shall be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.
3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B- Class” cutters, the Contractor shall provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s shall be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor shall ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 shall be considered the same as those for welding HY-130.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor
USCGC MOHAWK (WMEC 913)
Page 15 of 181 Attachment (1)
3 (Rev-4) shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.
3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".
USCGC MOHAWK (WMEC 913)
Page 16 of 181 Attachment (1)
4 (Rev-4)
3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel Surfaces by Stripe Coating”
3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED- STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.
3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3:
SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".
3.7.1.5 SFLC Std Spec 6310, page Appendix C-8, Under "Epoxy/Primer/Mid-Coat", add line Column 2:
International Intergard 264. Column 3: Various. Under "Polysiloxane", add line Column 2: International Interfine
979. Column 3: Various.
3.7.2 SFLC Standard Specification 0000 General Requirements.
3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph
3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
USCGC MOHAWK (WMEC 913)
Page 17 of 181 Attachment (1)
5 (Rev-4)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
USCGC MOHAWK (WMEC 913)
Page 18 of 181 Attachment (1)
6 (Rev-4)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
USCGC MOHAWK (WMEC 913)
Page 19 of 181 Attachment (1)
7 (Rev-4)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
USCGC MOHAWK (WMEC 913)
Page 20 of 181 Attachment (1)
8 (Rev-4)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils) Mean Reading (mils) IAW ASTM DD4417).
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
USCGC MOHAWK (WMEC 913)
Page 21 of 181 Attachment (1)
9 (Rev-4)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
USCGC MOHAWK (WMEC 913)
Page 22 of 181 Attachment (1)
10 (Rev-4)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE
COATING MFG PRODUCT NAME
BATCH
INDUCTION
TIME
COATING SYSTEM SEQUENCE
(PRIMER/TOUCHUP/3RD COAT, ETC.)
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
APPLICATION METHOD (AIRLESS, CONVENTIONAL SPRAY,
ROLLED)
AVERAGE DFT
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
USCGC MOHAWK (WMEC 913)
Page 23 of 181 Attachment (1)
11 (Rev-4)
11000_1016_FLT
REC_11000_UWHIB_FLT_270B WMEC (ALL) (1211)
WORK ITEM 1: Hull Plating (U/W Body), Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect/survey the vessel’s Under Water (U/W) hull plating, including U/W appendages and coating system.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 905 WMEC 114-001, Rev D, Skeg
Coast Guard Drawing 905 WMEC 114-002, Rev C, Bilge Keels
Coast Guard Drawing 905 WMEC 114-003, Rev B, Shaft Fairwaters & Rope Guards
Coast Guard Drawing 905 WMEC 114-004, Rev A, Spray Rail Arrgt & Dets.
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
OTHER REFERENCES
ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
USCGC MOHAWK (WMEC 913)
DRYDOCK AVAILABILITY FY2018 Solicitation 70Z080-18-Q-P45B6900
Page 24 of 181 Attachment (1)
USCGC MOHAWK (WMEC-270B) DRYDOCK AVAILABILITY FY2018
12 (Rev-4)
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Inspection. The Contractor shall accompany the Underwater Hull Inspection Board (UWHIB) in the performance of the below inspection tasks, as applicable, using the drawings listed in Section 2 (References) as guidance. The Contractor shall provide the following, to facilitate the UWHIB in assessing the condition of the designated U/W hull components and systems:
A hull repair supervisor and a marker.
Temporary staging and other necessary equipment, as applicable, for ensuring safe access to all areas of the U/W hull.
NOTES
1. The COR will convene the UWHIB as soon as possible after the vessel has been dry-docked and before any work (except U/W hull cleaning/wash down) is performed on the U/W hull and appendages.
2. Some of the components and/or systems addressed in this work item may not be applicable to all vessel classes.
3.2.1 Hull plating. Inspect the condition of the hull plating (including thruster tunnel plating, as applicable), for the presence of marine growth, deformation, and any evidence of major corrosion or electrolytic action.
3.2.1.2 Inspect the hull and keel areas, report on the condition of butt-welded seams, doubler plates, lap seams, and for any signs of damaged plating or unusual waviness in the plating.
3.2.2 Sea chests and all other cooling system intake components. Inspect all sea chests, sea beam arrays, tunnels, hull openings, and grates for general appearance, loose, damaged, or missing grates, loose or missing fasteners, condition of sea strainers and lockwire on bolts, marine growth on grating slots, and any obstructions in the openings that might prevent proper suction and discharge of water.
3.2.3 Rudders. Check general condition, condition around the drain plugs, and check for pitting, if any, on the leading and trailing edges.
3.2.4 Propeller and shaft associated components. Inspect the condition of propellers for signs of corrosion, pitting, erosion, fouling, cracks, dings, and nicks by side and blade; inspect fairwaters,…
This is the start of the file's text. The full file is on GovTribe.