Richard Etheridge FY 2018 Dockside Specifications/Statement of Work

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC RICHARD ETHERIDGE (WPC 1102)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2018

Developed By: Kent W Ross

(Rev-0, 2 January 2018)

USCGC RICHARD ETHERIDGE (WPC-154) DOCKSIDE AVAILABILITY FY2018

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. vi Consolidated List of Critical Inspection Items ........................................................................................... vii Principal Characteristics ............................................................................................................................ viii General Requirements WORK ITEM 1: Machinery Ventilation System, Clean WORK ITEM 2: Interior Wet Deck Coverings, Reseal WORK ITEM 3: BHD Penetrations, Remove WORK ITEM 4: HVAC Duct System, Clean WORK ITEM 5: Sewage and Grey Water System, Clean and Inspect iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 154 WPC 127-302, Rev B, Potable Water & Sewage Tank Fabrication Details

Coast Guard Drawing 154 WPC 506-201, Rev A, Fills Vents, Sounds, and Overflows Arrangement

Coast Guard Drawing 154 WPC 506-301, Rev -, Fills, Vents, Sounds, Overflows Diagram

Coast Guard Drawing 154 WPC 512-201, Rev -, HVAC Arrangement

Coast Guard Drawing 154 WPC 512-301, Rev A, HVAC System Diagram

Coast Guard Drawing 154 WPC 512-305, Rev 8, HVAC Equipment List

Coast Guard Drawing 154 WPC 513-201, Rev 1, Machinery Ventilation Arrangement

Coast Guard Drawing 154 WPC 513-301, Rev C, Machinery Ventilation Diagram

Coast Guard Drawing 154 WPC 528-301, Rev -, Grey Water System Diagram

Coast Guard Drawing 154 WPC 555-301, Rev D, Fixed Fire Extinguishing System Diagram

Coast Guard Drawing 154 WPC 593-201, Rev D, Sewage System Arrangement

Coast Guard Drawing 154 WPC 593-301, Rev A, Sewage System Diagram

Coast Guard Drawing 154 WPC 593-303, Rev -, Sewage Control System

Coast Guard Drawing 154 WPC 601-302, Rev C, General Arrangement

Coast Guard Drawing 154 WPC 631-301, Rev A, Paint and Preservation Schedule

Coast Guard Drawing 154 WPC 633-301, Rev B, Cathodic Protection System

Coast Guard Drawing 154 WPC 640-201, Rev E, Living Compartments and Arrangements

Coast Guard Drawing 154WPC 634-301, Rev A, Deck Covering Schedule

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual

Coast Guard Technical Publication (TP) 8057, 07 JUN 2017, Preliminary –Range Hood Fire Fighting

System R-102-1T-4N-6F

Coast Guard Technical Publication (TP) 8123, 15 SEP 2015, Preliminary - Heating, Ventilation, and Air

Conditioning System - Frc-514-P1

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes v (Rev-0)

Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean

Shipboard Ventilation Systems

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets vi (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM

DESCRIPTION

NSN/PN QTY ESTIMATED

COST

($/UNIT)

5 N Sewage Tank Zinc

Anode

NSN: 5342-01-447-4686/

ZHC-42

2 $142.19

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter vii (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5

(Inspection report particulars)):

Work

Item Title

This section is not applicable to this package.

viii (Rev-0)

PRINCIPAL CHARACTERISTICS

154' WPC (SENTINEL CLASS)

PHYSICAL

Anchor ROCNA, anchor, 150 KG/ 331 LB, Stainless Steel

Bulkheads (7), Watertight Bulkheads located below the Main Deck

Displacement, delivery, light ship 302 Metric Tons

Draft, full load 2.58 Meters (8.46 Feet)

End of service life displacement 353 Metric Tons

Framing Longitudinal

Full load displacement 353 Metric Tons

Height of highest projection 17.22 Meters (56.5 Feet)

Length overall (loa) 46.80 Meters (153.5 Feet)

Maximum beam 7.75 Meters (25.43 Feet)

Minimum operating displacement 314 Metric Tons

Waterline length (lwl) 44.35 Meters (145.5 Feet)

HULL

Hull/main weatherdeck material AH-36 Steel

Superstructure 5456-H1111 Aluminum

MACHINERY

Bow thruster Schottel STT 60 LK

Diameter of propeller 1900 mm

Emergency service generator (edg) Cummins 6BTA5.9-DM Diesel with Stanford 93KW Generator

Fin stabilizer (2), Quantum QC1500

Main propulsion (2), MTU 20V4000 M93L, Sequential Turbo-Charged Diesels

Number of blades 6

Number of propellers (2) Michigan Wheel Marine

Propeller pitch capability Fixed

Propulsion shafts (2), Electralloy Nitronic 50HS (9430mm) Shafts

Reduction gears (2), ZF 23560C/D Series

Rudders (2), 316L Stainless Steel

Shaft rotations per minute 478

Shaft(s) bearing, aft (2), Duramax Bearings

Shaft(s) bearing, intermediate (2), Duramax Bearings

Shaft(s) diameter 8 Inches

Shaft(s) Seal (2), Wartsila Mechanical Seals

Ship service generators (2), Cummins QSM11-DM Diesels with Stanford 317KW Generator

TANK CAPACITIES AT 95% LIQUID LOAD (22,958 TOTAL GALLONS)

Fresh water tank, port (3-38-2-w) 708 gal

Fresh water tank, stbd (3-38-1-w) 756 gal

Fuel oil edg day tank (1-10-1-f) 134 gal

Fuel oil gen. ovrflw tnk, ctr. (3-40-0-f) 1,159 gal

Fuel oil overflow tank, center (3-10-0-f)

616 gal

Fuel oil service tank, #1 port (3-17-2-f) 1,750 gal

Fuel oil service tank, #1 stbd (3-17-1-f) 1,750 gal

Fuel oil service tank, #2 port (3-40-2-f) 890 gal

Fuel oil service tank, #2 stbd (3-40-1-f) 890 gal

Fuel oil storage tank, #1 center (3-11-0- 5,040 gal ix (Rev-0) f)

Fuel oil storage tank, #2 center (3-23-0-f)

5,350 gal

TANK CAPACITIES AT 95% LIQUID LOAD (22,958 TOTAL GALLONS)

Grey water tank, (3-17-0-w) 2,668 gal.

Lube oil storage tank, (2-35-2-f) 146 gal.

Oily water tank, (3-34-1-w) 336 gal.

Sewage collection tank, (3-6-0-w) 429 gal.

Waste oil tank, (3-34-2-f) 336 gal.

1 (Rev-0)

00000_1216_FLT

REC_00000_FLT_Commercial Project @ CG Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and

'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is

Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

2 (Rev-0)

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec

0000, in accomplishing the following task:

Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec

6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes

(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC

Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable

Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is _Small________.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an

NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3 (Rev-0)

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The

Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility

Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System

(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste

Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the

Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the

Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For

Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor shall be aware of the following:

3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the

Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast

Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:

4 (Rev-0)

3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.

3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".

3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for

Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel

Surfaces by Stripe Coating”

3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED-

STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.

3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line

Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3:

SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE

WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".

3.7.2 SFLC Standard Specification 0000 General Requirements.

3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing

Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”

3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph

3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC

Std Spec 6310 (Critical drying time requirements)).”

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

5 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

6 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

7 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

8 (Rev-0)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading

(mils)

Mean Reading (mils) IAW ASTM DD4417).

9 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

10 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

COATING MFG PRODUCT NAME

BATCH

INDUCTION

TIME

COATING SYSTEM SEQUENCE

(PRIMER/TOUCHUP/3RD COAT, ETC.)

Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.

SPOT 1 2 3 4 5

AVERAGE

VALUE

*BASE METAL READING

(BMR) Required, If Magnetic

Pull-Off (Type I/Banana) Gauge Is

Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

1 AVG. BMR DEVIATION

1 AVG. BMR DEVIATION

APPLICATION METHOD (AIRLESS, CONVENTIONAL SPRAY,

ROLLED)

AVERAGE DFT

11 (Rev-0)

WORK ITEM 1: Machinery Ventilation System, Clean

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean the interior of the following ventilation system components and ducts.

TABLE 1 –MACHINERY VENTILATION DUCTS TO BE CLEANED

Duct Main Engine Room Supply

Main Engine Room Exhaust

Generator Room Supply

Generator Room Exhaust

PORT Steering Gear Room Supply

PORT Steering Gear Room Exhaust

STBD Steering Gear Room Supply

STBD Steering Gear Room Exhaust

FWD Auxiliary Machinery Room Supply

FWD Auxiliary Machinery Room Exhaust

Galley Hood Supply

Galley Hood Exhaust

EDG Room Supply

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 154 WPC 513-201, Rev 1, Machinery Ventilation Arrangement

Coast Guard Drawing 154 WPC 513-301, Rev C, Machinery Ventilation Diagram

Coast Guard Drawing 154 WPC 555-301, Rev D, Fixed Fire Extinguishing System

Diagram

Coast Guard Drawing 154 WPC 640-201, Rev E, Living Compartments and

Arrangements

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean Shipboard Ventilation Systems

Coast Guard Technical Publication (TP) 8057, 07 JUN 2017, Preliminary –Range Hood

Fire Fighting System R-102-1T-4N-6F

12 (Rev-0)

Coast Guard Technical Publication (TP) 8123, 15 SEP 2015, Preliminary - Heating, Ventilation, and Air Conditioning System - Frc-514-P1

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std

Spec 0000, paragraph 3.3.5 (Interferences).

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

The Contractor is reminded to comply with ALL requirements invoked by this work item, such as SFLC Std Spec 0000 and SFLC Std

Spec 5100 (e.g. mark and restore damper positions; remove all intake and exhaust screens, clean vent systems in their entirety from the point where the air enters the system to the point where the air is discharged from the system; restore, renew, or repair all articles or component removed or disturbed to their original condition if damaged or modified during contract work, etc).

3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast

Guard Personnel perform an initial operational test of the ventilation systems included in this work item, to demonstrate the existing operational condition. Document all modifications to the system (e.g. new holes in existing duct, etc.) that will be required to perform the cleaning work, do not perform modifications without Coast Guard authorization. Submit a CFR.

13 (Rev-0)

NOTE

Please be aware that this work item does not describe cleaning work for MDE and SSDG combustion air intake ducting (the large vertical trunks on main deck and the 01 deck whose inlets face aft). DO NOT perform any work on those ducts via this work item.

This work item only requires work to be performed on vent ducting that is connected to directly to machinery space “compartments”.

3.3 Cleaning requirements. The Contractor shall clean and inspect the interior surfaces of ventilation system ducting runs and components listed in the table beneath paragraph 1.1 above, shown on the Coast Guard drawings and TPs listed in Section 2, in accordance with SFLC Std

Spec 5100. Submit a CFR.

3.3.1 Duct Interior Images for Final Report. After gaining access to duct interiors, take a digital photo of each duct interior surfaces at the opening created to show the condition of the duct work prior to cleaning. Then prior to closing the duct work accesses take a final image of the same area post-cleaning. Add these images to the final report submitted in paragraph 3.6 below.

3.3.2 Notification. The Contractor shall give written notification to the COR, 48 hours before starting ventilation cleaning work.

3.3.3 Re-certification. After cleaning and inspecting the interior surfaces of the Galley Hood

System, the Contractor shall re-certify the Galley Hood System in accordance with Coast Guard

Drawing 154 WPC 555-301, Rev D, Fixed Fire Extinguishing System Diagram and Coast Guard

Drawing 154 WPC 640-201, Rev E, Living Compartments and Arrangements.

Coast Guard personnel will operate all shipboard machinery and equipment.

3.4 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the ventilation systems included in this work item to be in satisfactory operating condition. Submit a CFR.

4. NOTES

This section is not applicable to this work item.

14 (Rev-0)

63410_JLW_0617_154WPC

WORK ITEM 2: Interior Wet Deck Coverings, Reseal

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to reseal the deck coverings described in Table 1.

TABLE 1 - DECK COVERING LOCATIONS TO BE SEALED

LOCATION

NAME, SPACE

APPROX.

SURFACE

AREA

(SQFT)

COVE

BASE

REPAIRS, IN ADDITION TO RESEALING,

REQUIRED TO COMPLETE THE

RESEAL

Ship’s Office (1-16-1-A) 35 YES Various cracking found along edge seam

Passage (1-15-0-L) 30 YES Various cracking found along edge seam

Mess Deck (1-17-0-Q) 105 YES Various cracking found along edge seam

Galley (1-18-2-Q) 80 YES Approx 50 minor gouges approx 1/8” deep and

½” lg. and approx 20 linear inches of 1/8” deep cracks

Passage (1-23-0-L) 130 YES N/A

Passage (2-10-0-L) 70 YES Approx 24 linear inches of 1/8” deep cracks

Shower (2-12-1-L) 15 YES N/A

Shower (2-13-1-L) 15 YES N/A

Shower (2-14-1-L) 15 YES N/A

Passage (2-23-0-L) 50 YES Approx 4 linear inches of 1/8” deep cracks

Climate Controlled Store

Room (2-23-4-A)

60 YES Approx 3 linear inches of 1/8” deep cracks

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 154WPC 634-301, Rev A, Deck Covering Schedule

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

15 (Rev-0)

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the

Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std

Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Inspection and Report. The Contractor shall inspect all deck areas being resealed as specified in Table 1, and all other affected components (e.g. cove base PC 7 of Coast Guard Drawing 154

WPC 634-001, non-skid slip resistant tread stickers PC 6 of Coast Guard Drawing 154 WPC 634-

001, etc.). Determine if repairs in addition to those already specified in Table 1 will be required to complete the scope of work specified herein. Submit a CFR detailing findings and recommended additional repairs. Perform those repairs after the KO releases a modification or change request authorizing those growth repairs.

3.3 Epoxy flake system resealing. The Contractor shall reseal the deck areas specified. Sand down the existing deck covering to the color layer to remove all discolorations and damage.

Reapply color coat to obtain uniform color. Reapply sealers. Renew pc 6 of Coast Guard

Drawing 154 WPC 634-001 (slip-resistant treads) where disturbed. Maintain the existing net weight of the deck covering system by maintaining the original thickness of the epoxy flake system; generally apply no more material than was removed. Allow sealer to cure for the manufacturer recommended times.

16 (Rev-0)

CAUTION

Epoxy flake system is applied over delicate joiner deck on most of the

2nd deck areas. Do not damage joiner deck during removal of top layer of existing deck material.

To minimize impact on cutter weight & moment, do not add excessive deck covering material, beyond what was removed. Make new deck covering thickness as close as practicable to the original, pre-resealed thickness.

3.4 Cove Base. The Contractor shall renew all associated cove base (PC 7 on Coast Guard

Drawing 154WPC 634-301) for each compartment listed in Table 1 if the associated Cove Base column is marked “YES”.

4.1 Images of Deck Damage.

17 (Rev-0)

Images above are of holes and a crack in the Galley one step deck (1-18-2-Q).

18 (Rev-0)

Images above are cracks in the Forward Passageway one step deck (2-10-0-L).

Images above are cracks in Passageway one step deck (2-23-0-L).

Image above is a crack in the Climate Control Room one step deck (2-23-4-A).

19 (Rev-0)

Image above are the cracks along the seam where the one step is breaking free from the bulkhead in the Passage and Messdeck one step deck (1-15-0-L and 1-17-0-Q).

20 (Rev-0)

Image above shows the crack along the seam where the one step is breaking free from the bulkhead in the ship’s office one step deck (1-16-1-A).

Image above shows the notable divot in the one step deck in the passageway (1-23-2-L).

21 (Rev-0)

40000_JLW_0617_154WPC

WORK ITEM 3: BHD Penetrations, Remove

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to remove bhd penetration pipes left behind from electrical equipment already removed.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 154 WPC 631-301, Rev A, Paint and Preservation Schedule

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove

22 (Rev-0) all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec

0000, paragraph 3.3.5 (Interferences).

3.2 Removals . The Contractor shall per form the following

3.2.1 Main Deck BHD Penetrations. Grind off the following 8 empty/unused BHD penetrations flush with interior/exterior bhd. Weld repair the holes to leave appearance as unnoticeable as practicable.

Touch-up preserve in accordance with requirements below.

STBD side of AFT DC locker 1-34-1-E, QTY:3

PORT side above Engine Room Hatch 1-34-2, QTY:3

Port side taffrail next to Aft port Capstan, QTY:2

3.3 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310, Appendix

A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting

Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in SFLC Std Spec

0000, Appendix A (Requirements for Preservation of Ship Structures). Abide by the exception cited below.

3.3.1 Exception to coating systems specified in SFLC 6310. All preservation coating systems used shall be in accordance with Coast Guard Drawing 154 WPC 631-301, do not use the coating systems specified in SFLC Std Spec 6310.

4.1 Images of BHD Pens.

23 (Rev-0)

WORK ITEM 4: HVAC Duct System, Clean

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean the interior of the following ventilation system components and ducts.

TABLE 1 – AREAS WITH HVAC DUCT OR COMPONENTS TO BE CLEANED

Compartment Items To Be Cleaned.

Pilot House (01-19-0-C) All supply and return ducting and associated grating/louvers, etc.

Main Deck

HVAC Equipment Room (1-24-1-Q) All supply and return ducting and associated grating/louvers, etc.

All surfaces inside of air handler assembly that contact air going out to supply ducts (e.g. coils, filters, plenums, etc.)

Passage (1-23-0-L) All supply and return ducting and associated grating/louvers, etc.

Mess Deck (1-17-0-Q) All supply and return ducting and associated grating/louvers, etc.

Galley (1-18-2-Q) All supply and return ducting and associated grating/louvers, etc.

Office (1-16-1-A) All supply and return ducting and associated grating/louvers, etc.

CO Cabin (1-12-1-L) All supply and return ducting and associated grating/louvers, etc.

XO Stateroom (1-12-2-L) All supply and return ducting and associated grating/louvers, etc.

OPS CPO Stateroom (1-15-2-L) All supply and return ducting and associated grating/louvers, etc.

Second Deck

Climate Controlled Store Room (2-

23-4-A)

All supply and return ducting and associated grating/louvers, etc.

C4ISR Equipment RM (2-23-3-Q) All supply and return ducting and associated grating/louvers, etc.

ENG CPO Stateroom (2-32-2-L) All supply and return ducting and associated grating/louvers, etc.

2 Person Stateroom (2-21-2-L) All supply and return ducting and associated grating/louvers, etc.

4 Person Stateroom (2-20-1-L) All supply and return ducting and associated grating/louvers, etc.

4 Person Stateroom (2-17-2-L) All supply and return ducting and associated grating/louvers, etc.

2 Person Stateroom (2-17-1-L) All supply and return ducting and associated grating/louvers, etc.

2 Person Stateroom (2-15-2-L) All supply and return ducting and associated grating/louvers, etc.

2 Person Stateroom (2-15-1-L) All supply and return ducting and associated grating/louvers, etc.

1 Person Stateroom (2-10-2-L) All supply and return ducting and associated grating/louvers, etc.

1 Person Stateroom (2-10-1-L) All supply and return ducting and associated grating/louvers, etc.

Passage (2-10-0-L) All supply and return ducting and associated grating/louvers, etc.

TABLE 2 – CONTRACTOR FURNISHED TEMP HVAC (PARA 3.3)

YES

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 154 WPC 512-201, Rev -, HVAC Arrangement

24 (Rev-0)

Coast Guard Drawing 154 WPC 512-301, Rev A, HVAC System Diagram

Coast Guard Drawing 154 WPC 512-305, Rev 8, HVAC Equipment List

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean

Shipboard Ventilation Systems

Coast Guard Technical Publication (TP) 8123, 15 SEP 2015, Preliminary - Heating, Ventilation, and Air Conditioning System - Frc-514-P1

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

25 (Rev-0)

Coast Guard personnel will operate all shipboard machinery and equipment.

The Contractor is reminded to comply with ALL requirements invoked by this work item, such as SFLC Std Spec 0000 and SFLC Std Spec 5100 (e.g.

mark and restore damper positions; remove all intake and exhaust screens, clean vent systems in their entirety from the point where the air enters the system to the point where the air is discharged from the system; restore, renew, or repair all articles or component removed or disturbed to their original condition if damaged or modified during contract work etc).

3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard

Personnel perform an initial operational test of the ventilation systems included in this work item, to demonstrate the existing operational condition. Document all modifications to the system (e.g. new holes in existing duct, etc.) that will be required to perform the cleaning work, do not perform modifications without Coast Guard authorization. Submit a CFR.

3.3 Temporary HVAC. If “YES” is denoted in Table 2 then the Contractor shall provide temporary ventilation to all impacted areas equivalent to the normal zonal ventilation rating for those spaces (i.e.

maintain existing climate control) for the duration of work as described in SFLC Std Spec 0000, otherwise the Coast Guard will furnish any required temporary ventilation.

3.4 Cleaning requirements. The Contractor shall clean and inspect the interior surfaces of ventilation system ducting runs and components listed in the table beneath paragraph 1.1 above, shown on the Coast

Guard drawings and TPs listed in Section 2, in accordance with SFLC Std Spec 5100. Submit a CFR.

3.4.1 Duct Interior Images for Final Report. After gaining access to duct interiors, take a digital photo of each duct interior surfaces at the opening created to show the condition of the duct work prior to cleaning.

Then prior to closing the duct work accesses take a final image of the same area post-cleaning. Add these images to the final report submitted in paragraph 3.6 below.

3.5 Notification. The Contractor shall give written notification to the COR, 48 hours before starting ventilation cleaning work.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.6 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the ventilation systems included in this work item to be in satisfactory operating condition. Submit a CFR.

26 (Rev-0)

59301_JLW_0617_154WPC

WORK ITEM 5: Sewage and Grey Water System, Clean and Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean the sewage and grey water system (e.g. tanks, piping, etc.).

TABLE 1

USE OF COAST GUARD SEWAGE AND GREY WATER DISPOSAL FACILITIES

(PARA 3.3.4.2)

NO

1.1.1 Repairs. The scope of know repair work, in addition to cleaning and inspection requirements, are described below.

1.1.2 Repair Work Images. The images below demonstrate extent of repair work required as explained in

Table 2.

TABLE 2

KNOWN REQUIRED REPAIR WORK

(PARA 3.4.1)

REPAIR

ITEM

DESCRIPTION

1 As shown in 1.1.2. Repair Work Images, the flange along the top of frame 4.5 that supports the sewage tank does not run continuously along the base of the sewage tank per DWG. 154-WPC-

127-302 Rev A. Repair work required is approximately 2 sqft of frame fabrication and renewal.

1.2 Government-furnished property.

Port side facing FWD

STBD side facing FWD

STBD side facing

FWD

Port side facing Aft file://///d05ms-mwebapps1/../sflc/ProductLineSpecs/SWBS%20ETC.pdf

27 (Rev-0)

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

N Sewage Tank Zinc Anode NSN: 5342- 01-447-4686/ZHC-42 2 $142.19

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 154 WPC 127-302, Rev B, Potable Water & Sewage Tank Fabrication

Details

Coast Guard Drawing 154 WPC 506-201, Rev A, Fills Vents, Sounds, and Overflows

Arrangement

Coast Guard Drawing 154 WPC 506-301, Rev -, Fills, Vents, Sounds, Overflows Diagram

Coast Guard Drawing 154 WPC 528-301, Rev -, Grey Water System Diagram

Coast Guard Drawing 154 WPC 593-201, Rev D, Sewage System Arrangement

Coast Guard Drawing 154 WPC 593-301, Rev A, Sewage System Diagram

Coast Guard Drawing 154 WPC 593-303, Rev -, Sewage Control System

Coast Guard Drawing 154 WPC 601-302, Rev C, General Arrangement

Coast Guard Drawing 154 WPC 633-301, Rev B, Cathodic Protection System

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against

28 (Rev-0) contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec

0000, paragraph 3.3.5 (Interferences).

3.1.5 Personnel qualification. The Contractor shall ensure that personnel accomplishing this work are qualified and experienced in operating the pressurized water system and handling the chemicals. For each operator/cleaning technician, submit documentation of applicable experience and training obtained within the last twelve months along with the Cleaning Plan (see paragraph 3.2.1 (Cleaning Plan)).

3.1.6 Temporary Sanitary and Sewage Facilities. Whenever sewage or grey water collection service is disrupted due to contractor repairs, the Contractor shall provide temporary facilities in accordance with

SFLC Standard Spec 0000 par 3.2.11.

3.1.7 Refer to Coast Guard Drawings 154 WPC 506-201, 154 WPC 506-301, 154 WPC 528-301, 154

WPC 593-301, 154 WPC 593-303, 154 WPC 601-302, and 154 WPC 633-301.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an operational pre-test of all items and shipboard devices to be disturbed, used, repaired, or altered, (e.g. TLIs, pumps, etc.) to demonstrate existing operational condition and to determine a more precise scope of cleaning required. Prior to system cleaning the Contractor shall submit a CFR that details any required growth repairs identified during the operational test and that specifies a

“Cleaning Plan” described…