BARRACUDA_(WPB_87)_Price_Schedule_Quote_Blank.xls

XLS spreadsheet 29 KB Posted

Attached to
USCGC BARRACUDA DOCKSIDE REPAIRS
Solicitation number
70Z080-18-Q-P4518900
Issued by

About this file

Schedule

View the file

Other files

File Type Posted
BARRACUDA_(WPB_87)_DS_FQ3_JEB_17R0.doc DOC document
Barracuda_Dockside_Combined_Synopsis_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR: Contractor's Name
USCGC BARRACUDA (WPB-87) DOCKSIDE AVAILABILITY FY2018
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001HVAC System, Ducting, CleanJOB1$0.00
D-002Gaylord Hood System, Ducting, CleanJOB1$0.00
D-003Shaft Seal Piping System, RenewJOB1$0.00
D-004HVAC System, RepairJOB1$0.00
D-005HVAC Air Intake Box, RenewJOB1$0.00
D-006HVAC Piping “Tree”, RenewJOB1$0.00
D-007Rails, Remove and RenewJOB1$0.00
D-008Install Halyard Ring Eye BoltsJOB1$0.00
D-009Machinery Space Manual Ventilation Damper Shutdown, InstallJOB1$0.00
D-00CTravel and PerdiemJOB$0.00
Total Price of Definite Items$0.00
Total Price of Travel$0.00
Total Price of Definite and Optional Items$0.00
Composite Labor Rate:

&C(10/17/2017) Draft-4 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
162Baltimore, MD
152Biloxi, MS
156Boston, MA
150Charleston, SC
160Corpus Christi, TX
151Hampton Roads
164Honolulu, HI
155Houston, TX
156Los Angeles, CA
55Median Rate
49Miami
O-00C50Narragansett Bay, RI
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009)_x000D_ Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it.