SCHEDULE_B.xls
XLS spreadsheet 37 KB Posted
- Attached to
- CGC RESOLUTE DS
- Solicitation number
- 70Z080-18-Q-P4502100
About this file
Updated Schedule B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00002.pdf | ||
| SCHEDULE_B.xls | XLS spreadsheet | |
| A00001.pdf | ||
| CGC_RESOLUTE_Specification.pdf | ||
| SCHEDULE_B.xls | XLS spreadsheet | |
| 70Z080-18-Q-P4502100.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CGC RESOLUTE DS
| CGC RESOLUTE (WMEC 620) | |||||
| DOCKSIDE AVAILABILITY FY2019 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Chill Water System, General Maintenance | JOB | 1 | ||
| D-002 | Boilers, Renew | JOB | 1 | ||
| D-003 | Potable Water Pneumatic Tanks, Clean, Inspect, and Hydrostatically Test | JOB | 1 | ||
| D-004 | Hot Water Accumulator Tanks, Clean, Inspect, and Hydrostatically Test | JOB | 1 | ||
| D-005 | Single Point Davit, Renew | JOB | 1 | ||
| D-006 | Grey Water Holding Tanks, Clean and Inspect | JOB | 1 | ||
| D-007 | Sewage Holding Tank, Clean and Inspect | JOB | 1 | ||
| D-008 | Sewage Discharge and Vacuum Pump/Motor Assemblies, Renew | JOB | 1 | ||
| D-009 | Sewage Piping, Clean and Flush (“B-Class”) | JOB | 1 | ||
| D-010 | Emergency Diesel Generator (EDG) Fuel Oil Tank, Replace | JOB | 1 | ||
| D-011 | Fire Hose Stations, Modify | JOB | 1 | ||
| D-012 | Lube Oil Spinner System Discharge Piping, Modify | JOB | 1 | ||
| D-013 | Relocate Emergency Diesel Generator (EDG), Sea Strainer and Associated Piping | JOB | 1 | ||
| D-014 | Passageway Deck, Renew and Preserve | JOB | 1 | ||
| D-015 | Void Air Escape Gooseneck, Renew | JOB | 1 | ||
| D-016 | Fuel Cross Connect Piping, Renew | JOB | 1 | ||
| D-017 | Watertight Hatch (External DC Deck and Below), Renew | JOB | 1 | ||
| D-018 | Fan Coil Units, Renew | JOB | 1 | ||
| D-019 | Small Boat Cradle Support Webbing, Renew | JOB | 1 | ||
| D-020 | Fuel Oil Piping, Renew | Hour | |||
| O-00A | Composite Labor Rate | NSP | EA | NSP | |
| D-00B | GFP Report | JOB | |||
| Travel and Perdiem | $0.00 | Day | 5 | $0.00 | |
| D-00C | Laydays | ||||
| Total Price |