Request_for_Quotation_70Z050-18-R-ADM80100.pdf

PDF 229 KB Posted

Attached to
TRANSFORMER AND RECEPTACLE REPLACEMENT FOR POWER MOUND 4 Federal contract opportunity
Solicitation number
70Z05018RADM80100
Issued by
Department of Homeland Security US Coast Guard

About this file

Request for Quotation 70Z050-18-R-ADM80100

View the file

Other files for this federal contract opportunity

Other files attached to TRANSFORMER AND RECEPTACLE REPLACEMENT FOR POWER MOUND 4, newest first.
File Type Posted
Site_Visit_Attendees.pdf PDF
General_Decision_Number_HI170001_12.08.2017.pdf PDF
PM4_Transformer_&_Recepticle_Replacement_Proj__10363623.pdf PDF
RFQ_Cover_Letter_ADM80100.pdf PDF
PM4_Transformer_&_Recepticle_Replacement_Proj__10363623.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

b. TELEPHONE

AREA CODE

NUMBER

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

8. TO:

b. COMPANYa. NAME

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

c. CITY

d. STATE e. ZIP CODE

7. DELIVERY

FOB DESTINATION

OTHER

(See Schedule)

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

NAME TELEPHONE NUMBER

AREA CODE NUMBER

2118508ADM80170Z050-18-R-ADM80100

USCG FD&CC, 915 Second Ave, Room 2664, Seattle, WA 98174-1011

Gabriel Perez

PROPECTIVE QUOTER

00001 THE CONTRACTOR SHALL PROVIDE ALL

MATERIALS, EQUIPMENT, TRANSPORTATION

AND LABOR REQUIRED TO PERFORM THE

WORK AS SPECIFIED IN THE ATTACHED SOW.

DESIGN AND BUILD THE PM4 XFMR REC

REPLMT PROJECT AT USCG BASE HONOLULU

HAWAII

QUOTES MUST HAVE AT LEAST A 90-DAY

EXPIRATION DATE.

1 LS

206 220-7424 U.S. Coast Guard Base

400 Sand Island Pkwy

Honolulu

96819-4323HI

12/12/2017

01/08/2018

0.00

1 22

70Z050-18-R-ADM80100

SECTION D – PACKAGING AND MARKING

D.1 PACKAGING AND MARKING

All shipments of materials, equipment and/or supplies by the Contractor to the project shall be addressed to the Contractor and not the U.S. Coast Guard. Preservation, packaging and packing shall be in accordance with standard practices for commercial packaging.

SECTION E – INSPECTION AND ACCEPTANCE CONSTRUCTION

E.1 FAR 52.252-2 CLUASES INCORPORATED BY REERENCE (FEB 1998)

This contract incorporates one or more clauses by reverence, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these addresses:

https://www.acquisition.gov/browsefar

THE FOLLOWING FEDERAL ACQUISITION REGULATION CLAUSES ARE HEREBY

INCORPORATED:

CLAUSE NO. TITLE:

FAR 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

E.2 U.S. COAST GUARD INSPECTION/ACCEPTANCE

Coast Guard inspection and acceptance under this contract will be accomplished by the Contracting Officer’s Representative designated in writing by the Contracting Officer.

SECTION F – DELIVERIES/PERFORMANCE

F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these addresses:

https://www.acquisition.gov/browsefar

THE FOLLOWING FEDERAL ACQUISITION REGULATION CLAUSES ARE HEREBY

INCORPORATED:

CLAUSE NO. TITLE:

FAR 52.242-14 Suspension of Work (APR 1984) https://www.acquisition.gov/browsefar

SECTION F – DELIVERIES/PERFORMANCE

F.2 PERIOD OF PERFORMANCE

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS AFTER

DATE OF RECEIPT OF

NOTICE OF AWARD

001 FOR THE JOB 180 CALENDAR DAYS

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 CONTRACT ADMINISTRATION

a. Contracting Officer means a person with the authority to enter into, administer and and/or terminate contracts and make related determinations and findings. The Contracting Officer signs all contractual documents, approves and signs all modifications to contracts, processes and approves payment requests, reviews and makes final decisions on contractual discrepancies, and administers the contract. The Contracting Officer is the only individual authorized to make changes to a contract.

b. The Contract Administrator for this procurement action is: Gabriel D. Perez, U.S. Coast Guard

c. The Contracting Officer for this procurement action is:

Gabriel D. Perez, U.S. Coast Guard

d. All correspondence including modification proposals, extension requests, and contract submittals shall be submitted to the contracting officer via e-mail. The address is as follows: gabriel.d.perez@uscg.mil

Office Hours: 8:00 A.M. to 4:00 P.M. Pacific Standard Time Monday thru Friday (Except Federal Holidays)

NOTE: Include Contact Number on all correspondence.

i. The Contracting Officer’s Representative (COR) will be designated at time of award. The specific duties, authority and responsibility of the COR will be furnished to the Contractor after award in accordance with contract clause HSAR 3052.242-72 Section I.

G.2 INVOICES

a. Invoices shall be prepared and submitted in accordance with the provisions of FAR Clauses 52.232-5, Payments Under Fixed-Price Construction Contracts (May 2014) and FAR 52.232-27, Prompt Payment for Construction Contracts (Jan 2017).

b. Invoices shall be submitted for payment to the U.S. Coast Guard Finance Center website listed below:

http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm

Electronic submission of invoices is MANDATORY for this contract and/or any orders issued in accordance with this contract.

Contractor must also submit a copy of the invoice and any supporting documentation according to detailed invoicing instructions (supplied at time of award), as well as is listed below.

Each invoice shall contain the following information:

(1) Contract or Delivery/Task Order Number

(2) Name of the Contracting Officer

(3) Invoice Routing Code (IRC): SMC

(4) DUNS number

(5) Invoice number

(6) Invoice date

(7) Line item number (Ex. 0001, 0002) and associated amount invoicing for each

(8) Phone number and e-mail contact for inquiries or issues

(9) Company information (identical to information in SAMS) http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm

(10) Annotate on the invoice indicating that the contractor represents a small business for accelerated payment purposes.

The Coast Guard (IRC) for this contract and all delivery/task orders is:

SMC

Each invoice must be submitted to the designated billing office via one of the following modes, listed in descending order of preference:

(1) FINCEN Website invoice receipt form:

(2) Fax: 757-523-6900

(3) Mailed to:

Commercial Invoices U.S. Coast Guard Finance Center 1430A Kristina Way Chesapeake, VA 23326

To facilitate processing, all proper invoices with supporting information which are submitted electronically, using the FINCEN web based invoice submission capability, must be submitted as a single Adobe.pdf formatted file.

A courtesy copy of the invoice with supporting documentation shall also be e-mailed to the Contracting Officer (and COR) at the address(es) cited below:

(1) gabriel.d.perez@uscg.mil Contractor Officer

(2) mark.c.mcall@uscg.mil COR

In accordance with the Prompt Payment Act, for the purposes of determining a payment due date and the date on which interest will begin to accrue if a payment is late, a proper invoice shall be deemed to have been received:

(1) On the later of:

(i) For invoices that are mailed or transmitted via facsimile, the date a proper invoice is actually received by the designated billing office and annotates the invoice with date of receipt at the time of receipt.

(i) For invoices electronically transmitted by the contractor via web based submission, the date a transmission is received by the designated billing office, and receipt confirmation is provided to the designated recipient;

or

(ii) The seventh day after the date on which the property is actually delivered or performance of the services is actually completed; unless –

a) The agency has actually accepted the property or services before the seventh date in which case the acceptance date shall substitute for the seventh date after the delivery date: or

b) A longer acceptance period is specified in the contract, in which case the date of actual acceptance or the date on which such longer acceptance period ends shall substitute for the seventh day after the delivery date.

(ii) On the date on the invoice by the contractor , when the agency fails to annotate the invoice with date of receipt of the invoice at the time of receipt (such invoice must be determined to be a proper invoice); or

(iii) On the date of delivery, when the contract specifies that the delivery ticket may serve as an invoice.

mailto:gabriel.d.perez@uscg.mil mailto:mark.c.mcall@uscg.mil

(iv) Web based submission by the contractor and receipt confirmation does not reflect Government review or acceptance of the invoice.

(v) Payment inquiries and status may be obtained at the following website:

http://www.fincen.uscg.mil/secrue/payment.htm

c. The contractor may invoice monthly for progress payments as the work proceeds. All invoices for progress payments shall be accompanied by a Contractor Certification as identified in FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, paragraph (c) and the information required by paragraph (b)(1)(i)-(v). Payments will be processed within 30 days of receipt.

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 INFORMATION CONCERNING SAFETY AND ENVIRONMENTAL

All contract work shall be performed in accordance with all applicable federal, state, and local safety and environmental laws and regulations.

SECTION I – CONTRACT CLAUSES

I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:

https://www.acquisition.gov/browsefar https://www.dhs.gov/acquisition-policies-regulations

THE FOLLOWING FEDERAL ACQUISITION REGULATION CLAUSES

CLAUSE NO. TITLE:

FAR 52.203-5 Covenant Against Contingent Fees (May 2014)

FAR 52.203-7 Anti-Kickback Procedures (May 2014)

FAR 52.204-7 System for Award Management (Oct 2016)

FAR 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014)

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984), Alternate I (Apr 1984)

FAR 52.213-4 Terms and Conditions – Simplified Acquisitions (Other Than Commercial Items)

(Jan 2017)

FAR 52.215-8 Order of Precedence – Uniform Contract Format (Oct 1997)

CLAUSE NO. TITLE:

FAR 52.215-22 Limitations on Pass-Through Charges – Identification of Subcontract Effort (Oct 2009)

FAR 52.215-23 Limitations on Pass-Through Charges (Oct 2009), Alternate I (Oct 2009) http://www.fincen.uscg.mil/secrue/payment.htm https://www.dhs.gov/acquisition-policies-regulations

FAR 52.219-6 Notice of Total Small Business Set-Aside (Nov 2011)

FAR 52.222-6 Construction Wage Rate Requirements (May 2014)

FAR 52.222-7 Withholding of Funds (May 2014)

FAR 52.222-8 Payrolls and Basic Records (May 2014)

FAR 52.222-9 Apprentices and Trainees (Jul 2005)

FAR 52.222-10 Compliance with Copeland Act Requirements (Feb 1988)

FAR 52.222-11 Subcontracts (Labor Standards) (May 2014)

FAR 52.222-12 Contract Termination-Debarment (May 2014)

FAR 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations

(May 2014)

FAR 52.222-14 Disputes Concerning Labor Standards (Feb 1988)

FAR 52.222-15 Certification of Eligibility (May 2014)

FAR 52.222-21 Prohibition of Segregated Facilities (Apr 2015)

FAR 52.222-27 Affirmative Action Compliance Requirements for Construction (April 2015)

FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction

Contracts (Sep 2013)

FAR 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011)

FAR 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises (Jun 2000)

FAR 52.227-1 Authorization and Consent (Dec 2007)

FAR 52.227-4 Patent Indemnity – Construction Contracts (Dec 2007)

FAR 52.228-11 Pledges of Assets (Jan 2012)

FAR 52.228-14 Irrevocable Letter of Credit (Nov 2014)

FAR 52.232-5 Payments Under Fixed-Price Construction Contracts (May 2014)

SECTION I – CONTRACT CLAUSES

CLAUSE NO. TITLE:

FAR 52.232-23 Assignment of Claims (May 2014)

FAR 52.232-27 Prompt Payment for Construction Contracts (Jan 2017)

FAR 52.236-2 Differing Site Conditions (Apr 1984)

FAR 52.236-3 Site Investigation and Condition Affecting the Work (Apr 1984)

FAR 52.236-5 Material and Workmanship (Apr 1984)

FAR 52.236-6 Superintendence by the Contractor (Apr 1984)

FAR 52.236-7 Permits and Responsibilities (Nov 1991)

FAR 52.236-8 Other Contracts (Apr 1984)

FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

(Apr 1984)

FAR 52.236-11 Use and Possession Prior to Completion (Apr 1984)

FAR 52.236-12 Cleaning Up (Apr 1984)

FAR 52.236-13 Accident Prevention (Nov 1991)

FAR 52.236-14 Availability and Use of Utility Services (Apr 1984)

FAR 52.236-15 Schedules for Construction Contracting (Apr 1984)

FAR 52.236-17 Layout of Work (Apr 1984)

FAR 52.236-21 Specifications and Drawing for Construction (Feb 1997), Alternative II (Apr 1984)

Upon completing the work under this contract, the Contractor shall furnish 2 sets of prints of all shop drawings as finally approved. These drawings shall show changes and revisions made up to the time the equipment is completed and accepted.

FAR 52.236-26 Preconstruction Conference (Feb 1995)

FAR 52.236-27 Site Visit (Construction) (Feb 1995)

FAR 52.236-28 Preparation of Proposals - Construction (Oct 1997)

FAR 52.243-5 Changes and Changed Conditions (Apr 1984)

FAR 52.244-6 Subcontracts for Commercial Items (Jan 2017)

FAR 52.246-21 Warranty of Construction (MAR 1994), Alternate I (Apr 1984)

FAR 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (Apr 1984)

FAR 52.249-10 Default (Fixed-Price Construction) (Apr 1984)

THE FOLLOWING DEPARTMENT OF HOMELAND SECRUITY ACQUISITION REGULATION

CLAUSES ARE HERE BY INCORPORATED

CLAUSE NO. TITLE:

3052.209-70 Prohibition on Contracts with Corporate Expatriates (JUN 2006)

3052.222-70 Strikes or Picketing Affecting Timely Completion of the Contract Work (DEC 2003)

3052.222-90 Local Hire (JUN 2006)

3052.223-70 Removal or Disposal of Hazardous Substances – Applicable Licenses and Permits

(JUN 2006)

3052-223-90 Accident and Fire Reporting (DEC 2003)

3052.228-70 Insurance (DEC 2003)

3052.242-71 Dissemination of Contract Information (DEC 2003)

3052.242-72 Contracting Officer’s Technical Representative (DEC 2003)

SECTION I – CONTRACT CLAUSES

I.1 52.225-9 -- Buy American–Construction Materials (May 2014)

(a) Definitions. As used in this clause—

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: ______ [Contracting Officer to list applicable excepted materials or indicate “none”]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars) * Item 1 Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]

[Include other applicable supporting information.]

[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

(End of Clause)

I.2 52.233-2 -- Service of Protest (Sep 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the USCG Ombudsman via OPAP@uscg.mil and the Contracting Officer or by hand delivery to the Contracting Officer. The Ombudsman Hotline telephone number is:

202-372-3695.

mailto:OPAP@uscg.mil

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

I.3 52.252-1 – Solicitation Provisions Incorporated by Reference (Feb 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/vffara.htm

(End of Provision)

I.4 52.252-2 – Clauses Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/vffara.htm

(End of Clause)

SECTION J – LIST OF ATTACHEMENTS

J.1 General Decision Number HI170001 12/08/2017 for Construction Types: Building, Heavy (Heavy and Dredging), Highway and Residential J.2 Scope of Work

SECTION K – REPRESENTATION, CERTIFICATIONS AND OTHER STATEMENTS OF

OFFERORS

K.1 52.204-3 -- Taxpayer Identification (Oct 1998)

(a) Definitions.

“Common parent,” as used in this provision, means that corporate entity that owns or controls an affiliated group of corporations that files its Federal income tax returns on a consolidated basis, and of which the offeror is a member.

“Taxpayer Identification Number (TIN),” as used in this provision, means the number required by the Internal Revenue Service (IRS) to be used by the offeror in reporting income tax and other returns. The TIN may be either a Social Security Number or an Employer Identification Number.

(b) All offerors must submit the information required in paragraphs (d) through (f) of this provision to comply with debt collection requirements of 31 U.S.C. 7701(c) and 3325(d), reporting requirements of 26 U.S.C. 6041, 6041A, and 6050M and implementing regulations issued by the IRS. If the resulting contract is subject to the reporting requirements described in Federal Acquisition Regulation (FAR) 4.904, the failure or refusal by the offeror to furnish the information may result in a 31 percent reduction of payments otherwise due under the contract.

(c) The TIN may be used by the Government to collect and report on any delinquent amounts arising out of the offeror’s relationship with the government (31 U.S.C. 7701(c)(3)). If the resulting contract is subject to http://farsite.hill.af.mil/vffara.htm http://farsite.hill.af.mil/vffara.htm the payment reporting requirements described in FAR 4.904, the TIN provided hereunder may be matched with IRS records to verify the accuracy of the offeror’s TIN.

(d) Taxpayer Identification Number (TIN).

[_] TIN:_____________________.

[_] TIN has been applied for.

[_] TIN is not required because:

[_] Offeror is a nonresident alien, foreign corporation, or foreign partnership that does not have income effectively connected with the conduct of a trade or business in the United States and does not have an office or place of business or a fiscal paying agent in the United States;

[_] Offeror is an agency or instrumentality of a foreign government;

[_] Offeror is an agency or instrumentality of a Federal Government;

(e) Type of organization.

[_] Sole proprietorship;

[_] Partnership;

[_] Corporate entity (not tax-exempt):

[_] Corporate entity (tax-exempt):

[_] Government entity (Federal, State, or local);

[_] Foreign government;

[_] International organization per 26 CFR 1.6049-4;

[_] Other _________________.

(f) Common Parent.

[_] Offeror is not owned or controlled by a common parent as defined in paragraph (a) of this provision.

[_] Name and TIN of common parent:

Name_______________________________

TIN________________________________

K.2 52.204-8 -- Annual Representations and Certifications (Jan 2017)

(a)

(1) The North American Industry classification System (NAICS) code for this acquisition is 238160

(2) The small business size standard is $15M

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)

(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph

(d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certification in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

[_] (i) Paragraph (d) applies.

[_] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)

(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions.

This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements—Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation.

(vii) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(viii) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(ix) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(xii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xiv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xvi) 52.222-57, Representation Regarding Compliance with Labor Laws (Executive Order 13673). This provision applies to solicitations expected to exceed $50 million which are issued from October 25, 2016 through April 24, 2017, and solicitations expected to exceed $500,000, which are issued after April 24, 2017.

Note to paragraph (c)(1)(xvi): By a court order issued on October 24, 2016, 52.222-57 is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, DoD, GSA, and NASA will publish a document in the Federal Register advising the public of the termination of the injunction.

(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation.

This provision applies to solicitations that include the clause at 52.204-7.

(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xxi) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $77,533, the provision with its Alternate II applies.

(D) If the acquisition value is $79,507 or more but is less than $100,000, the provision with its Alternate III applies.

(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

___ (i) 52.204-17, Ownership or Control of Offeror.

___ (ii) 52.204-20, Predecessor of Offeror.

___ (iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

___ (iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.

___ (v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

___ (vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).

___ (vii) 52.227-6, Royalty Information.

___ (A) Basic.

___ (B) Alternate I.

___ (viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the SAM Web site accessed through https://www.acquisition.gov . After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted https://www.acquisition.gov/ electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date].

These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

K.3 52.222-22 -- Previous Contracts and Compliance Reports (Feb 1999)

The offeror represents that --

(a) It * has, * has not participated in a previous contract or subcontract subject to the Equal Opportunity clause of this solicitation;

(b) It * has, * has not filed all required compliance reports; and

(c) Representations indicating submission of required compliance reports, signed by proposed subcontractors, will be obtained before subcontract awards.

THE FOLLOWING FEDERAL ACQUISITION REGULATION PROVISION IS HEREBY

INCORPORATED:

PROVISION NO. TITLE:

FAR 52.204-16 Commercial and Government Entity Code Reporting (Jul 2016)

PROVISION NO. TITLE:

FAR 52.204-17 Ownership or Control of Offeror (Jul 2016)

FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment

Opportunity for Construction (Feb 1999)

FAR 52-223-1 Biobased Product Certification (May 2012)

(End of provision)

SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

l.1 52.252-1 -- Solicitation Provisions Incorporated by Reference (Feb 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): https://www.acquisition.gov/browsefar

THE FOLLOWING FEDERAL ACQUISITION REGULATION PROVISION IS HEREBY

INCORPORATED:

PROVISION NO. TITLE:

FAR 52.232-38 Submission of Electronic Funds Transfer Information with Offer (Jul 2013) FAR 52.222-5 Construction Wage Rate Requirements – Secondary Site of the Work

(May 2014)

52.225-12 -- Notice of Buy American Requirement—Construction Materials Under Trade Agreements (May 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American--Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225- 11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 18 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of provision)

FAR 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to inspect the site where the work will be performed.

A site visit is scheduled for December 21, 2017 at 09:00 AM Local Time. Please arrive at USCG Base Honolulu, HI. The base address is 400 Sand Island Parkway Honolulu, HI 96819. You will park at N-40 Parking Area. If you need additional assistance finding the parking area please contact Charles Ah Nee at

(808) 842-2903. We will be meeting in the EC Conference Room located in Building 942 (right across from the gym). Please contact Gabe Perez via e-mail at gabriel.d.perez@uscg.mil with a list of attendees no later than 48 hours prior to the site visit. Although the site visit IS NOT mandatory, it is highly encouraged that you have your team and any major subcontractors attend the meetings. No other site visits will be allowed. Respectfully, L.2 FAR 52.236.28 Preparation of Proposals – Construction (Oct 1997)

(a) Proposals must be

(1) submitted on the forms furnished by the Government or on copies of those forms, and

(2) manually signed. The person signing a proposal must initial each erasure or change appearing on any proposal form.

(b) The proposal form may require offerors to submit proposed prices for one or more items on various bases, including –

(1) Lump sum price;

(2) Alternate prices;

(3) Units of construction; or

(4) Any combination of paragraphs (b)(1) through (b)(3) of this provision.

(c) If the solicitation requires submission of a proposal on all items, failure to do so may result in the proposal being rejected without further consideration. If a proposal on all items is not required, offerors should insert the words “no proposal” in the space provided for any item on which no price is submitted.

(d) Alternate proposals will not be considered unless this solicitation authorizes their submission.

L.3 SUBMISSION OF QUOTES AND ACKNOWLEDGING AMENDMENTS

(a) Quoters interested in submitting a quote shall complete the following information:

(1) On the Standard Form 18 (Page 1): Block 11; Block 12 if a discount is offered Blocks 13, 14, 15 and 16.

(2) In the Contract Clauses Section:

******Section F, F.2 Section I.2, I.3 Section K, K.1, K.3 (brand name or equal)

(b) Quoters shall e-mail one copy of the signed Request for Quotation and applicable contract clauses to gabriel.d.perez@uscg.mil. Request for Quotations and any amendments shall be received on or before 3 :00 p.m. Pacific Time on the required date specified in Block 10 of the Standard Form 18 or subsequent amendments, if any.

(c) Only written, emailed quotations will be considered – no facsimile transmissions accepted.

(d) This Request for Quotation is 100% Set-Aside for Total Small Business.

SECTION M – EVALUATION FACTORS FOR AWARD

M.1 LEGAL EFFECT OF QUOTATIONS

(a) A quotation is not an offer and consequently, cannot be accepted by the Government to form a binding contract. Therefore, issuance by the Government of a purchase order is an offer by the Government to the contractor to purchase construction services upon specified terms and conditions. A contract is established when the contractor accepts the offer or begins performance.

(b) Normally acceptance of the offer is made in writing by the contractor by signing and returning copy of the purchase order (see Section M.2 (b)).

M.2 AWARD

(a) Award may be made without discussion of quotations received. Hence, quotations shall be submitted on the most favored terms from a price and technical standpoint which the quoter can submit to the Government. Award will be made based on the lowest quoted price – received in writing from a responsible quoter if the Contracting Officer determines that the price is reasonable.

(b) Award shall be made by mailing or otherwise furnishing a properly executed purchase order to the successful awardee. The Coast Guard will require the awardee to accept the purchase order consistent with the provisions of FAR 13.302-3, Obtaining Contractor Acceptance and Modifying Purchase Orders, prior to undertaking performance. The contractor will be required to submit to the Contracting Officer, within seven (7) days of notice of selection for award, a signed copy of the purchase order form, OF347, accepting the purchase order. The Coast Guard may, by written notice to the awardee, at any time before acceptance occurs, withdraw, amend, or cancel its offer.

mailto:gabriel.d.perez mailto:timothy.d.cowley@uscg.mil

File details come from the government source that posted it.