Cummins_Overhaul_Spec_Rev.2.docx
DOCX document 102 KB Posted
- Attached to
- Cummins Engines Remanufacture
- Solicitation number
- 70Z04019Q55350B00
About this file
Cummins Engine Parts
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cummins_Questionnaire_v2.docx | DOCX document | |
| 8_19-Q-55350_Cummins_Eng_Reman_Spec_(REV_3).doc | DOC document | |
| Cummins_Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISION No. N/A___
CUMMINS OVERHAUL SPECIFICATION
FOR
CUMMINS / ONAN GENERATOR SET P/N 35MCGBA
CUMMINS / MERCRUISER QSD2.8L/220
CUMMINS 6CTA8.3M1
CUMMINS QSB6.7LM
ORGINATED BY: K. Brickell DATE: 1 Oct, 2018
ORIGINATOR’S COMMAND:_SURFACE FORCES LOGISTICES CENTER
DEPARTMENT/DIVISION: SMALL BOAT PRODUCT LINE
INTERNAL REVIEWER_____________________________ DATE____________
SWORB APPROVAL____________________________ DATE____________
CUMMINS OVERHAUL SPECIFICATION
1.0 SCOPE
1.1 General -This document sets forth the requirements for the overhaul of the following assets to Original Equipment Material (OEM) specifications, parts, and standards:
a. Cummins/ONAN Generator Set, P/N 35MCGBA
b. Cummins/MerCruiser QSD 2.8L/220
c. Cummins 6CTA8.3M1
d. Cummins QSB6.7L The contractor shall inspect each wooden or metal crate to determine crates condition. This inspection shall be documented with the crates discrepancies, plan of repairs or replacement, and painting and marking, and all cost associated with.
These Cummins Engines and Generator Set, with attached hang-ons, shall be dynamometer and/or load tested, preserved, painted, packaged, and shipped back to the Coast Guard Yard, Baltimore, MD. All of the machinery being overhauled is to be used onboard various U.S. Coast Guard boats.
1.2 Government Furnished Property (GFP) – The below listed items are property of, and managed by the USCG Surface Forces Logistic Center (SFLC) Baltimore, MD.
a. Cummins/Onan Generator Set, P/N 35MCGBA (NSN: 6115-01-456-6346)
b. Cummins/MerCruiser QSD 2.8L/220 (NSN: 2815-01-585-2703)
c. Cummins 6CTA8.3M1 (NSN: 2815-01-450-5653)
d. Cummins QSB 6.7L / (NSN: 2815-01-649-6211)
e. Cummins QSB 6.7L / ZF 280-1 (NSN: 2815-01-659-4809)
f. Shipping container for Cummins / Onan Generator Set (Wooden Crate)
g. Shipping container for Cummins / MerCruiser QSD 2.8L / 220 (NSN: 8145-01-F11-2100)
h. Shipping container for Cummins 6CTA8.3M1 (NSN: 2815-01-LG4-8745)
i. Shipping container for Cummins QSB 6.7L (NSN: N/A)
2.0 APPLICABLE DOCUMENTS
2.1. Document Availability – To obtain the referenced documents see section 6.1
2.2. Government Documents – The following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the documents listed here by number and date shall be those in the current Department of Defense Single Stock Point (DODSSP) for military specifications, standards, and related publications.
a. USCG Technical Publications 3347, Auxiliary Diesel Generator Set Model 35MCGBA
b. USCG Drawing 49A BUSL-502-50, 4 Cylinder Engine Outline
c. USCG Surfaces Forces Logistics Center- D-000-0100 REV G, Dated 2/06, Bar Coding for USCG SFLC Material
d. USCG SFLC Standard Specification 3101
2.2.1. Military Specifications
a. MIL-L-2104F, Dated 28 Sep 1992, Lubricating Oil
b. MIL-D-3464E, Dated 21 Apr 1987, Desiccant, Activated Bag
c. MIL-PRF-32295A, Dated 19 APR 2010, Cleaner, Non-Aqueous, Low-VOC, HAP-Free
d. MIL-I-24092D, Dated 21 Sep 1993, Insulating Varnishes and Solventless Resins for Application by the Dip Process
e. MIL-STD-2073-1E, Dated May 2008, Standard for Military Packaging
2.3. Commercial Documents – The Following documents form a part of this specification to the extent specified here. The documents shall be the version listed by number and date from the referenced industry organization. Commercial documents may be listed in the Department of Defense Single Stock Point (DODSSP)
2.3.1. American National Standards Institute (ANSI)/ National Conference of Standards Laboratories (NCSL)
a. ANSI/NCSL Z540, Dated 2006, Requirements for the Calibration of Measuring and Test Equipment
b. ANSI/ASQC Q9003, Dated 1994, Quality Systems – Model for Quality Assurance in Final Inspection and Test
c. ANSI/EASA AR100, Dated 2006, Recommended Practice for the Repair of Rotating Electrical Apparatus
2.3.2. American Society for Testing and Materials (ASTM)
a. ASTM D 975, REV C, Dated 2010, Diesel Fuel #2
2.3.3. Cummins Engine Company
a. Cummins/Onan 35MCGBA Genset Service Manual No. 960-0506, Dated Feb 1991
b. Cummins/Onan 35MCGBA Parts Manual No. 960-0206, Dated Jul 1996
c. All Cummins/Onan Bulletins that are applicable to the Coast Guard 35MCGBA Genset
d. Cummins/MerCruiser QSD2.8 Engine Service Manual No. 90-866941, Dated Nov 2007
e. Cummins/MerCruiser QSD2.8 Parts Manual No. 90-898181001, Dated Aug 2009
f. All Cummins/MerCruiser Bulletins that are applicable to the Coast Guard QSD2.8L Engine
g. Cummins 6CTA8.3M1 Shop Manual No. 3666008
h. Cummins 6CTA8.3M1 Parts Manual No. 3884333
i. All Cummins Bulletins that are applicable to the Coast Guard 6CTA8.3M1 Engine
j. Cummins QSB6.7M Shop Manual No. 4310612
k. Cummins QSB6.7M Parts Manual No. 4056622
2.4. Specification Order of Precedence – In the event of a conflict between the text of this specification and the references cited herein, this specification shall take precedence.
2.4.1. Departure from Specification - Departure from this specification shall not be allowed unless approved by the Coast Guard Contracting Officer.
a. If the contractor finds it necessary to implement change or depart from applicable specifications, they shall request permission.
b. Request for change by contractors shall clearly describe the changes proposed, the reasons for and advantages of the changes proposed, and the contract’s price increase or decrease (if any) that would result.
3.0 REQUIREMENTS
3.1. General - The contractor shall overhaul/recondition the Propulsion Engines and Auxiliary Generator Set within one hundred (100) calendar days after approval of the Core Condition report (Appendix B). The contractor shall provide all labor, equipment, special tools, parts and materials required to accomplish the following:
a. Receive the Propulsion or Auxiliary Generator Unit
b. Submit a Core Condition Report (Appendix A)
c. Submit a Disassembly Report (Appendix B)
d. Overhaul/Recondition the Propulsion or Generator Set
e. Perform Dynamometer Testing (Appendix D)
f. Perform Internal Preservation
g. Perform External Preservation and Painting of Propulsion or Generator Set Unit
h. Package Propulsion or Generator Set in Shipping Container
i. Preserve and Properly Label Shipping Container
j. Cumulative Tracking Report (Appendix C)
3.2. Government Furnished Property – The Government reserves the right to supply Government Furnished Property (GFP) at anytime during the existence of this contract. The contractor shall provide protective storage for the GFP when not in use, and safe handling when in use.
3.2.1. The storage area shall at a minimum be closed on all sides, dry, and locked when unattended. Uncrated engines shall be stored inside at all times. Empty containers may be stored outside in a covered area.
3.3. Equipment Configuration - The following Master Serial Numbers are provided to identify the correct Coast Guard specific configuration of the machinery to be overhauled:
a. Cummins/Onan Generator, Model 35MCGBA, Serial No. F990937130
b. Cummins/Onan Prime Mover, Model 4B3.9G(M), Serial No. 45797460
c. Cummins Propulsion Engine, Model 6CTA8.3M1, Serial No. 45928899
d. Cummins/MerCruiser Propulsion Engine, Model QSD2.8L/220, Serial No. 88305719
e. Cummins Propulsion Engine, Model QSB 6.7L, Serial No. 73657526
f. Twin Disc Gear, MG-507 Serial No. 3E1281
g. ZF Reduction Gear, Model 280-1, Serial No. 20205142
3.4. Internal Inspection – For any part included on the Disassembly Report (Appendix B) the Contractor shall supply the Contracting Officer’s Representative (COR) with pictures of the faulty part, clearly displaying the part failure.
3.5. Overhaul Parts – The contractor shall use only OEM parts for the overhauls of the Cummins Engine Company/MerCruiser/Onan, Twin Disc, and ZF Reduction Gears.
3.6. All gaskets, seals, o- rings, copper seals, hoses, belts, and sensors shall be replaced with new regardless of condition. All parts listed for each asset in Appendix F shall be replaced during the overhaul. All other parts not listed shall be inspected for critical dimensions and wear limits and replaced as authorized by the KO. The Government reserves the right to supply parts as Government Furnished Property at any time during this contact.
3.7. Propulsion Unit – The Cummins QSB 6.7L Engines will have ZF Model 280-1 Reduction Gears, or a Twin Disc Model MG-507 attached that are to be included in the overhaul process. All Propulsion units shall be overhauled in accordance with OEM specifications and standards, restoring each Propulsion Unit to a like- new condition.
3.8. Generator – Each Generator shall be cleaned, inspected for damage and corrosion, overhauled, and tested in accordance with OEM specifications, SFLC Standard Specification 3101, and current industry standards. The Generator shall be restored to a like-new condition using only OEM parts.
3.9. Technical Representative Services – When requested by the Contracting Officer, the Contractor shall provide OEM certified personnel for discussion, resolution, and repair of technical problems. Troubleshooting and repair of technical problems may require Contractor personnel to travel to Coast Guard units. In correcting technical problems the Contractor shall abide by the following:
3.9.1. Technical Services Performed Onsite – The Contractor shall perform all services onboard the USCG vessel unless otherwise directed by the Contracting Officer.
Hours of Operation – The Contractor employees shall generally perform all work between the hours of 0800 and 1630 local time, Monday through Friday. However, Contractor employees shall be required to work other than normal business hours, including weekends and holidays.
Locations – The services will primarily be required in vessel homeports located throughout the continental United States, Hawaii and Alaska.
Contractor Response – The Contractor shall be required to supply a Technical Representative to the designated location within thirty-six (36) hours after notification by the Contracting Officer. The Contracting Officer shall establish the dates the Technical Representative is required.
Task Orders – Surface Forces Logistics Center (SFLC) will issue a Task Orders stating where and when the services are required. SFLC will supply the Contractor with the nature of the problem (if known) along with a POC and phone number. The Contractor shall be responsible to contact the POC within twenty-four (24) hours after notification by the Contracting Officer.
The results of the Representative's findings shall be provided in writing within twenty-four (24) hours of arrival. Approval to perform repairs will be made by the Contracting Officer after evaluation from the USCG Contracting Officer’s Technical Representative
3.10. Paint Requirement for Metal Shipping Containers- All internal & external surfaces shall have all scale and loose paint removed. The containers will then be primed as per The Society for Protective Coatings (SSCP) Paint 25 and painted with two coats of the corresponding colors mentioned below and sited in [FED STD 595 C with CHANGE NOTICE 1] using paint in accordance with Commercial Item Description (CID) A-A-2962A.
a. Shipping container for Cummins, QSB 6.7L – Use color # 15123
b. Shipping container for Cummins/MerCruiser QSD 2.8L/220 – Use color # 686
c. Shipping container for Cummins/6CTA8.3M1 – Use color # 15123
d. Shipping container for Cummins/Onan Generator Set – Use color # 15123
3.11. Labor – Contractor shall perform all labor, and authorized machinists, mechanics and technicians.
3.12. Core Acceptance Criteria – The contractor shall accept the core based on a complete internal inspection and submit written notification and reasoning of non-acceptance for propulsion units not acceptable for reconditioning/ overhaul within ten (10) calendar days after the receipt of a propulsion unit.
3.12. Documentation – This specification sets forth the requirements for the following documentation.
a. Core Condition Report, in accordance with Appendix A
b. Disassembly Report, in accordance with Appendix B
c. Cumulative Tracking Report, in accordance with Appendix C
d. Dynamometer Test Report, in accordance with Appendix D
e. Warranty Notice in accordance with Appendix E
f. Mandatory Replacement Parts List in accordance with Appendix F
g. Contingency Parts List in accordance with Appendix G
h. Engineering Changes and / or TCTO’s List in accordance with Appendix H
3.13. Core Condition and Disassembly Reports – The contractor shall submit a completed Appendix A to the contracting officer within ten (10) calendar days after receipt of a propulsion unit. Appendix B will be sent to the contracting officer (15) fifteen calendar days after Appendix A.
3.14 Cumulative Tracking Report – The contractor shall maintain and submit, by the 15th of each month, the Cumulative Tracking Report, Appendix C, for all propulsion units.
3.15. Engineering Change / Time Compliance Technical Order (TCTO) – NA for this contract.
3.16. Warranty - A warranty of one year from installation or 1000 operating hours, whichever occurs first and 24 months of storage is required covering the entire marine engine and/or generator set. Storage commences upon receipt of engine at the designated Coast Guard facility. The contractor shall contact the field unit to arrange a resolution of a claim within 24 (twenty-four) hours after receiving notification by the Coast Guard of a warranty claim. The contractor shall contact SFLC’s Contracting Officers Representative (COR) to evaluate the contractors proposed duration of warranty repair time.
In the event the Coast Guard decides the proposed warranty repair time compromises the Coast Guards mission and decides on removal/replacement, the contractor shall coordinate and fund all necessary shipping arrangements for the failed engine to be returned to the origin of exchanged/overhaul facility for repairs and returned to a designated Coast Guard facility after repairs have been completed.
The contractor shall repair/rebuild the failed engine to the condition level necessary for the contractor to honor a new full warranty (to be funded by the Coast Guard.) In the event that the work is found not to be warranted, the contractor shall stop work immediately and contact the Contracting Officer.
The contractor shall submit to the Contracting Officer an inspection report for approval containing any parts and pricing for any work/repairs that are required that were not a result of the specific casualty.
3.17. Notifications & Inspections – The contractor shall be responsible for notifying the Contracting Officer’s Contracting Officer Representative (COR) at least seven (7) calendar days prior to inspections or monitored testing required herein.
3.18. Failure Analysis - In the event of a failure, the Technical Representative shall determine the cause of casualty, systems, root cause, and corrective action. And a report of the findings shall be submitted to the Contracting Officer.
4.0 QUALITY ASSURANCE
4.1. General – The contractor shall maintain an inspection system, which shall insure that each item offered to the Coast Guard for acceptance, or approval conforms to the contract requirements. The inspection system shall be documented, meet the requirements of ASQC-Q9003-1994 and be available for review by the Coast Guard.
4.2. Records – The contractor shall maintain records of all inspections and tests. The records at a minimum shall indicate the nature and number of observations made, the number and type of deficiencies found, and the corrective action taken.
4.3. Calibration System – The contractor, as well as any subcontractors, shall be required to maintain a test equipment calibration program in compliance with ANSI/NCSL Z540, Dated 2006. The program shall be documented and traceable to the National Institute of Standards (NIST).
4.4 Responsibility for Inspection – The contractor shall be responsible for the performance of all inspection requirements specified herein. The contractor shall provide space, personnel, and test equipment for conducting all inspection requirements. All inspection and testing shall be performed at the contractor’s plant or at other facilities acceptable to the Coast Guard. The Coast Guard reserves the right to verify or have performed any of the inspections that are deemed necessary to assure that supplies and services conform to the prescribed requirements. The contractor shall notify the KO seven (7) working days prior to all inspections and tests.
4.5 Responsibility for Compliance – All items shall meet the provisions of sections 3 & 5. The inspections set forth in this specification shall become part of the contractor’s overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the government for acceptance comply with all requirements of the contract. Sampling for quality conformance does not authorize submission of known defective material (either indicated or actual) nor does it commit the government to acceptance of defective material.
4.6 Inspection System – The contractor shall maintain an inspection system, which shall insure that each item offered to the Coast Guard for acceptance, or approval conforms to the contract requirements. The inspection system shall be documented and available for review by the Coast Guard.
4.7 Tests & Inspections – The inspections/tests required here is the minimum required and are not intended to replace any controls, examination, inspections or tests normally employed by the contractor to assure the quality of the propulsion unit.
4.7.1 Each prime mover provided under this contract shall be tested / inspected on an approved dynamometer under load to ensure the propulsion unit performance is in accordance with the manufacturer’s requirements as per Appendix D. The contractor shall complete and submit the report required in Appendix D.
4.8 Dynamometer Test Reports – The contractor shall submit a dynamometer test report, Appendix D, within seven (7) calendar days after completion of the dynamometer test. The report shall consist of the data obtained during the dynamometer prime unit test. One copy of the report shall be packed and delivered with each generator set under this contract.
4.9 Failure Responsibility – If the Generator Set fails to pass any inspection/test the contractor shall report the failure and the recommended solution to the Contracting Officer. If approved, the corrective action on the materials or processes shall be taken in accordance with this section.
a. The inspection/test shall be discontinued until all corrective action has been taken.
b. After all corrective actions have been taken the inspection/test shall be continued or repeated at the option of the Contracting Officer.
c. Acceptance shall be withheld until re-inspection has been shown that the corrective action was successful and the item satisfactorily passes all inspections and tests.
d. All corrective actions shall be documented as part of the contractor’s inspection system and submitted for approval to the Contracting Officer.
4.10 Packing Inspection – The Contracting Officer’s Representative (COR) shall be notified prior to the packaging, packing and marking of the completed units in accordance with section 3.17.
5.0 PRESERVATION, PACKAGING, PACKING, & MARKING
5.1. Internal Preservation – Preservation in accordance with O.E.M. Policy shall not be started until a successful dynamometer test has been completed and accepted by the Contracting Officer’s Representative (COR).
5.2. External Preservation – After completion of the internal preservation, the propulsion unit shall be prepared in accordance with the following procedure.
a. All surfaces shall be cleaned of grease and oil.
b. All loose scale and paint shall be removed; areas feathered and brought to a smooth surface.
c. The following items shall be masked and not painted.
1. Rubber hoses and wires
2. Alternator, Water Valves, Fuel Sight Glass
3. Hot surface areas of the turbocharger
4. All identification plates
5. The engine drive shaft output flange
6. The flywheel and rear bolt face
7. The front and rear seals
d. All exposed metal surfaces shall be primed with one coat (2-3 mils) of primer in accordance with Cummins item number SS8061. Allow a minimum of seven (7) hours to dry.
e. Two color coats approximately (2 mils); total thickness (3-5 mils) shall be sprayed on all surfaces. Allow seven (7) hours drying time between coats. The color shall be Cummins Marine Grey part number 3375379.
f. When all paint is dry, the masking shall be removed.
g. Coat all unpainted metal surfaces with a light amount of grease, except for hot surfaces.
h. Plug any fittings/flanges or openings that will allow foreign material to enter the engine during storage.
i. Open all jacket water and raw water-cooling system petcocks and drain any residual fluid into a portable container. Once drained, close all petcocks.
j. A completed Appendix D and Appendix E shall be attached to the top of the engine in a plastic bag.
k. The contractor shall place a total of 80 units of desiccant conforming to MIL-D-3464E (activated bag: 1 ounce equals 1 unit), in the interior of the sealed shipping bag for engines in wooden creates, and metal container, in the receptacle provided.
l. The contractor shall install the propulsion unit into the metal or wooden shipping container. The contractor shall ensure that all of the container accessories (if applicable), such as rubber engine mounts, desiccant, humidity indicator, pressure valve, and sealing gasket are in place and in good working order. The steal container shall be sealed such that the cover makes 100% contact with the sealing gasket.
m. The metal containers shall have Humidity Indicator (if applicable) shall have the inner retaining nut permanently attached to the inside of the container to allow for the removal and replacement of the indicator.
n. All engines both wooden creates and/or metal containers the engine must be sealed in a bag to prevent moisture from reaching the engine.
5.3. Marking – Each preserved and packaged item shall be marked in the upper left-hand side and end of each box. The lettering shall be stenciled and at least 1” high, in black print lettering on a highly contrasting background.
5.3.1. This marking shall consist of the STOCK NUMBER, MODEL NUMBER, ITEM NAME, SERIAL NUMBER, CONTRACT NUMBER, DELIVERY ORDER NUMBER, GROSS WEIGHT (in lbs), CONDITION CODE, QUANTITY AND UNIT OF ISSUE, AND LABELED; COAST GUARD SFLC MATERIAL.
| Stock Number | (As per section 1.2, Example: 2815-01-033-3050) | ||
| Model Number | (As per section 1.2) | ||
| Item Name | (Example: Generator Set, or Engine, Diesel) | ||
| Serial Number | See Engine or Generator | ||
| Contract Number | See Contract | ||
| Delivery Order Number | See Delivery Order | ||
| Shipping Weight | As Determined By Contractor | ||
| Condition Code | Condition “A” | ||
| Quantity & Unit of Issue | 1 – Each |
(And the Following):
Reusable Shipping Container – Do Not Damage. Do Not Stack More Than Two High. Remove Bolts Prior To Removing Cover. Use Forklift To Unload – Do Not Lift By Cover. Preserved For Long Term Storage.
5.3.2. Special Markings – (IF APPLICABLE) The container shall be marked with the following special markings:
a. LOCATING DOWEL (place above locating dowel, if applicable)
b. VENT: DO NOT BLOCK (place next to vent, if applicable)
c. HUMIDITY INDICATOR (place next to indicator, if applicable)
5.3.3. The contractor shall paint over all other marking not required by paragraph 5.3.
5.4. Bar Coding – The contractor shall supply bar code labels on all Contract Line Item Number’s (CLIN) except for those that require data submissions only.
5.4.1. All bar coded labels shall be in accordance with SFLC specification D-000-0100 Rev G, FEB/06.
a. The actual labels shall be Type “V“. Grade “A“, Style “2“, Composition “B” with plastic laminate.
b. Each label shall contain encoded data for the Stock Number, Contract Number, and the Delivery Order Number as applicable.
c. The marking required in 5.3 can be applied separately or as part of the Bar Code Label.
6.0 NOTES
6.1. Government & Commercial Document Sources
6.1.1. Government Documents
a. Department of Defense Single Stock Point for Military Specifications, Standards, and Related Publications (DODSSP Documents) Http://dodssp.daps.dla.mil/
b. DOD & Navy Publications and Forms (Other Than DODSSP) Naval Publication and Forms Center 5801 Tabor Ave.
Philadelphia, PA 19120 215-697-2000
c. USCG Surface Forces Logistics Center 2401 Hawkins Point Road Baltimore, MD 21226-5000 410-762-6229 ATTN: Contracting Officer SBPL
6.1.2. Commercial Documents
a. Society of Automotive Engineers INC. (SAE) 400 Commonwealth Drive Warrendale, PA 15096 412-776-4841
FAX 412-776-5760
b. American Society for Testing & Materials (ASTM) 1916 Race Street Philadelphia, PA 19103-1187 215-299-5585
FAX 215-977-9679
c. American National Standards Institute (ANSI) 1430 Broadway New York, NY 10018 212-642-4900
d. American Society for Quality Control (ASQC) 611 East Wisconsin Avenue Milwaukee, Wisconsin 53202
e. Cummins Engine Company, INC.
500 Jackson Street Columbus, Indiana 47202
6.2. Appendices – The following Appendices form a part of this specification.
Appendix A: Core Condition Appendix B: Disassembly Report Appendix C: Cumulative Tracking Report Appendix D: Engine Testing Report Appendix E: Warranty Notice Appendix F: Mandatory Replacement Parts List Appendix G: Contingency Parts List
6.3. Glossary
a. C.P.L. – Control Parts List
b. Core – Either the engine block or the generator housing including the attachments mentioned in Appendix A.
c. Field Unit – United States Coast Guard units located throughout the fifty (50) United States and it territories.
d. O.E.M. – Original Equipment Manufacturer
e. O.E.P.L. – Original Equipment Parts List
f. Prime Mover – An engine used to transfer power, in the form of a turning motion, to the generator or reduction gear.
g. Propulsion Unit – Main Propulsion Engines listed in section 1.2, B through E.
h. Exchange – Exchange of used parts for original equipment manufacturer (OEM) parts.
i. Recondition – To recondition parts with O.E.M. parts to O.E.M. new specifications.
USCG-SFLC
APPENDIX A
Core Condition Report (For QSB 6.7L, QSD 2.8/220, and 6CTA8.3M1) Work Order #____________ Delivery Order #__________ Engine Serial # _______________ Reduction Gear Serial # (If applicable) ___________________ Core Acceptance is based on the following:
a. Core must be in the configuration of Master Serial Numbers listed above (Section 1.2).
b. Core must have no non-operational damage.
c. Core must be a complete unit and not disassembled.
NOTE: Missing parts from Appendix A are to be replaced and priced as per Appendix B of this contract.
1. Core Acceptable__________, Non Acceptable___________ Remarks _______________________________________________________________________________
2. Condition of shipping container;
| Serviceable_______________________ |
| Needs Repair_____________________ |
3. Photograph of prime mover; front, right side, left side, and rear views to include serial number in picture frame.
APPENDIX A
(CONTINUED)
Engine Model (Circle one): QSB 6.7L, QSD 2.8/220, and 6CTA8.3M1
| ITEM |
| NAME |
| P/N |
| MISSING |
| 1. |
| COOLER, LUBE OIL |
| 2. |
| FUEL PUMP |
| 3. |
| MANIFOLD, EXH, PORT |
| 4. |
| MANIFOLD, EXH, STBD |
| 5. |
| HEAD, CYLINDER |
| 6. |
| MANIFOLDS, INTAKE |
| 7. |
| DAMPER, VIBRATION |
| 8. |
| STARTER |
| 9. |
| COOLER, GEAR OIL |
| 10. |
| AIRSEP, (WALKER) |
| 11. |
| HEATER, ENGINE |
| 12. |
| PUMP, SEA WATER |
| 13. |
| HOUSING HEAT EXCH |
| 14. |
| EXHAUST RISER |
| 15. |
| EXHAUST RISER |
| 16. |
| TURBOCHARGER |
METAL SHIPPING CONTAINER:
| ITEM |
| NAME |
| P/N |
| MISSING |
| 1. |
| HUMIDITY INDICATOR |
| 2. |
| SEALING GASKET |
| 3. |
| VALVE, PRESSURE |
| 4. |
| RUBBER MOUNT |
| 5. |
| WOOD SKID |
REMARKS:
APPENDIX A
Core Condition Report (For 35MCGBA Genset Only) Work Order #____________ Delivery Order #__________ Prime Mover Serial # ________________ Generator Serial # ________________ Core Acceptance is based on the following:
a. Core must be in the configuration Master Serial #45797460 (Prime Mover) and Master Serial #F990937130 (Generator) as an attached set.
b. Core must have no non-operational damage.
c. Core must be a complete unit and not disassembled.
NOTE: Missing parts from Appendix A are to be replaced and priced as per section B of this contract.
4. Core Acceptable__________, Non Acceptable___________ Remarks _______________________________________________________________________________
5. Condition of metal shipping container;
| Serviceable_______________________ |
| Needs Repair_____________________ |
6. Photograph of prime mover and generator; front, right side, left side, and rear views to include serial number in picture frame.
APPENDIX A
PRIME MOVER:
| ITEM |
| NAME |
| P/N |
| MISSING |
| 1. |
| COOLER, LUBE OIL |
| 2. |
| FUEL INJECTION PUMP |
| 3. |
| MANIFOLD, EXHAUST |
| 4. |
| TURBOCHARGER |
| 5. |
| HEAD, CYLINDER |
| 6. |
| MANIFOLDS, INTAKE |
| 7. |
| DAMPER, VIBRATION |
| 8. |
| STARTER |
| 9. |
| COOLER, GEAR OIL |
| 10. |
| AIRSEP, (WALKER) |
| 11. |
| HEATER, ENGINE |
| 12. |
| PUMP, SEA WATER |
| 13. |
| EXPANSION TANK |
| 14. |
| EXHAUST ELBOW |
| 15. |
| ELECTRONIC GOVERNOR |
| 16. |
| AIR CLEANER |
SHIPPING CONTAINER (if applicable):
| ITEM |
| NAME |
| P/N |
| MISSING |
| 1. |
| HUMIDITY INDICATOR |
| 2. |
| SEALING GASKET |
| 3. |
| VALVE, PRESSURE |
| 4. |
| RUBBER MOUNT |
| 5. |
| WOOD SKID |
REMARKS:
Appendix B Disassembly Report
Delivery Order Number: ___________________
Date: ___________________________________
Engine Model Number: ____________________
Engine Serial Number: ____________________
| Reason for Replacement |
| Qty |
| Part No. |
| Part Description |
| Unit Price |
| Amount |
Total
APPENDIX C
CUMULATIVE TRACKING REPORT
SUBMIT BY THE 15TH OF THE MONTH
| Engine In SER. # |
| Work # |
| Delivery Order # |
| Date Received |
| Core Accepted Y/N |
| Eng Out Ser. # |
APPENDIX D
Engine/Prime Mover Testing
1.0 General Test Requirements
1.1 Readings as detailed in this Appendix are to be followed as per OEM standards for dynamometer testing. These recordings of the test procedure shall be filled out and submitted as part of the required test report. The contractor may use a similar test report in lieu of this report as long as the same information contained in this appendix is included.
1.2 Each engine shall be fitted with a lube oil filter. The engine shall be filled with MIL-L- 2104F compatible grade lube oil particular to that piece of equipment. The fuel oil shall be as per ASTM D 975 Rev C # 2 diesel and flow through an OEM filter/separator before entering engine fuel pump. The cooling system shall be filled with clean potable water. An outside clean potable water source shall be used as raw water-cooling. All engine lube oil filter elements shall be replaced with new after completion of engine dynamometer test. Old filter elements shall be cut open and inspected for foreign material.
1.3 The engine shall be dynamometer tested with transmission and all applicable hang on attachments. Exhaust blankets are not required to be attached during dynamometer test.
1.4 The horsepower reading is read as shaft horsepower at the prime mover output flange.
2.0 Engine Parameters
2.1 Basic Run-In, 5-10 Minutes
ENGINE
| MIN |
| ACTUAL |
| MAX |
| SPEED |
| RPM |
| LUBE OIL PRESSURE |
| PSI |
| BLOW-BY |
| IN-H20 |
| JACKET WATER TEMP IN |
| DEG F |
| JACKET WATER TEMP OUT |
| DEG F |
| LUBE OIL TEMP |
| DEG F |
ACCEPTABLE______________
UNACCEPTABLE___________
STOP ENGINE: CHECK ALL FLUID LEVELS AND TOP OFF AS REQUIRED.
2.2 Phase 1, 15 Minutes
| MIN |
| ACTUAL |
| MAX |
| SPEED |
| RPM |
| HORSEPOWER |
| SHP |
| LUBE OIL PRESSURE |
| PSI |
| BLOW-BY |
| IN-H20 |
| JACKET WATER TEMP IN |
| DEG F |
| JACKET WATER TEMP OUT |
| DEG F |
| LUBE OIL TEMP |
| DEG F |
ACCEPTABLE______________
UNACCEPTABLE___________
STOP ENGINE: CHECK ALL FLUID LEVELS AND TOP OFF AS REQUIRED.
2.3 Phase 2, 15 Minutes
| MIN |
| ACTUAL |
| MAX |
| SPEED |
| RPM |
| HORSEPOWER |
| SHP |
| LUBE OIL PRESSURE |
| PSI |
| BLOW-BY |
| IN-H20 |
| JACKET WATER TEMP IN |
| DEG F |
| JACKET WATER TEMP OUT |
| DEG F |
| LUBE OIL TEMP |
| DEG F |
2.4 Phase 3, 15 Minutes
| MIN |
| ACTUAL |
| MAX |
| SPEED |
| RPM |
| HORSEPOWER |
| SHP |
| LUBE OIL PRESSURE |
| PSI |
| BLOW-BY |
| IN-H20 |
| JACKET WATER TEMP IN |
| DEG F |
| JACKET WATER TEMP OUT |
| DEG F |
| LUBE OIL TEMP |
| DEG F |
NOTE: Phase 3 and after, if blow-by is too high decrease the load by one phase and run for 30 minutes. Return the engine to the original phase’s specification and continue the run-in period.
2.5 Phase 4, 15 Minutes
| MIN |
| ACTUAL |
| MAX |
| SPEED |
| RPM |
| HORSEPOWER |
| SHP |
| LUBE OIL PRESSURE |
| PSI |
| BLOW-BY |
| IN-H20 |
| JACKET WATER TEMP IN |
| DEG F |
| JACKET WATER TEMP OUT |
| DEG F |
| LUBE OIL TEMP |
| DEG F |
2.6 Final Run –In, Not To Exceed 5 Minutes
| MIN |
| ACTUAL |
| MAX |
| SPEED |
| RPM |
| HORSEPOWER |
| SHP |
| FUEL RAIL PRESSURE |
| PSI |
| FUEL RATE |
| LB/HR |
| LUBE OIL PRESSURE |
| PSI |
| BLOW-BY |
| IN-H20 |
| JACKET WATER TEMP IN |
| DEG F |
| JACKET WATER TEMP OUT |
| DEG F |
| LUBE OIL TEMP |
| DEG F |
| MANIFOLD AIR PRESSURE |
| IN-HG |
2.7 Any unusual noises as determined by the Coast Guard representative, external leakage, or any other noncompliance to this specification, the propulsion unit will be found unacceptable.
2.8 All above test will be verified and accepted by the Coast Guard Representative.
APPENDIX E
CUMMINS/ONAN 35MCGBA GENSET
WARRANTY NOTICE
This item has a warranty for whichever comes first:
1 year of operation from installation Or 1000 hours of operation If any discrepancies are noted upon receipt
1. DO NOT REPAIR OR REPLACE!
2. CALL: USCG SURFACE FORCES LOGISTICS CENTER
CENTRAL ENGINE OVERHAUL
SMALL BOAT PRODUCT LINE (SBPL)
COMMERCIAL (410) 762-6237/6159
Have the following information ready when calling the (SBPL)
| ________ Date Received | ________ Date Installed |
| ________ Serial No. | ________ Vessel Home Port |
| ________ Engine Hours | ________ Vessel Hull No |
| 3. A Report of Discrepancy (ROD) Form 364 must also be submitted to Surface Forces Logistics Center. |
NOTES:
| (1) Preventative Maintenance (PMS) should still be performed as per applicable Maintenance Procedure Cards (MPC’s). PMS does not void the warranty. |
| (2) If the above procedure is not followed, the warranty may be affected. |
APPENDIX E
(CONTINUED)
CUMMINS 4B3.9.G (M) ENGINE INFORMATION
1. General Checks Upon Receipt Of Propulsion Unit A. A Complete Inspection Should Be Made Of The Unit's Condition.
B. Inspect The Jacket Water, Fuel Oil, Lube Oil, And Raw Water Systems For Preservatives Remaining In These Systems.
C. Preservation Tags On The Engine Will Tell You To What Extent The Unit Has Been Preserved And What Should Be Done Before Placing The Unit In Operation.
D. Uncover All Taped And Plugged Openings Prior To The Connection Of Hoses And Lines.
E. Insure That All Lube Oil Lines Left On Board Are Flushed And All Filters Are Changed.
F. Confirm The Calibration Of The L/O Dipstick. The Dipstick Should Be Marked To Show A Low And High Mark With Engine At Its Installed Angle. Refer To Service Manual For Quantity.
G. Insure The Prime Mover Will Bar Over By Hand.
H. Check Engine Mounts.
2. GENERAL WARRANTY PARAMETERS
A. THINGS THAT WILL NOT VOID THE WARRANTY.
a. Preventive maintenance as set forth in applicable Maintenance Procedure Cards may be performed.
b. Basic troubleshooting of the Generator Set in accordance with Cummins Operation and Maintenance Bulletin No. 3666087- B3.9, B4.5, B4.5 RGT, and B5.9 Service Manual December 9, 2010, Generator Set Service Manual P/N 0960-0508 and Generator Set Parts Manual P/N 0960-0206..
c. Any Repairs must only be performed after contacting Central Engine Overhaul for approval. (410) 762-6237/6790/6089 NOTE: Emergency repairs/replacement of parts may be performed, but notifying Central Engine Overhaul as soon as possible, in order to confirm your warranty status.
APPENDIX E
· CAUTION: LUBE OIL HAS BEEN DRAINED FROM ENGINE; DO NOT OPERATE UNIT UNTIL FLUIDS ARE ADDED.
· CAUTION: FUEL SYSTEM HAS BEEN PRESERVED. FUEL SYSTEM MUST BE FLUSHED COMPLETELY WITH DIESEL FUEL.
· CAUTION: JACKET WATER COOLANT SYSTEM HAS BEEN PRESERVED. SYSTEM MUST BE FLUSHED .
· CAUTION: DO NOT ROTATE THE ENGINE CRANKSHAFT UNTIL READY TO INSTALL UNIT
· CAUTION: REMOVE ALL COVERS, PLUGS AND TAPE COVERING OPENINGS
· ADDITIONAL QUESTIONS, CALL CENTRAL ENGINE OVERHAUL AT (410) 762-6237/6790/6089
APPENDIX E
CUMMINS QSB 6.7L, 6CTA8.3M1, QSD2.8/220
WARRANTY NOTICE
This item has a warranty for whichever comes first:
1 year of operation from installation Or 1000 hours of operation If any discrepancies are noted upon receipt
1. DO NOT REPAIR OR REPLACE!
2. CALL: USCG SURFACE FORCES LOGISTICS CENTER
CENTRAL ENGINE OVERHAUL
SMALL BOAT PRODUCT LINE (SBPL)
COMMERCIAL (410) 762-6237/6790/6089
Have the following information ready when calling the (SBPL)
| ________ Date Received | ________ Date Installed |
| ________ Serial No. | ________ Vessel Home Port |
| ________ Engine Hours | ________ Vessel Hull No |
| 3. A Report of Discrepancy (ROD) Form 364 must also be submitted to Surface Forces Logistics Center. |
NOTES:
| (1) Preventative Maintenance (PMS) should still be performed as per applicable Maintenance Procedure Cards (MPC’s). PMS does not void the warranty. |
| (2) If the above procedure is not followed, the warranty may be affected. |
APPENDIX E
(CONTINUED)
CUMMINS QSB 6.7L, 6CTA8.3M1, QSD2.8/220 ENGINE INFORMATION
1. General Checks Upon Receipt Of Propulsion Unit I. A Complete Inspection Should Be Made Of The Unit's Condition.
J. Inspect The Jacket Water, Fuel Oil, Lube Oil, And Raw Water Systems For Preservatives Remaining In These Systems.
K. Preservation Tags On The Engine Will Tell You To What Extent The Unit Has Been Preserved And What Should Be Done Before Placing The Unit In Operation.
L. Uncover All Taped And Plugged Openings Prior To The Connection Of Hoses And Lines.
M. Insure That All Lube Oil Lines Left On Board Are Flushed And All Filters Are Changed.
N. Confirm The Calibration Of The L/O Dipstick. The Dipstick Should Be Marked To Show A Low And High Mark With Engine At Its Installed Angle. Refer To Service Manual For Quantity.
O. Insure The Prime Mover Will Bar Over By Hand.
P. Check Engine Mounts.
2. GENERAL WARRANTY PARAMETERS
B. THINGS THAT WILL NOT VOID THE WARRANTY.
a. Preventive maintenance as set forth in applicable Maintenance Procedure Cards may be performed.
b. Basic troubleshooting as per Cummins Service Manual.
c. Any Repairs must only be performed after contacting Central Engine Overhaul for approval. (XXX) XXX-XXXX NOTE: Emergency repairs/replacement of parts may be performed, but notifying Central Engine Overhaul as soon as possible, in order to confirm your warranty status.
APPENDIX E
(CONTINUED)
· CAUTION: LUBE OIL HAS BEEN DRAINED FROM ENGINE; DO NOT OPERATE UNIT UNTIL FLUIDS ARE ADDED.
· CAUTION: FUEL SYSTEM HAS BEEN PRESERVED. FUEL SYSTEM MUST BE FLUSHED COMPLETELY WITH DIESEL FUEL.
· CAUTION: JACKET WATER COOLANT SYSTEM HAS BEEN PRESERVED. SYSTEM MUST BE FLUSHED .
· CAUTION: DO NOT ROTATE THE ENGINE CRANKSHAFT UNTIL READY TO INSTALL UNIT
· CAUTION: REMOVE ALL COVERS, PLUGS AND TAPE COVERING OPENINGS
· ADDITIONAL QUESTIONS, CALL CENTRAL ENGINE OVERHAUL AT (XXX) XXX-XXXX
APPENDIX F
MANDATORY REPLACEMENT PARTS LIST
MACHINERY DESCRIPTION
| Manufacturer |
| Cummins/Onan |
| Engine Model # |
| 4B3.9.G(M) |
| Description |
| Prime Mover for Generator |
Repair Item Serial Number
MANDATORY REPLACEMENT PARTS FOR EACH OVERHAUL
| No. |
| Description |
| Part No. |
| Qty. |
| Unit Price |
| Total Price |
| 1 |
| Rectifier, Forward Assy. |
| 357-0091SO |
| 1 |
| 2 |
| Rectifier, Reverse Assy. |
| 357-0092 |
| 1 |
| 3 |
| Ball Bearing |
| 510-0165 |
| 1 |
| 4 |
| Ring, Exciter Retaining |
| 518-0122 |
| 1 |
| 5 |
| Seal, Edging (Sold by the foot) |
| 508-0139 |
| 4 |
| 6 |
| Gasket Set, Lower Engine |
| 3802375 |
| 1 |
| 7 |
| Gasket Set, Upper Engine |
| 4089648 |
| 1 |
| 8 |
| Main Bearing Set |
| 4955855 |
| 1 |
| 9 |
| Engine Piston Kit |
| 2802060 |
| 4 |
| 10 |
| Piston Pin |
| 3934048 |
| 4 |
| 11 |
| Ring, Retaining |
| 3920691 |
| 8 |
| 12 |
| Cleaner, Air |
| 140-2646-01 |
| 1 |
| 13 |
| Governor Actuator (24V) |
| 150-2331-01 |
| 1 |
| 14 |
| Governor Control (24V) |
| 151-0715-04 |
| 1 |
TOTAL:
APPENDIX G
CONTINGENCY REPLACEMENT PARTS LIST
MACHINERY DESCRIPTION
| Manufacturer |
| Cummins/Onan |
| Engine Model # |
| 4B3.9.G(M) |
| Description |
| Prime Mover for Generator |
Repair Item Serial Number
MANDATORY REPLACEMENT PARTS FOR EACH OVERHAUL
| No. |
| Description |
| Part No. |
| Qty. |
| Unit Price |
| Total Price |
| 1 |
| Engine |
| 4B3.9.G(M) |
| 1 |
TOTAL:
MACHINERY DESCRIPTION
| Manufacturer |
| Cummins / Cummins - MerCruiser |
| Engine Model # |
| QSD-2.8L/220 |
| Description |
| Main Propulsion Engine |
Repair Item Serial Number
MANDATORY REPLACEMENT PARTS FOR EACH OVERHAUL
| No. |
| Description |
| Part No. |
| Qty. |
| Unit Price |
| Total Price |
| 1 |
| Connecting Rods |
| 898101584 |
| 4 |
| 2 |
| Cylinder Kit (incl. Pistons/Rings) |
| 891726 |
| 4 |
| 3 |
| Main Bearings: Std Set |
| 879194165 |
| 1 |
| 4 |
| Piston Cooler Kit |
| 879194188 |
| 1 |
| 5 |
| Gasket Set, Engine |
| 879194153 |
| 1 |
| 6 |
| Rod Bearing Set: Std |
| 898101414 |
| 4 |
| 7 |
| Belt |
| 57-898101624 |
| 1 |
| 8 |
| Decal |
| 37-8M0021526 |
| 1 |
| 9 |
| Alternator |
| 898101505 |
| 1 |
| 10 |
| Oil Separator Blow-by Valve |
| 898101751 |
| 1 |
| 11 |
| Injector Assy |
| 898101423 |
| 4 |
| 12 |
| Injection Pump Assy |
| 879194120 |
| 1 |
| 13 |
| Fuel Regulating Valve |
| 879172103 |
| 1 |
| 14 |
| Fuel Cooler |
| 896332110 |
| 1 |
| 15 |
| Turbo Charger |
| 896332158 |
| 1 |
| 16 |
| Air Filter |
| 855514002 |
| 1 |
| 17 |
| Cylinder Head (includes valves) |
| 900-898101415 |
| 4 |
| 18 |
| Dip Stick, Oil |
| 898101599 |
| 1 |
| 19 |
| Oil Pump |
| 896332186 |
| 1 |
| 20 |
| Thermostat Valve |
| 879194215 |
| 1 |
| 21 |
| J/W Pump Assy |
| 896332168 |
| 1 |
| 22 |
| Starter Motor |
| 879172259 |
| 1 |
| 23 |
| R/W Pump |
| 854179001 |
| 1 |
| 24 |
| Steering Pump |
| 898101502 |
| 1 |
| 25 |
| Belt, Steering Pump |
| 57-898101580 |
| 1 |
TOTAL:
MACHINERY DESCRIPTION
| Manufacturer |
| Cummins / Cummins - MerCruiser |
| Engine Model # |
| QSD-2.8L/220 |
| Description |
| Main Propulsion Engine |
Repair Item Serial Number
MANDATORY REPLACEMENT PARTS FOR EACH OVERHAUL
| No. |
| Description |
| Part No. |
| Qty. |
| Unit Price |
| Total Price |
| 1 |
| Engine |
| QSD-2.8L/220 |
| 1 |
| 2 |
| Engine Control Module (ECM) |
| 896332255 |
| 1 |
| 3 |
| Intercooler |
| 896332112 |
| 1 |
| 4 |
| Oil Cooler Heat Exchanger |
| 898101491 |
| 1 |
| 5 |
| Heat Exchanger |
| 879194181 |
| 1 |
TOTAL:
MACHINERY DESCRIPTION
| Manufacturer |
| Cummins |
| Engine Model # |
| 6CTA8.3M1 |
| Description |
| Main Propulsion Engine |
Repair Item Serial Number
MANDATORY REPLACEMENT PARTS FOR EACH OVERHAUL
| No. |
| Description |
| Part No. |
| Qty. |
| Unit Price |
| Total Price |
| 1 |
| Connecting Rods |
| 3901383RX |
| 6 |
| 2 |
| Piston Kit (incl. Pistons/Rings) |
| 4020059 |
| 6 |
| 3 |
| Main Bearings: Std Set |
| 3945917 |
| 1 |
| 4 |
| Piston Pins |
| 3934046 |
| 6 |
| 5 |
| Gasket Set, Engine Upper |
| 4025271 |
| 1 |
| 6 |
| Rod Bearing Set: Std |
| 3950661 |
| 12 |
| 7 |
| Cylinder Liner Kit |
| 3800328 |
| 6 |
| 8 |
| Starter Motor |
| 3910646 |
| 1 |
| 9 |
| Gasket Set, Engine Lower |
| 3800558 |
| 1 |
| 10 |
| Alternator V-Belt |
| 3911562 |
| 1 |
| 11 |
| Alterntor |
| 4629JA |
| 1 |
| 12 |
| Injector Assy |
| 3802202 |
| 6 |
| 13 |
| Vibration Damper |
| 3914450 |
| 1 |
| 14 |
| Fuel Shutoff SOL Valve |
| 3928161 |
| 1 |
| 15 |
| Aftercooler |
| 3914502 |
| 1 |
| 16 |
| Turbo Charger |
| 3527017 |
| 1 |
| 17 |
| Air Restriction Indicator |
| CD210 |
| 1 |
| 18 |
| Air Filter |
| CD176 |
| 1 |
| 19 |
| Oil Cooler T-Stat |
| 3923477 |
| 1 |
| 20 |
| Oil Cooler Core |
| 3918175 |
| 1 |
| 21 |
| Retaining Ring |
| 3920692 |
| 12 |
| 22 |
| Valve, Intake |
| 3802463 |
| 6 |
| 23 |
| Valve, Exhaust |
| 3921444 |
| 6 |
| 24 |
| Oil Pump Kit |
| 3802278 |
| 1 |
| 25 |
| Thermostat Valve |
| 3928640 |
| 2 |
| 26 |
| J/W Pump Assy |
| 3920509 |
| 1 |
| 27 |
| Fuel Inj Pump |
| 3921123RX |
| 1 |
| 28 |
| Fuel Transfer Pump |
| 4988749 |
| 1 |
| 29 |
| Elbow Hose |
| 3920762 |
| 1 |
| 30 |
| Cam Bushing |
| 5283368 |
| 7 |
| 31 |
| Hose |
| 3897107 |
| 1 |
| 32 |
| Hose |
| 3920994 |
| 1 |
| 33 |
| Hose |
| 63495-B |
| 1 |
| 34 |
| Hose |
| 63241-N |
| 1 |
| 35 |
| Hose |
| 67185 |
| 2 |
| 36 |
| Hose |
| 3905034 |
| 1 |
| 37 |
| Hose |
| 3924493 |
| 1 |
| 38 |
| Elbow Hose |
| 3918607 |
| 1 |
| 39 |
| Hose |
| 3918611 |
| 5 |
| 40 |
| Hump Hose |
| 3030763 |
| 1 |
| 41 |
| Hose |
| 3897502 |
| 1 |
| 42 |
| Hose |
| 3897507 |
| 1 |
| 43 |
| Hose |
| 3905082 |
| 1 |
| 44 |
| Hose |
| 3913724 |
| 1 |
| 45 |
| Hose |
| 3913751 |
| 1 |
| 46 |
| Hose |
| 3913752 |
| 1 |
| 47 |
| Hose |
| 3286499 |
| 2 |
| 48 |
| Hose Clamp |
| 3922844 |
| 12 |
| 49 |
| Hose Clamp |
| 3922843 |
| 12 |
TOTAL
MACHINERY DESCRIPTION
| Manufacturer |
| Cummins |
| Engine Model # |
| 6CTA8.3M1 |
| Description |
| Main Propulsion Engine |
Repair Item Serial Number
MANDATORY REPLACEMENT PARTS FOR EACH OVERHAUL
| No. |
| Description |
| Part No. |
| Qty. |
| Unit Price |
| Total Price |
| 1 |
| Engine |
| 6CTA8.3M1 |
| 1 |
| 2 |
| Crankcase |
| 3934900 |
| 1 |
| 3 |
| Crankshaft |
| 3917320 |
| 1 |
TOTAL:
MACHINERY DESCRIPTION
| Manufacturer |
| Cummins |
| Engine Model # |
| QSB6.7L |
| Description |
| Main Propulsion Engine |
Repair Item Serial Number
MANDATORY REPLACEMENT PARTS FOR EACH OVERHAUL
| No. |
| Description |
| Part No. |
| Qty. |
| Unit Price |
| Total Price |
| 1 |
| Piston Kit |
| 4309259 |
| 6 |
| 2 |
| Rod Bearings |
| 3969562 |
| 6 |
| 3 |
| Rod Bearings |
| 4892795 |
| 6 |
| 4 |
| Main Bearings Upper STD |
| 5287907 |
| 6 |
| 5 |
| Main Bearings Lower STD |
| 5287908 |
| 7 |
| 6 |
| Thrust Bearing STD |
| 3978822 |
| 1 |
| 7 |
| Cam Bushings |
| 4983253 |
| 2 |
| 8 |
| Sea Water Pump |
| 5268375 |
| 1 |
| 9 |
| Major Kit |
| 5268424 |
| 1 |
| 10 |
| Drive Belt |
| 5307825 |
| 1 |
| 11 |
| Drive Belt |
| 4946197 |
| 1 |
| 12 |
| Molded Hoses |
| 5270525 |
| 1 |
| 13 |
| Molded Hoses |
| 70458A |
| 1 |
| 14 |
| Molded Hoses |
| 5270529 |
| 1 |
| 15 |
| Molded Hoses |
| 5270530 |
| 1 |
| 16 |
| Plain Hose |
| 63549A |
| 1 |
| 17 |
| Hose Clamp |
| 3922846 |
| 2 |
| 18 |
| Hose Clamp |
| 3922847 |
| 4 |
| 19 |
| Hose Clamp |
| 3922849 |
| 2 |
| 20 |
| Hose Clamp |
| 3819725 |
| 2 |
| 21 |
| Flexible Hose |
| 3918496 |
| 1 |
| 22 |
| Idler Shaft |
| 3935229 |
| 1 |
| 23 |
| Drive Belt Idler Pulley |
| 3978324 |
| 1 |
| 24 |
| Water Pump |
| 5294904 |
| 1 |
| 25 |
| Lube Oil Section Tube |
| 5291847 |
| 1 |
| 26 |
| Zinc Anodes Plug |
| 68241 |
| 2 |
| 27 |
| Zinc Anodes Plug |
| 3957921 |
| 1 |
| 28 |
| Zinc Anodes Plug |
| 5290511 |
| 2 |
| 29 |
| Exhaust Discharge (Riser) |
| 3978842 |
| 1 |
| 30 |
| Lube Oil Cooler Core |
| 3975818 |
| 1 |
| 31 |
| Lube Oil Regulator Plunger |
| 3918428 |
| 1 |
| 32 |
| Lube Oil Regulator Spring |
| 3925009 |
| 1 |
| 33 |
| Lube Oil Pressure Relief Valve |
| 5306512 |
| 1 |
| 34 |
| Flexible Hose |
| 5293165 |
| 1 |
| 35 |
| Flexible Hose |
| 5293166 |
| 1 |
| 36 |
| Oil Filter Cartridge |
| 3903264 |
| 1 |
| 37 |
| Seal and Gasket Kit Lower |
| 4309460 |
| 1 |
| 38 |
| Seal and Gasket Kit Upper |
| 4309459 |
| 1 |
| 39 |
| Cylinder Heads (Recon) |
| 5271171NX |
| 1 |
| 40 |
| Injectors |
Recon Equivalent 5303101
5303101 NX
| 41 |
| Fuel Pressure Pump |
Recon Equivalent 4989266
4989266 NX
| 42 |
| Turbocharger Kit |
Recon Equivalent 4309148
4309148 NX
| 43 |
| Lube Oil Pump |
| 4983496 |
| 1 |
| 44 |
| Raw Water Heat Exchanger Core |
| 5273349 |
| 1 |
| 45 |
| Starter |
| 5290001 |
| 1 |
| 46 |
| Alternator |
| 5293213 |
| 1 |
| 47 |
| Lube Oil Filter Head Assy |
| 3979393 |
| 1 |
| 48 |
| Thermostat |
| 5292725 |
| 1 |
| 49 |
| Thermostat Seal |
| 3954829 |
| 1 |
| 50 |
| Air Cleaner Element |
| 5309235 |
| 1 |
Total
MACHINERY DESCRIPTION
| Manufacturer |
| Cummins |
| Engine Model # |
| QSB6.7L |
| Description |
| Main Propulsion Engine |
Repair Item Serial Number
MANDATORY REPLACEMENT PARTS FOR EACH OVERHAUL
| No. |
| Description |
| Part No. |
| Qty. |
| Unit Price |
| Total Price |
| 1 |
| Engine |
| QSB6.7L |
| 1 |
| 2 |
| Crankcase |
| 3934900 |
| 1 |
| 3 |
| Crankshaft |
| 3917320 |
| 1 |
TOTAL:
MACHINERY DESCRIPTION
| Manufacturer |
| Twin Disc |
TWIN DISC
MG-507-A1, 2.54:1 RATIO
| Engine Model # |
| For Cummins Engine 6CTA8.3M1 |
| Description |
| REDUCTION GEAR |
Repair Item Serial Number
MANDATORY REPLACEMENT PARTS FOR EACH OVERHAUL
| No. |
| Description |
| Part No. |
| Qty. |
| Unit Price |
| Total Price |
| 1 |
| BRG KIT |
| K964 |
| 01 |
| 2 |
| GASKET AND SEAL KIT |
| K961 |
| 01 |
| 3 |
| BREATHER |
| M2280 |
| 01 |
| 4 |
| PUMP |
| PX4917B |
| 01 |
| 5 |
| O-RING |
| A2916DK |
| 02 |
| 6 |
| SCREEN FILTER |
| B2130A |
| 01 |
| 7 |
| SHIM |
| P5081 |
| 03 |
| 8 |
| SHIM |
| P5081A |
| 03 |
| 9 |
| SHIM |
| P5710 |
| 02 |
| 10 |
| SHIM |
| P5710A |
| 02 |
| 11 |
| SHIM |
| P5136 |
| 02 |
| 12 |
| SHIM |
| P5158 |
| 02 |
| 13 |
| SHIM |
| P5136A |
| 02 |
| 14 |
| SHIM |
| P5136B |
| 02 |
| 15 |
| SPRING |
| A2704BS |
| 01 |
| 16 |
| SPRING |
| A2703AP |
| 01 |
| 17 |
| DETENT PLATE |
| XB2134 |
| 01 |
| 18 |
| SHIM |
| B3357 |
| 03 |
| 19 |
| SHIM |
| B3357A |
| 03 |
| 20 |
| RUBBER BLOCK |
| A3905B |
| 26 |
| 21 |
| CLUTCH PLATES SINTERED |
| P3924C |
| 14 |
| 22 |
| CLUTCH PLATE STEEL |
| P5389 |
| 12 |
| 23 |
| SNAP RING |
| A2669K |
| 02 |
| 24 |
| SNAP RING |
| PM5108A |
| 02 |
| 25 |
| CLUTCH SPRING |
| P5146 |
| 02 |
| 26 |
| LOCK WASHER |
| PM5729A |
| 01 |
TOTAL:
MACHINERY DESCRIPTION
| Manufacturer |
| Z-F Reduction Gear |
Z-F GEAR
280-1 1.39:1 RATIO
WITH 12V ELECTRIC SHIFT OPTION
| Engine Model # |
| For Cummins Engines QSB 6.7L |
| Description |
| Main Propulsion Engine |
Repair Item Serial Number
MANDATORY REPLACEMENT PARTS FOR EACH OVERHAUL
| No. |
| Description |
| Part No. |
| Qty. |
| Unit Price |
| Total Price |
| 1 |
| GASKET KIT IRM280A-1 |
| 3803207199513 |
| 1 |
| 2 |
| CLUTCH KIT 20/22 ZF280PL-1 |
| 3803207199511 |
| 1 |
| 3 |
| MAINTENANCE KIT |
| 3803207199510 |
| 1 |
| 4 |
| O-RING, OIL PUMP |
| 3800634303746 |
| 1 |
| 5 |
| O-RING, OIL PUMP |
| 3800634303814 |
| 1 |
| 6 |
| PUMP SUPPORT |
| 3803207306002 |
| 1 |
| 7 |
| FEED BUSHING |
| 3803207301011 |
| 1 |
TOTAL:
MACHINERY DESCRIPTION
| Manufacturer |
| Z-F Reduction Gear |
Z-F GEAR
280-1 3.00:1 RATIO
WITH 12V ELECTRIC SHIFT OPTION
| Engine Model # |
| For Cummins Engines QSB 6.7L |
| Description |
| Main Propulsion Engine |
Repair Item Serial Number
MANDATORY REPLACEMENT PARTS FOR EACH OVERHAUL
| No. |
| Description |
| Part No. |
| Qty. |
| Unit Price |
| Total Price |
| 1 |
| GASKET KIT IRM280A-1 |
| 3803207199513 |
| 1 |
| 2 |
| CLUTCH KIT 20/22 ZF280PL-1 |
| 3803207199511 |
| 1 |
| 3 |
| MAINTENANCE KIT |
| 3803207199510 |
| 1 |
| 4 |
| O-RING, OIL PUMP |
| 3800634303746 |
| 1 |
| 5 |
| O-RING, OIL PUMP |
| 3800634303814 |
| 1 |
| 6 |
| PUMP SUPPORT |
| 3803207306002 |
| 1 |
| 7 |
| FEED BUSHING |
| 3803207301011 |
| 1 |
TOTAL:
image1.jpeg image2.jpeg image3.jpeg
File details come from the government source that posted it.