70Z04019Q61351 Attachment 1 COAST GUARD Water Tight Closure ASSESSMENT PROGRAM Statement of Work Appendix D
STATEMENT OF WORK
UNITED STATES COAST GUARD
SURFACE FORCES LOGISTICS CENTER
COAST GUARD WATERTIGHT CLOSURE ASSESSMENT PROGRAM
1. BACKGROUND
The Surface Forces Logistics Center (SFLC) is the Coast Guard’s sole Inventory Control Point (ICP) for all its surface assets (cutters and boats). The Survivability and Sustainment Branch within Engineering Services Division (ESD) at Coast Guard Surface Forces Logistics Center (SFLC), under Coast Guard Headquarters Unit, Naval Engineering CG-45, has the responsibility for implementation and management of a Coast Guard wide Condition Based Maintenance (CBM) program to effectively manage its naval engineering maintenance program. The CBM program embraces Navy CBM policy identified in the Office of the Chief of Naval Operations (OPNAV) instruction 4790.16, which states that maintenance be accomplished based on the objective evidence of need. The objective evidence of need comes from Reliability Centered Maintenance (RCM). This program supports the goal of achieving a clearly delineated standardized maintenance program that is sustainable, and supports continuous improvement. .
2. PURPOSE
The purpose of the WTC Assessment Program is to conduct a thorough analysis of a vessel’s watertight integrity and remaining service life of all watertight closures and Damage Control (DC) Fittings. Upon completion of the analysis, this program allows for repair of watertight closures and DC fittings, which have been determined to pose a threat to operations, crew safety, and vessel watertight integrity. A secondary purpose of this programis training to Damage Control Petty Officers (DCPOs) in order to strengthen and reinforce proper maintenance and repair procedures of WTC and DC fiiting to improve safety and to reduce Coast Guard maintenance costs.
3. SCOPE
The USCG hasa requirement for Watertight Closure (WTC) assessments’ repairs, and training that will occur on twenty-two (22) cutter classes, or approximately 251 cutters every 2 years. A list of cutters currently in the program can be found in Appendix B. Watertight Closure and DC Fitting assessments and inspections to be conducted onboard cutters listed on the WTC listings by Class. The WTC listings are found in Appendix C; the numbers and names of each of the cutter classes are found in Appendix B; cutter classes’ homeports are found in Appendix D
4. REFERENCES
4.1 Naval Engineering Manual COMDINST M9000.6 (series)
4.2 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std0000), 2014, General Requirements
4.3 Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
4.4 Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
5. SCOPE
5.1 GENERAL
5.1.1. . The work will not be classified. No security clearance is required.
5.1.2. Contractor will perform repairs to select Watertight Closure and DC Fitting as defined by subsequent individual task order.
5.1.3. Contractor may be required to provide preventative maintenance support on a cutter within one week of an individual task order. Individual task orders will detail requested maintenance actions.
5.1.4. Contractor to provide all necessary labor, equipment, tools, and materials, unless otherwise stated in individual task order.
5.1.5. The Contractor shall accomplish all cutter repairs IAW the requirements of SFLC Std Specs 0000, 0740, and 6310.
5.1.6. Pertaining to this SOW, the reference of a work-day or man-day will consist of an 8 hour work day, unless otherwise directed.
5.1.7. The general requirements provided herein apply to all task orders. However, they may be modified and supplemented within the individual Task Orders to suit the complexity of the task.
5.1.8. Release of information generated for the Coast Guard shall not be allowed without prior written consent of the Contracting Officer (CO).
5.1.9. Contractor may perform hot work. Before performing any hot work, Contractor shall ensure that the space or compartment is certified “Safe for Hot Work” by a Marine Chemist. Contractor shall also ensure fire watch personnel with appropriate fire extinguishers are properly positioned prior to engaging in any work meeting the definition of hot work.
5.1.10. The Contractor shall ensure that all contractor furnished equipment is in accordance with manufacturer’s instructions, and is in proper working order, prior to each assessment.
5.1.11. The Contractor shall have the capacity to conduct at least two assessments concurrently.
5.1.12. Contractor shall designate one person as the Program Manager, to be the Point of Contact for the Government. The Program Manager should be familiar with marine watertight closures, preferable experience with Coast Guard, Navy, NOAA.
5.2 WATERTIGHT CLOSURE ASSESSMENT
5.2.1. Contractor will conduct Watertight Closure and DC Fitting assessments and inspections onboard cutters listed on the “WTC listings by Class” in response to an awarded task order. The WTC listings are found in Appendix C. The numbers and names of each of the cutter classes are found in Appendix B. The cutter classes’ homeports are found in Appendix D. Contractor will conduct cutter assessment visits as tasked by individual task orders for DC and Watertight Closures and Remote Operating Gear (ROG). The assessment will consist of comparing the various WTC’s condition to that of the OEM’s WTC Specification.
5.2.2. Contractor will prepare a management plan for approval by the cutter’s EO/EPO, outlining the Contractor’s plan for executing the assessments. The plan shall include an overall plan, checklists utilized during execution and examples of deliverables listed in 7.3, with a time line as described in 7.4.
5.2.3. Identify parts required to correct deficiencies in the designated WTC assessed. Submit repair recommendations and documentation changes for review and approval.
5.2.4. The assessment shall document hardware and installation design and safety deficiencies.
5.2.5. While conducting WTC assesments, the Contractor will provide On-the-Job-Training (OJT) to no more than two unit Coast Guard personnel at any one time. The Contractor will train Coast Guard personnel by allowing Coast Guard personnel to shadow the Contractor while conducting assessments in order to learn assessment and repair techniques used by Contractor. This training is to be on a not-to-interfere basis.
5.2.6. Contractor will provide technical assistance on shipboard visits to assess WTC / equipment / components to determine repairs required or replacement of malfunctioning or failed components, units or subsystems. Assistance will generally consist of problem analysis, trouble-shooting, isolation, and testing. Document results including conditions found with recommendations for corrective actions. Accomplish repairs incidental to assessment completion (such as replacement of worn parts) necessary to support ship operability.
5.2.7. At the end of a visit, the contractor has used less then full work-day. The Contractor will utilize the remaining man-day by performing repairs that do not require materials, other than consumables or parts that will be provided by cutter personnel. These WTC repairs may include cleaning, greasing, or making minor adjustments to safety devices that were assessed to ensure the meet WTC specifications.
5.2.8. Contractor will provide technical assistance consisting of assessment for DC and Watertight Closures systems on board U.S. Coast Guard Cutters.
5.2.9. As defined in individual task orders, provide necessary parts and watertight closures to complete repairs.
5.2.10. The contractor shall accomplish all repairs incidental to assessment completion (such as replacement of worn parts) necessary to support ship operability as required in the task order SOW. If additional repairs are identified during repair visit that are not included in the repair SOW, the contractor shall advise the crew and report this fact as soon as possible to the COR by phone or email with the crew’s assistance, if necessary. The contractor shall also inform the COR if repairs can be completed with available tools, parts and materials. The contracting officer and the contractor will agree, via written modification, on the resolution of the additional work, including whether the visit will be extended to allow completion of the repirs not included in the repair SOW.
5.2.11. The number of work-days on board (O/B) a cutter to complete the assessments are:
| 5 days O/B: | 420 WAGB, 418 WMSL, 399 WAGB, 378 WHEC, 282 WMEC, 295 WIX, 270 WMEC, 210 WMEC, 240 WLBB, 225 WLB, 175 WLM, 140 WTGB. |
| 4 days O/B: | 154 WPC. |
| 3 days O/B: | 160 WLIC, 100 WLI, 100 WLIC, 87 WPB, 75 WLIC, 75 WLR, 65 WLI, 65 WLR, 65 WYTL. |
5.3 WATERTIGHT CLOSURE REPAIR
5.3.1. Contractor will conduct WTC Repair visits to assess and/ or restore watertight integrity in accordance with ship’s configuration.
5.3.2. Contractor will perform repairs to select Watertight Closure and DC Fitting as required by subsequent individual task orders. Contractor will supply parts and conduct any repairs as outlined in individual Task Orders for Watertight Closure repair and overhaul visits. This may include any repairs to closures as well as replacements.
5.3.3. . Contractor will provide technical assistance consisting of modernization, industrial/pier side refurbishment, and logistic support for DC and Watertight Closures systems on board U.S. Coast Guard Cutters. The type of work required and exact location will be identified in the individual Task Orders.
5.3.4. The amount time to complete Water Tight Repairs will be calculated by work-days. The team of personnel to conduct WTC repairs will consist a minimum of 3 personnel. The determination for the amount of work-days will be negotiated between the Coast Guard and the contractor. The individual Task Order will have a CLIN for the quantity of work-days required to complete the repairs.
5.4 ASSESSMENT ANALYZING
5.4.1. Contractor may be tasked to review and analyze Coast Guard collected data, whether on-site or remotely, to identify trends and ensure data quality. The task will be described in an individual Task Orders.
6. .QUALITY ASSURANCE
6.1 The Contractor shall establish and maintain a quality assurance program commensurate with the level of qualitycontrol routinely employed in the commercial industry and applicable generally to the tradesinvolved and type of workrequired by this statement of work to ensure that all tasks are completed in a commercially reasonable manner in accordance with the terms of the contract, this Statement of Work, and the individual task order requirements.
6.2 The government reserves the right to reviewand approve or reject the content and format of the deliverables in part or in their entirety prior to acceptance
7. DELIVERABLES
7.1 The general requirements for all deliverables stated herein apply to all task orders. However, the deliverable requirements may be modified by individual task order to suit the complexity and type of project.
7.2 The final deliverable for assessment reports will be formatted in a way that any additional work that is required can be incorporated into a repair Task Order. All readings reported will also have a colunm stating if they are within spec or not and give a value of the normal range. Also provide assessment visit data on a CD that is formatted so that it can be loaded into the Coast Guard maintenance tracking system (currently FLS and ALMIS)
7.3 The Contractor shall provide copies of the following, for WTC Assessments and WTC repairs to the cutter EO/EPO, Product Line Maintenance Manager, and COR:
7.3.1. Pre-Survey Brief:
7.3.1.1. Provide handouts that explain the WTC Assessment/Repair Program and specific assessment procedures required.
7.3.1.2. Discuss the Ship’s Force role in supporting the assessment.
7.3.1.3. Watertight closures to be assessed, and schedule of assessment.
7.3.1.4. Information regarding DCPO training to be conducted.
7.3.1.5. Content, issue date, and use of the reports.
7.3.1.6. Questions and answers.
7.3.2. Pre-Departure Report/DeBrief:
7.3.2.1. Complete list of watertight closures assessed.
7.3.2.2. List of Watertight Closures not assessed and the reasons for non-assessment.
7.3.2.3. Condition found on all assessed Watertight Closures.
7.3.2.4. List of repairs accomplished.
7.3.2.5. List of repairs required and recommended time frame for accomplishment.
7.3.2.6. Questions and answers.
7.3.3. Final Report.
7.3.3.1. Cover.
7.3.3.2. Title page.
7.3.3.3. Table of contents.
7.3.3.4. Complete list of watertight closures assessed or repaired.
7.3.3.5. List of Watertight Closures not assessed, and the reasons for non-assessment.
7.3.3.6. Condition found on all assessed watertight closures.
7.3.3.7. List of repairs accomplished.
7.3.3.8. List of repairs required and the recommended time frame for accomplishment.
7.4 Delivery Schedule Table
Deliverable Table
WTC Assessments / Repairs
| Description |
| Responsible |
| Recipient |
| Completion/Delivery Time Frame |
| Management Plan section 5.2.2 |
| Contractor |
| Cutter EO/EPO |
| 5 days from award of Task Order |
| Pre-Survey Brief section 7.3.1 |
| Contractor |
| Cutter EO/EPO |
| Upon Arrival at cutter |
| Pre-DepartureReport/Brief section7.3.2 |
| Contractor |
| Cutter EO/EPO |
| Upon completion of Assessment on cutter |
| Draft/Intial submission of Final Report section 7.3.3 |
| Contractor |
| PL & COR |
| 45 Days after assessment |
| Gov't review |
| PL |
| Contractor |
| 10 Days after receipt of Draft Final Report |
| Final Report, judicated comments |
| Contractor |
| Cutter, PL, COR |
| 14 Daysafter Government review comments received |
70Z04019Q61351 Amendment A0003 Attachment 1 Coast Guard Watertight Closure Assessment Program Statement of Work 70Z04019Q61351
Coast Guard Water Tight Closure Assessment Program Statement of Work (cont’d)
APPENDIX A: GLOSSARY
| ALMIS |
| Asset Logistics Management Information System |
| CBM |
| Condition Based Maintenance |
| CGMAP |
| Coast Guard Machinery Assessment Program |
| COR |
| Contracting Officer's Representative |
| DCPO |
| Damage Control Petty Officer |
| EPO |
| Engineering Petty Officer |
| ESD |
| Engineering Services Division |
| FLS |
| Fleet Logistics System |
| GFE |
| Government Furnished Equipment |
| HM&E |
| Hull Mechanical, and Electrical |
| ICP |
| Inventory Control Point |
| ILS |
| Integrated Logistics Support |
| IT |
| Information Technology |
| MCA |
| Material Condition Assessment |
| MIMOSA |
| Machinery Information Management Open System Alliance |
| MPC |
| Maintenance Procedure Card |
| NSTM |
| Naval Ship's Technical Manual |
| OPNAV |
| Office of the Chief of Naval Operations |
| ROG |
| Remote Operating Gear |
| SFLC |
| Surface Forces Logistics Center |
COAST GUARD WATER TIGHT CLOSURE ASSESSMENT PROGRAM Statement of Work Appendix A
APPENDIX B: CUTTER TABLE
B.1 This is a list of Coast Guard Cutters anticipated for regular, WTC Assessments/ Repairs, subject to change as necessary to meet the needs of the Coast Guard, particularly after accepting delivery of newly commissioned vessels and homeport changes.
B.2
| LENGTH |
| CLASSN |
| CUTTER NAME |
| HULL # |
1 Cutter in 420 Class
8 Cutters in 418 Class
1 Cutters in 399 Class
3 Cutters in 378 Class
| 378 |
| WHEC |
| DOUGLAS MUNRO |
| 724 |
1 Cutter in 282 Class
13 Cutters in 270 Class
| 270 |
| WMEC |
| HARRIET LANE |
| 903 |
16 cutters in WLB Class
14 Cutters in 210 Class
14 Cutters in 175 Class
| 175 |
| WLM |
| KATHERINE WALKER |
| 552 |
| 175 |
| WLM |
| ABBIE BURGESS |
| 553 |
| 175 |
| WLM |
| JOSHUA APPLEBY |
| 556 |
| 175 |
| WLM |
| ANTHONY PETIT |
| 558 |
| 175 |
| WLM |
| BARBARA MABRITY |
| 559 |
| 175 |
| WLM |
| HARRY CLAIBORNE |
| 561 |
34 Cutters in 154 Class
| 154 |
| WPC |
| BERNARD C. WEBBER |
| 1101 |
| 154 |
| WPC |
| RICHARD ETHERIDGE |
| 1102 |
| 154 |
| WPC |
| WILLIAM FLORES |
| 1103 |
| 154 |
| WPC |
| ROBERT YERED |
| 1104 |
| 154 |
| WPC |
| MARGARET NORVELL |
| 1105 |
| 154 |
| WPC |
| CHARLES DAVID JR |
| 1107 |
| 154 |
| WPC |
| CHARLES SEXTON |
| 1108 |
| 154 |
| WPC |
| KATHLEEN MOORE |
| 1109 |
| 154 |
| WPC |
| RAYMOND EVANS |
| 1110 |
| 154 |
| WPC |
| WILLIAM TRUMP |
| 1111 |
| 154 |
| WPC |
| RICHARD NIXON |
| 1113 |
| 154 |
| WPC |
| HERIBERTO HERNANDEZ |
| 1114 |
| 154 |
| WPC |
| JOSEPH NAPIER |
| 1115 |
| 154 |
| WPC |
| WINSLOW GRIESSER |
| 1116 |
| 154 |
| WPC |
| DONALD HORSLEY |
| 1117 |
| 154 |
| WPC |
| JOSEPH TEZANOS |
| 1118 |
| 154 |
| WPC |
| ROLLIN FRITCH |
| 1119 |
| 154 |
| WPC |
| LAWRENCE LAWSON |
| 1120 |
| 154 |
| WPC |
| JOHN MCCORMICK |
| 1121 |
| 154 |
| WPC |
| BAILEY BARCO |
| 1122 |
| 154 |
| WPC |
| BENJAMIN DAILEY |
| 1123 |
| 154 |
| WPC |
| OLIVER BERRY |
| 1124 |
| 154 |
| WPC |
| JOSEPH GERCZAK |
| 1126 |
| 154 |
| WPC |
| RICHARD SNYDER |
| 1127 |
| 154 |
| WPC |
| NATHAN BRUCKENTHAL |
| 1128 |
| 154 |
| WPC |
| FORREST REDNOUR |
| 1129 |
| 154 |
| WPC |
| TERRELL HORNE |
| 1131 |
| 154 |
| WPC |
| BENJAMIN BOTTOMS |
| 1132 |
| 154 |
| WPC |
| JOSEPH DOYLE |
| 1133 |
| 154 |
| WPC |
| WILLIAM HART |
| 1134 |
| 154 |
| WPC |
| ANGELA MCSHAN |
| 1135 |
| 154 |
| WPC |
| EDGAR CULBERTSON |
| 1137 |
| 154 |
| WPC |
| HAROLD MILLER |
| 1138 |
| 154 |
| WPC |
| MYRTLE HAZARD |
| 1139 |
| 154 |
| WPC |
| OLIVER HENRY |
| 1140 |
| 154 |
| WPC |
| CHARLES MOULTHROP |
| 1141 |
| 154 |
| WPC |
| ROBERT GOLDMAN |
| 1142 |
| 154 |
| WPC |
| FREDERICK HATCH |
| 1143 |
| 154 |
| WPC |
| GLENN HARRIS |
| 1144 |
| 154 |
| WPC |
| EMLEN TUNNELL |
| 1145 |
| LENGTH |
| CLASS |
| CUTTER NAME |
| HULL # |
1 Cutter in 295 Class
1 Cutter in 240 Class
4 Cutters in 160 Class
9 Cutters in 140 Cutter Class
| 140 |
| WTGB |
| BISCAYNE BAY |
| 104 |
| 140 |
| WTGB |
| PENOBSCOT BAY |
| 107 |
| 140 |
| WTGB |
| STURGEON BAY |
| 109 |
3 Cutters in 100 Class
73 Cutters in 87 Class
8 Cutters in 75 WLIC Class
12 Cutters in 75 WLR Class
2 Cutters in 65 WLI Class
11 Cutters in 65 WYTL Class
6 Cutters in 65 WLR Class
COAST GUARD Water Tight Closure ASSESSMENT PROGRAM Statement of Work Appendix B
APPENDIX C: WTC LISTINGS BY CLASS
C.1 WTC lists included below provide an approximation of the current watertight closures installed onboard each cutter class. Actual configurations may vary slightly. These matrices are subject to change to meet the needs of the Coast Guard.
C.2 WTC acronym definitions:
| IDWTRH |
| Individually Dogged Watertight Raised Hatch |
| IDWTH |
| Individually Dogged Watertight Hatch |
| QAWTD |
| Quick Acting Watertight Door |
| QAWTS |
| Quick Acting Watertight Scuttle |
| QAATD |
| Quick Acting Air Tight Door |
C.3 420’ WAGB WTC Matrix 420' WAGB WTC Summary
C.4 418’ WMSL WTC Matrix 418' WMSL WTC Summary
C.5 399’ WAGB WTC Matrix 399’ WAGB WTC Summary
C.6 378’ WHEC WTC Matrix 378' WHEC WTC Summary
C.7 282’ WMEC WTC Matrix 282' WMEC WTC Summary
C.8 270’ WMEC WTC Matrix 270' WMEC WTC Summary
C.9 225’ WLB WTC Matrix 225' WLB WTC Summary
C.10 210’ WMEC WTC Matrix 210' WMEC WTC Summary
C.11 175’ WLB WTC Matrix 175' WLM WTC Summary
C.12 295’ WIX WTC Matrix 295' WIX WTC Summary
C.13 240’ WLBB WTC Matrix 240' WLBB WTC Summary
C.14 160’ WLIC WTC Matrix 160' WLIC WTC Summary
C.15 154’ FRC WTC Matrix 154' FRC WTC Summary
C.16 140’ WTGB WTC Matrix 140' WTGB WTC Summary
C.17
C.18 100’ WLI WTC Matrix 100' WLIC WTC Summary
C.19 87’ WPB WTC Matrix 87' WPB WTC Summary
C.20 75’ WLIC WTC Matrix 75' WLIC WTC Summary
C.21 75’ WLR WTC Matrix 75' WLR WTC Summary
C.22 65’ WLI WTC Matrix 65' WLI WTC Summary
C.23 65’ WYTL WTC Matrix 65' WYTL WTC Summary
C.24 65’ WLR WTC Matrix
65' WLR WTC Summary
COAST GUARD WATER TIGHT CLOSURE ASSESSMENT PROGRAM Statement of Work (cont’d) Appendix C
APPENDIX D: CUTTER CLASSES HOMEPORTSTABLE
D.1 This is a list of Coast Guard Cutters Classes Homeports anticipated for regular, WTC Assessments/ Repairs, subject to change as necessary to meet the needs of the Coast Guard, particularly after accepting delivery of newly commissioned vessels and homeport changes.
D.2
420 Class
418 Class
399 Class
378 Class
282 Class
270 Class
225 WLB
| 225 |
| WLB |
| San Francisco, CA |
| 225 |
| WLB |
| Apra Harbor, Guam |
210 Class
| 210 |
| WMEC |
| Cape Canaveral, FL |
| 210 |
| WMEC |
| St Peterburg, FL |
| 210 |
| WMEC |
| Little Creek, VA |
175 Class
| 175 |
| WLM |
| South Portland, ME |
| 175 |
| WLM |
| St. Petersburg, FL |
| 175 |
| WLM |
| Atlantic Beach, FL |
154 Class
| 154 |
| WPC |
| Atlantic Beach, NC |
| 154 |
| WPC |
| Apra Harbor, Guam |
295 Class
240 Class
160 Class
140 Class
| 140 |
| WTGB |
| Sault St. Marie, MI |
| 140 |
| WTGB |
| Sturgeon Bay, WI |
100 Class
| 100 |
| WLIC |
| Sault St. Marie, MI |
| 100 |
| WLIC |
| Atlantic Beach, NC |
87 Class
| 87 |
| WPB |
| Corpus Christie, TX |
| 87 |
| WPB |
| Atlantic Beach, FL |
| 87 |
| WPB |
| Cape Canaveral, FL |
| 87 |
| WPB |
| Marina Del Rey, CA |
75 Class
| 75 |
| WLIC |
| Corpus Christi, TX |
| 75 |
| WLIC |
| St. Petersburg, FL |
65 Class
| 65 |
| WYTL |
| Southwest Harbor, ME |
| 65 |
| WYTL |
| South Portland, ME |