SOLICITATION

REQUEST FOR QUOTE

70RFP419QE6000003

Installation for Intrusion Detection System (IDS)

United States Marine Corps Administrative Center

Kansas City, Missouri (MO0039)

Introduction:

Department of Homeland Security (DHS), National Protection and Programs Directorate (NPPD), Federal Protective Service (FPS) is issuing this competitive Request for Quote (RFQ) for the purpose of awarding a firm-fixed price purchase order. This purchase order will be for all necessary equipment, labor, supervision and materials for installation of Intrusion Detection System (IDS) at the United States Marine Corps Administrative Center (MO0039), 2306 East Bannister Road Kansas City, MO 64131.

Pre-proposal Conference/Site Visit:

A highly recommended (see Solicitations Provisions titled, Site Visit Attendance) site visit date and time are to be determined. Please contact Megan Kelly at Megan.Kelly@ice.dhs.gov no later than February 15, 2019 for site visit information.

Supplemental Instructions:

1. Vendors are requested to submit quotes in response to this RFQ via email to Megan Kelly at Megan.Kelly@ice.dhs.gov and Marcus Mason at Marcus.L.Mason@ice.dhs.gov, no later than March 15, 2019 at 4:00 PM. EST.

2. Quotes must include a total price for all labor, materials, supervision, tools, and equipment necessary to comply with the attached Requirements Document.

The Contractor shall provide catalog cut sheets of the equipment and wiring schematic diagram and/or block diagram with sufficient descriptive data, which should include one

(1) copy of a complete schedule of materials, devices and equipment, including a list of manufacturers, complete model number(s) with related published technical specifications and quantities of all the equipment which the Contractor proposes to incorporate in the system. The literature furnished must be identified or marked exactly to show the item which it pertains. This information shall be provided with the quote.

3. Questions regarding this RFQ shall be submitted via email to Megan Kelly at Megan.Kelly@ice.dhs.gov and Marcus Mason at Marcus.L.Mason@ice.dhs.gov, no later than February 26, 2019 at 4:00 PM. EST.

4. Contractor is requested to complete Online Representations and Certifications and to verify their company is active in System for Award Management by going to www.sam.gov.

Contents

Standard Form 1449 – Solicitation/Contract/Order Form………………………………

Clauses Incorporated By Reference…..……………………………………………………………….4

Addendum to FAR 52.212-4 Contract Terms and Conditions: Commercial Items……………………4

FAR 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders -- Commercial Items..…………………………………………………..…………………………………5

HSAR 3052.212-70 Contract Terms and Conditions Applicable To DHS Acquisition of Commercial Items…………………………………………………………………………………………..…… 13-14

FAR 52.228-5 Insurance- Work on A Government Installation……………………………………….14

Statement of Work..…………………………………………………………………………………….15

Solicitation Provisions..………………………………………………………………………………...55

Attachments

SCA Wage Determination No. 2015-5105 Rev 7 Non-Disclosure Form: DHS Form 11000-6

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

OPO/FPS/EACCG/R6

1901 North Highway 360, Ste. 500 Ofc of Procurement Operations - FPS U.S. Dept. of Homeland Security NPPD/FPS/East CCG/Region 6

MO0039 CODE 16. ADMINISTERED BYCODE

X

X

X

561621

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED OROPO/FPS/EACCG/R6

RFPIFB

10. THIS ACQUISITION ISCODE

RFQ

14. METHOD OF SOLICITATION

13b. RATING

NAICS:

SMALL BUSINESS

03/15/2019 1600 ET

02/12/2019

(215) 521-2288Megan Kelly (No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

70RFP419QE6000003

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 3 192119R06000P0115OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

Grand Prairie TX 75050-1412

TELEPHONE NO.

17a. CONTRACTOR/

KANSAS CITY MO

2306 E BANNISTER RD

FEDERAL BG

15. DELIVER TO

Grand Prairie TX 75050-1412 1901 North Highway 360, Ste. 500 Office of Procurement Operations Federal Protective Service U.S. Dept. of Homeland Security

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$20.5

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

11.

SEE SCHEDULE

12. DISCOUNT TERMS

THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

8(A)

NPPD/FPS/East CCG/Region 6

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

The US Department of Homeland Security (DHS), Federal Protective Service (FPS) has a requirement for purchase and install of an Intrusion Detection system located in Kansas City, Missouri.

A highly encouraged site visit is to be determined. Please contact Megan Kelly no later than Friday February 15, 2019 for site visit information.

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED . YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

OFFER

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT:

REF.

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 2/2012) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

0001 1 LS

0002 1 LS

This solicitation and award will be in accordance with Simplified Acquisition Procedures established in FAR Part 12 and 13. This will be awarded as a Firm-Fixed Price (FFP) purchase order. All work will be performed during normal business hours (0800 - 1600) Monday through

Friday excluding federal holidays. Service

Contract Act Wage Determination 2015-5105 Rev 7, Occupation Code 23160 - Electrician, Maintenance

- is hereby incorporated into any resultant purchase order.

Delivery: 60 Days After Notice to Proceed

Purchase and Install an Intrusion Detection

System (IDS) in accordance with the attached statement of work dated 07 February 2019. The contractor is responsible for all tools, equipment, labor, supervision, and materials necessary to provide a fully functional IDS system.

Product/Service Code: 6350

Product/Service Description: MISCELLANEOUS ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS

Purchase and install weather housings in accordance with the attached statement of work dated 07 February 2019.

Product/Service Code: 6350

Continued ...

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

3 2 of

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

70RFP419QE6000003

Product/Service Description: MISCELLANEOUS ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS

Points of Contact:

Contract Specialist: Megan Kelly

Email: Megan.Kelly@ice.dhs.gov

Phone: 215-321-2288

Contracting Officer: Marcus Mason

Email: Marcus.L.Mason@ice.dhs.gov

Phone: 817-649-6224

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

RFQ: 70RFP419QE6000003

Terms and Conditions

FAR 52.252-2 -- CLAUSES INCORPORATED BY REFERENCE. (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/; http://www.dhs.gov/xopnbiz/regulations/

FAR 52.212-4 Contract Terms and Conditions--Commercial Items (Oct 2018)

ADDENDUM TO FAR 52.212-4 CONTRACT TERMS AND CONDITIONS:

COMMERCIAL ITEMS

SUBMISSION OF INVOICES:

1. In accordance with Contract Administration Data, invoices shall now be submitted via one of the following three methods:

a. By Mail

DHS-NPPD-FPS-Region 6 Burlington Finance Center P.O. Box 1279 Williston, VT 05495-1279

b. By facsimile (fax): (include a cover sheet with point of contact & # of pages):

802-288-7658

c. By e-mail: NPPDInvoice.Consolidation@hq.dhs.gov

Invoices submitted by other than these three methods will be returned. The contractor’s Taxpayer Identification Number (TIN) must be registered in the Central Contractor Registration (http://www.ccr.gov) prior to award and shall be notated on every invoice submitted to FPS to ensure prompt payment provisions are met. The FPS Region Number (6) shall also be notated on every invoice. To assist in timely payment, it is also recommended that the contractor provide the Requisition Number on the submitted invoice

2. In accordance with Section I, Contract Clauses, FAR 52.212-4 (g)(1), Contract Terms and

Conditions – Commercial Items, or FAR 52.232-25 (a)(3), Prompt Payment, as applicable, the information required with each invoice submission is as follows:

o Invoice must include Name and address of the Contractor;

Invoice date and number;

Contract number, contract line item number and, if applicable, the order number;

Description, quantity, unit of measure, unit price and extended price of the items delivered;

Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

Terms of any discount for prompt payment offered;

http://www.acquisition.gov/far/ mailto:NPPDInvoice.Consolidation@hq.dhs.gov

Name and address of official to whom payment is to be sent;

Name, title, and phone number of person to notify in event of defective invoice; and Taxpayer Identification Number (TIN). The Contractor shall include its

TIN on the invoice only if required elsewhere in this contract. (See paragraph 1 above.)

Electronic funds transfer (EFT) banking information.

a. The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

b. If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration, or 52.232-34, Payment by Electronic Funds Transfer—Other Than Central Contractor Registration), or

c. EFT banking information is not required if the Government waived the requirement to pay by EFT.

Invoices without the above information may be returned for resubmission.

FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items (Jan 2019)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115- 91).

(3) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)

(4) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(5) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77, 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.]

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C.

3509).

___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub L. 111-5) (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009).

___ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109-282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

___ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) (31 U.S.C. 6101 note).

___ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).

___ (10) [Reserved]

___ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).

___ (ii) Alternate I (Nov 2011) of 52.219-3.

___ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).

___ (ii) Alternate I (Jan 2011) of 52.219-4.

___ (13) [Reserved]

_X__ (14) (i) 52.219-6, Notice of Total Small Business Aside (Nov 2011) (15 U.S.C. 644).

___ (ii) Alternate I (Nov 2011).

___ (iii) Alternate II (Nov 2011).

___ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

___ (ii) Alternate I (Oct 1995) of 52.219-7.

___ (iii) Alternate II (Mar 2004) of 52.219-7.

___ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).

___ (17) (i) 52.219-9, Small Business Subcontracting Plan (Aug 2018) (15 U.S.C. 637 (d)(4)).

___ (ii) Alternate I (Nov 2016) of 52.219-9.

___ (iii) Alternate II (Nov 2016) of 52.219-9.

___ (iv) Alternate III (Nov 2016) of 52.219-9.

___ (v) Alternate IV (Aug 2018) of 52.219-9.

_X__ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).

___ (19) 52.219-14, Limitations on Subcontracting (Jan 2017) (15 U.S.C. 637(a)(14)).

___ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C.

637(d)(4)(F)(i)).

___ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657f).

___ (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C.

632(a)(2)).

___ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).

___ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).

_X__ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

___ (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2018) (E.O.

13126).

_X__ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

_X__ (28) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).

___ (ii) Alternate I (Feb 1999) of 52.222-26.

___ (29) (i) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

___ (ii) Alternate I (July 2014) of 52.222-35.

___ (30) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C.

793).

___ (ii) Alternate I (July 2014) of 52.222-36.

___ (31) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).

___ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

___ (33) (i) 52.222-50, Combating Trafficking in Persons (JAN 2019)

(22 U.S.C. chapter 78 and E.O. 13627).

___ (ii) Alternate I (Mar 2015) of 52.222-50, (22 U.S.C. chapter 78 and E.O. 13627).

___ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

___ (35) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA- Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

___ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

___ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O.13693).

___ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).

___ (38) (i) 52.223-13, Acquisition of EPEAT® -Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514

___ (ii) Alternate I (Oct 2015) of 52.223-13.

___ (39) (i) 52.223-14, Acquisition of EPEAT® -Registered Television (Jun 2014) (E.O.s 13423 and 13514).

___ (ii) Alternate I (Jun 2014) of 52.223-14.

___ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C.

8259b).

___ (41) (i) 52.223-16, Acquisition of EPEAT® -Registered Personal Computer Products (Oct 2015) (E.O.s 13423 and 13514).

___ (ii) Alternate I (Jun 2014) of 52.223-16.

___ (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging while Driving (Aug 2011) (E.O. 13513).

___ (43) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).

___ (44) 52.223-21, Foams (Jun 2016) (E.O. 13696).

___ (45) (i) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).

___ (ii) Alternate I (Jan 2017) of 52.224-3.

___ (46) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).

___ (47) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C.

4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110- 138, 112-41, 112-42, and 112-43).

___ (ii) Alternate I (May 2014) of 52.225-3.

___ (iii) Alternate II (May 2014) of 52.225-3.

___ (iv) Alternate III (May 2014) of 52.225-3.

___ (48) 52.225-5, Trade Agreements (Aug 2018) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

___ (49) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

___ (50) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

___ (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C.

5150).

___ (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

___ (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505), 10 U.S.C. 2307(f)).

___ (54) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

_X__ (55) 52.232-33, Payment by Electronic Funds Transfer--System for Award Management (Oct 2018) (31 U.S.C. 3332).

___ (56) 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management (Jul 2013) (31 U.S.C. 3332).

___ (57) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

___ (58) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

___ (59) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C.

637(d)(12)).

___ (60) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631).

___ (ii) Alternate I (Apr 2003) of 52.247-64.

___ (iii) Alternate II (Feb 2006) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or executive orders applicable to acquisitions of commercial items:

___ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495)

_X__ (2) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67.).

___ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

___ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C.206 and 41 U.S.C.

chapter 67).

___ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

___ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67).

___ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67).

___ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).

___ (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

___ (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792).

(d) Comptroller General Examination of Record The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records -- Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)

(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Jan 2019) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115- 91).

(iv) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(v) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (1) of FAR clause 52.222-17.

(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(vii) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).

(viii) 52.222-35, Equal Opportunity for Veterans (Oct 2019) (38 U.S.C. 4212).

(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

(x) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).

(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xii) 52.222-41, Service Contract Labor Standards (Aug 2018), (41 U.S.C. chapter 67).

(xiii) (A) 52.222-50, Combating Trafficking in Persons (Jan 2019) (22 U.S.C. chapter 78 and E.O. 13627).

(B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 E.O. 13627).

(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)

(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)

(xvi) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).

(xvii) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).

(xviii) 52.222-62, Paid sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

(xix) (A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).

(B) Alternate I (Jan 2017) of 52.224-3.

(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxii) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph

(d) of FAR clause 52.247-64.

(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of Clause)

HSAR 3052.212-70 CONTRACT TERMS AND CONDITIONS APPLICABLE TO DHS

ACQUISITION OF COMMERCIAL ITEMS (SEP 2012)

The Contractor agrees to comply with any provision or clause that is incorporated herein by reference to implement agency policy applicable to acquisition of commercial items or components. The provision or clause in effect based on the applicable regulation cited on the date the solicitation is issued applies unless otherwise stated herein. The following provisions and clauses are incorporated by reference:

(a) Provisions - None

(b) Clauses.

_X _ 3052.204-71 Contractor Employee Access.

_X _ 3052.228-70 Insurance.

_X _ 3052.242-72 Contracting Officer’s Technical Representative.

FAR 52.228-5 Insurance -- Work on a Government Installation (Jan 1997)

Federal Protective Service U.S. Department of Homeland Security

STATEMENT OF WORK

for

Installation of Intrusion Detection (IDS) System

7 February 2019

United States Marine Corps Administrative Center 2306 East Bannister Road Kansas City, MO 64131

Building Number: MO0039

STATEMENT OF WORK

TABLE OF CONTENTS

/ For Official Use Only (FOUO)

A. BACKGROUND

B. PURPOSE

C. SCOPE

C.1 GENERAL

C.2 INSTALLATION REQUIREMENTS

C.3 THIS BULLET DOES NOT APPLY TO THIS PROJECT

C.4 THIS BULLET DOES NOT APPLY TO THIS PROJECT. ............................................................ ERROR! BOOKMARK NOT DEFINED.

C.5 NETWORKING EQUIPMENT

C.6 OPERATING SYSTEMS UPDATES AND SERVICE PACKS

C.7 THIS BULLET DOES NOT APPLY TO THIS PROJECT

C.8 Appendicies

D. SYSTEM/EQUIPMENT SALIENT CHARACTERISTICS AND REQUIREMENTS

D.1 INTRUSION DETECTION SYSTEM

D.4 MEGACENTER COORDINATION

E. ADDITIONAL PROJECT REQUIREMENTS

E.1 DESIGN STANDARDS

E.2 MATERIALS AND EQUIPMENT

E.3 ELECTRICAL AND CABLING REQUIREMENTS

E.4 FINAL INSPECTION AND ACCEPTANCE

E.5 CLEANLINESS, PROTECTION, AND PATCHING

E.6 WARRANTY AND MAINTENANCE

E.7 SAFETY AND HEALTH

E.8 QUALITY CONTROL PLAN

E.9 TRAINING

E.10 CONFIGURATION MANAGEMENT – ONLY APPLICABLE IF IDS NETWORK ENABLED

E.11 COMPONENT/DEVICE CONFIGURATIONS – ONLY APPLICABLE IF IDS NETWORK ENABLED

E.12 NETWORK SETTINGS – ONLY APPLICABLE IF IDS NETWORK ENABLED

E.13 WIRELESS NETWORK SECURITY

E.14 AUDIT AND ACCOUNTABILITY

E.15 IDENTIFICATION AND AUTHENTICATION / ACCESS CONTROL

E.16 DATA PROTECTION

E.17 USER ACCOUNTS

E.18 INCIDENT MANAGEMENT AND DISASTER RECOVERY

E.19 SOFTWARE MAINTENANCE

E.20 ENTERPRISE ARCHITECTURE

F. DELIVERABLES

F.1 GENERAL

F.2 REQUEST FOR QUOTATION (RFQ)

F.3 PRE-INSTALLATION DELIVERABLES

F.4 POST-INSTALLATION DELIVERABLES

G. PROJECT ADMINISTRATION

G.1 WORK AUTHORIZATION

G.2 PERIOD OF PERFORMANCE

G.4 CONTACTS

G.5 SPECIAL SCHEDULING REQUIREMENTS

G.6 CONTRACTOR ACCESS AND USE OF PREMISES

G.7 SECURITY REQUIREMENTS

G.8 CONTRACTOR SUITABILITY REQUIREMENTS

H. APPLICABLE STANDARDS

H.1 GENERAL

H.2 ACCESSIBILITY REQUIREMENTS (SECTION 508)

I ACCOUNTABLE PROPERTY:

I.1 DEFINITIONS:

I.2 DELIVERABLES:

I.3 INVOICES:

I.4 PROPERTY ACCOUNTABILITY:

I.5 PHYSICAL INVENTORY: ................................................................................................. ERROR! BOOKMARK NOT DEFINED.

I.6 PROPERTY DISPOSAL:

I.7 LOST, STOLEN, DAMAGED OR DESTROYED (LDD) PROPERTY: ....................................... ERROR! BOOKMARK NOT DEFINED.

J. INFORMATION TECHNOLOGY SECURITY

J.1 SECURITY CERTIFICATION/ACCREDITATION

J.2 SECURITY REVIEW AND REPORTING

J.3 CONTINUOUS MONITORING

A. BACKGROUND

A.1 The Federal Protective Service (FPS) is the federal law enforcement agency responsible for the protection and security of federal facilities, employees, and visitors. FPS actively works to reduce security vulnerabilities of federal facilities from criminal, terrorist, accidental, and natural disaster threats to ensure properties remain safe, secure, and available to the American public and employees of the federal Government.

A.2 The following Statement of Work (SOW) and guidelines have been developed by the

Department of Homeland Security (DHS), National Protection and Programs Directorate (NPPD), Federal Protective Service (FPS) to mitigate threats and vulnerabilities pertaining to federal buildings and Government leased spaces. The SOW and regulations were developed with the notion that the security posture of each federally owned building or Government leased space is unique.

B. PURPOSE

B.1 Description of Existing System

Currently, the Intrustion Detection System is based off of the Picture Perfect 4.6 (Casi) access control system. There is no alarm panel, all alarms are generated by the access control system which has contacts on all doors but a few sets, all roll up doors and limited glass breaks. The glass breaks are functioning; however, due to there age they have passed the standard lifecycle limit and have to be replaced. There are seven sets of double doors with card reader access and all roll up doors have door contacts. The emergency exit doors have approximately 75% door contacts; however, not all doors with door contacts generate alarms at the access control monitor. The system was installed by the previous tenant over ten years previously the C & C group, which currently has a maintenance contract with the current tenant.. The system is monitored locally in the security console which has a seven day a week by 24 hours a day protective security officer (PSO). The system is not monitored by the Battle Creek MegaCenter (BCMC). This is a hard wired installation consisting of surface mount door contacts, roll up door contacts and outdated glass breaks. This system was monitored previously by the Battle Creek MegaCenter (BCMC); however, it has not been monitored offsite for several years. This monitoring was via POTS landline.

B.2 Description of New System

Intrusion Detection System:

The proposed new system would be a comination of reuse of existing components and installation of new components where needed to meet the Interagency Security Committee, Facility Security Level 3 standards. MO0039 was a FSL 3 level facility during the last assessement conducted in 2017. The new system would have the capability for monitoring offsite once the POTS line is reestablished with a completed IDS installation.

The following equipment is to be provided and installed.

1. BCMC accepted alarm panel & enclosure with tamper alarm switch,

2. Six (6) 12 volt, 18 amp hour batteries,

3. Additional enclosure for backup batteries,

4. Six (6) Picture Perfect output relay boards,

5. Programming of IDS system and Access Control System

6. Two (2) tamper alarms, one for each enclosure,

7. Two (2) locks, one for each enclosure,

8. Replace/Install thirty-five (35) hard wired magnetic door contacts on doors (17 single and 9 Double doors) (one contact per door),

9. Install nine (9) overhead door contacts on roll up doors.

10. Replace twenty-one (21) obsolete wired dual technology glass break detectors,

11. 18-4 Plenum rated alarm wiring and conduit as required.

B.2.1 The IDS main system components will reside in the security control room. The proposed work would consist of replacing all glass break detectors, installing new door contacts, installing IDS wiring and contacts ev that currently do not have door contacts, installing IDS alarm panel, installing Picture Perfect output boards and connecting the new alarm panel with the output from the Picture Perfect access control alarms.

At completion of project all Picture Perferct door, glass break and panel tamper alarms should be received at BCMC. The proposed work will remove nonfunctioning existing perimeter alarm equipment for disposal by the selected vendor. The price for removing and disposing of components will be included in proposed bid.

B.2.2. The IDS system shall be used to monitor the perimeter of the facility via door contacts, Picture Perfect Access Control System and glassbreak detectors. Monitoring will be done by the FPS BCMC. The BCMC is able to monitor Bosch/Radionics, Honeywell/Ademco and DMP alarm systems via internet protocol (IP) or via dial up analog phone lines. This installation will be performed using a dial up phone line. The selected system must meet the requirements put forth in Appendix C.7.2, BCMC Installation Standards. For this installation, the tenant agency must provide the dial up phone line module, and will be using a dial up phone line connection. Vendor shall be a licensed distributer and installer of the selected system they are installing. The MegaCenter Alarm Requirement (MAR Document) shall be filled out and submitted to the BCMC 72 hours before scheduled testing of equipment. The MAR document will be provided with the Notice to Proceed. Contractor shall be at the facility during testing with PMC. The MAR is contained in Appendix C.7.3.

B.2.3 Video Surveillance System

Install seven (7) Weatherproof NEMA Enclosure w/Cooling Fans and power, size:

17x14x6 Vented ABS, on selected poles (see drawing) where existing cameras are located to protect the electricity to the camera and the power supplies.

C. SCOPE

C.1 General

C.1.1 As part of the pre-bid process, FPS may have a site visit and all interested Contractors are invited to attend. The purpose of the site visit is for Contractors to survey the site and review the requirements of this SOW. A site visit will be scheduled by the COR/FPS PM. All questions relevant to this SOW shall be submitted in writing to the COR/FPS PM. The Contractor shall not make or assume any changes to this SOW without written approval from the COR/FPS PM.

C.1.2 The Contractor will first perform system familiarization and examination to develop a methodology for adding required components and replacing non-functioning or obsolete components. The contractor will only remove currently installed wire and cable that is in nonfunctioning.

C.1.3 The existing system shall remain fully functional and operational to the extent possible during the installation of the new components. The Contractor shall submit a system cutover plan in accordance with Section F Deliverables. The cutover plan shall be reviewed and approved in writing by the FPS PM. If no cutover is needed due to adding new functionality in stages without degradation of current capabilies then the contractor will make such known and not have to create a cutover plan.

C.1.4 The Contractor shall provide and install and configure the system as described and/or shown herein. The system shall include all connectors, adapters, terminators, and appurtenances to interconnect all equipment. The Contractor shall also supply all cabling and miscellaneous materials necessary to interconnect all equipment installed in accordance with this SOW.

C.1.5 The Contractor shall be required to be familiar with all applicable codes while carrying out the work outlined in this SOW. The Contractor shall complete the work pursuant to this SOW following all applicable codes and standards including, but not limited to:

Occupational Safety and Health Administration (OSHA), Underwriters Laboratories (UL), National Fire Protection Association (NFPA), National Electrical Code (NEC), and any additional federal, state and local codes and policies.

C.1.6 The Contractor shall furnish all tools and equipment necessary to complete all work outlined in this SOW. By no means shall the Contractor be authorized the use of Government owned property, tools or equipment, to complete work in accordance with this SOW.

C.1.7 In the event any operational system or utility (e.g. fire, IDS, HVAC) is required to be disabled or turned off, forty-eight (48) hour notice shall be required and approved by the GSA Building Manager, FPS Inspector, and/or FPS PM prior to deactivation.

a) The Contractor, prior to departing for the day, shall ensure all system(s) previously disabled or turned off are functioning properly. A basic functional test shall be required to determine proper functionality of the system(s) and should be reported to the FPS PM.

b) In the event a system is non-functional once enabled or turned on, it shall be the responsibility of the Contractor, at no additional cost to the Government, to restore the system(s) prior to departure from the site.

c) If the Contractor fails to restore all system(s) before departing, they shall be liable for all costs incurred by the Government to restore system(s) functionality.

C.1.8 All personnel engaged in installation activities pursuant to this SOW shall be licensed by the state, local authority, and/or the city local authority in the required trades or professions which require licensing by such jurisdictions. The type and level of license shall be consistent with requirements of the jurisdictions and work to be performed by this SOW.

C.1.9 It shall be the sole responsibility of the contractor to employ personnel licensed and qualified to carry out all tasks outlined in this SOW. At no time during the installation shall the contractor require Government personnel to complete tasks required to be completed by the contractor as covered by this SOW.

C.1.10 The Contractor shall be solely responsible for ensuring their employees and subcontractors abide by all requirements of the contract. At all times while work is being performed in accordance with this contract, the Contractor shall have someone acting in supervisory capacity available to answer questions, resolve issues, supervise company employee(s), and subcontractor(s).

C.1.11 The Contractor shall provide a daily access schedule to coordinate installation activities. The schedule shall be submitted as part of the project plan.

C.1.12 The Contractor shall maintain a separate set of drawings, schematics, and wiring diagrams of the IDS system to be used for creating as-built drawings. This set shall be accurately kept up to date by the Contractor, noting all changes and additions to the system and shall be available for the final inspection walkthrough.

C.1.13 The Contractor may be required to attend installation construction meetings.

C.2 Installation Requirements

C.2.1 The Contractor shall provide all necessary equipment, labor, supervision, and tools required to provide and install a new, fully functional IDS system in the project space.

The Contractor will install cam locks on all of the security equipment panel enclosures.

All equipment connected to AC power will be protected from surges. Equipment protection shall withstand surge test waveforms described in IEEE C62.41.1 and IEEE C62.41.2. Fuses shall not be used for surge protection.

C.2.2 The IDS system for this project uses hard-wired door contacts and glass break. The use of wireless transmitters for doors and window coverage is acceptable if more beneficial to the government in cost. If a wireless connection is necessary, the vendor shall communicate the details to FPS prior to the work for approval to proceed.

The Contractor shall coordinate with the FPS COR to ensure the new system(s) are installed and operational per FPS requirements, industry best practices for commercial buildings and national/local building codes.

C.2.3 The Contractor, for all equipment/device(s) requiring licensing, shall purchase/install license(s) as required by the manufacturer. All licensing fees shall be nonrecurring.

C.2.4 The keypad for the IDS system shall be mounted within security console space, at a height that is acceptable to the occupants of the space; consideration to the Americans with Disabilities Act (ADA) should be given, however, if it presents an undue hardship to occupants, then mount at the tenant desired space.

No exposed wiring shall be permitted. If there is a need for surface wiring, it must be protected in rigid or flexible conduit, approved by the project manager and COR.

The only type of wiring that shall be used is stranded 18/4 copper wire or 18/2 stranded copper wire. All wires shall be routed through the hollow wall or drop ceiling, and will only be permitted in surface mounted rigid conduit or flex conduit with the written permission of the FPS technical systems POC. Wiring shall be installed on dedicated support system using supports such as j-hooks or saddle support systems at no more than five foot (5’0”) intervals. Cable supports shall be securely attached directly to building structure. Do not attach cabling or supports to ductwork, piping, grid hangers, conduit, or equipment, and shall not be directly lying on top of tiles.

C.2.5 The Contractor shall be responsible to provide the necessary equipment and tools to access all equipment which is not accessible by ladder.

C.2.6 All measurements and equipment locations are approximate and shall be verified by the

Contractor for accuracy and installation feasibility. The Government shall not be held responsible for any error or variation in any measurements or other data listed, nor shall the Contractor, because of an error or variation in any measurement listed, be relieved of the responsibility to carry out the requirements in accordance with the true intent and meaning of the specifications without additional cost to the Government.

C.2.7 All ceiling tiles removed to accommodate installation shall be returned at the end of the work day.

C.2.8 The Contractor shall remove and haul debris from the project site daily and dispose of in a proper, acceptable manner in accordance with all federal, state and local laws and regulations, off of the job site property. The debris created from this project shall not be disposed of at the job site, in Government dumpsters, or on Government property.

C.2.9 The Contractor shall verify all equipment locations with the FPS PM prior to installation.

C.2.10 The Contractor, when removing the existing equipment, cabling, and appurtenances in accordance with this SOW, shall ensure all openings or penetrations are sealed and/or patched accordingly to protect against weather exposure, unless otherwise designated for reuse. All openings or penetrations that are designated for reuse shall be sealed and/or patched accordingly to protect against weather exposure at the completion of installation. All penetrations that become exposed to weather during installation shall be protected from exposure throughout the installation period.

C.3 Networking Equipment

C.3.1 As required per this SOW, the contractor shall purchase, install, and configure all equipment, components, and necessary appurtenances for a complete and appropriately configured non-Ethernet network connectiong between the control panel and the MegaCenter via hard wired telephone. The Picture Perfect Access Control system will not be networked to any Internet capable network, and remain a closed system network.

C.3.2 All control panel boxes, power supplies and major communication devices shall be installed on the wall. An appropriately sized piece of ¾” plywood shall be mounted on the wall, painted with fire retardant paint, and all equipment mounted on the plywood.

Final mounting location shall be approved by the FPS PM.

C.3.3 This bullet does not apply to this project.

C.4 Operating Systems Updates and Service Packs

C.4.1 Operating systems and software applications shall be capable of being updated/patched after delivery. The Contractor shall ensure that all installed server(s) and client workstation(s) Operating System Software (OS), if applicable, at the time of installation, are current with all security updates/patches, service packs, revisions, and shall provide through the warranty period. The IDS firmware and all other installed software shall be the current version with all applicable updates and installed in accordance with manufacturers recommendations.

C.4.2 The Contractor shall remove and/or disable all software components that are not required for the operation and maintenance of the IDS system; and shall provide documentation on what is removed and/or disabled. The software to be removed and/or disabled shall include, but is not limited to: games, device drivers for network devices not delivered, messaging services (e.g., MSN, AOL IM), Servers or clients for unused Internet services, unused networking and communications protocols, unused document processing utilities (Microsoft Word, Excel, PowerPoint, Adobe Acrobat, OpenOffice, etc.).

C.4.3 The Contractor shall provide notification of patches affecting security within a pre-negotiated period as identified in the patch management process.

a) Pre-Contract Award – The Contractor shall provide details on their patch management and update process. Responsibility for installation and update of patches shall be identified.

b) Post-Contract Award - The Contractor shall provide notification of known vulnerabilities affecting Contractor-supplied or required OS, application, and third-party software within 30 days after public disclosure for a period of one year from approved acceptance testing.

C.7 Appendicies

C.7.1 IDS Component List & Components List with location identifier. This attachments are at the end of the document identified as Appendix C.7.1.

C.7.2 IDS Locations: See floor plans at the end of the SOW. The contractor and FPS shall verify all equipment locations.

C.7.3 BCMC Installation Standards: This document will be a separate file attachment due to size and complexity.

C.7.4 BCMC MAR Form: This document will be a separate file attachment due to size and complexity.

D. SYSTEM/EQUIPMENT SALIENT CHARACTERISTICS AND