Additional_Data.pdf
PDF 53 KB Posted
- Attached to
- Janitorial Services
- Solicitation number
- 70B03C18Q00000034
About this file
Additional Data
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Building_data.pdf | ||
| 70B03C18Q-00034-Mod_00-A00_02072018.pdf | ||
| Pricing_Matrix_02072018.xlsx | XLSX spreadsheet | |
| PR_20104271-Past_Performance_Contacts.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1) Tile square footage in building: Approx. 950 square feet
2) Carpet square footage in building: Approx. 2600-3000 square feet
3) Number of stalls Men's Room: 1 locker room/restroom and 1 public restroom
4) Number of stalls Women's Room: 1 locker room/restroom and 1 public restroom
5) Number of Windows and their sizes
4 @ 48”x34”; indoor office windows 1 @ 110”x35”; with glass sections-sliding doors 2 @ 80”x 34”; interior office
1 @ 110”x 36”; with 3 glass sections -Front Lobby 1 @ 73”x36”; with 3 glass sections -walkway entrance 8 @ 36”x45”; Outdoor office windows 1 @ 37”x34”; walk up service door.
6) Period of performance information is provided in paragraph (vii) of the FBO notice.
7) HSBP1017P00242, the prior contract award, can be researched on www.fpds.gov or www.usaspending.gov.
8) Per paragraphs 4.2.2, 4.2.4, 5.2 and 5.3 (page 30 of 51) of the statement of work (SOW), the contractor is requireded to properly stock and supply all cleaning supplies, paper towels, trash can liners and other janitorial supplies. Supply consumption can be based on 3 regular full-time staff and approximately 2,000 travelers through the Port each year.
9) While hard surface floors are not listed directly in Appendix B, their appearance must be maintained in accordance with paragraph 4.1 of the SOW.
File details come from the government source that posted it.