This document is a Special Provision for Slope Restoration issued by the City of Detroit for non-freeway projects in Michigan. The scope of work involves preparing lawns and slopes designated for restoration by applying topsoil, fertilizer, seed, mulch, mulch blankets, turf reinforcement mat (TRM), bonded fiber matrix (BFM), or modified mulch blanket. Construction must begin as soon as possible after final grading but no later than the timeframes specified in the Standard Specifications for Construction. The work includes shaping and compacting areas to be seeded, placing a minimum of 4 inches of topsoil, incorporating seed into the top half-inch of soil, spreading mulch at two tons per acre (or three tons per acre for dormant seeding), and installing mulch anchoring, blankets, TRM, or BFM as required. The contractor must ensure turf establishment meets specifications outlined in sections 816 and 917 of the Standard Specifications for Construction and Standard Plan R-100 Series, with work completed in accordance with subsection 816.03.

Materials specified include seeding mixture, Class A chemical fertilizer nutrient, topsoil (estimated at 80 percent furnished and 20 percent salvaged), and mulching materials. Modified mulch blankets must use excelsior material free of chemical additives with 100 percent biodegradable netting manufactured from natural materials such as jute, sisal, or coir fiber; plastic-based netting including polypropylene, nylon, polyethylene, and polyester is expressly prohibited. The contractor bears responsibility for re-seeding at no cost if turf is not well-established at the end of the first growing season, and must provide weed control at no additional cost if weeds exceed 10 percent of the restoration area. Measurement and payment are based on completed work at the contract unit price using the pay item "Slope Restoration, Non-Freeway, Type B" measured in square yards, which includes topsoil surface, fertilizer, seeding mixture, and mulch blanket installation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF DETROIT

SPECIAL PROVISION

FOR

SLOPE RESTORATION, NON-FREEWAY

OHM:AJ 1 of 3 10-21-25

a. Description. This work consists of preparing all lawns and slopes on non-freeway projects designated for slope restoration on the plans or as directed by the Engineer and applying topsoil, fertilizer, seed, mulch with mulch anchor, mulch blanket, high velocity mulch blanket, permanent turf reinforcement mat (TRM), bonded fiber matrix (BFM), or modified mulch blanket to those areas. Ensure turf establishment is in accordance with section 816 and 917 of the Standard Specifications for Construction and Standard Plan R-100 Series, except as modified herein or otherwise directed by the Engineer.

b. Materials. The materials, application rates, and construction methods specified in sections 816 and 917 of the Standard Specifications for Construction apply unless modified by this special provision or otherwise directed by the Engineer. Furnish the following materials on this project:

1. Seeding mixture as called for on the plans.

2. Chemical fertilizer nutrient, Class A.

3. Topsoil. The following percentages of furnished and salvaged topsoil are estimated for this project and provided for informational purposes only.

Topsoil Furnished: 80 percent Topsoil Salvaged: 20 percent

4. Mulching material.

5. Modified Mulch Blanket. Where modified mulch blanket is required, furnish an excelsior mulch blanket free of chemical additives. Ensure the netting thread is 100 percent biodegradable and manufactured with non-plastic materials such as jute, sisal, or coir fiber.

Degradable, photodegradable, UV-degradable, oxo-degradable, or oxo-biodegradable plastic netting including polypropylene, nylon, polyethylene, and polyester is not an acceptable alternative. All netting materials must have a loose weave design with movable junctions between the machine and cross-machine direction twines that move independently and reduce the potential for wildlife entanglement.

c. Construction. Ensure construction methods are in accordance with subsection 816.03 of the Standard Specifications for Construction. Begin this work as soon as possible after final grading of the areas designated for slope restoration but no later than the maximum time frames specified in subsection 208.03 of the Standard Specifications for Construction. It may be necessary, as directed by the Engineer, to place materials by hand.

Shape, compact, and ensure all areas to be seeded are weed-free prior to placing topsoil. Place topsoil to the minimum depth of 4 inches and in accordance with the plans and standard specifications to meet proposed finished grade. If the area being restored requires more than the minimum depth of topsoil to meet finished grade, fill this additional depth using topsoil or, at the Contractor’s option, embankment. Furnishing and placing this additional material is included in this item of work.

Ensure topsoil is weed and weed seed free and friable prior to placing seed. Remove any stones greater than 1/2-inch in diameter or other debris. Apply seed mixture and fertilizer to prepared soil surface. Incorporate seed into top 1/2-inch of topsoil.

Spread mulch at a rate of two tons per acre. If the Engineer allows dormant seeding spread mulch at a rate of 3 tons per acre. Place mulch anchoring over the mulch at a rate in accordance with subsection 816.03.F of the Standard Specifications for Construction. Place mulch blanket and high-velocity mulch blanket in accordance with subsection 816.03.G of the Standard Specifications for Construction and Standard Plan R-100 Series.

Install areas constructed with the TRM on prepared (seeded) grades as shown on the plans in accordance with the manufacturer’s published installation guidelines. Anchor the top edge of the TRM in a minimum six-inch deep trench. Operation of equipment on the slope is prohibited after placement of the TRM. No credit for splices, overlaps, tucks, or wasted material will be made.

Mix the BFM and organic binders thoroughly at a rate of 40 pounds for each 100 gallons of water or as otherwise recommended by the manufacturer. Hydraulically apply the BFM slurry in successive layers, from two or more directions, to fully cover 100 percent of the soil surface.

Ensure the minimum application rate is at least 3000 pounds of BFM for each acre or otherwise apply in accordance with the manufacturer’s recommendations as appropriate depending on site conditions.

Do not apply BFM on saturated soils or immediately before, during, or after rainfall.

Install modified mulch blanket in accordance with the manufacturer’s published guidelines and as directed by the Engineer.

If an area washes out after this work has been properly completed and approved by the Engineer, make the required corrections to prevent future washouts and replace the topsoil, fertilizer, seed, and mulch treatment. This replacement will be paid for as additional work using the applicable pay items.

If an area washes out for reasons attributable to the Contractor’s activity or failure to take proper precautions, replacement will be at no cost to the contract.

The Engineer will inspect the seeded turf to ensure it is well-established, in a vigorous growing condition, and contains the species called for in the seeding mixture.

If the seeded turf is not well-established at the end of the first growing season, the Contractor is responsible to re-seed until the turf is well established and approved by the Engineer at no cost to the contract.

Provide weed control, if weeds are determined by the Engineer to cover more than 10 percent of the total area of slope restoration, in accordance with subsection 816.03.I of the Standard Specifications for Construction. Weed control will be at no additional cost to the contract.

d. Measurement and Payment. The completed work, as described, will be measured and paid for at the contract unit price using the following pay items:

Pay Item Pay Unit

Slope Restoration, Non-Freeway, Type B ...................................................... Square Yard

Place Slope Restoration, Non-Freeway, Type B parallel (8 feet minimum) to the edge of the roadway in areas that have a 1 on 3 slope or less, in any ditch with a grade less than 1.5 percent, as shown on the plans, or as directed by the Engineer. Slope Restoration, Non- Freeway, Type B will be measured by area in square yards in place. Slope Restoration, Non-Freeway, Type B includes installing Topsoil Surface; Fertilizer, Chemical Nutrient;

seeding mixture; and Mulch Blanket.