This is an Advertisement for Bids issued by the City of Monroe, Georgia for the 2025 CDBG Sanitary Sewer System & Storm Drain Improvements project (CDBG No. 25p-x-147-2-6802). The project encompasses the construction of 2,585 linear feet of 8" DR 17 HDPE sanitary sewer pipe bursting, 11 manhole rehabilitations, 34 new sanitary sewer services, 5,386 linear feet of rollover curb and gutter, 2,188 linear feet of 18" RCP storm drain pipe, 11 GDOT 1019a structures, and associated pavement work including 256 tons of OGI Superpave and 406 tons of 9.5mm Superpave asphalt, plus striping, erosion control, traffic control, bypass pumping, and surface restoration. Sealed bids will be received at Monroe City Hall, 215 North Broad Street, Monroe, Georgia 30655 until August 14, 2026 at 11:00 am local time, at which point they will be publicly opened and read. All work must be completed within 180 consecutive calendar days from the notice to proceed. Bid documents, plans, and specifications are available from Hofstadter and Associates, Inc., Consulting Engineers at 4571 Arkwright Road, Macon, Georgia 31210 for a non-refundable deposit of $200 per set in PDF format, available by appointment only.

Bids must be submitted on furnished Bid Proposal Forms and accompanied by a Bidder's Bond payable to the City of Monroe for 10 percent of the bid amount, which will be forfeited as liquidated damages if the bidder fails to execute a written contract and provide required Payment and Performance Bonds and Insurance Certificates. No bids will be considered unless sealed and filed prior to the deadline; bids arriving after the designated time will be returned unopened. The project is funded through Community Development Block Grants (CDBG) and is subject to Section 3 of the HUD Act of 1968 requirements, with Section 3 Business Concerns encouraged to apply. The project is also subject to Build America, Buy America (BABA) Act compliance. Bids cannot be withdrawn for 60 days following the opening. The City of Monroe reserves the right to reject any or all bids and to disregard informalities or irregularities in proposals.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AB-1

ADVERTISEMENT FOR BIDS

Sealed bids will be received for the 2025 CDBG: Sanitary Sewer System & Storm Drain Improvements, CDBG No. 25p-x-147-2-6802 at the Monroe City Hall, 215 North Broad Street, Monroe, Georgia 30655 until 8/14/2026 at 11:00 am (Local Time), at which time they will be publicly opened and read.

The work under this Contract will consist generally of the following:

The construction of ± 2,585 LF of 8” DR 17 HDPE sanitary sewer pipe bursting; ±11 manholes rehabilitations; ±34 new sanitary sewer services for existing structures; ±5,386 LF of rollover curb and gutter following existing roadway elevation, ±2,188 LF of 18” RCP storm drain pipe, ±11 GDOT 1019a structures, leveling and resurfacing upon completion of pipe work including ±256 TONS of OGI Superpave, ±406 TONS of 9.5mm Superpave Asphalt, striping, erosion control; traffic control; bypass pumping; surface restoration; and all other appurtenances required to construct the project.

All work on the Project must be completed within 180 consecutive calendar days of date of notice to proceed.

Bid shall be submitted on Bid Proposal Forms furnished for that purpose, in accordance with the Contract Documents and the Plans and Specifications, which are on file and may be reviewed (by appointment only) at the office of Hofstadter and Associates, Inc., Consulting Engineers, 4571 Arkwright Road, Macon, Georgia 31210.

Copies of Bid Forms, Plans, Specifications and Contract Documents may be obtained from Hofstadter and Associates, Inc., 4571 Arkwright Road, Macon, Georgia 31210, upon deposit of $200 per set (.pdf format). No refund will be made for returned documents.

No bid will be considered unless sealed and filed with the City of Monroe prior to the time set forth above, and accompanied by a Bidder's Bond, payable to the City of Monroe, Georgia, for 10 percent of the amount of the bid; to be forfeited as liquidated damages in the event that the bid be accepted and the bidder fail to enter promptly into a written contract and furnish the required Payment Bond and Performance Bond and Insurance Certificates. Bids arriving after the designated time will be returned unopened.

Monroe is committed to Affirmatively Further Fair Housing. This project is covered under the requirements of Section 3 of the HUD Act of 1968. This contract opportunity is a Section 3 Covered Contract Section 3 Business Concerns are encouraged to apply. Monroe is committed to providing all persons with equal access to its services, programs, activities, education and employment regardless of race, color, national origin, religion, sex, familial status, disability or age. Section 3 documents are required prior to Notice of Award.

Build America, Buy America (BABA) Contract Clause All requirements of the Build America, Buy America (BABA) Act, 41 USC 8301 note, and all applicable rules and notices, as may be amended, shall be complied with if applicable to the infrastructure project. Pursuant to HUD’s Notice, “Public Interest Phased Implementation Waiver for FY 2022 and 2023 of Build America, Buy America Provisions as Applied to Recipients of HUD Federal Financial Assistance” (88 FR 17001), any funds obligated by HUD on or after the applicable listed effective dates, are subject to BABA requirements, unless excepted by a waiver.

No bids shall be withdrawn for a period of 60 days after the opening of bids. Owner reserves the right to reject any or all bids and to overlook and/or disregard informalities or irregularities in the proposals.

DATED: July 8, 2026