FB-670_DDX_Pricing_Sheet.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
SBRF FB-670 Dry Dock Federal contract opportunity
Solicitation number
6991PE19Q000023
Issued by
Department of Transportation Maritime Administration

About this file

Pricing Sheet

View the file

Other files for this federal contract opportunity

Other files attached to SBRF FB-670 Dry Dock, newest first.
File Type Posted
6991PE19Q000023_Comb._Syn_Sol_Revised.pdf PDF
FB-670_DDX_Pricing_Sheet_R1.xlsx XLSX spreadsheet
FB-670_DDX_Spec_2019_R3_091219.pdf PDF
FB-670_Fleet_positions_BSY_2010.pdf PDF
Wage_Determination.pdf PDF
FB-670_DDX_Spec_2019_R2_082019.pdf PDF
SBRF_BARGE_FB-670___CATHODIC_PROTECTION_PLAN_8-1-19.pdf PDF
4008-003-01A_MAIN_DECK_MODIFICATION_INCIDENTAL_ANCHOR_DEPLOYMENT.PDF PDF
4008-003-02_GEN_ARRGT_SCANTLINGS.PDF PDF
6991PE19Q000023_Comb._Syn_Sol.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sq Fts

Square footage calculationLWEaTotal
Underwater/Antifouling area6020
Bottom1153213680
Flat side7072980
Rake side401741360
Freeboard Area680
Rake ends (bow/stern)10322640
Vertical54240
Deck3520
Main Deck, Total1103213520
Main Deck, non-skid903212880
Main Deck, not non-skid20321640

Compartment Sq Fts

Compartments Square footage calculationLWEaTotal
End Compartment52801320ea
Bottom162041280
overhead162041280
fwd bhd2204160
aft bhd2204160
shell plate16104640
CL plating16104640
intermediate plating16104640
framing480enter this number manually
Mid Compartment148903722.4ea
Bottom163642304
overhead163642304
fwd bhd163642304
aft bhd163642304
shell plate361041440
CL plating361041440
intermediate plating361041440
framing1354
Grand total20170

Pricing Sheet

BG-8506 FUEL BARGE Drydocking and Repair
CLINDESCRIPTIONContractor Price

1.1 Delivery/Towing

1.2 On-Board Container Removal

1.3 Defueling and Tank Cleaning

1.4 Drydocking (incl LayDays)

1.5 Hull, Deck & Deckhouse Cleaning & Inspection

1.6 Surface Preparation

1.7 Coating

1.8 Cathodic Protection

1.9 Tank Internal Inspection

1.10 ABS Requirements

2Supplemental Labor = 500 hrs @ $___/Hr
Supplemental Materials$ 20,000
GRAND TOTAL$ 20,000
Notes:

2014 Lead Blast Sample

3ER & Aft Bosn Stores Preservation Combined6900sf$159,051$52,391$8,688$15,7562651530$267,697
R&R interferences1lot1005007500100
Access cuts4ea402005500160
R&R Protection1lot10050000100
R&R Staging1lot964800096
Mobilization/Demob blast equip, etc1lot10050001500100
HP Wash store room & dispose of wash water1lot60300050160
Blast to SP-6 100% entire room / stores6900sf0.1250.62500863
Purchase & dispose of Blastox grit @ 12 lb / sf41.4tons445000166
Clean up for paint1job12060000120
Apply two full coats high builds epoxy13800sf0.0150.600207
Apply one stripe coat3450lot0.0150.60052
Lead clean up, showers, monitoring, blood testing1lot240120040000240
Environmental controls1lot120240000120
Final lead clean up1lot12060000120
Clean up & touch ups1lot14874000148
S&S consumables2651hrs00040