Quote_Sheet.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- FS-65 MARY ANN Dry Dock
- Solicitation number
- 6991PE18Q000021
About this file
Specs and Quote Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FS-65-20.PDF | ||
| MARY-ANN.DOC | DOC document | |
| 140578-21_Plan_Profile.pdf | ||
| General_Arrangement_-_MARY_ANN_(FS-65).pdf | ||
| 140578-16_Compartment_and_Tanks_Arrt.pdf | ||
| 6991PE18Q000021.pdf | ||
| MARY_ANN_DDX_2018_Spec_R1_051618.docx | DOCX document | |
| RFQ_Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sq Fts
| Square footage calculation | L | W | Ea | Total | |||
| Underwater/Antifouling area | 4193 | ||||||
| Bottom | 103 | 30 | 1 | 3090 | |||
| Flat side | 103 | 4 | 2 | 824 | |||
| Transom | 30 | 2 | 1 | 60 | 1/2 bh | end & bot | |
| Skeg | 3 | 219 | 42 | 31 | 73 | ||
| Freeboard Area | 828 | ||||||
| flat Sides | 73 | 3 | 2 | 438 | |||
| Bow | 30 | 5 | 2 | 300 | |||
| Transom | 30 | 3 | 1 | 90 | |||
| Deck | 1/2bh | 3090 | |||||
| Main Deck bow only | 465 | 1 | 2 | 930 | |||
| Main deck w/house top | 72 | 30 | 1 | 2160 | |||
| 0 | |||||||
| Main Deck FR 3 to 5 | 16 | 30 | 1 | 480 | |||
| Deck house | 612 | ||||||
| Port/stbd | 32 | 4 | 2 | 256 | |||
| fwd/aft | 27 | 4 | 2 | 216 | |||
| Crane pedestal | 10 | 4 | 1 | 40 | |||
| Crane pedestal gussets | 5 | 4 | 5 | 100 | |||
| Total | 8723 | ||||||
| Anchor chain | |||||||
| Assume 1 lin ft = 1 sqft | 1 | 1 | 1980 | 1980 | |||
| 1.14 deck doubler | 30 | 2 | 1 | 60 | |||
| 1.14 side shell doubler | 7 | 3 | 2 | 42 |
Ballast
| ASM "Black Beauty" QCM | ||||||||
| 1 gal = 18.75 lbs | as weighed by ASM | |||||||
| 1 gal = .1337 ft3 | 1/7.48 | |||||||
| 18.75 #/gal x 1/.1337 gal/ft3 = | 140.23934181 | lb/ft3 | ||||||
| 50000 / 140.24 = | 356.5333333333 | ft3 | ||||||
| Fwd void = 17ft L x 30 ft W | ||||||||
| L | W | D | ||||||
| 17 | 30 | 0.7 | 357 | ft3 | ||||
| or | ||||||||
| 8 - 1/2" deep | ||||||||
| or | ||||||||
| 13.22222328 | yd3 | |||||||
| ASM Brazillian "pigs" | ||||||||
| Anchor chain | ||||||||
| lg/link | wd/link | lg/5-links " | #links/shot | wt/shot | shots/50K lb | lin ft | # 16 ft lengths | |
| 1.75" | 10.5 | 6.3 | 38.5 | 153 | 2590 | 19.3 | 1737.5 | 108.6 |
| 2" | 12 | 7.2 | 44 | 133 | 3360 | 14.9 | 1339.3 | 83.7 |
| 2.25" | 13.5 | 8.125 | 49.5 | 119 | 4250 | 11.8 | 1058.8 | 66.2 |
| 2.5 | 107 | 5270 | 9.5 | 853.9 | 53.4 |
2" chain ballast
| Chain ballast, FWD Void Space, BHD3 to BHD5 | |||
| Knowns: | 2" chain | ||
| Longitudinal FR spacing | 24 | inches | |
| Number of longitudinal FR divisions | 14 | each (7 P&S) | |
| Width of chain | 7.1875 | inches | |
| 5 links of chain = | 44 | inches | |
| weight of 1 shot | 2520 | lbs | Assuming wastage at 25% |
| number of links per shot | 133 | ||
| Length of void space | 192 | inches | |
| width of void space | 360 | inches | |
| Total weight of ballast desited | 50000 | lbs | |
| Number of shots in 50,000 lbs | 19.84 | shots (according to chart) | |
| The first course has to be laid inbetween interfering longitudinal framing | |||
| 3.34 | in the 24" long. FR spacing, 3.34 runs fo chain will lie in each long. Frame division | ||
| 4.36 | number of 44" sections in 192" | ||
| 21.82 | number of links in 192" | ||
| 18.95 | Lbs per link | ||
| 413.40 | weight per 192" (16') run | ||
| 17362.6794258373 | weight of first course | ||
| 42 | number of runs for first course | ||
| 7.47 | number of shots in first course | ||
| The second sourse can be laid on top of the first, with the links nestled, and is not so restricted by the framing | |||
| 50.09 | number of potential 16' chain runs in the second course | ||
| 32637.3205741627 | weight needed for second/subsequent courses | ||
| 78.95 | number of runs needed for second/subsequent courses | ||
| 413.40 | weight of each 16' run | ||
| 20669.86 | weight of 50 ea. 16' runs in second course | ||
| 8.89 | number of shots for second course |
| Third course | ||
| 11967.46 | Weight require for third course | |
| 28.95 | number of runs for third course | |
| 5.15 | number of shots for third course |
| 21.50 | total number of shots required |
| 21.56 | height of three courses of chain (inches) |
2 12" chain ballast
| Chain ballast, FWD Void Space, BHD3 to BHD5 | |||
| Knowns: | 2 1/2" chain | ||
| Longitudinal FR spacing | 24 | inches | |
| Number of longitudinal FR divisions | 14 | each (7 P&S) | |
| Width of chain | 9 | inches | |
| 5 links of chain = | 55 | inches | |
| weight of 1 shot | 3952.5 | lbs | Assuming wastage at 25% |
| number of links per shot | 107 | ||
| Length of void space | 192 | inches | |
| width of void space | 360 | inches | |
| Total weight of ballast desited | 50000 | lbs | |
| Number of shots in 50,000 lbs | 12.65 | shots (according to chart) | |
| The first course has to be laid inbetween interfering longitudinal framing | |||
| 2.67 | in the 24" long. FR spacing, 3.34 runs fo chain will lie in each long. Frame division | ||
| 3.49 | number of 44" sections in 192" | ||
| 17.45 | number of links in 192" | ||
| 36.94 | Lbs per link | ||
| 644.76 | weight per 192" (16') run | ||
| 27079.8300764656 | weight of first course | ||
| 37.33 | number of runs for first course | ||
| 6.64 | number of shots in first course | ||
| The second sourse can be laid on top of the first, with the links nestled, and is not so restricted by the framing | |||
| 40.00 | number of potential 16' chain runs in the second course | ||
| 22920.1699235344 | weight needed for second/subsequent courses | ||
| 35.55 | number of runs needed for second/subsequent courses | ||
| 644.76 | weight of each 16' run | ||
| 22566.53 | weight of 50 ea. 16' runs in second course | ||
| 8.89 | number of shots for second course |
| Third course | ||
| 353.64 | Weight require for third course | |
| 0.55 | number of runs for third course | |
| 0.10 | number of shots for third course |
| 15.62 | total number of shots required |
| 27.00 | height of three courses of chain (inches) |
Quote Sheet
| MARY ANN Self-Propelled Crane Barge DD&R Quote Sheet | ||
| CLIN | DESCRIPTION | Price |
| 1.1 | Drydocking (incl LayDays) |
1.2 Hull, Deck & Deckhouse Cleaning & Inspection
1.3 Anodes
1.4 Not Used
1.5 Not Used
1.6 Main Deck Hatches/Scuttles Replacement
1.7 Renew Chocks at FR11 P&S
1.8 Not Used
1.9 Not Used
1.10 Underwater Hull, Freeboard and Deck Surface Preparation
1.11 Hull, Main Deck & Deck House Coating
1.12 Propellers, Nozzles, Shafts, and Bearings
1.13 Rudders
| OPTIONS | |
| 1.14 | Cross-Deck Ship Anchor Chain Guide and Chain Stopper, Design |
| Cross-Deck Ship Anchor Chain Guide and Chain Stopper, Install |
1.15 Ballast Installation
1.16 Renew Engine Room Soft Patch
| SUPPLEMENTAL ITEMS | |
| 2 | Supplemental Labor: ___ per hour for 500 hours |
Supplemental Material $ 14,000
GRAND TOTAL $ 14,000