NM_FTFS_107(1)_100__Plans_signed.pdf

PDF 13 MB Posted

Attached to
NM FTFS 107(1) Lincoln NFSR 107 Federal contract opportunity
Solicitation number
6982AF18B000014
Issued by
Department of Transportation Federal Highway Administration

About this file

Plans

View the file

Other files for this federal contract opportunity

Other files attached to NM FTFS 107(1) Lincoln NFSR 107, newest first.
File Type Posted
Bid_Tabs.pdf PDF
Bid_Opening_Summary_.pdf PDF
QnA_1.17.19.pdf PDF
QnA_1.15.19.pdf PDF
QnA_1.9.19.pdf PDF
QnA_1.7.19.pdf PDF
Hydraulics_NM_FTFS_107(1)_Mingus_Mountain.pdf PDF
6982AF18B000014.pdf PDF
NM_FTFS_107(1)_100__Cross_Sections.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1 of 2

SYMBOLS AND ABBREVIATIONS

CONVENTIONAL PLAN

A2

ABBREVIATIONS DRAINAGE SYMBOLS

GEOLOGIC SYMBOLS

DI

FENCE & CATTLEGUARD SYMBOLS

Cattleguard (Existing, Proposed)

Fence w/ Gate (Existing, Proposed)

Fence (Existing, Proposed)

Material Source

Boring Location (Existing, Proposed)

Riprap Apron (Proposed)

Underdrain (Existing, Proposed)

With Drop Inlet (Existing, Proposed)

With Headwalls (Existing, Proposed)

With End Sections (Existing, Proposed)

Pipe Culvert (Existing, Proposed)

Box Culvert (Existing, Proposed)

Bridge (Existing, Proposed)

Spring

River

Wetland

Large Creek

Lake, Pond or Reservoir

Drainage or Small Creek

Flow Arrow

Ditch (Existing, Proposed)

SPRING

D jt.J int.

incr.

incl.

IDI

hwy.

HW

horiz.

hex.

HES

hdwl.H gdr.

galv.

ga.G ftg.

fin.

FES

Fed.

f.f.F ext.

exp. jt.

exc.

EW

et ux et al

ER

EQ or eq.

EOP

engr(s).

emb.

elev.

El. 94.066 e

EE

dwg(s).

DLC

Dist.

dist.

diaph.

diag.

dia. or D

DI

DHV

decr.D culv.

CTSM

ctrs.

CS

cr.

corr.

cont.

constr. jt.

constr.

conc.

col.

Co.

CMP

clr.

c-c

CBCC

brg.

br.

BP

BM

BK

beg.

b.f.B asph.

appr.

alt.

AH

aggr.

ADT

abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall

Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve

WW

VPI

vph vert.

VV

typ.

TS

transv.

TCE

TBM

tan.

T.

TT

sym.

struc.

str.

stiff.

std.

sta.

ST

st.

spec.

spa.

shldr.

sec.

SC

SADT

SS

rte.

Rt. or RT

RH

ret. wall

Res.

res.

reqd.

reinf.

reconst.

rdwy.

rd.

R/W

R.

RR

quant., QtyQ pvmt.

PT

psi proj.

POT

POS

POC

pl.

PI

perf.

PCC

PCP

OD

o.f.

o.c.O

no. or # neg.

NC

NN

mtn(s).

mon.

min.

max.

matl.

maint.

mag.M

LW

Lt. or LT

LPSM

long.

lat.

lam.

LL

EROSION & SEDIMENT CONTROL SYMBOLS

joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement

Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline

Ø

Riprap

Rolled Erosion Control Product

Diversion Berm

Check Dam

Bonded Fiber Matrix Mulching

Fiber Roll (Slope Protection)

Temporary Inlet Protection

Silt Fence

Fiber Roll (Ditch and/or Cut Slope)

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts A G e n s h t\

S Y

M

N M

.d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r r y a n .m a th is

NUMBER

SHEET

NM

Lincoln NFSR 107

NM FTFS 107(1)

SYMBOLS AND ABBREVIATIONS

CONVENTIONAL PLAN

Sheet 2 of 2

A3

Tree with > 18" diameter at breast height (DBH)

Type 2 Object Marker

36 31

36 31

6 1

ˆ

Treeline

Tree

MAPPING SYMBOLS

LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS

RIGHT-OF-WAY SYMBOLS

ROADWAY SYMBOLS

SIGN SYMBOLS

UTILITY SYMBOLS

Retaining Wall (Existing, Proposed)

Median & Side Barrier (Existing, Proposed)

Guardwall (Existing, Proposed)

Guardrail (Existing, Proposed)

GUARDRAIL, BARRIER & WALL SYMBOLS

Post Mounted (Existing, Proposed)

Portable (Proposed)

Delineator (Existing, Proposed)

Commercial (Existing, Proposed)

Signs

Telephone

Power

Fiber Optic

CATV

Overhead Utility Line (Existing, Proposed)

Water

Telephone

Sanitary Sewer

Power

Oil

Gas

Fiber Optic

CATV

Underground Utility (Existing, Proposed)

Telephone Pedestal (Existing, Proposed)

Telephone Booth (Existing, Proposed)

Street Light (Existing, Proposed)

Support Pole Anchor (Existing, Proposed)

Support Pole (Existing, Proposed)

Surface (Existing, Proposed)

Underground (Existing, Proposed)

Irrigation Ditch

999.9

Roadway Obliteration

Roadway Centerline (With Station ticks)

Proposed

Existing

Edge of Roadway

Toe of Fill

Transition

Top of Cut

Slope Stake Limits

Clearing/Construction Limits

Survey Control Point

Trail

Spot Elevation

Double Track

Single Track

Railroad

North Arrow

Coordinate Grid Tick

Building (Existing, Proposed)

Section Corner (Found)

Section Corner (Found, Projected)

Section Corner (Found, Projected)

Right-of-Way Line (Proposed)

Right-of-Way Line (Existing)

Property Line

Parcel Number

Monument (As described)

Temporary (Proposed)

Permanent (Proposed)

Permanent (Existing)

Easements

National Wildlife Refuge

National Park

National Forest

Bureau of Land Management

Bureau of Indian Affairs

Section

Section

Section

Township or Range Line

City

County

State

National

Boundaries

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts A G e n s h t\

S Y

M

N M

.d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r r y a n .m a th is

NUMBER

SHEET

NM

REVISIONS (OR CHANGE NOTICES)

DESCRIPTION

NO.

DATE INIT.

A4

SURVEY CONTROL

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts A G e n s h t\

C T

L

N M

.d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r r y a n .m a th is

NUMBER

SHEET

NM

SITE MAP

RATON

ALBUQUERQUE

SANTA FE

SOCORRO

LAS

LAS

CRUCES

VEGAS

Tucumcari

Farmington

Taos

Santa Rosa

Roswell

Carlsbad

Alamogordo

Silver

City

Cuba

Bernalillo

Dulce

INTERSTATE

INTERSTATE

INTERSTATE

INTERSTATE

COLORADO

OKLA.

T E

X A

S

TEXAS

MEXICO

A R I Z

O N

A

9 miles

Angus Ranch

Runnels

T u rk e y C a n y o n

Bonito Creek

Bonito Creek B e a r C r e e k

A5

Angus

Alto

Sierra Vista

NM FTFS 107(1)

Monjeau Peak

Scale in Feet

400' 800'

Scale in Miles

2 4

Ranch

Runnels

100+00.00

NM FTFS 107(1)

BEGIN PROJECT

143+83.91

NM FTFS 107(1)

END PROJECT

Area

Staging

500 feet

To campground

1500 feet

To campground

Existing NFSR 107

Ex ist ing N

FS

R 1

Existin g NFSR 107

Existing NFSR 107

New NFSR 10

New NFSR 107

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts A G e n s h t\

S T

E

N M

.d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r r y a n .m a th is

NUMBER

SHEET

NM

10' 10'

5' Clear zone 5' Clear zone

Station to Station

LENGTH OF PROJECT

TOTAL (mi)

TOTALS (ft)

(ft)

Roadway

Hinge point

Hinge point

1:4

Cut slope

(variable)

See plans for locations of curves and superelevations

METHOD OF SUPERELEVATION ON CURVES

SubgradeSubgrade

Traveled way Traveled way ditch

Graded

NO SCALE

NOTE:

Superelevations shown in plans Superelevat ions shown in plans grade

Profile superelevation

Pivot point for

(variable)

Fill slope

1.

3.

2.

2.

cut slope

Rounded

MAINLINE

TYPICAL SECTIONS

limit stake

Slope

1:4

5'

Clearing and construction limits

5' limit

Slope stake

A6

Average 20 ft

100+00.00 to 143+83.91

0.83

4383.91

4383.91

100+00.00 to 143+83.91

TYPICAL SECTION

1'

Existing ground

1'4'

100+00.00 to 143+83.91

EXISTING TYPICAL SECTION

Existing width varies

Existing aggregate depth varies 4.

111+00.00 to 136+00.00 RT

SPECIAL DITCH TYPICAL SECTION

B=5'F=5' aggregate) roadway

(top of

Profile grade

1:2

MGS Guardrail way

Traveled

5.

SECTION DETAIL

GUARDRAIL TYPICAL

6.

5.

4.

3.

2.

1.

6.6.

location of guardrail.

Refer to plans and tabulations for right side of the roadway.

Detail applies to both the left and

Edge of traveled way

4% 4%

9' 9'

8" block

2'

1:2

1:4

Hinge point

(v ar iab le)

2.

Existing ground

3.cut slope

Rounded

Cu t s lop e

5' limit

Slope stake

6' ditch

Graded

1.

B=5'

F= 5'

-4% Normal crownNormal crown -4% mulching limits

Topsoil, seeding, and mulching limits

Topsoil, seeding, and method 2, surface course

3" Roadway aggregate, 2' and cross section sheets.

Cross slopes are at a 4% crown unless otherwise noted on the plan and profile

Provide alternative grading behind terminal sections per Standard 617-20.

undisturbed land.

Approximate Sta. 102+00 to 113+00 and Sta. 137+00 to 141+00 is reduce the B and F dimensions to the actual cut height.

Round all earth slopes and all rippable rock slopes. For cut heights less than B, See the cross sections for cut and fill slope ratios.

slope ratios may be adjusted by the CO to assure adequate drainage and stability.

The gradient and width of roadway ditches and the excavation and embankment

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts A G e n s h t\

T Y P

N M

.d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r r y a n .m a th is

NUMBER

SHEET

NM

STATION

CLASS

TYPE1.

(ft)

LENGTH

TOTAL

s = 1:4 for type 2 approach s = 1:3 for type 1 approach d = 3' for type 2 approach d = 2' for type 1 approach x = 15' Minimum for type 2 approach x = 0' for type 1 approach

(ft)

R

(ft)

R

(ft)

W 1 2

16'x

20' desired

15' min.

APPROACH ROADS

TYPICAL SECTIONS

widths greater than 15 feet.

Apply the normal crown to approach roads with

CLASSTYPE

APPLICATION

SAMPLE

Paved apron

ADT ≥ 200

100 ≤ ADT < 199

25 ≤ ADT < 100

ADT < 25

Minimum 2-Way Use

Logging Truck Use

Farm Equipment

Minimum 1-Way Use

Field Access

A

E

D

C

B

A

D

C

B

A

* Match existing

(ft)

W

WIDTH

MIN.

(ft)

R

RADIUS

MIN.

N/A

A7

140+32 Lt.

137+67 Rt.

126+50 Rt.

118+68 Rt.

116+08 Lt.

112+50 Rt.

102+28 Lt.

101+60 Rt.

101+52 Lt.

100+65 Rt.

2B

1B

1A

1A

1B

1B

1B

1A

1A

1A

13.9

20.9

14.5

14.4

20.5

1'

W

1' d

4.4.

method 2, surface course

3" Roadway aggregate, (ft)

LENGTH

PAVED

7.

Variable

V a ria b le s

M a in li n e

Mainline

±2%

TYPICAL PROFILE

Shoulder edge

A

TYPICAL SYMBOL

grade (optional)

Typical maximum design b y t h e C o n tr a c ti n g O ff ic e r

R ig h t-o f-w a y o r a s s ta k d

NOTE:Paved length base edge

Aggregate

Approach Road

TYPICAL PLAN

TYPES 1 & 2

APPROACH ROAD

REMARKS

APPROACH ROAD SUMMARY

Flatten slope road connection on plan and profile sheet

Example of symbol showing standard approach shown may be varied ±20°.

Under special conditions, the approach road angle

3.

2.

1.

Subgrade edge

Subgrade edge

Aggregate base edge

End Section A-A

Type

Class

Mainline stationing

Typical maximum grade ±10%VPI

VPC

90° edge subgrade

Normal

R

Total length

R1

WW

with mainline roadway construction.

Construct cut and fill slopes for approach roads to match locations to be field verified.

Stations shown are approximate locations. Actual maximum.

0% to -2% grade. Under special conditions, use 6% grades within ±2%. In snowy regions restrict this to a

Construct approach roads with landing areas having

A

A

SECTION A-A

6.

6.

5.

7.

6.

5.

4.

3.

2.

1.

approach road centerline.

existing radii or widths. R is on the left side of the

Vary radii to fit unusual field conditions. Do not reduce existing conditions as directed by the CO.

Adjust approach dimensions as necessary to fit

Approach roads were not designed for this project.

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts A G e n s h t\

T Y P

N M

.d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r r y a n .m a th is

NUMBER

SHEET

NM

Sheet and Description

B3 B4 B5-B6

Surfacing, Grading, and

Drainage Summaries

Permanent Sign Summary

Miscellaneous Summaries Allowance Bid

Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15215-1000 SURVEY AND STAKING, APPROACH ROAD EACH 5 5

A0060 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 4 4

A0080 15215-5000 SURVEY AND STAKING, BOX CULVERT EACH 3 3

A0100 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL MILE 0.830 0.830

A0120 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 0.830 0.830

A0140 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0160 15401-0000 CONTRACTOR TESTING LPSM ALL

A0180 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0200 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL LPSM ALL

A0220 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 2,992 208 3,200

A0240 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 450 450

A0260 15802-0000 WATERING FOR DUST CONTROL LPSM ALL

A0280 20101-0000 CLEARING AND GRUBBING ACRE 4.6 0.2 4.8

A0300 20301-2400 REMOVAL OF SIGN EACH 2 2

A0320 20401-0000 ROADWAY EXCAVATION CUYD 6,575 725 7,300

A0340 20441-0000 WASTE CUYD 358 42 400

A0360 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 282 18 300

A0380 30202-2100 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE TON 1,716 84 1,800

A0400 60103-0000 CONCRETE, HEADWALL (10 FT x 6 FT BOX) EACH 2 2 Includes wingwalls and toewalls

A0420 60103-0000 CONCRETE, HEADWALL (12 FT x 6 FT BOX) EACH 2 2 Includes wingwalls and toewalls

A0440 60103-0000 CONCRETE, HEADWALL (12 FT x 8 FT BOX) EACH 2 2 Includes wingwalls and toewalls

A0460 60201-0800 24-INCH PIPE CULVERT LNFT 152 8 160

A0480 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 8 8

A0500 60220-3050 10 FEET SPAN, 6 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT LNFT 39 39

A0520 60220-3975 12 FEET SPAN, 6 FEET RISE, PRECAST REINFORCED CONCRETE BOX CULVERT LNFT 61 61

A0540 60220-4050 12 FEET SPAN, 8 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT LNFT 36 36

A0560 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS LNFT 663 37 700

A0580 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT EACH 12 12

A0600 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40

A0620 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH HOUR 20

A0640 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 20

A0660 62201-3000 HYDRAULIC EXCAVATOR HOUR 20

A0680 62301-0000 GENERAL LABOR HOUR 40

A0700 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 20

A0720 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 40

A0740 62402-0200 FURNISHING AND PLACING TOPSOIL, 3-INCH DEPTH ACRE 1.5 0.1 1.6

A0760 62406-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH ACRE 1.7 0.1 1.8

A0780 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 3.2 0.2 3.4

A0800 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 2.1 0.1 2.2

MileStone: 100% Date Completed: 08/28/18 Report Date: 08/28/18

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Schedule A

-A ug

-2

:0

PM

Remarks and/or Determination of Estimated QuantityPay Item Description Unit

Estimated Quantities

N

N M

\1

(1

R oa dw ay

\C A D

D _S he et s\ B -S um m

SO

Q .x ls m

]S he et

STATE PROJECT

B1NM FTFS 107(1)NM

SHEET

NUMBER

Sheet and Description

B3 B4 B5-B6

Surfacing, Grading, and

Drainage Summaries

Permanent Sign Summary

Miscellaneous Summaries Allowance Bid

Schedule

A0820 62516-3000 MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX SQYD 5,174 326 5,500

A0840 63301-0000 SIGN SYSTEM EACH 4 4

A0860 63308-2000 OBJECT MARKER, TYPE 2 EACH 4 4

A0880 63316-1000 REMOVE AND RESET SIGN EACH 1 1

A0900 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 8 8 8 ft. min.

A0920 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 80 80

A0940 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 40 40

A0960 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 18 18

A0980 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE LNFT 300 300 As directed by CO

A1000 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 160 160

-A ug -2

:0

PM

MileStone: 100% Date Completed: 08/28/18 Report Date: 08/28/18

N

N M

\1

(1

R oa dw ay

\C A D

D _S he et s\ B -S um m

SO

Q .x ls m

]S he et

2)

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated Quantity

STATE PROJECT

B2NM FTFS 107(1)NM

SHEET

NUMBER

B3

DRAINAGE SUMMARIES

SURFACING, GRADING, AND

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts B S u m m S

U M

N

M .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r r y a n .m a th is

NUMBER

SHEET

NM

B4

PERMANENT SIGN SUMMARY

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts B S u m m S

U M

N

M .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r r y a n .m a th is

NUMBER

SHEET

NM

B5

MISCELLANEOUS SUMMARIES

Sheet 1 of 2

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts B S u m m S

U M

N

M .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r r y a n .m a th is

NUMBER

SHEET

NM

B6

MISCELLANEOUS SUMMARIES

Sheet 2 of 2

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts B S u m m S

U M

N

M .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r r y a n .m a th is

NUMBER

SHEET

NM

P O

T

.0

P C

.6

P R

C

.4

P T

.6

0 P

C

.7

PT

.1

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts C

M L P

P P

N P

N M

.d g n

U s e r r y a n .m a th is

NUMBER

SHEET

Superelevation Diagram

NM

Lincoln NFSR 107

NM FTFS 107(1)

V P I

E L

,7

.0

-8 .3

-0.700%

300' VC

K = 39

V P I

E L

,7

.0

-0.700% -2.100%

200' VC

K = 143

SSD = 871'

V P I

E L

,7

.7

-2.100%

-1.500%

100' VC

K = 167

V P I

E L

,7

.9

-1.500% +1.300%

250' VC

K = 89

V P I

E L

,7

.5

+1.300%

-4.300%

150' VC

K = 27

SSD = 268'

C1

Profile grade

Existing ground

-5%

100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00 113+00 114+00

200'100'0

Scale in Feet

A

A

A

B

B

E = 1778967.1102

N = 897433.6973

100+00.00

NM FTFS 107(1)

BEGIN PROJECT

MPH

Remove existing sign

W13-1p

W1-2L

Install W1-4R

Install W1-4R

2+

Install Guardrail, RT

Install Guardrail, LT

Install Guardrail, RT

Install Guardrail, LT

Bo nit o C ree k

Bonito Creek

B e a r

C re e k

B e a r

C re e k

0%

+5%

-5%

0%

+5%

+3.79% LT

-2.00% RT

-4.00% LT/RT

Curve = LIN-1

PI 101+98.39

D

R = 310.00'

T = 73.74'

L = 144.79'

Curve = LIN-2

PI 104+73.75

D

R = 550.00'

T = 204.31'

L = 391.24'

Curve = LIN-3

PI 113+02.41

D

R = 450.00'

T = 147.71'

L = 285.45'

-1.80% LT

+1.80% RT

-4.00% LT/RT

NOTE:

field and modify the superelevation transitions as needed.

preliminary layout. Verify the slope of the box culvert in the

The cross slope at the proposed box culvert is based on the1.

1.

1.

LINCOLN NFSR 107 STA. 100+00 TO 114+00

Placed Riprap, Method A, Class 3 LT

End sections LT/RT

Install 24-Inch Pipe Culvert, 28 LNFT

Sta. 107+85

Axis of rotation

Placed Riprap, Method A, Class 3

End sections LT/RT

Install 24-Inch Pipe Culvert, 46 LNFT

Sta. 102+28, LT

S e e S h e e t

D

C la s s L

T R

T

M e th o d A

P la c e d R ip r a p

H e a d w a ll L

T R

T

C o n c r e te r is e b o x c u lv e r t

L

N F T s p a n x

S ta

100+29

100+52

101+07

S e e S h e e t

D

C la s s L

T R

T

M e th o d A

P la c e d R ip r a p

H e a d w a ll L

T R

T

C o n c r e te r is e b o x c u lv e r t

L

N F T s p a n x

S ta

PT

.1

PC

.1

P T

.1

P C

.2

P T

.6

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts C

M L P

P P

N P

N M

.d g n

U s e r r y a n .m a th is

NUMBER

SHEET

Superelevation Diagram

NM

Lincoln NFSR 107

NM FTFS 107(1)

V P I

E L

,6

.5

-4.300% +3.6

300' VC

K = 38

V P I

E L

,7

.5

+3.6

-6.500%

200' VC

K = 20

SSD = 207'

V P I

E L

,6

.5

-6.500%

200' VC

K = 51

-2.600%

V P I

E L

,6

.5

-2.600%

-1.000%

150' VC

K = 94

C2

Profile grade

Existing ground

114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00 126+00 127+00 128+00

200'100'0

Scale in Feet

+5%

-5%

A

A

B

USFS Rules

Remove and Reset Sign

B o n it o C r e e k

Bonito Creek

0%

+5%

0%

-5%

-4.00% LT/RT

Curve = LIN-4

PI 116+42.01

R = 250.00'

T = 87.83'

L = 168.92'

D

Curve = LIN-5

PI 124+60.86

D

R = 1,500.00'

T = 287.63'

L = 568.37'

Placed Riprap, Method A, Class 3 LT

End sections LT/RT

Install 24-Inch Pipe Culvert, 30 LNFT

Sta. 116+00

LINCOLN NFSR 107 STA. 114+00 TO 128+00

Axis of rotation

5 7

P T

.6

P C

.8

P T

.6

P C

.8

PRC

9+ .3

P T

.6

P C

.7

P T

.2

P O

T

.9

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts C

M L P

P P

N P

N M

.d g n

U s e r r y a n .m a th is

NUMBER

SHEET

Superelevation Diagram

NM

Lincoln NFSR 107

NM FTFS 107(1)

V P I

E L

,6

.7

-1.000%

-3.800%

200' VC

K = 71

SSD = 485'

V P I

E L

,6

.5

-3.800%

-1.200%

250' VC

K = 96

-1.200%

V P I

E L

,6

.5

-3.700%

150' VC

K = 60

SSD = 507'

V P I

E L

,6

.7

-3.700%

200' VC

K = 47

V P I

E L

,6

.9

+0.600% -2.900%

100' VC

K = 29

SSD = 358'

-2.900%

128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00 141+00 142+00

C3

200'100'0

Scale in Feet

-5%

+5%

Profile grade

Existing ground

137+67 1

B

140+32B

NOTE: See Note 1

Install W1-5R

Remove existing sign

W1-5L

Bonito Creek

Install Guardrail, LT

Install Guardrail, RT

0%

+5%

0%

-5%

-4.00% LT/RT

Curve = LIN-6

PI 132+93.11

D

R = 500.00'

T = 87.25'

L = 172.75'

Curve = LIN-7

PI 137+81.03

D

R = 220.00'

T = 210.17'

L = 335.52'

Curve = LIN-8

PI 140+38.22

D

R = 150.00'

T = 131.83'

L = 216.31'

Curve = LIN-9

PI 142+60.44

D

R = 280.00'

T = 78.73'

L = 153.50'

+1.10% LT

-1.10% RT

-4.00% LT/RT

2.

2.

LINCOLN NFSR 107 STA. 128+00 TO 142+00

Axis of rotation field and modify the superelevation transitions as needed.

preliminary layout. Verify the slope of the box culvert in the

The cross slope at the proposed box culvert is based on the2.

LIDAR data for this area.

analysis and culvert design was completed with available and at the location of the proposed box culvert. The hydraulic

The existing stream crossing was not surveyed downstream of1.

Placed Riprap, Method A, Class 3

End sections LT/RT

Install 24-Inch Pipe Culvert, 48 LNFT

Sta. 137+67, RT

S e e S h e e t

D

C la s s L

T R

T

M e th o d A

P la c e d R ip r a p

H e a d w a ll L

T R

T

C o n c r e te r is e b o x c u lv e r t

L

N F T s p a n x

S ta

120' radius

LIN-8 maybe adjusted to a minimum of impacts as directed by the CO; Curve adjust alignment as necessary to avoid in the survey; field verify locations and

Locations of these trees were not included

Do not disturb existing cottonwood trees

138+50

139+49

139+24

7670P C

.7

P T

.2

P O

T

.9

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts C

M L P

P P

N P

N M

.d g n

U s e r r y a n .m a th is

NUMBER

SHEET

Superelevation Diagram

NM

Lincoln NFSR 107

NM FTFS 107(1)

V P I

E L

,6

.3

-2.900% +5.

5%

140' VC

K = 18

,6

.0

142+00 143+00 144+00

-5%

+5%

C4

Existing ground

Profile grade

200'100'0

Scale in Feet

E = 1783081.1960

N = 897572.5900

143+83.91

NM FTFS 107(1)

END PROJECT

No Garbage existing sign

Do not disturb

Install W1-5R

0%

+5%

0%

-5%

-4.00% LT/RT

+1.96% LT

-4.27% RT

Curve = LIN-9

PI 142+60.44

D

R = 280.00'

T = 78.73'

L = 153.50'

LINCOLN NFSR 107 STA. 142+00 TO 143+83.91

Axis of rotation

.9

143+83.91

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts D

M in o r P

P D

R G

N

M .d g n

U s e r r y a n .m a th is

NUMBER

SHEET

NM

Lincoln NFSR 107

NM FTFS 107(1)

D1

Roadway Centerline

Edge of Traveled Way

Edge of Traveled Way

MGS Guardrail, Steel Posts

-1.80% +1.80%

CL

Sta. 103+46.00 R 1

Des. Grade = 7718.13

0 10 20 30 40 50-40 -30 -20 -10

20'10'0

Scale in Feet

Bonito Creek

Thalweg

Backfill

N.T.S.

"1

E m b e d m e n t

Foundation fill

12.0'

Class 3 Riprap

1'

3.5'

.0 haunch (typ.)

12" x 12"

CONCRETE BOX CULVERT TYPICAL SECTION

1'

.5

Wingwall A

Wingwall B Wingwall D

Wingwall C

Concrete wingwall (typ.).

El. 7718.07

Wingwall A & B

Traveled Way

Edge of Traveled Way

Edge of

Ground

Existing

Toe wall (typ.)

Sta. 103+46.00 (typ.).

headwall

Concrete

El. 7719.15

Wingwall C & D 29'32'

12' span x 6' rise concrete box culvert

Elev. 7713.15

Stream Inlet

7711.65Elev.

Box Culvert Inlet Invert

Elev. 7712.07

Stream Outlet

7710.57Elev.

Box Culvert outlet Invert

-1.80%

Pay Length = 61'-0"

CL

ty p

PLAN

ty p.

Class 3 Riprap (typ.)

'0

El. 7714.07

Wingwall B

El. 7718.07

Wingwall A

El. 7719.15

Wingwall D

El. 7715.65

Wingwall C

BONITO CREEK BOX CULVERT @ STA. 103+46

ELEVATION

20'

1' 1'Headwall (typ.)

of culvert to the distance shown in plan view.

Continue riprap and low flow channel backfill outside

Granular Rock Backdrain is subsidiary to box culvert.

Riprap meeting the requirements of Section 703.17.

3. Place Granular Rock Backdrain material over Class 3

Headwall. See Special 601-A for details.

and paid for according to item 60103-0000, Concrete,

2. Headwalls, toewalls, and wingwalls will be constructed for box culvert requirements.

1. See Section 602 of the Special Contract Requirements

NOTES:

Low Flow Channel Backdrain Granular Rock

L o w F lo w C h a n n e l

3.

3.

Reinforced Concrete Box Culvert.

12 Feet Span, 6 Feet Rise Precast paid under item 60220-3975, geometry. Channel grading work is the existing channel cross sectional outlet as directed by the CO. Match the proposed box culvert inlet and

Grade the existing channel to match

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts D

M in o r P

P D

R G

N

M .d g n

U s e r r y a n .m a th is

NUMBER

SHEET

NM

Lincoln NFSR 107

NM FTFS 107(1)

D2Edge of Traveled Way Edge of Traveled Way

MGS Guardrail, Steel Posts

Existing Ground

0 10 20 30 40 50-40 -30 -20 -10

20'10'0

Scale in Feet

Bear Creek

-4.00%-4.00%

Thalweg

Backfill

N.T.S.

"1

E m b e d m e n t

Foundation fill

Class 3 Riprap

10"

3.5'

.0 haunch (typ.)

10" x 10"

CONCRETE BOX CULVERT TYPICAL SECTION

10"10'

(typ.).

headwall

Concrete

Centerline

Roadway

.5

Wingwall A

Wingwall B

Wingwall D

Wingwall C

CL

El. 7706.14

Wingwall A & B

Wingwall B El. 7702.81

Wingwall A El. 7702.81

Traveled Way

Edge of

Wingwall D El. 7703.57

Wingwall C El. 7703.57

El. 7706.90

Wingwall C & D

Traveled Way

Edge of

Toe wall (typ.)

7698.81Elev.

Box Culvert Outlet Invert

Sta. 110+57.97 R 1

Des. Grade = 7707.86

7699.57Elev.

Box Culvert Inlet Invert

10' span x 6' rise concrete box culvert

Sta. 110+58.00

Elev. 7700.31

Stream Outlet Elev. 7701.07

Stream Inlet slope

1:2 max.

-2.00%

45° (typ.)

(t y p

Class 3 Riprap (typ.)

PLAN

BEAR CREEK BOX CULVERT @ STA. 110+58

ELEVATION

'0

R d w y

S e c ti o n

V a r ie s

Pay Length = 39'

19'20'

2'

9'

9'

2'

1' 1'

Headwall (typ.)

of culvert to the distance shown in plan view.

Continue riprap and low flow channel backfill outside

Granular Rock Backdrain is subsidiary to box culvert.

Riprap meeting the requirements of Section 703.17.

3. Place Granular Rock Backdrain material over Class 3

Headwall. See Special 601-A for details.

and paid for according to item 60103-0000, Concrete,

2. Headwalls, toewalls, and wingwalls will be constructed for box culvert requirements.

1. See Section 602 of the Special Contract Requirements

NOTES:

L o w F lo w C h a n n e l

3.

Low Flow Channel Backdrain Granular Rock 3.

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts D

M in o r P

P D

R G

N

M .d g n

U s e r r y a n .m a th is

NUMBER

SHEET

NM

Lincoln NFSR 107

NM FTFS 107(1)

D3

Edge of Traveled Way

MGS Guardrail, Steel Posts

0 10 20 30 40 50-40 -30 -20 -10

20'10'0

Scale in Feet

Bon ito

Cre ek

Sta. 139+00.00 R 1

Des. Grade = 7647.24

+1.10% -1.10%

Thalweg

Backfill

N.T.S.

"1

E m b e d m e n t

Foundation fill

12.0'

Class 3 Riprap

1'

3.5' haunch (typ.)

12" x 12"

CONCRETE BOX CULVERT TYPICAL SECTION

1'

.5

Wingwall A

Wingwall B

Wingwall D

Wingwall C

Centerline

Roadway

Way

Traveled

Edge of

Concrete wingwall (typ.).

(typ.).

headwall

Concrete

CL

Wingwall B El. 7647.94

Wingwall A El. 7647.94

El. 7647.94

Wingwall A & B

El. 7647.55

Wingwall C & D

Wingwall D El. 7647.55

Wingwall C El. 7647.55

Toe wall (typ.)

7639.94

Stream Inlet Elev.

Elev. 7638.44

Box Culvert Inlet Invert

Elev. 7638.05

Box Culvert Outlet Invert

Elev. 7639.55

Stream Outlet

17.6'18.4'

Way

Traveled

Edge of

Way

Traveled

Edge of

12' span x 8' rise concret box culvert

Sta. 139+00.00

-1.10%

Pay Length = 36'-0"

5°

2'

9'

9'

2' ty p

5°

Class 3 Riprap (typ.)

PLAN

BONITO CREEK BOX CULVERT @ STA. 139+00

ELEVATION

12' 15'

See Note

Existing Ground available LIDAR data for this area.

The hydraulic analysis and culvert design was completed with

The existing stream crossing was not sureyed at this location.

NOTE:

' 3

1'1'

Headwall (typ.)

L o w F lo w C h a n n e l

Low Flow Channel Backdrain Granular Rock of culvert to the distance shown in plan view.

Continue riprap and low flow channel backfill outside

Granular Rock Backdrain is subsidiary to box culvert.

Riprap meeting the requirements of Section 703.17.

3. Place Granular Rock Backdrain material over Class 3

Headwall. See Special 601-A for details.

and paid for according to item 60103-0000, Concrete,

2. Headwalls, toewalls, and wingwalls will be constructed for box culvert requirements.

1. See Section 602 of the Special Contract Requirements

NOTES:

3.

3.

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts E E

C P

N M

.d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r r y a n .m a th is

NUMBER

SHEET

NM

Lincoln NFSR 107

NM FTFS 107(1)

0 1

E1

200'100'0

Scale in Feet

200'100'0

Scale in Feet

200'100'0

Scale in Feet

100+00.00

NM FTFS 107(1)

BEGIN PROJECT

100+00 TO 129+00

SEDIMENT CONTROL PLAN

EROSION AND

Typ.

Bonded Fiber Matrix

Mulching, Hydraulic Method, Spaced at 50'

Soil Erosion Control, Check Dam

Sta. 100+00 to 102+00, RT

Soil Erosion Control, Silt Fence

Sta. 102+00 to 103+11, RT

Soil Erosion Control, Silt Fence

Sta. 103+30 to 104+53, RT

Soil Erosion Control, Silt Fence

Sta. 102+48 to 103+77, LT

Soil Erosion Control, Silt Fence

Sta. 109+50 to 110+33, RT

Soil Erosion Control, Silt Fence

Sta. 110+61 to 111+09, RT

Soil Erosion Control, Silt Fence

Sta. 103+97 to 110+57, LT

Soil Erosion Control, Silt Fence

Sta. 110+81 to 111+64, LT

Spaced at 80'

Soil Erosion Control, Check Dam

Sta. 113+00 to 114+60, RT

Spaced at 80'

Soil Erosion Control, Check Dam

Sta. 117+00 to 117+80, RT

Soil Erosion Control, Silt Fence

Sta. 114+00 to 116+51, LT

Soil Erosion Control, Silt Fence

Sta. 116+67 to 117+24, LT

Spaced at 50'

Soil Erosion Control, Check Dam

Sta. 119+00 to 120+50, RT

Soil Erosion Control, Silt Fence

Sta. 119+50 to 121+00, LT

Spaced at 100'

Soil Erosion Control, Check Dam

Sta. 121+50 to 125+50, RT

Soil Erosion Control, Silt Fence

Sta. 123+50 to 127+00, LT

Typ.

Bonded Fiber Matrix

Mulching, Hydraulic Method, STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts E E

C P

N M

.d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r r y a n .m a th is

NUMBER

SHEET

NM

Lincoln NFSR 107

NM FTFS 107(1)

E2

200'100'0

Scale in Feet

129+00 TO 143+83.91

SEDIMENT CONTROL PLAN

EROSION AND

143+83.91

NM FTFS 107(1)

END PROJECT

Soil Erosion Control, Silt Fence

Sta. 138+50 to 139+81

Typ.

Bonded Fiber Matrix

Mulching, Hydraulic Method, Soil Erosion Control, Silt Fence

Sta. 128+50 to 130+00, LT

Spaced at 80'

Soil Erosion Control, Check Dam

Sta. 129+00 to 133+00, RT

Soil Erosion Control, Silt Fence

Sta. 131+50 to 135+70, LT

Spaced at 80'

Soil Erosion Control, Check Dam

Sta. 136+00 to 137+60, RT

SILT FENCE

6" min. trench

6" min.

18" min.

30" min.

24" min.

C157-50

NOTE:

4.

3.

2.

1.

6 ft. (max.)

fence support mesh = withoutPost spacing

10 ft. (max.)

fence support mesh =withPost spacing running around the ends.

fence up the slope to prevent water from

As the slope is constructed, curve the silt contours as closely as possible.

Install silt fence to follow the ground manufacturer's recommendations.

machine-sliced silt fence according to the slicing as approved by the CO. Install

Silt fence may be installed using machine

DETAIL APPROVED FOR USE

REVISED: 08/2014

A

M

DETAIL

E3

ELEVATION

PLAN

POST AND GEOTEXTILE INSTALLATION DETAIL

SILT FENCE INSTALLATION AT TOE OF FILL

Flow Fi ll slo pe

Flow

T o e o f s lo p e

Flow

(undisturbed)

Existing ground

END POSTS DETAIL

PLAN

PLAN

END DETAIL

ELEVATION

Fi ll sl op e

Steel or wood post

Backfilled and compacted soil

Limits of clearing

Steel or wood post

Varies

Varies

See Note 3 for spacing

See Note 4

Fasten fabric to posts.

around each post one full turn.

Fold geotextile fabric

NO SCALE

PLAN

T o e o f s lo p

Note 3See

Staple or tie

Top of posts tied together.

Posts driven tightly together.

Steel or wood posts

POSTS AT JOINTS

See End Posts Detail

End posts

Geotextile fabric

Staple or tie

SILT FENCE AS PERIMETER CONTROL

Fill

Existing ground

Sheet flow Silt fence

PLAN

SECTION A-A

A

A

Roadway

Edge of shoulder

Edge of shoulder

Toe of slope

Toe of slope

Posts Detail

See End

End posts

Silt fence

Fence support mesh (optional)

Section A fabric

Geotextile

Section B

Geotextile fabric

Geotextile

See Typical Section Sheet

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts E C .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

REVISED:

DETAIL

U.S. CUSTOMARY DETAIL

DETAIL APPROVED FOR USE

U s e r r y a n .m a th is

NUMBER

SHEET

NM

12" min.

DETAIL APPROVED FOR USE 01/2011

FIBER ROLL

Maximum spacing (ft)

9" Ø Fiber Roll

Flow

12" min.

C le a r in g

L im it

S lo p

S ta k e

INSTALLATION DETAIL

FIBER ROLL AS PERIMETER CONTROL

uphill side of fiber roll

Place excavated material on

AT CULVERT OUTLET

FIBER ROLL

flared end section

Culvert inlet with

AT CULVERT INLET

FIBER ROLL

flared end section

Culvert outlet with Flow

D ire c tio n o f ru n o ff

Flow

FIBER ROLL LAPPING DETAIL

Stagger joints (typ.)

FIBER ROLL JOINT DETAIL

FIBER ROLL SLOPE LAYOUT

spacing table See Fiber Roll

Install fiber rolls along contours Wood stakes

Fiber Roll

Slope

Fiber Roll

Pay Limits

Pay Limits overlap 12" (min.)

Fill slope

C157-55 side of fiber roll material on uphill

Place excavated

Flow Flow

54" or larger

Culvert Size

24" or smaller

30" to 48"

9" Ø Fiber Roll length (ft)

FIBER ROLLS AT CULVERTS*

needed due to project-specific conditions.

top of the culvert inlet only. Adjust length as

*Approximate length shown for rolls across the

See note 6 control runoff culvert as needed to

Install fiber rolls below

6.

5.

4.

3.

2.

1.

disturbance.

and all water entering the culvert is crossing the disturbance is on both the road and around the culvert

Place fiber rolls all the way around the inlet when the under it.

water is forced to flow through fiber roll rather than against upstream side of fiber roll to ensure storm with trench bottom and sides. Tamp soil backfill to the contour. Place fiber rolls in continuous contact

For fiber rolls on bare soil, construct trenches parallel

Expose stakes 2" above top of fiber roll.

Drive stakes into undisturbed soil at least 12" deep.

from each end.

2' o.c. max. culverts. Stake fiber rolls 6-inches stakes. Space stakes 4' o.c. max. on slopes and

Stake fiber rolls in place with 1" x 1" or 1" Ø wood vary more than 5% from level.

section of fiber roll, do not allow the fiber roll to

Install fiber rolls along slope contours. For any 20' to installation.

Repair all rills or gullies and properly compact prior

A A

Trench 2" min.

See no te 3

See no te 3

2" min.

Trench table for length requirements

See Fiber Rolls at Culverts culvert inlet

Install fiber rolls around table for length requirements

See Fiber Rolls at Culverts culvert outlet

Install fiber rolls around

Flow

Fiber roll roll 2" min.

Trench fiber

SECTION A-A

REVISED: 12/2017

E4

Flow

NO SCALE

1V:4H or flatter

Slope Gradient

1V:2H or steeper

STAKE DETAIL

uphill side of fiber roll

Place excavated material on

Fill or cut slope

FIBER ROLL SPACING TABLE*

project-specific conditions.

*Approximate spacing shown. Adjust spacing as needed due to

Between 1V:4H and 1V:3H

Between 1V:3H and 1V:2H

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts E C .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

U.S. CUSTOMARY DETAIL

U s e r r y a n .m a th is

NUMBER

SHEET

NM

CHECK DAM

(ft)

6" min.

16" min Trench 2" min.

9" Ø min.

Fiber roll

Trench 2" min.

E5 sediment log.

* Spacing calculated based on 9" Ø min

157-A

Check dams paid as 15705-1400 Soil Erosion Control, Fiber Roll.

Adjust check dam spacing based on site-specific conditions.

around the ends of the fiber roll.

Provide sufficient length to prevent water from flowing

Expose stakes 2" (min.) above top of fiber roll.

Drive stakes into undisturbed soil of trench bottom 16" (min).

2' (max) spacing.

Drive stakes at each end of the fiber roll and at

Stake fiber rolls in place with 1⅛" x 1⅛" wood stakes.

Install check dams in ditches perpendicular to the flowline.

Repair all rills or gullies and properly compact prior to installation.

7.

6.

5.

4.

3.

2.

1.

PLAN

Flow

Flow

Se e

Not e

GRADE

DITCH

CROSS SECTION

See Note 5 the ends to prevent flow around

Curve ends upstream similar for flat-bottom ditches.

Check dam installation details are

V-ditch design shown.

Flow Line

STAKING DETAIL

FIBER ROLL

uphill side of fiber roll

Place excavated material on

(See Note 6)

CHECK DAM SPACING*

FIBER ROLL

FIBER ROLL CHECK DAM

SPACING (max.)

CHECK DAM

8%

5%

4%

3%

2%

See Note 4

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts E S p A .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

SPECIAL

U.S. CUSTOMARY SPECIAL

U s e r r y a n .m a th is

NUMBER

SHEET

NM

PLASTIC LINED DIVERSION CHANNEL

RIPRAP LINED DIVERSION CHANNEL

TEMPORARY CULVERT

DIVERSION CHANNEL

SECTION B-B

SECTION A-A

SECTION A-A SECTION B-B

SECTION B-B

PLAN

W

B

W

B

W

B B

W

T T

Ø when scheduled)

Silt fence (typ.

embankment

Roadway embankment

Roadway

Temporary culvert backfill

Subgrade

Bedding

Sandbags

Riprap lining Riprap lining backflow into natural channel

Use sandbags to prevent

Permanent natural channel

Earthwork limits when scheduled)

Silt fence (typ.

See Note 6

Permanent culvert

Roadway centerline temporary barrier

Use sandbags to construct

SandbagsPlastic liner

SSSS

SS SS

D

D D

D

SS

SS

SS SS

FlowFlow

FlowFlow

Plastic liner when scheduled)

Silt fence (typ.

using one of the methods listed in Subsection 204.11(a).

temporary culvert. Compact temporary culvert backfill channel through the roadway embankment with

When specified replace the portion of the diversion

A

A

BB

GeotextileGeotextile

Flow

Natural ground and secure with sandbags (typ.)

liner. Bury the upstream edge of the liner a minimum of

Do not construct with longitudinal joints if using a plastic

Construct channel at a minimum grade of 0.5 percent.

width of the temporary diversion channel.

Use plastic liner or riprap along the entire length and outlet, etc.

bypass pipes, elbows, connections, energy dissipators at

Contractor is responsible for sizing all pumps, dams, flow volumes in the Dewatering Plan.

and sediment control measures, and anticipated stream

157. Include layout, methods, equipment, soil erosion a Dewatering Plan to the CO as required by SCR Section

Dewatering is the responsibility of the Contractor. Submit

6.

5.

4.

3.

2.

1.

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts E S p B .d g

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

U s e r r y a n .m a th is

NUMBER

SHEET

NM

Lincoln NFSR 107

NM FTFS 107(1)

DIVERSION CHANNELS

TEMPORARY

6" deep and secure with riprap or sandbags.

2'2'

Bury plastic liner 6" deep

2'2'

E6

157-B

NOTE:

with plastic liner or riprap

Temporary diversion channel

DETAIL APPROVED FOR USE 08/2006

AND FURROW DITCH

EMBANKMENT BENCHING

C204-50

F1

NOTE:

2.

1.

m in

8' ±

Existing ground

FURROW DITCH

EMBANKMENT BENCHING

8' bench height (typ.)

Top of subgrade bench height.

meet 12' minimum bench width and 8' typical

Bench into existing slope as necessary to

1V:3H or flatter.

Benching is not required for ground sloped at

12' (min.)

See Note 2

Proposed em bankm ent slope

Existing ground

Height varies pattern benching

Typical

Proposed cut slope the Typical Section sheet

Slope rounding as shown on

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts F C .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

U.S. CUSTOMARY DETAIL

U s e r r y a n .m a th is

NUMBER

SHEET

NM

C251-50

CLASS

RIPRAP

SECTION

END

WITH

SECTION

END

WITHOUT

(CY)

QUANTITY

RIPRAP

ESTIMATED

(SY)

QUANTITY

GEOTEXTILE

ESTIMATED

(inches) D

SIZE

CULVERT

(feet) L

APRON

OF

LENGTH

(feet) H

APRON

OF

DEPTH

CLASS

RIPRAP

SECTION

END

WITH

SECTION

END

WITHOUT

PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES

OUTLET WITHOUT DITCH

(CY)

QUANTITY

RIPRAP

ESTIMATED

(SY)

QUANTITY

GEOTEXTILE

ESTIMATED

(inches) D

SIZE

CULVERT

(feet) L

APRON

OF

LENGTH

(feet) H

APRON

OF

DEPTH

PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES

OUTLET WITH DITCH

AT CULVERT OUTLETS

PLACED RIPRAP

14.5

12.5

14.5

12.5

2.5

2.5

1.5

1.5

1.5

2.5

2.5

1.5

1.5

1.5

2'

2'

38.6

29.9

15.2

10.8

4.5

2.7

1.4

35.6

27.3

13.4

9.3

3.6

0.9

G1

2.5

2.5

1.5

1.5

1.5

2.5

2.5

1.5

1.5

49.8

38.7

18.5

13.3

5.2

3.2

1.7

44.5

34.1

15.6

10.9

5.2

2.2

C

PLAN VIEW PLAN VIEW

Geotextile

END SECTION

CULVERT WITHOUT STANDARD

SECTION C-C

END SECTION

CULVERT WITH STANDARD

S p a n

D ia o r m in

S p a n

D ia o r

L

A A

B B

PLAN VIEW

Variable slope ground Original

Geotextile

END SECTION

CULVERT WITHOUT STANDARD

SECTION B-BSECTION A-A

END SECTION

CULVERT WITH STANDARD

S p a n

D ia o r

S p a n

D ia o r m in

Geotextile

Variable slope ground Original m in

L

D D

D

H

H

D D

D

WITHOUT DITCH

PROTECTIVE APRON AT CULVERT OUTLET

WITH DITCH

PROTECTIVE APRON AT CULVERT OUTLET

L

C C

C

NOTE:

H

D

Geotextile

SECTION E-ESECTION D-D

Geotextile ground Original m in ditch slope

Match existing

D

H m in ground Original m in

D m in

H ditch slope

Match existing

D D EE

ground

Original

D

D it c h B o tt o m

W id th

D it c h B o tt o m

W id t h

D

4D

PLAN VIEW

or flatter

Sloped 1V:2H will not be measured for payment.

3. Excavation for placement of riprap

Subsection 714.01(a).

2. Furnish geotextile conforming to slopes of less than 10%.

1. Use for aprons serving culverts with

D

D D

Flowline

D

D D

(min.)

(min.)

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts G C .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

U.S. CUSTOMARY DETAIL

DETAIL APPROVED FOR USE

U s e r r y a n .m a th is

NUMBER

SHEET

NM

601-A

WING ELEVATION

b.f. = both faces o.f. = other face f.f. = fill face

Abbreviations:

T1

AND WINGWALLS

HEADWALLS

BOX CULVERT

1'-0"

HEADWALL DETAIL

#4 bars (6 tot.)

#4 @ 12" headwall reinforcement into

Extend longitudinal box H e a d w a ll L e n g th

TOEWALL DETAIL

1'-0"

(6 tot.)

#4 bars

#4 @ 18" toewall reinforcement into

Extend longitudinal box

2 (max.)

c l.

WINGWALL TYPICAL SECTION

8" 0-10

4'-6"

1-7

L

0-8

1'-0" 1'-6"

1'-0" to wall) perpendicular

(measured

H m a x

#4 @ 12"

#5 @ 6"

#5 @ 12"

#4 bars (9 tot.)

#4 @ 12" b.f.

#4 @ 12"

#5 @ 6" recommendations install per manufacturer's

Geocomposite sheet drain

@ 8'-0" (max.) o.c.

slope 2% to drain sheet drain manufacturer.

recommended by

Provide drain grate as material

Limits of backfill

#4 @ 6"

NOTES:

footing) and headwall (above filler between wingwall

" expansion joint2

Finished slope

See Headwall Detail

See Toewall Detail culvert

Concrete box Toewall

Other face of wingwall footing bars splice to longitudinal

2-#4 bars b.f.

longitudinal footing bars

#4 bars splice to footing & toewall bars splice to longitudinal

4-#4 bars

Concrete box culvert

Face of headwall

See Box Culvert Plan and Profile Sheet filler (nail in place)

" expansion joint2

3" cl.

Class 3 riprap

1'-10" min. splice

W ingw all Length

@ 8'-0" (max.) o.c.

Foundation fill

R wingwall typical section.

behind the wingwalls and headwalls. Limits are shown on the

10. Use Backfill material meeting the requirements of subsection 704.03 construction.

9. The contractor is responsible for the stability of the structure during

Headwalls.

8. Include geocomposite sheet drains in the cost of 60103-0000, Concrete,

7. Clean all construction joints thoroughly before concrete is poured.

coefficient of friction between concrete and soil = 0.65.

surcharge = equivalent height of soil, heq = 2 feet. For sliding, nominal pressure equivalent to a fluid unit weight = 35 lbs. per cubic foot. Live load through 2016. Factored bearing resistance, q =5.0 ksf. Lateral earth

AASHTO LRFD Bridge Design Specifications 7th Edition, 2014 with interims

6. Design Data:

28-day compressive strength f'c = 4000 psi.

5. Concrete shall conform to Section 601 in the SCRs, with a minimum the face of any bar of 2", unless shown otherwise on the plans.

M322, Grade 60 deformed. Use a minimum concrete covering to

4. Use reinforcing steel meeting the requirements of AASHTO M31 or shown on the Box Culvert Plan and Profile Sheet.

3. Dimensions, elevations and angles for wingwalls and headwalls are shall be included in the unit cost of 60103-0000, Concrete Headwalls.

2. Expansion joint material shall conform to AASHTO M213. Payment

".4

31. Chamfer all exposed concrete corners

TYPICAL HEADWALL / WINGWALL PLAN DETAIL

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts T S p A .d

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

U.S. DEPARTMENT OF TRANSPORTATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U s e r r y a n .m a th is

NUMBER

SHEET

NM

4.

3.

2.

1.

METAL ROUND PIPE CULVERT

METAL PIPE ARCH CULVERT

FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT

FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT

STEEL ALUMINUM

DIAMETER

VALENT

EQUI-

RADIUS

CORNER

MINIMUM

COVER

MINIMUM

SPAN x RISE

SIZE

PIPE ARCH

SIZE

PIPE ARCH

SPAN x RISE DIAMETER

VALENT

EQUI-

RADIUS

CORNER

MINIMUM

COVER

MINIMUM

COVER

MINIMUM

DIAMETER

SIZE

PIPE

SIZE

PIPE

DIAMETER COVER

MINIMUM

ALUMINUMSTEEL

of camber or increase the pipe culvert gradient.

elevation of the inlet invert, reduce the amount parabolic curve as designed exceeds the curve. If the midpoint elevation on the pipe length. Develop camber on a parabolic inverts an ordinate amount equal to 1% of the from a chord through the inlet and outlet

When directed, camber pipe culverts upward pavement for both flexible and rigid pavement.

from the top of the pipe to the top of the rigid pavements. Measure maximum fill height pavements, and to the top of the pavement for pipe culvert to the subgrade for flexible

Measure minimum cover from the top of the corrugation pipe.

Obtain approval before furnishing annular of helical lockseam and welded seam pipe.

corrugations are more restrictive than those

Fill heights for culvert pipe with annular lockseam and welded seam pipe only.

The fill heights in the table are for helical special analysis by the CO.

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts T S td

.d g n

FEDERAL LANDS HIGHWAY OFFICE

STANDARD

U.S. CUSTOMARY STANDARD

U s e r r y a n .m a th is

NUMBER

SHEET

NM

Lincoln NFSR 107

NM FTFS 107(1)

602-1

STANDARD APPROVED FOR USE 12/1993

REVISED: 4/1994 6/2005

METAL PIPE CULVERT

Fill heights exceeding 100 feet require

" CORRUGATIONS2

1" x 3

22 3" x 1" CORRUGATIONS

METAL THICKNESS (INCH/GAGE)

0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8

MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES

" CORRUGATIONS2

1" x 3

22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS

METAL THICKNESS (INCH/GAGE)

0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8

MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES

INCHES

INCHES

142 x 91

137 x 87

128 x 83

117 x 79

112 x 75

103 x 71

95 x 67

87 x 63

83 x 57

81 x 59

77 x 52

73 x 55

71 x 47

66 x 51

64 x 43

60 x 46

57 x 38

49 x 33

42 x 29

35 x 24

28 x 20

24 x 18

21 x 15

17 x 13

INCHES

INCHES

3.5

INCHES

" CORRUGATIONS2

1" x 3

22 3" x 1" CORRUGATIONS

METAL THICKNESS (INCH/GAGE)

5" x 1" CORRUGATIONS

0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14

MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)

0.109/120.138/10 0.168/8

INCHES INCHES INCHES

103 x 71

95 x 67

87 x 63

81 x 59

73 x 55

66 x 51

64 x 43

60 x 46

57 x 38

49 x 33

42 x 29

35 x 24

28 x 20

24 x 18

21 x 15

17 x 13

INCHES

3.5

" CORRUGATIONS2

1" x 3

METAL THICKNESS (INCH/GAGE)

3" x 1" CORRUGATIONS

0.135/100.105/120.075/14

MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)

0.060/160.135/100.105/120.075/140.060/16

T2

2.

1.

SMOOTH SLEEVE BAND FLAT BAND

SEMI-CORRUGATED BAND

HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS

SLEEVE JOINT

SIDE VIEW SIDE VIEW SIDE VIEW

END VIEW

END VIEWEND VIEW

Oval Lug

Band Angle

Bar & Strap

Integral Flange Wedge and Strap

Stab type joint

Smoother sleeve with center stop.

DIAMETER

ROUND PIPE

SPAN × RISE

PIPE ARCH

CORRUGATION

W

Band Band

Band Bolts

Pipe

Band

Bolts

Angle

Pipe

BandBand

Bolts

Pipe heel and toe of angle of corrugation at fillet weld at crest

Rivet, spot weld, or

Angle

Wedge be used.

Highway Bridges, Division II Section 26 may criteria of AASHTO Standard specifications for devices that comply with the joint performance

Other types of coupling bands or fastening specified in the Special Contract Requirements.

Watertight pipe joints are not required unless of corrugation at heel and toe of angle

Rivet, spot weld, or fillet weld at crest strap connector

Bolt, bar and

Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as [1]

For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the [2] dimension of the end corrugation in the pipe.

[1]COUPLING BANDS FOR METAL PIPE CULVERT

Use annular corrugated bands with pipes having annular corrugations or with helical pipe [3] the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses

CORRUGATED

ANNULAR

CORRUGATED

HELICALLY

[4]BANDS

CORRUGATED

SEMI-

[2]SIZE

[3]BANDS [5]BANDS

Band corrugation in pipe end with second annular around band meshes

Continuous corrugation

W

BoltsBand

WW

STATE PROJECT

A

M N N

M R o a d w a y C

A D

D S h e e ts T S td

.d g n

FEDERAL LANDS HIGHWAY OFFICE

U.S. CUSTOMARY STANDARD

U s e r r y a n .m a th is

NUMBER

SHEET

NM

Lincoln NFSR 107

NM FTFS 107(1)

602-2

MINIMUM BAND WIDTH (INCHES)

1 × 2

1 × 3

3 × 1

5 × 1 78 to 144

36 to 72

78 to 144

36 to 72

78 to 84

42 to 72

12 to 36

87 × 64 to 142 × 91

60 × 46 to 81 × 59

87 × 64 to 142 × 91

60 × 46 to 81 × 59

49 × 33 to 83 × 57

17 × 13 to 42 × 29

10.5

10.5

10.5

10.5

10.5

10.5

10.5

INCHESINCHESINCHES

rerolled with 3" × 1" pipe corrugations.

COUPLING BAND

METAL PIPE CULVERT

having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on

" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3

2pipe ends rerolled with 2 steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:

thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.

Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.

"2 1" × 3

2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 corrugations on rerolled pipe ends.

diameter, required above 42" diameter

Second angle connection optional to 42" diameter, required above 42" diameter

Second angle connection optional to 42"

T3

NOTE:

[6]underdrain

Use helical corrugated bands with pipes having helically corrugated ends.[4]

[5]

[6]

" for 18" round culvert (21" × 15" pipe arch) or less8

" for 21" round culvert (24" × 18" pipe arch) or more2

See Section 704 for bedding and backfill requirements.

dimension of all pipe arch culverts.

H equals the diameter of all round pipe culverts or the rise amount of camber or increase the pipe culvert gradient.

designed exceeds the elevation of the inlet invert, reduce the curve. If the midpoint elevation on the parabolic curve as to 1% of the pipe length. Develop camber on a parabolic through the inlet and outlet inverts an ordinate amount equal

When directed, camber pipe culverts upward from a chord

3.

2.

1.

be adjusted to tie into impervious material.

granular material is used for backfill. Width may material at the pipe culvert inlet where

Construct piping plug of impermeable backfill

MULTIPLE PIPE INSTALLATION

PIPING PLUG

TRENCH EXCAVATION IN EMBANKMENT

BELOW NATURAL GROUND OR

ON UNSTABLE MATERIAL

NATURAL GROUND

ABOVE AND BELOW

ON NATURAL GROUND

ABOVE NATURAL GROUND

ON UNYIELDING MATERIAL

PIPE BEDDING

ELEVATION

SECTION A-A

LEGEND:

Bedding material (uncompacted)

Impermeable backfill material.

BEDDING DEPTH

MINIMUM SPACING

SPACING

or SPAN

DIAMETER

PIPE SIZE (H) DEPTH

Roadway embankment Roadway embankment

Natural ground

Toe plate Toe plate

Natural ground Natural ground

Roadway embankment

Roadway excavation

Natural ground

H

Width

H H

H H

H H

H H

H

H

H

Finished subgrade Finished subgrade

Natural ground

Finished subgrade

Pipe culvert

Embankment slope

High water elevation treatment

Culvert end

Piping plug before trench excavation embankment height

Finished subgrade or

Original natural ground surface

A

A

Finished subgrade

Roadway embankment

Roadway embankment

Finished subgrade trench…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.