Bid_Tabs.pdf

PDF 697 KB Posted

Attached to
NM FTFS 107(1) Lincoln NFSR 107 Federal contract opportunity
Solicitation number
6982AF18B000014
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to NM FTFS 107(1) Lincoln NFSR 107, newest first.
File Type Posted
Bid_Opening_Summary_.pdf PDF
QnA_1.17.19.pdf PDF
QnA_1.15.19.pdf PDF
QnA_1.9.19.pdf PDF
QnA_1.7.19.pdf PDF
Hydraulics_NM_FTFS_107(1)_Mingus_Mountain.pdf PDF
6982AF18B000014.pdf PDF
NM_FTFS_107(1)_100__Plans_signed.pdf PDF
NM_FTFS_107(1)_100__Cross_Sections.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 01/25/19

1 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF18B000014

Division: Central Federal Lands

State: NM County: Lincoln

Federal Land: Lincoln National Forect Opened at: Lakewood, CO

Opened by: Ryan Phillips

Date: 01/24/19

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Roper Construction, Inc. ( $822,709.00 ) no PO Box 969 Alto, NM 88312

CF Padilla, LLC $1,103,990.00 62A Tribal Road 90 SW Albuquerque, NM 87105

Mesa Verde Enterprises, Inc. $1,363,279.21 396 La Luz Gate Rd.

Alamogordo, NM 88311

Academy Consulting, LLC ( $1,492,449.70 ) no 405 Executive Drive Langhorne, PA 19047

Pride General Contractors, LLC $1,587,878.80 700 N. Copia St.

El Paso, TX 79903

Smithco Construction, Inc. $1,829,605.00 6 Kind Canyon Coop Caballo, NM 87931

Hasse Contracting Co., Inc. $1,899,998.10 3327 Tower Rd., SW Albuquerque, NM 87121

Sedona Contracting Inc $1,905,900.10 1505 West Amador Las Cruces, NM 88005

Southwest General Construction, Inc. $1,934,966.28 1100 S. Main St. Suite 106 Las Cruces, NM 88005

GC Works, Inc. $1,952,414.36

Contract Specialist 1/25/2019

2 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF18B000014

Division: Central Federal Lands

State: NM County: Lincoln

Federal Land: Lincoln National Forect Opened at: Lakewood, CO

Opened by: Ryan Phillips

Date: 01/24/19

5933 NE Win Sivers Dr. Ste 205 Portland, OR 97220

3 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF18B000014

Division: Central Federal Lands

State: NM County: Lincoln

Federal Land: Lincoln National Forect Opened at: Lakewood, CO

Opened by: Ryan Phillips

Date: 01/24/19

Contractor Comment Bid Amount Responsive

Engineer's Estimate $1,175,960.35

4 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

Roper Construction, Inc. Lump Sum $40,000.00 CF Padilla, LLC Lump Sum $87,000.00 Mesa Verde Enterprises, Inc. Lump Sum $250,521.22 Academy Consulting, LLC Lump Sum $150,000.00 Pride General Contractors, LLC Lump Sum $80,712.00 Smithco Construction, Inc. Lump Sum $150,000.00 Hasse Contracting Co., Inc. Lump Sum $172,725.47 Sedona Contracting Inc Lump Sum $35,724.00 Southwest General Construction, Inc. Lump Sum $265,309.79 GC Works, Inc. Lump Sum $161,900.90 Engineer's Estimate ALL LPSM Lump Sum $97,070.35

A0040 15215-1000 SURVEY AND STAKING, APPROACH ROAD

Roper Construction, Inc. $690.00 $3,450.00 CF Padilla, LLC $833.00 $4,165.00 Mesa Verde Enterprises, Inc. $1,370.88 $6,854.40 Academy Consulting, LLC $170.00 $850.00 Pride General Contractors, LLC $2,360.00 $11,800.00 Smithco Construction, Inc. $1,200.00 $6,000.00 Hasse Contracting Co., Inc. $3,285.00 $16,425.00 Sedona Contracting Inc $1,423.60 $7,118.00 Southwest General Construction, Inc. $749.39 $3,746.95 GC Works, Inc. $13,728.00 $68,640.00 Engineer's Estimate 5 EACH $2,000.00 $10,000.00

A0060 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

Roper Construction, Inc. $630.00 $2,520.00 CF Padilla, LLC $764.00 $3,056.00 Mesa Verde Enterprises, Inc. $685.44 $2,741.76 Academy Consulting, LLC $170.00 $680.00 Pride General Contractors, LLC $2,360.00 $9,440.00 Smithco Construction, Inc. $2,000.00 $8,000.00 Hasse Contracting Co., Inc. $3,900.00 $15,600.00 Sedona Contracting Inc $1,779.50 $7,118.00 Southwest General Construction, Inc. $686.95 $2,747.80 GC Works, Inc. $13,728.00 $54,912.00 Engineer's Estimate 4 EACH $1,200.00 $4,800.00

A0080 15215-5000 SURVEY AND STAKING, BOX CULVERT

Roper Construction, Inc. $2,590.00 $7,770.00 CF Padilla, LLC $3,125.00 $9,375.00 Mesa Verde Enterprises, Inc. $1,713.60 $5,140.80 Academy Consulting, LLC $200.00 $600.00 Pride General Contractors, LLC $2,360.00 $7,080.00 Smithco Construction, Inc. $3,000.00 $9,000.00 Hasse Contracting Co., Inc. $6,730.00 $20,190.00 Sedona Contracting Inc $2,372.65 $7,117.95 Southwest General Construction, Inc. $2,810.22 $8,430.66 GC Works, Inc. $13,728.00 $41,184.00 Engineer's Estimate 3 EACH $3,000.00 $9,000.00

5 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0100 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL

Roper Construction, Inc. $4,200.00 $3,486.00 CF Padilla, LLC $5,000.00 $4,150.00 Mesa Verde Enterprises, Inc. $11,488.16 $9,535.17 Academy Consulting, LLC $1,020.00 $846.60 Pride General Contractors, LLC $7,080.00 $5,876.40 Smithco Construction, Inc. $15,000.00 $12,450.00 Hasse Contracting Co., Inc. $13,790.00 $11,445.70 Sedona Contracting Inc $8,575.00 $7,117.25 Southwest General Construction, Inc. $4,496.36 $3,731.98 GC Works, Inc. $3,432.00 $2,848.56 Engineer's Estimate 0.830 MILE $6,000.00 $4,980.00

A0120 15236-2000 SURVEY CONTROL, GRADE FINISHING

Roper Construction, Inc. $6,500.00 $5,395.00 CF Padilla, LLC $7,500.00 $6,225.00 Mesa Verde Enterprises, Inc. $14,915.36 $12,379.75 Academy Consulting, LLC $1,020.00 $846.60 Pride General Contractors, LLC $11,800.00 $9,794.00 Smithco Construction, Inc. $10,000.00 $8,300.00 Hasse Contracting Co., Inc. $15,800.00 $13,114.00 Sedona Contracting Inc $8,575.00 $7,117.25 Southwest General Construction, Inc. $8,118.43 $6,738.30 GC Works, Inc. $3,432.00 $2,848.56 Engineer's Estimate 0.830 MILE $5,000.00 $4,150.00

A0140 15301-0000 CONTRACTOR QUALITY CONTROL

Roper Construction, Inc. Lump Sum $30,000.00 CF Padilla, LLC Lump Sum $53,000.00 Mesa Verde Enterprises, Inc. Lump Sum $87,185.70 Academy Consulting, LLC Lump Sum $118,000.00 Pride General Contractors, LLC Lump Sum $17,700.00 Smithco Construction, Inc. Lump Sum $90,000.00 Hasse Contracting Co., Inc. Lump Sum $101,117.93 Sedona Contracting Inc Lump Sum $104,724.00 Southwest General Construction, Inc. Lump Sum $77,746.30 GC Works, Inc. Lump Sum $54,912.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

A0160 15401-0000 CONTRACTOR TESTING

Roper Construction, Inc. Lump Sum $10,000.00 CF Padilla, LLC Lump Sum $25,754.00 Mesa Verde Enterprises, Inc. Lump Sum $26,460.00 Academy Consulting, LLC Lump Sum $10,500.00 Pride General Contractors, LLC Lump Sum $23,600.00 Smithco Construction, Inc. Lump Sum $50,000.00 Hasse Contracting Co., Inc. Lump Sum $86,340.00 Sedona Contracting Inc Lump Sum $31,537.00 Southwest General Construction, Inc. Lump Sum $16,736.45 GC Works, Inc. Lump Sum $41,184.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00

6 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0180 15501-0000 CONSTRUCTION SCHEDULE

Roper Construction, Inc. Lump Sum $5,000.00 CF Padilla, LLC Lump Sum $3,534.00 Mesa Verde Enterprises, Inc. Lump Sum $1,789.20 Academy Consulting, LLC Lump Sum $20,500.00 Pride General Contractors, LLC Lump Sum $9,440.00 Smithco Construction, Inc. Lump Sum $5,000.00 Hasse Contracting Co., Inc. Lump Sum $27,450.00 Sedona Contracting Inc Lump Sum $3,500.00 Southwest General Construction, Inc. Lump Sum $8,842.84 GC Works, Inc. Lump Sum $5,200.00 Engineer's Estimate ALL LPSM Lump Sum $6,000.00

A0200 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL

Roper Construction, Inc. Lump Sum $20,000.00 CF Padilla, LLC Lump Sum $110,000.00 Mesa Verde Enterprises, Inc. Lump Sum $27,310.50 Academy Consulting, LLC Lump Sum $60,000.00 Pride General Contractors, LLC Lump Sum $50,740.00 Smithco Construction, Inc. Lump Sum $100,000.00 Hasse Contracting Co., Inc. Lump Sum $95,850.00 Sedona Contracting Inc Lump Sum $49,613.00 Southwest General Construction, Inc. Lump Sum $125,523.31 GC Works, Inc. Lump Sum $54,912.00 Engineer's Estimate ALL LPSM Lump Sum $45,000.00

A0220 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Roper Construction, Inc. $3.20 $10,240.00 CF Padilla, LLC $2.09 $6,688.00 Mesa Verde Enterprises, Inc. $3.03 $9,696.00 Academy Consulting, LLC $1.25 $4,000.00 Pride General Contractors, LLC $5.90 $18,880.00 Smithco Construction, Inc. $4.00 $12,800.00 Hasse Contracting Co., Inc. $4.30 $13,760.00 Sedona Contracting Inc $5.15 $16,480.00 Southwest General Construction, Inc. $3.00 $9,600.00 GC Works, Inc. $5.49 $17,568.00 Engineer's Estimate 3,200 LNFT $4.00 $12,800.00

A0240 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Roper Construction, Inc. $5.20 $2,340.00 CF Padilla, LLC $1.80 $810.00 Mesa Verde Enterprises, Inc. $2.71 $1,219.50 Academy Consulting, LLC $5.25 $2,362.50 Pride General Contractors, LLC $8.26 $3,717.00 Smithco Construction, Inc. $5.00 $2,250.00 Hasse Contracting Co., Inc. $8.30 $3,735.00 Sedona Contracting Inc $7.15 $3,217.50 Southwest General Construction, Inc. $5.31 $2,389.50 GC Works, Inc. $6.86 $3,087.00 Engineer's Estimate 450 LNFT $6.00 $2,700.00

7 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0260 15802-0000 WATERING FOR DUST CONTROL

Roper Construction, Inc. Lump Sum $2,000.00 CF Padilla, LLC Lump Sum $21,000.00 Mesa Verde Enterprises, Inc. Lump Sum $11,566.80 Academy Consulting, LLC Lump Sum $20,000.00 Pride General Contractors, LLC Lump Sum $17,700.00 Smithco Construction, Inc. Lump Sum $50,000.00 Hasse Contracting Co., Inc. Lump Sum $46,930.00 Sedona Contracting Inc Lump Sum $26,874.00 Southwest General Construction, Inc. Lump Sum $29,568.05 GC Works, Inc. Lump Sum $82,368.00 Engineer's Estimate ALL LPSM Lump Sum $35,000.00

A0280 20101-0000 CLEARING AND GRUBBING

Roper Construction, Inc. $3,125.00 $15,000.00 CF Padilla, LLC $4,500.00 $21,600.00 Mesa Verde Enterprises, Inc. $3,534.30 $16,964.64 Academy Consulting, LLC $3,500.00 $16,800.00 Pride General Contractors, LLC $3,599.00 $17,275.20 Smithco Construction, Inc. $12,000.00 $57,600.00 Hasse Contracting Co., Inc. $16,640.00 $79,872.00 Sedona Contracting Inc $8,166.00 $39,196.80 Southwest General Construction, Inc. $8,978.81 $43,098.29 GC Works, Inc. $4,804.80 $23,063.04 Engineer's Estimate 4.8 ACRE $3,000.00 $14,400.00

A0300 20301-2400 REMOVAL OF SIGN

Roper Construction, Inc. $100.00 $200.00 CF Padilla, LLC $100.00 $200.00 Mesa Verde Enterprises, Inc. $267.75 $535.50 Academy Consulting, LLC $300.00 $600.00 Pride General Contractors, LLC $590.00 $1,180.00 Smithco Construction, Inc. $600.00 $1,200.00 Hasse Contracting Co., Inc. $3,800.00 $7,600.00 Sedona Contracting Inc $550.00 $1,100.00 Southwest General Construction, Inc. $103.99 $207.98 GC Works, Inc. $137.28 $274.56 Engineer's Estimate 2 EACH $100.00 $200.00

A0320 20401-0000 ROADWAY EXCAVATION

Roper Construction, Inc. $10.00 $73,000.00 CF Padilla, LLC $10.90 $79,570.00 Mesa Verde Enterprises, Inc. $24.42 $178,266.00 Academy Consulting, LLC $20.00 $146,000.00 Pride General Contractors, LLC $23.60 $172,280.00 Smithco Construction, Inc. $20.00 $146,000.00 Hasse Contracting Co., Inc. $26.00 $189,800.00 Sedona Contracting Inc $37.05 $270,465.00 Southwest General Construction, Inc. $19.58 $142,934.00 GC Works, Inc. $61.78 $450,994.00 Engineer's Estimate 7,300 CUYD $21.00 $153,300.00

8 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0340 20441-0000 WASTE

Roper Construction, Inc. $20.00 $8,000.00 CF Padilla, LLC $21.00 $8,400.00 Mesa Verde Enterprises, Inc. $18.21 $7,284.00 Academy Consulting, LLC $33.75 $13,500.00 Pride General Contractors, LLC $29.50 $11,800.00 Smithco Construction, Inc. $40.00 $16,000.00 Hasse Contracting Co., Inc. $22.00 $8,800.00 Sedona Contracting Inc $46.95 $18,780.00 Southwest General Construction, Inc. $53.77 $21,508.00 GC Works, Inc. $48.05 $19,220.00 Engineer's Estimate 400 CUYD $12.00 $4,800.00

A0360 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3

Roper Construction, Inc. $100.00 $30,000.00 CF Padilla, LLC $120.00 $36,000.00 Mesa Verde Enterprises, Inc. $220.85 $66,255.00 Academy Consulting, LLC $169.50 $50,850.00 Pride General Contractors, LLC $64.90 $19,470.00 Smithco Construction, Inc. $200.00 $60,000.00 Hasse Contracting Co., Inc. $138.00 $41,400.00 Sedona Contracting Inc $282.20 $84,660.00 Southwest General Construction, Inc. $83.27 $24,981.00 GC Works, Inc. $205.92 $61,776.00 Engineer's Estimate 300 CUYD $120.00 $36,000.00

A0380 30202-2100 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE

Roper Construction, Inc. $45.00 $81,000.00 CF Padilla, LLC $38.00 $68,400.00 Mesa Verde Enterprises, Inc. $38.23 $68,814.00 Academy Consulting, LLC $45.75 $82,350.00 Pride General Contractors, LLC $47.20 $84,960.00 Smithco Construction, Inc. $115.00 $207,000.00 Hasse Contracting Co., Inc. $95.00 $171,000.00 Sedona Contracting Inc $61.35 $110,430.00 Southwest General Construction, Inc. $57.03 $102,654.00 GC Works, Inc. $137.28 $247,104.00 Engineer's Estimate 1,800 TON $40.00 $72,000.00

A0400 60103-0000 CONCRETE, HEADWALL (10 FT x 6 FT BOX)

Roper Construction, Inc. $8,000.00 $16,000.00 CF Padilla, LLC $13,000.00 $26,000.00 Mesa Verde Enterprises, Inc. $12,771.91 $25,543.82 Academy Consulting, LLC $16,400.00 $32,800.00 Pride General Contractors, LLC $10,620.00 $21,240.00 Smithco Construction, Inc. $30,000.00 $60,000.00 Hasse Contracting Co., Inc. $35,270.00 $70,540.00 Sedona Contracting Inc $42,500.00 $85,000.00 Southwest General Construction, Inc. $14,974.69 $29,949.38 GC Works, Inc. $2,059.20 $4,118.40 Engineer's Estimate 2 EACH $20,000.00 $40,000.00

9 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0420 60103-0000 CONCRETE, HEADWALL (12 FT x 6 FT BOX)

Roper Construction, Inc. $8,000.00 $16,000.00 CF Padilla, LLC $13,000.00 $26,000.00 Mesa Verde Enterprises, Inc. $13,457.35 $26,914.70 Academy Consulting, LLC $16,400.00 $32,800.00 Pride General Contractors, LLC $14,160.00 $28,320.00 Smithco Construction, Inc. $32,000.00 $64,000.00 Hasse Contracting Co., Inc. $36,760.00 $73,520.00 Sedona Contracting Inc $42,750.00 $85,500.00 Southwest General Construction, Inc. $15,174.51 $30,349.02 GC Works, Inc. $2,196.48 $4,392.96 Engineer's Estimate 2 EACH $25,000.00 $50,000.00

A0440 60103-0000 CONCRETE, HEADWALL (12 FT x 8 FT BOX)

Roper Construction, Inc. $8,000.00 $16,000.00 CF Padilla, LLC $13,000.00 $26,000.00 Mesa Verde Enterprises, Inc. $14,113.77 $28,227.54 Academy Consulting, LLC $0.00 $0.00 Pride General Contractors, LLC $17,700.00 $35,400.00 Smithco Construction, Inc. $35,000.00 $70,000.00 Hasse Contracting Co., Inc. $38,930.00 $77,860.00 Sedona Contracting Inc $42,500.00 $85,000.00 Southwest General Construction, Inc. $15,574.19 $31,148.38 GC Works, Inc. $2,333.76 $4,667.52 Engineer's Estimate 2 EACH $30,000.00 $60,000.00

A0460 60201-0800 24-INCH PIPE CULVERT

Roper Construction, Inc. $60.00 $9,600.00 CF Padilla, LLC $88.00 $14,080.00 Mesa Verde Enterprises, Inc. $134.09 $21,454.40 Academy Consulting, LLC $93.75 $15,000.00 Pride General Contractors, LLC $118.00 $18,880.00 Smithco Construction, Inc. $120.00 $19,200.00 Hasse Contracting Co., Inc. $89.00 $14,240.00 Sedona Contracting Inc $242.45 $38,792.00 Southwest General Construction, Inc. $72.80 $11,648.00 GC Works, Inc. $205.92 $32,947.20 Engineer's Estimate 160 LNFT $110.00 $17,600.00

A0480 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

Roper Construction, Inc. $430.00 $3,440.00 CF Padilla, LLC $450.00 $3,600.00 Mesa Verde Enterprises, Inc. $1,031.95 $8,255.60 Academy Consulting, LLC $659.50 $5,276.00 Pride General Contractors, LLC $5,192.00 $41,536.00 Smithco Construction, Inc. $1,500.00 $12,000.00 Hasse Contracting Co., Inc. $805.00 $6,440.00 Sedona Contracting Inc $1,441.50 $11,532.00 Southwest General Construction, Inc. $401.20 $3,209.60 GC Works, Inc. $936.00 $7,488.00 Engineer's Estimate 8 EACH $600.00 $4,800.00

10 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0500 60220-3050 10 FEET SPAN, 6 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT

Roper Construction, Inc. $1,440.00 $56,160.00 CF Padilla, LLC $1,690.00 $65,910.00 Mesa Verde Enterprises, Inc. $2,207.55 $86,094.45 Academy Consulting, LLC $2,052.00 $80,028.00 Pride General Contractors, LLC $1,829.00 $71,331.00 Smithco Construction, Inc. $2,000.00 $78,000.00 Hasse Contracting Co., Inc. $2,660.00 $103,740.00 Sedona Contracting Inc $2,550.25 $99,459.75 Southwest General Construction, Inc. $5,927.83 $231,185.37 GC Works, Inc. $1,996.80 $77,875.20 Engineer's Estimate 39 LNFT $1,600.00 $62,400.00

A0520 60220-3975 12 FEET SPAN, 6 FEET RISE, PRECAST REINFORCED CONCRETE BOX CULVERT

Roper Construction, Inc. $1,627.00 $99,247.00 CF Padilla, LLC $2,057.00 $125,477.00 Mesa Verde Enterprises, Inc. $2,348.88 $143,281.68 Academy Consulting, LLC $2,052.00 $125,172.00 Pride General Contractors, LLC $2,183.00 $133,163.00 Smithco Construction, Inc. $2,250.00 $137,250.00 Hasse Contracting Co., Inc. $2,300.00 $140,300.00 Sedona Contracting Inc $2,769.00 $168,909.00 Southwest General Construction, Inc. $4,453.32 $271,652.52 GC Works, Inc. $2,371.20 $144,643.20 Engineer's Estimate 61 LNFT $1,800.00 $109,800.00

A0540 60220-4050 12 FEET SPAN, 8 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT

Roper Construction, Inc. $1,716.00 $61,776.00 CF Padilla, LLC $2,129.00 $76,644.00 Mesa Verde Enterprises, Inc. $2,506.16 $90,221.76 Academy Consulting, LLC $2,052.00 $73,872.00 Pride General Contractors, LLC $2,950.00 $106,200.00 Smithco Construction, Inc. $2,500.00 $90,000.00 Hasse Contracting Co., Inc. $3,180.00 $114,480.00 Sedona Contracting Inc $3,002.85 $108,102.60 Southwest General Construction, Inc. $7,663.86 $275,898.96 GC Works, Inc. $2,620.80 $94,348.80 Engineer's Estimate 36 LNFT $2,000.00 $72,000.00

A0560 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS

Roper Construction, Inc. $34.50 $24,150.00 CF Padilla, LLC $41.00 $28,700.00 Mesa Verde Enterprises, Inc. $28.84 $20,188.00 Academy Consulting, LLC $140.00 $98,000.00 Pride General Contractors, LLC $70.80 $49,560.00 Smithco Construction, Inc. $40.00 $28,000.00 Hasse Contracting Co., Inc. $27.00 $18,900.00 Sedona Contracting Inc $40.00 $28,000.00 Southwest General Construction, Inc. $33.63 $23,541.00 GC Works, Inc. $54.91 $38,437.00 Engineer's Estimate 700 LNFT $50.00 $35,000.00

11 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0580 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT

Roper Construction, Inc. $3,540.00 $42,480.00 CF Padilla, LLC $4,300.00 $51,600.00 Mesa Verde Enterprises, Inc. $2,356.20 $28,274.40 Academy Consulting, LLC $1,200.00 $14,400.00 Pride General Contractors, LLC $3,540.00 $42,480.00 Smithco Construction, Inc. $3,600.00 $43,200.00 Hasse Contracting Co., Inc. $2,220.00 $26,640.00 Sedona Contracting Inc $3,020.00 $36,240.00 Southwest General Construction, Inc. $2,747.77 $32,973.24 GC Works, Inc. $3,432.00 $41,184.00 Engineer's Estimate 12 EACH $4,000.00 $48,000.00

A0600 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Roper Construction, Inc. $90.00 $3,600.00 CF Padilla, LLC $100.00 $4,000.00 Mesa Verde Enterprises, Inc. $91.04 $3,641.60 Academy Consulting, LLC $343.50 $13,740.00 Pride General Contractors, LLC $354.00 $14,160.00 Smithco Construction, Inc. $100.00 $4,000.00 Hasse Contracting Co., Inc. $120.00 $4,800.00 Sedona Contracting Inc $113.00 $4,520.00 Southwest General Construction, Inc. $112.41 $4,496.40 GC Works, Inc. $205.92 $8,236.80 Engineer's Estimate 40 HOUR $110.00 $4,400.00

A0620 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

Roper Construction, Inc. $125.00 $2,500.00 CF Padilla, LLC $90.00 $1,800.00 Mesa Verde Enterprises, Inc. $144.59 $2,891.80 Academy Consulting, LLC $275.00 $5,500.00 Pride General Contractors, LLC $354.00 $7,080.00 Smithco Construction, Inc. $110.00 $2,200.00 Hasse Contracting Co., Inc. $115.00 $2,300.00 Sedona Contracting Inc $113.00 $2,260.00 Southwest General Construction, Inc. $154.64 $3,092.80 GC Works, Inc. $168.48 $3,369.60 Engineer's Estimate 20 HOUR $120.00 $2,400.00

A0640 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

Roper Construction, Inc. $225.00 $4,500.00 CF Padilla, LLC $144.00 $2,880.00 Mesa Verde Enterprises, Inc. $144.59 $2,891.80 Academy Consulting, LLC $280.85 $5,617.00 Pride General Contractors, LLC $472.00 $9,440.00 Smithco Construction, Inc. $200.00 $4,000.00 Hasse Contracting Co., Inc. $163.00 $3,260.00 Sedona Contracting Inc $152.00 $3,040.00 Southwest General Construction, Inc. $154.64 $3,092.80 GC Works, Inc. $544.13 $10,882.60 Engineer's Estimate 20 HOUR $170.00 $3,400.00

12 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0660 62201-3000 HYDRAULIC EXCAVATOR

Roper Construction, Inc. $225.00 $4,500.00 CF Padilla, LLC $198.00 $3,960.00 Mesa Verde Enterprises, Inc. $187.43 $3,748.60 Academy Consulting, LLC $326.75 $6,535.00 Pride General Contractors, LLC $472.00 $9,440.00 Smithco Construction, Inc. $180.00 $3,600.00 Hasse Contracting Co., Inc. $156.00 $3,120.00 Sedona Contracting Inc $152.00 $3,040.00 Southwest General Construction, Inc. $154.64 $3,092.80 GC Works, Inc. $544.13 $10,882.60 Engineer's Estimate 20 HOUR $160.00 $3,200.00

A0680 62301-0000 GENERAL LABOR

Roper Construction, Inc. $50.00 $2,000.00 CF Padilla, LLC $34.00 $1,360.00 Mesa Verde Enterprises, Inc. $37.49 $1,499.60 Academy Consulting, LLC $75.00 $3,000.00 Pride General Contractors, LLC $70.80 $2,832.00 Smithco Construction, Inc. $50.00 $2,000.00 Hasse Contracting Co., Inc. $35.00 $1,400.00 Sedona Contracting Inc $40.00 $1,600.00 Southwest General Construction, Inc. $20.63 $825.20 GC Works, Inc. $31.20 $1,248.00 Engineer's Estimate 40 HOUR $50.00 $2,000.00

A0700 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

Roper Construction, Inc. $150.00 $3,000.00 CF Padilla, LLC $41.00 $820.00 Mesa Verde Enterprises, Inc. $94.50 $1,890.00 Academy Consulting, LLC $200.00 $4,000.00 Pride General Contractors, LLC $295.00 $5,900.00 Smithco Construction, Inc. $180.00 $3,600.00 Hasse Contracting Co., Inc. $100.00 $2,000.00 Sedona Contracting Inc $210.00 $4,200.00 Southwest General Construction, Inc. $81.06 $1,621.20 GC Works, Inc. $187.20 $3,744.00 Engineer's Estimate 20 HOUR $125.00 $2,500.00

A0720 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

Roper Construction, Inc. $150.00 $6,000.00 CF Padilla, LLC $83.00 $3,320.00 Mesa Verde Enterprises, Inc. $107.10 $4,284.00 Academy Consulting, LLC $225.00 $9,000.00 Pride General Contractors, LLC $401.20 $16,048.00 Smithco Construction, Inc. $240.00 $9,600.00 Hasse Contracting Co., Inc. $160.00 $6,400.00 Sedona Contracting Inc $210.00 $8,400.00 Southwest General Construction, Inc. $147.38 $5,895.20 GC Works, Inc. $187.20 $7,488.00 Engineer's Estimate 40 HOUR $150.00 $6,000.00

13 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0740 62402-0200 FURNISHING AND PLACING TOPSOIL, 3-INCH DEPTH

Roper Construction, Inc. $25,000.00 $40,000.00 CF Padilla, LLC $6,300.00 $10,080.00 Mesa Verde Enterprises, Inc. $14,888.75 $23,822.00 Academy Consulting, LLC $56,455.00 $90,328.00 Pride General Contractors, LLC $46,964.00 $75,142.40 Smithco Construction, Inc. $60,000.00 $96,000.00 Hasse Contracting Co., Inc. $22,560.00 $36,096.00 Sedona Contracting Inc $38,650.00 $61,840.00 Southwest General Construction, Inc. $24,377.11 $39,003.38 GC Works, Inc. $5,491.20 $8,785.92 Engineer's Estimate 1.6 ACRE $11,000.00 $17,600.00

A0760 62406-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH

Roper Construction, Inc. $5,000.00 $9,000.00 CF Padilla, LLC $5,500.00 $9,900.00 Mesa Verde Enterprises, Inc. $2,677.50 $4,819.50 Academy Consulting, LLC $32,260.00 $58,068.00 Pride General Contractors, LLC $109,091.00 $196,363.80 Smithco Construction, Inc. $36,000.00 $64,800.00 Hasse Contracting Co., Inc. $11,810.00 $21,258.00 Sedona Contracting Inc $7,735.00 $13,923.00 Southwest General Construction, Inc. $3,230.36 $5,814.65 GC Works, Inc. $5,491.20 $9,884.16 Engineer's Estimate 1.8 ACRE $3,300.00 $5,940.00

A0780 62510-2000 SEEDING, HYDRAULIC METHOD

Roper Construction, Inc. $2,250.00 $7,650.00 CF Padilla, LLC $2,800.00 $9,520.00 Mesa Verde Enterprises, Inc. $1,466.20 $4,985.08 Academy Consulting, LLC $10,000.00 $34,000.00 Pride General Contractors, LLC $8,260.00 $28,084.00 Smithco Construction, Inc. $1,800.00 $6,120.00 Hasse Contracting Co., Inc. $1,840.00 $6,256.00 Sedona Contracting Inc $1,755.00 $5,967.00 Southwest General Construction, Inc. $1,303.94 $4,433.40 GC Works, Inc. $1,166.88 $3,967.39 Engineer's Estimate 3.4 ACRE $1,100.00 $3,740.00

A0800 62515-2000 MULCHING, HYDRAULIC METHOD

Roper Construction, Inc. $3,400.00 $7,480.00 CF Padilla, LLC $4,100.00 $9,020.00 Mesa Verde Enterprises, Inc. $2,411.89 $5,306.16 Academy Consulting, LLC $8,500.00 $18,700.00 Pride General Contractors, LLC $9,440.00 $20,768.00 Smithco Construction, Inc. $1,800.00 $3,960.00 Hasse Contracting Co., Inc. $1,580.00 $3,476.00 Sedona Contracting Inc $2,800.00 $6,160.00 Southwest General Construction, Inc. $2,406.80 $5,294.96 GC Works, Inc. $1,578.72 $3,473.18 Engineer's Estimate 2.2 ACRE $2,300.00 $5,060.00

14 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0820 62516-3000 MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX

Roper Construction, Inc. $1.55 $8,525.00 CF Padilla, LLC $1.88 $10,340.00 Mesa Verde Enterprises, Inc. $1.30 $7,150.00 Academy Consulting, LLC $1.90 $10,450.00 Pride General Contractors, LLC $7.08 $38,940.00 Smithco Construction, Inc. $1.25 $6,875.00 Hasse Contracting Co., Inc. $0.85 $4,675.00 Sedona Contracting Inc $1.35 $7,425.00 Southwest General Construction, Inc. $1.19 $6,545.00 GC Works, Inc. $1.72 $9,460.00 Engineer's Estimate 5,500 SQYD $3.00 $16,500.00

A0840 63301-0000 SIGN SYSTEM

Roper Construction, Inc. $1,450.00 $5,800.00 CF Padilla, LLC $1,750.00 $7,000.00 Mesa Verde Enterprises, Inc. $374.85 $1,499.40 Academy Consulting, LLC $225.00 $900.00 Pride General Contractors, LLC $1,416.00 $5,664.00 Smithco Construction, Inc. $1,500.00 $6,000.00 Hasse Contracting Co., Inc. $353.00 $1,412.00 Sedona Contracting Inc $5.00 $20.00 Southwest General Construction, Inc. $749.39 $2,997.56 GC Works, Inc. $124.80 $499.20 Engineer's Estimate 4 EACH $500.00 $2,000.00

A0860 63308-2000 OBJECT MARKER, TYPE 2

Roper Construction, Inc. $275.00 $1,100.00 CF Padilla, LLC $300.00 $1,200.00 Mesa Verde Enterprises, Inc. $58.91 $235.64 Academy Consulting, LLC $125.00 $500.00 Pride General Contractors, LLC $472.00 $1,888.00 Smithco Construction, Inc. $300.00 $1,200.00 Hasse Contracting Co., Inc. $55.00 $220.00 Sedona Contracting Inc $805.00 $3,220.00 Southwest General Construction, Inc. $68.69 $274.76 GC Works, Inc. $124.80 $499.20 Engineer's Estimate 4 EACH $120.00 $480.00

A0880 63316-1000 REMOVE AND RESET SIGN

Roper Construction, Inc. $1,200.00 $1,200.00 CF Padilla, LLC $1,450.00 $1,450.00 Mesa Verde Enterprises, Inc. $535.50 $535.50 Academy Consulting, LLC $360.00 $360.00 Pride General Contractors, LLC $944.00 $944.00 Smithco Construction, Inc. $1,500.00 $1,500.00 Hasse Contracting Co., Inc. $1,640.00 $1,640.00 Sedona Contracting Inc $300.00 $300.00 Southwest General Construction, Inc. $249.80 $249.80 GC Works, Inc. $249.60 $249.60 Engineer's Estimate 1 EACH $300.00 $300.00

15 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0900 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Roper Construction, Inc. $550.00 $4,400.00 CF Padilla, LLC $1,111.00 $8,888.00 Mesa Verde Enterprises, Inc. $260.06 $2,080.48 Academy Consulting, LLC $1,020.00 $8,160.00 Pride General Contractors, LLC $944.00 $7,552.00 Smithco Construction, Inc. $600.00 $4,800.00 Hasse Contracting Co., Inc. $435.00 $3,480.00 Sedona Contracting Inc $400.00 $3,200.00 Southwest General Construction, Inc. $248.55 $1,988.40 GC Works, Inc. $249.60 $1,996.80 Engineer's Estimate 8 EACH $300.00 $2,400.00

A0920 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

Roper Construction, Inc. $20.00 $1,600.00 CF Padilla, LLC $55.00 $4,400.00 Mesa Verde Enterprises, Inc. $36.14 $2,891.20 Academy Consulting, LLC $42.00 $3,360.00 Pride General Contractors, LLC $59.00 $4,720.00 Smithco Construction, Inc. $25.00 $2,000.00 Hasse Contracting Co., Inc. $50.00 $4,000.00 Sedona Contracting Inc $20.00 $1,600.00 Southwest General Construction, Inc. $37.47 $2,997.60 GC Works, Inc. $62.40 $4,992.00 Engineer's Estimate 80 EACH $20.00 $1,600.00

A0940 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

Roper Construction, Inc. $40.00 $1,600.00 CF Padilla, LLC $166.00 $6,640.00 Mesa Verde Enterprises, Inc. $83.00 $3,320.00 Academy Consulting, LLC $120.00 $4,800.00 Pride General Contractors, LLC $177.00 $7,080.00 Smithco Construction, Inc. $60.00 $2,400.00 Hasse Contracting Co., Inc. $88.00 $3,520.00 Sedona Contracting Inc $75.00 $3,000.00 Southwest General Construction, Inc. $68.69 $2,747.60 GC Works, Inc. $149.76 $5,990.40 Engineer's Estimate 40 EACH $60.00 $2,400.00

A0960 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Roper Construction, Inc. $250.00 $4,500.00 CF Padilla, LLC $173.00 $3,114.00 Mesa Verde Enterprises, Inc. $634.42 $11,419.56 Academy Consulting, LLC $611.00 $10,998.00 Pride General Contractors, LLC $236.00 $4,248.00 Smithco Construction, Inc. $150.00 $2,700.00 Hasse Contracting Co., Inc. $515.00 $9,270.00 Sedona Contracting Inc $400.00 $7,200.00 Southwest General Construction, Inc. $48.34 $870.12 GC Works, Inc. $312.00 $5,616.00 Engineer's Estimate 18 EACH $180.00 $3,240.00

16 out of 16

Project No: NM FTFS 107(1)

Project Name: Lincoln NSFR 107

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0980 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

Roper Construction, Inc. $5.00 $1,500.00 CF Padilla, LLC $16.00 $4,800.00 Mesa Verde Enterprises, Inc. $6.13 $1,839.00 Academy Consulting, LLC $50.00 $15,000.00 Pride General Contractors, LLC $8.26 $2,478.00 Smithco Construction, Inc. $6.00 $1,800.00 Hasse Contracting Co., Inc. $4.80 $1,440.00 Sedona Contracting Inc $600.00 $180,000.00 Southwest General Construction, Inc. $2.90 $870.00 GC Works, Inc. $6.86 $2,058.00 Engineer's Estimate 300 LNFT $6.00 $1,800.00

A1000 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Roper Construction, Inc. $50.00 $8,000.00 CF Padilla, LLC $41.00 $6,560.00 Mesa Verde Enterprises, Inc. $22.20 $3,552.00 Academy Consulting, LLC $80.00 $12,800.00 Pride General Contractors, LLC $47.20 $7,552.00 Smithco Construction, Inc. $45.00 $7,200.00 Hasse Contracting Co., Inc. $63.50 $10,160.00 Sedona Contracting Inc $41.00 $6,560.00 Southwest General Construction, Inc. $4.45 $712.00 GC Works, Inc. $31.20 $4,992.00 Engineer's Estimate 160 HOUR $45.00 $7,200.00

Total Schedule - All Items

Roper Construction, Inc. $822,709.00 CF Padilla, LLC $1,103,990.00 Mesa Verde Enterprises, Inc. $1,363,279.21 Academy Consulting, LLC $1,492,449.70 Pride General Contractors, LLC $1,587,878.80 Smithco Construction, Inc. $1,829,605.00 Hasse Contracting Co., Inc. $1,899,998.10 Sedona Contracting Inc $1,905,900.10 Southwest General Construction, Inc. $1,934,966.28 GC Works, Inc. $1,952,414.36 Engineer's Estimate $1,175,960.35