QnA_5.7.2018.pdf
PDF 69 KB Posted
- Attached to
- TX FLAP 100(1) & TX FTFW LAAT 10(2)
- Solicitation number
- 6982AF18B000008
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for
TX FLAP 100(1) & TX FTFW LAAT 10(2)
May 7, 2017
Questions Answers
1 Can a contractor get fill material on-site at the Refuge? No
2 Who would conduct biological monitoring? A USFWS biologist or other qualified staff would “clear” an area for construction in regards to any Aplomado Falcon nest or an ocelot den site.
3 Can a contractor get water for the construction project on-site? Potentially. Coordinate with the Rio Hondo Cooperative to get permission and a water meter setup.
4 How can the site be accessed? All access should be along Buena Visit Road and into the project on
Bayside Drive through the Southern entrance.
File details come from the government source that posted it.