QnA_5.7.2018.pdf

PDF 69 KB Posted

Attached to
TX FLAP 100(1) & TX FTFW LAAT 10(2)
Solicitation number
6982AF18B000008
Issued by

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for

TX FLAP 100(1) & TX FTFW LAAT 10(2)

May 7, 2017

Questions Answers

1 Can a contractor get fill material on-site at the Refuge? No

2 Who would conduct biological monitoring? A USFWS biologist or other qualified staff would “clear” an area for construction in regards to any Aplomado Falcon nest or an ocelot den site.

3 Can a contractor get water for the construction project on-site? Potentially. Coordinate with the Rio Hondo Cooperative to get permission and a water meter setup.

4 How can the site be accessed? All access should be along Buena Visit Road and into the project on

Bayside Drive through the Southern entrance.

File details come from the government source that posted it.