UTFLAP_2496_1_100per_Plans_Signed.pdf
PDF 30 MB Posted
- Attached to
- UT FLAP 2496(1), Ephraim Canyon Road
- Solicitation number
- 6982AF18B000005
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Tabs.pdf | ||
| UT_FLAP_2496(1)_Bid_Opening_Summary.pdf | ||
| A001.pdf | ||
| UTFLAP_2496_1_GeometryReport7.xlsx | XLSX spreadsheet | |
| 6982AF18B000005.pdf | ||
| UTFLAP_2496_1_BlueTopReport6.xlsx | XLSX spreadsheet | |
| UTFLAP_2496_1_Final_Pavement_Report.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
for structural section details
See Mainline Typical Section
Construct 30° - 35° pavement edge (safety edge) necessary for drainage and appearance.
concrete pavement. Shape and compact as
(pay item 30202-2000) after placement of asphalt
Shoulder up with Roadway Aggregate, Method 2
TYPICAL SECTION
A7
METHOD OF SUPERELEVATION ON CURVES
Min. superelevation 2%
Normal crown -2% -2% Normal crown grade
Profile superelevation
Pivot point for
10+00 to 273+00
EXISTING TYPICAL SECTION
DETAIL A
Station to Station
LENGTH OF PROJECT
TOTAL (mi)
TOTALS (ft)
(ft)
Roadway
Ephraim Canyon Rd Option X
Ephraim Canyon Rd Schedule A
Alignment
211+50 to 273+00
10+00 to 211+50
4.98
26,300
6,150
20,150
12" Existing gravel surface
28 ft
8% Max. superele vation first asphalt lift)
(applied prior to
Prime coat asphalt lifts)
(applied between
Tack coat top asphalt lift)
(applied to
Fog seal pavement)
(top of
Profile grade
Placed in two lifts concrete pavement
4" Asphalt
1.
5:
Ex is tin g gr ou ndSee Detail A limit
Slope stake
10'4.8'
WIDENING ON CURVES
(ft)
Radius
(ft)
Widening
2.
Over 200' 0
130' to 200'
90' to 130'
70' & Under 4
70' to 90'
4.8' Clear Zone
10'
4.8' Clear Zone
3'
1.8' limit
Slope stake
10+00 to 273+00
TYPICAL SECTION
VariesVaries 3.
ShldrShldr Traveled Way Traveled Way
1:4 base
Aggregate
4.
5.
5.
247+50 TO 255+50
153+20 TO 154+55
GUARDRAIL
DETAIL B
o f s h o u ld e r
N o r m a l e d g e structural section for pavement
See Typical Section
Distance
Shy
3'
6.
Clearing and Construction Limits
5'
Varies
5.
1:4
1:6
1:3
1:2
0"
6"
Fill Condition
SHOULDER GRADING
DETAIL C
Cut Condition
2'2' min.
N
H
R E
E
AT
FOETAT
U
N
C I
L E
S
LAN
I G
N E
ISSEFORP
O
D E
S
10500197-2202
ERIN JAMES
Method 2 2" Roadway Aggregate, Aggregate) to placement of 2" Roadway for shaping roadway prior
Base (material to be used
Aggregate
Existing
5.E x is ti n g g ro u n d
5.
(Cut Condition)
Roadway Excavation
(Fill Condition)
Embankment Construction pavement
Asphalt concrete
GRADING SUMMARY DETAIL
(Roadway Reconditioning)
Leveling Aggregate
(Roadway Reconditioning)
Excavated Aggregate
Pavement Section
6" Proposed
See Grading Summary on B Sheets for volumes.
Exaggerated vertical scale for clarity.
See plans for locations of curves and superelevations.
8.
NOTES:
8.
7.
6.
5.
4.
3.
2.
1.
approved by the CO.
blue tops and minor profile adjustments as
Template Control includes survey for red tops and
Section 152 for grade finishing stake information.
Refer to Blue Top Survey information in SCR post type.
grading, and layout details. Refer to C Sheets for
See T Series for Guardrail Details for installation, aggregate to drain away from cut.
For shoulders in cut, grade slopes 1:3 and reshape
-1:2 for vertical drops greater than 12"
-1:3 for vertical drops 6" - 12"
-1:6 for vertical drops 6" or less as approved by the CO:
Fill slope increments are proposed as the following
Series for proposed ditch grading locations.
Spot ditch grading along alignment. Refer to C
Superelevation Diagram for cross slopes.
Cross slope varies throughout alignment. See superelevation transitions.
the curve widening to coincide with the throughout the superelevated sections. Transition below. Apply the widening on the inside of curves
Construct curve widening as shown in the table washboarding in existing gravel surface.
Grade and shape to meet tolerances. Remove
Roadway Bench
Aggregate
12" Existing
1:4
12"
STATE PROJECT
A
M d e n p w p p w ic s w o r k in g A
T y p
E C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
UT UT FLAP 2496(1)
Sheet and Description
B5 B6 B5 B8 B7-B8 B9-B10 B10 B11 B11
Grading Removals Surfacing Erosion
Control Drainage
Permanent Signs
& Pavement
Markings
Temporary
Traffic
Control
Miscellaneous Guardrail ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,733 87 1,820
A0140 15706-1600 SOIL EROSION CONTROL, STABILIZED
CONSTRUCTION EXIT EACH 1 1
A0160 20101-0000 CLEARING AND GRUBBING INCLUDES TEMPORARY
PLASTIC FENCE FOR
ENVIRONMENTALLY SENSITIVE
ACRE 2.5 0.1 2.6 AREAS
A0180 20220-1000 REMOVAL, INDIVIDUAL TREE EACH 11 11
A0200 20301-0700 REMOVAL OF DELINEATOR EACH 45 5 50
A0220 20301-2400 REMOVAL OF SIGN EACH 21 21
A0240 20302-1200 REMOVAL OF GUARDRAIL LNFT 164 11 175
A0260 20310-1000 PLUG, EXISTING PIPE EACH 1 1
A0280 20402-0000 SUBEXCAVATION CUYD 2,000 2,000
A0300 20420-0000 EMBANKMENT CONSTRUCTION INCLUDES CONSERVING AND
CUYD 1,021 179 1,200 PLACING TOPSOIL
A0320 25101-2100 PLACED RIPRAP, METHOD B, CLASS TYPE II RIPRAP DITCH
1(TYPE II RIPRAP DITCH) CUYD 484 16 500
A0340 25101-2200 PLACED RIPRAP, METHOD B, CLASS TYPE II RIPRAP DITCH
2(TYPE II RIPRAP DITCH) CUYD 70 5 75
A0360 25120-2100 RIPRAP DITCH, METHOD B, CLASS TYPE I RIPRAP DITCH
1(TYPE I RIPRAP DITCH) LNFT 2,854 246 3,100
A0380 25126-0000 REMOVE AND RESET BOULDER EACH 40 40
A0400 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 7,312 188 7,500
A0420 30301-6000 ROADWAY RECONDITIONING MILE 3.800 3.800
A0440 30302-1000 DITCH RECONDITIONING LNFT 2,000 2,000 AS DIRECTED BY THE CO
A0460 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY
MIX, 1/2-INCH OR 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3
MILLION ESAL TON 14,151 349 14,500
A0480 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 141 4 145
A0500 40601-0000 FOG SEAL TON 27 3 30
A0520 41102-1000 PRIME COAT, METHOD 1 SQYD 64,278 3,222 67,500
A0540 41105-0000 BLOTTER TON 0.44 0.56 1
A0560 41201-0000 TACK COAT TON 27 3 30
A0580 60201-0800 24-INCH PIPE CULVERT LNFT 90 5 95
-M a r-
:3
A
M c u s e rs
\e k it z m il \p w \c h m d e n \d m s
E p h ra im C a n y o n R o a d S c h e d u le
A .x ls x ]S h e e t SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B1FLAP 2496(1)UT
NUMBER
Grading Removals Surfacing Erosion
Control Drainage
Permanent Signs
& Pavement
Markings
Temporary
Traffic
Control
Miscellaneous Guardrail ALLOWANCE Bid
Schedule
A0600 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 4 4 INCLUDES PIPE ELBOWS
A0620 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 650 35 685
A0640 60704-0000 CLEANING CULVERT IN PLACE EACH 19 1 20
A0660 60901-0400 CURB, CONCRETE, 6-INCH DEPTH LNFT 398 27 425
A0680 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS UDOT MGS GUARDRAIL
A STEEL POSTS(UDOT MGS GUARDRAIL) LNFT 175 25 200
A0700 61702-0000 TERMINAL SECTION(UDOT TYPE II UDOT TYPE II ANCHOR
ANCHOR) EACH 2 2
A0720 61902-1400 GATE, METAL, 16 FEET WIDTH EACH 1 1
A0740 61903-1100 CATTLE GUARD, 32 FEET EACH 1 1
A0760 61920-3000 REMOVE AND RESET CATTLE GUARD EACH 1 1
A0780 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM
CAPACITY HOUR 32 32
A0800 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH HOUR 32 32
A0820 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM
RATED CAPACITY HOUR 32 32
A0840 62201-2750 MOTOR GRADER HOUR 32 32
A0860 62201-3000 HYDRAULIC EXCAVATOR HOUR 32 32
A0880 62301-0000 GENERAL LABOR HOUR 160 160
A0900 62302-1000 SPECIAL LABOR, HIRED TECHNICAL
SERVICES HOUR 40 40
A0920 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 40 40
A0940 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 2.6 0.1 2.7
A0960 62515-3000 MULCHING, HYDRAULIC METHOD, BONDED
FIBER MATRIX ACRE 2.6 0.1 2.7
A0980 63301-0000 SIGN SYSTEM EACH 13 13
A1000 63309-0900 DELINEATOR, TYPE FLEXIBLE EACH 138 2 140
A1020 63316-1000 REMOVE AND RESET SIGN EACH 5 5
A1040 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 31.0 31.0
A1060 63405-0050 PAVEMENT MARKINGS, SYMBOLS EACH 7 7
A1080 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
Estimated
Quantities
Remarks and/or Determination of Estimated Quantity
-M a r-
:3
A
M c u s e rs
\e k it z m il \p w \c h m d e n \d m s
E p h ra im C a n y o n R o a d S c h e d u le
A .x ls x ]S h e e t
(2 SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
STATE PROJECT
B2FLAP 2496(1)UT
Grading Removals Surfacing Erosion
Control Drainage
Permanent Signs
& Pavement
Markings
Temporary
Traffic
Control
Miscellaneous Guardrail ALLOWANCE Bid
Schedule
X0020 15101-0000 MOBILIZATION LPSM ALL
X0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
X0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0080 15401-0000 CONTRACTOR TESTING LPSM ALL
X0100 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 465 25 490
X0120 20101-0000 CLEARING AND GRUBBING INCLUDES TEMPORARY
PLASTIC FENCE FOR
ENVIRONMENTALLY
ACRE 1.2 0.1 1.3 SENSITIVE AREAS
X0140 20220-1000 REMOVAL, INDIVIDUAL TREE EACH 10 10
X0160 20301-0700 REMOVAL OF DELINEATOR EACH 27 3 30
X0180 20301-2400 REMOVAL OF SIGN EACH 4 4
X0200 20302-1200 REMOVAL OF GUARDRAIL LNFT 800 40 840
X0220 20420-0000 EMBANKMENT CONSTRUCTION INCLUDES CONSERVING AND
CUYD 329 21 350 PLACING TOPSOIL
X0240 25101-2100 PLACED RIPRAP, METHOD B, CLASS TYPE II RIPRAP DITCH
1(TYPE II RIPRAP DITCH) CUYD 13 2 15
X0260 25120-2100 RIPRAP DITCH, METHOD B, CLASS TYPE I RIPRAP DITCH
1(TYPE I RIPRAP DITCH) LNFT 60 5 65
X0280 25126-0000 REMOVE AND RESET BOULDER EACH 5 5
X0300 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 2,208 292 2,500
X0320 30301-6000 ROADWAY RECONDITIONING MILE 1.200 1.200
X0340 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY
MIX, 1/2-INCH OR 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3
MILLION ESAL TON 4,258 242 4,500
X0360 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 43 2 45
X0380 40601-0000 FOG SEAL TON 8 2 10
X0400 41102-1000 PRIME COAT, METHOD 1 SQYD 19,331 919 20,250
X0420 41105-0000 BLOTTER TON 0.13 0.87 1
X0440 41201-0000 TACK COAT TON 8 2 10
X0460 60704-0000 CLEANING CULVERT IN PLACE EACH 8 8
X0480 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS UDOT MGS GUARDRAIL
A STEEL POSTS(UDOT MGS GUARDRAIL) LNFT 775 25 800
X0500 61702-0000 TERMINAL SECTION(UDOT TYPE I ANCHOR) EACH 2 2 UDOT TYPE I ANCHOR
X0520 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 1.2 0.1 1.3
SUMMARY OF QUANTITIES - Option X
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of Estimated
Quantity
-M a r-
:4
P
M c u s e rs
\e k it z m il \p w \c h m d e n \d m s
E p h ra im C a n y o n R o a d O p ti o n X .x ls x ]S h e e t
STATE PROJECT
B3FLAP 2496(1) UT
Grading Removals Surfacing Erosion Control Drainage
Permanent Signs &
Pavement Markings
Temporary Traffic Control Miscellaneous Guardrail ALLOWANCE Bid
Schedule
X0540 62515-3000 MULCHING, HYDRAULIC METHOD, BON
FIBER MATRIX ACRE 1.2 0.1 1.3
X0560 63301-0000 SIGN SYSTEM EACH 4 4
X0580 63309-0900 DELINEATOR, TYPE FLEXIBLE EACH 43 7 50
X0600 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 9.0 9.0
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-F eb -2
1:
P M
C
PW
_E xp or t\ [E ph ra im C an yo nR oa d_
O pt io nX
.x ls x] S he et
2) SUMMARY OF QUANTITIES - Option X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B4FLAP 2496(1) UT
B5
SUMMARIES
GRADING AND SURFACING
N
H
R E
E
AT
FOETAT
U
N
C I
L E
S
LAN
I G
N E
ISSEFORP
O
D E
S
10500197-2202
ERIN JAMES
STATE PROJECT
P
M d e n p w p p w ic s w o r k in g B S u m E
C .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
DRAINAGE SUMMARY
B7
N
H
R E
E
AT
FOETAT
U
N
C I
L E
S
LAN
I G
N E
ISSEFORP
O
D E
S No. 317512
BRADLEY R.
HARTMAN
STATE PROJECT
P
M d e n p w p p w ic s w o r k in g B S u m E
C .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
B8
SUMMARIES
EROSION CONTROL
DRAINAGE AND
N
H
R E
E
AT
FOETAT
U
N
C I
L E
S
LAN
I G
N E
ISSEFORP
O
D E
S No. 317512
BRADLEY R.
HARTMAN
STATE PROJECT
P
M d e n p w p p w ic s w o r k in g B S u m E
C .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
Sheet 2 of 2
TRAFFIC SUMMARIES
B10
N
H
R E
E
AT
FOETAT
U
N
C I
L E
S
LAN
I G
N E
ISSEFORP
O
D E
S
10500197-2202
ERIN JAMES
STATE PROJECT
P
M d e n p w p p w ic s w o r k in g B S u m E
C .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
STATE PROJECT
A
M d e n p w p p w ic s w o r k in g C p n p
E C .d g n
U s e r D
E N
P W
P
NUMBER
SHEET
UT UT FLAP 2496(1)
Superelevation Diagram
6.9 9%
8.
.98
.93
DIV. OF WILDLIFE RESCOURCES
STATE OF UTAH
DIV. OF WILDLIFE RESCOURCES
STATE OF UTAH
DIV. OF WILDLIFE RESCOURCES
STATE OF UTAH
S E
C T
IO
N
, N
E , S
W
S E
C T
IO
N
, N
W , S
E
NE 1
/4, SW
1/1
SECTIO
N 1
3, SE 1
/4, NW
1/1
SECTIO
N 1
3, 31.40'
L = 163.98'
T = 83.05'
R = 420.00'
PI = 69+48.25
Curve = C16
63.36'
L = 109.68'
T = 55.74'
R = 250.00'
PI = 56+32.01
Curve = C12
74.16'
L = 237.70'
T = 120.01'
R = 700.00'
PI = 58+80.13
Curve = C13
L = 303.66'
T = 152.35'
R = 1500.00'
PI = 63+19.09
Curve = C14
L = 105.70'
T = 53.89'
R = 220.00'
PI = 67+81.99
Curve = C15
257.70'
.92'
P C
.7
P T
.4
P T
.8
P C
.2
P C
.1
P T
.1
P C
.1
P T
.9
P C
.2
P T
.8
68+52.81
67+51.69
67+51.69
61+77.54
61+77.54
57+76.92
56+01.65
56+01.65
57+61.86
57+76.92
57+61.86
59+81.02
59+81.02
60+49.96 61+23.54
64+59.60
64+59.60 65+13.60 66+67.07
68+04.31 68+84.43
68+84.43
-3.00%
3.00% 4.60%
-4.60%
-2.00%-2.00%
2.00%
-2.00% -3.20%
3.20%
-2.00%
2.00% 4.40%
-4.40%
56+63.40
56+63.40
56+94.17
56+94.17
Lt. EOP
Rt. EOP axis of rotation
Profile grade and
68+04.31
59+97.82 67+18.36
8.
6.
200'100'0
Scale in Feet
70+0069+0068+0067+0066+0065+0064+0063+0062+0061+0060+0059+0058+0057+00
Existing Ground
Existing Ground
56+00
EPHRAIM CANYON RD 56+00 TO 70+00
Ephraim Canyon Rd
-10%
0%
10%
-10%
0%
10%
C5
V illa s R d S k y lin e
P r o te c t in p la c e
C
M P
.9
E x is ti n g P r o te c t in p la c e
C
M P
.3
E x is ti n g
INV El. = 6547.75'
Culvert Inlet
8.
CEphraim Canyon Rd L
A to drain to culvert
Grade existing ditch o u tl e t p ip e i n c u lv e r t tr e n c h
I n s ta ll u n d e r d r a in
Bottom of underdrain to drain culvert
Grade existing ditch
R ip r a p A p r o n
C la s s
L t.
E n d S e c ti o n s
L t.
R t.
S k e w
L t.
I n s ta ll
X
C M
P
1:3 slopes around curve of converging ditches. Grade
Round out existing slope
See Standard 602-6 as approved by CO.ditch toward offsite section
Angle Type II flared end see Special 251-A
Install apron non-woven geotextile with Class 2 Type C
Riprap, Class 1 underdrain trench depth
Begin reducing underdrain
Bottom of
Grade Ditch Rt.
Grade backslope no steeper than 1:1.5.
for grading behind pipe inlet.
Refer to T Series Special 602-6
Grade Ditch Rt.
C o n fi r m f in a l lo c a ti o n w it h C
O i n f ie ld o u tl e t p ip e
I n s ta ll u n d e r d r a in
Ditch
2.
1.
NOTES:
trench depth as approved by CO.
outfalls to culvert apron, field fit
Underdrain outlet at 62+50
Finished Grade Detail on sheet C1.
higher than existing ground. See
Finished grade profile to be 6" 3.
Not to be paid for separately.
earthwork quantity totals.
included in roadway
Work for grading ditches
3.
3.
F ie ld V e r if y
E n d s e c ti o n L t.
a n d R t.
R e m o v e
C
P P e x is ti n g
C M
P
P lu g a n d a b a n d o n outlet pipe into riprap apron.
Outfall underdrain see Special 605-A.
Underdrain Outlet Pipe, Confirm final location with CO in field see Special 605-A.
Install underdrain outlet pipe, see Special 605-A underdrain system
End install standard
68+00 Rt.
see Special 605-A
Begin install standard underdrain system, 62+53 Rt.
Outlet INV El.=6524.21
Inlet INV El.=6527.07 field fit as approved by CO.
install 24" X 40' CMP and end section, and flared
Remove existing culvert
Ditch Flowline
Match Existing
INV El. = 6557.79
Ditch
X
C M
P
.5
C le a n e x is ti
N
H
R E
E
AT
FOETAT
U
N
C I
L E
S
LAN
I G
N E
ISSEFORP
O
D E
S
10500197-2202
ERIN JAMES
the US - 4
Waters of
A
M d e n p w p p w ic s w o r k in g C p n p
E C .d g n
U s e r D
E N
P W
P
NUMBER
SHEET
UT UT FLAP 2496(1)
Superelevation Diagram
8.
6.9 9%
3.49
-2.00%
4.60%
77+65.63
78+14.97
78+14.97
76+66.10
76+66.1075+05.98
75+05.9874+27.98
72+40.6370+77.90
74+27.98 72+61.47
72+40.63 72+61.47 78+62.84
-5.40%
5.40% 7.00%
-7.00%
5.42%
-5.42% axis of rotation
Profile grade and
70+13.80
70+13.80 71+40.36
73+34.15
Lt. EOP
Rt. EOP
75+96.38
78+62.84
77+07.69
77+07.69
70+26.62 71+94.41
78+96.17
-4.60%
PROCOR
PROCOR
PROCOR
PROCOR
PROCOR
PROCOR
DIV. OF WILDLIFE RESCOURCES
STATE OF UTAH
S W
S E
C T
IO
N
N E
Block 5 Lot 4
Block 5 Lot 5
Block 5 Lot 6
Block 3 Lot 17
Block 3 Lot 18
Block 3 Lot 19
Block 3
Lot 21
S E
S E
C T
IO
N
N E
SECTION 13, SE 1/4, NE 1/16
SECTION 13, NE 1/4, SE 1/16
L = 163.98'
T = 83.05'
R 420.00'
PI =
69+
48.25
C urve =
C
L = 50.14'
T = 25.15'
R = 260.00'
PI = 72+51.13
Curve = C17
L = 154.28'
T = 138.22'
R = 70.00'
PI = 75+30.30
Curve = C18
L = 110.83'
T = 58.08'
R = 150.00'
PI = 76+89.56
Curve = C19
P T
.3
P C
.4
L = 100.95'
T = 51.30'
R = 230.00'
PI = 78+36.79
Curve = C20
PT 78+
86.43
.1 7'
.9
.8
PT
2+
.1
P C
.9
PC
3+
.0
PT 75+46.36
PC 76+31.48
P T
.1
0 7
76+00
.1
200'100'0
Scale in Feet
79+0078+0077+0076+0075+0074+0073+0072+0071+0070+00
Existing Ground
E ph raim
C an yon R d
EPHRAIM CANYON RD 70+00 TO 79+00
C6
-10%
10%
0%
-10%
10%
0%
P r o te c t in p la c e
C
M P
.0
E x is ti n g
P r o te c t in p la c e
C
M P
.4
E x is ti n g
A
78+
A
A
A widening
End pavement
75+96.37 widening
Begin pavement
73+34.13
See Special 204-A
Riprap Ditch
.3
.7 see Special 204-A
End riprap ditch Type II
71+19.72 Rt.
see Special 204-A
Begin riprap ditch Type II
70+04.34 Rt.
Type II, Rt.
N
H
R E
E
AT
FOETAT
U
N
C I
L E
S
LAN
I G
N E
ISSEFORP
O
D E
S
10500197-2202
ERIN JAMES
US - 4
Waters of the
US - 5
Waters of the
2.
CEphraim Canyon Rd L
2.
1.
NOTE:
channel.
delineated Waters of the US
Do not place riprap within the sheet C1.
See Finished Grade Detail on higher than existing ground.
Finished grade profile to be 6"
A
M d e n p w p p w ic s w o r k in g C p n p
E C .d g n
U s e r D
E N
P W
P
NUMBER
SHEET
UT UT FLAP 2496(1)
Superelevation Diagram
8.
6.9 9%
8.
8.
PROCOR
PROCOR
PROCOR
PROCOR
PROCOR
.3 no t in us e Po wer po le
BENCH MARK40
.0
L .9
T .3
R .0
P I .7
C u rv e C
PT 7
8+86.4
PC 80
+55.3
L = 269.80'
T = 250.57'
R = 120.00'
PI = 83+05.96
Curve = C21
L = 155.97'
T = 82.68'
R = 190.00'
PI = 86+55.81
Curve = C22
247.93'
6.7
9'
L = 233.41'
T = 129.04'
R = 220.00'
PI = 90+14.93
Curve = C23
.8
.9
P T
.1
P C
.8
P T
.3
P C
.1
P T
.1
P C
.1
78+00
80+00
0 9
-5.79%-6.15%
90+88.10
90+88.10
88+04.06
89+17.09
89+17.09
86+95.90
86+95.9086+06.33
86+06.3380+94.99 82+85.59
80+94.99 82+85.59
5.79%6.15%
-2.00%-2.00% -2.00%
-7.32%
7.32%
Rt. EOP
Lt. EOP
85+50.33 axis of rotation
Profile grade and
92+78.76 79+47.46
79+68.93
80+23.05 83+57.53
84+11.65 84+96.33
91+93.03
91+39.17
S E
C T
IO
N
S E
C T
IO
N
EPHRAIM CITY
BLOCK 1
LOT 25
BLOCK 5
LOT 2
BLOCK 5
LOT 3
BLOCK 3
LOT 6
BLOCK 3
LOT 3
BLOCK 3
LOT 2
BLOCK 3
LOT 1
BLOCK 1
LOT 7
BLOCK 1
LOT 8 BLOCK 1
LOT 6
BLOCK 1
LOT 1BLOCK 1
LOT 9
SECTI
ON
, N
E 1/
4, S
E 1/
SECTI
ON
, S
E 1/
4, N
E 1/
BLOCK 1
LOT 5
BLOCK 1
LOT 2
Property Owner
200'100'0
Scale in Feet
93+0092+0091+0090+0089+0088+0087+0086+0085+0084+0083+0082+0081+0080+00
Existing GroundExisting Ground
79+00
EPHRAIM CANYON RD 79+00 TO 93+00
CEphraim Canyon Rd L
E p h raim
C an yon R d
-10%
10%
0%
10%
0%
-10%
C7
1.
NOTE:
sheet C1.
See Finished Grade Detail on higher than existing ground.
Finished grade profile to be 6"
X
C M
P
.0
C le a n e x is ti
Begin pavement widening
79+68.93
A
A
A
A3
80+80
78+87
A 3
See Special 204-A
See Special 204-A + .6
8+37.30
.0
.4
Riprap Ditch Type II, Rt.
Riprap Ditch Type II, Lt.
see Special 204-A
Begin riprap ditch Type II
83+37.30, Lt.
see Special 204-A
End riprap ditch Type II
85+34.68, Lt.
see Special 204-A
Begin riprap ditch Type II
80+53.40, Rt.
see Special 204-A
End riprap ditch Type II
83+43.08, Rt.
pavement section roadway mainline existing pullout to match
Pave 4' wide apron of
86+21 to 87+60, Rt widening
End pavement
84+11.65
N
H
R E
E
AT
FOETAT
U
N
C I
L E
S
LAN
I G
N E
ISSEFORP
O
D E
S
10500197-2202
ERIN JAMES
the US - 6
P
M d e n p w p p w ic s w o r k in g C p n p
E C .d g n
U s e r D
E N
P W
P
NUMBER
SHEET
UT UT FLAP 2496(1)
Superelevation Diagram
8.
8.
6.9 9%
6.9 9% n o t in u se
P o w e r p o le t in u se
P o w e r p
BENCH MARK
.0
.4 n o t in u se
P o w e r p t in u se
P o w e r p n o t in u se
P o w e r p
FOREST
NATIONAL
MANTI-LASAL
S E C T
IO
N
N W /4 S
W /1
S E C T
IO
N
S
W /4
N W /1
NATIONAL FOREST
MANTI-LASAL
S E C T
IO
N
S E C T
IO
N
233.87'
L = 199.56'
T = 107.62'
R = 215.00'
PI = 94+60.80
Curve = C24
2.
L = 195.92'
T = 221.72'
R = 80.00'
PI = 104+50.36
Curve = C26
.9
.0
P T
.3
PT
9+
.6
PC
2+ .6
PT 104+24.57
P C
.7
P T
.7
P C
.1
0+
2+
104+00
106+00
L = 183.89'
T = 118.30'
R = 115.00'
PI = 98+87.72
Curve = C25
101+46.59
99+19.63
99+19.63
98+14.74
98+14.74 95+21.14
95+21.1493+84.78
93+84.78 105+16.40
102+71.84
102+71.84
103+81.37
103+81.37
-7.99%
7.99%
-2.00%
-7.42%
7.42%
-2.00%
-5.85%
5.85%
96+27.16 96+87.78 axis of rotation
Profile grade and
101+36.81
Lt. EOP
Rt. EOP
-2.00%
97+41.7095+73.12 99+92.67 101+90.87
104+62.34
93+32.80
200'100'0
Scale in Feet
107+00106+00105+00104+00103+00102+00101+00100+0099+0098+0097+0096+0095+0094+00
Existing Ground Existing Ground
EPHRAIM CANYON RD 93+00 TO 107+00
93+00
Ep hr ai m C an yo n
R d
0%
10%
-10%
C8
0%
10%
-10%
P r o te c t in p la c e
C
M P
.8
E x is ti n g
X
C M
P
.3
C le a n e x is ti
X
C M
P
.6
C le a n e x is ti n g
See D Series
ATV Parking Lot, existing cattleguard
Remove and reset
94+27.50
CEphraim Canyon Rd L
See note 2.
4.
See note 3.
coordinate with CO.
environmental clearance, limits of ROW and
Grade to drain within
5.
5.
Type C non-woven geotextile
Riprap Class 2 with Class 2
5.
5.
See Special 204-A See Special 204-A
.3
.0
.6
.6 see D Series
Pullout Area 1, ATV Turnaround
End riprap ditch Type I
96+00, 22.81' Lt.
Type II
End riprap ditch
104+45.66, Lt.
Type II
Begin riprap ditch
101+13.64, Lt.
Riprap Ditch Type I, Lt. Riprap Ditch Type I, Lt.
ditch Type I
Begin riprap
36.65' Lt.
93+79.39, approved by the CO.
location and quantity as
Lot perimeter. Field verify boulders along ATV Parking
Remove and reset 35 mainline pavement section pullout to match roadway
Pave 4' wide apron of existing
102+68 to 103+42, Rt.
N
H
R E
E
AT
FOETAT
U
N
C I
L E
S
LAN
I G
N E
ISSEFORP
O
D E
S
10500197-2202
ERIN JAMES
the US - 6
Waters of
5.
4.
3.
2.
1.
NOTES:
channel.
delineated Waters of the US
Do not place riprap within
See Special 204-A.
for sight distance.
Trees to be removed by others pullout.
existing ditch and proximity to
No pavement widening due to proximity to parking lot.
adequate sight distance and
No pavement widening due to sheet C1.
See Finished Grade Detail on higher than existing ground.
Finished grade profile to be 6"
- 7
Wetland
A
M d e n p w p p w ic s w o r k in g C p n p
E C .d g n
U s e r D
E N
P W
P
NUMBER
SHEET
UT UT FLAP 2496(1)
Superelevation Diagram
6.9 9%
6.9 9%
6.9 9%
8.
9 7 .0
675.96'
L = 145.82'
T = 73.11'
R = 803.00'
PI = 111+73.64
Curve = C27
171.49'
L = 144.46'
T = 74.15'
R = 260.00'
PI = 114+91.99
Curve = C28
.7 9'
L = 135.24'
T = 68.97'
R = 280.00'
PI = 117+30.06
Curve = C29
37.46'
L = 126.32'
T = 63.40'
R = 600.00'
PI = 118+97.19
Curve = C30
.22'
P C
.8
P C
.0
P T
.3
P C
.3
P T
.1
P C
.8
P T
.3
P T
.3
P C
.5
119+47.81
116+18.55
114+47.04 115+33.10 117+70.70
117+70.70
118+19.76
118+49.18
118+49.18
119+47.81
-2.00%-2.40%
2.40%
-4.00%
4.00%
-5.42%
5.42%
-2.00%-2.80%
2.80%
-2.00% axis of rotation
Profile grade and
111+15.73
111+15.73
112+31.15
112+31.15
110+50.50
Rt. EOP
Lt. EOP
112+96.33 113+47.08 114+47.04 115+33.10 116+81.60
116+81.60
111+04.91
112+41.97 114+01.00 119+52.94
120+36.77120+04.22
120+90.71
FOREST
NATIONAL
MANTI-LASAL
S
EC
TI
O
N 8, N
W /4 S
W /1
S
EC
TI
O
N 8, N
W /4 S
W /1
S
EC
TI
O
N 8, N
W /4 S
W /1
S
EC
TI
O
N 8, N
W /4 S E 1/
S E C T
IO
N
, N
W /4 , S
E /1
S E C T
IO
N
, S
W /4 , N
E /1
N W /4 , S
W /1
S E C T
IO
N
S W /4 , N
W /1
S E C T
IO
N
200'100'0
Scale in Feet
121+00120+00119+00118+00117+00116+00115+00114+00113+00112+00111+00110+00109+00108+00
Existing Ground Existing Ground
EPHRAIM CANYON RD 107+00 TO 121+00
CEphraim Canyon Rd L
Ephraim Canyon Rd
107+00
-10%
10%
0%
10%
0%
-10%
C9
1.
NOTE:
sheet C1.
See Finished Grade Detail on higher than existing ground.
Finished grade profile to be 6"
P r o te c t in p la c e
C
M P
.5
E x is ti n g
X
C M
P
.3
C le a n e x is ti n g widening
Begin pavement
120+36.77, Rt.
N
H
R E
E
AT
FOETAT
U
N
C I
L E
S
LAN
I G
N E
ISSEFORP
O
D E
S
10500197-2202
ERIN JAMES
the US - 10
A
M d e n p w p p w ic s w o r k in g C p n p
E C .d g n
U s e r D
E N
P W
P
NUMBER
SHEET
UT UT FLAP 2496(1)
Superelevation Diagram
6.9 9%
6.9 9%
6.9 9%
8.
7932.4630
S W
S W
S E
C T I O
N
S W
S E
S E
C T I O
N
235.9 5'
50.87'
L = 445.09'
T = 268.83'
R = 315.00'
PI = 227+85.65
Curve = C58
PC
231+
37.62 L = 187.98'
T = 154.86'
R = 90.00'
PI = 232+92.47
Curve = C59
.4
.7
P T
.9
P C
.1
PT
+25 .5
PC
6+ .0
PT
.9
P C
.8
0+
4+
6+
L = 191.80'
T = 99.30'
R = 300.00'
PI = 223+73.45
Curve = C57
222+93.63
222+93.63
222+19.27
224+41.58
224+41.58
225+41.17
225+41.17 224+91.38
229+42.41
229+42.41 231+80.42
231+80.42 232+82.79
232+82.79
235+40.16
-2.00%
-7.88%
7.88%
-2.00% -3.80%
3.80%
-3.80%
3.80%
Rt. EOP
Lt. EOP axis of rotation
Profile grade and
222+70.55 229+65.49
230+16.77 230+46.27
231+00.57
235+94.02
234+16.94
233+62.64
235+00234+00233+00232+00231+00230+00229+00228+00227+00226+00225+00224+00223+00
Existing Ground Existing Ground
200'100'0
Scale in Feet
222+00
Existing Ground Existing Ground
EPHRAIM CANYON RD 225+00 TO 239+00 OPTION X
236+00
Ep hr aim C an yo n R d
-10%
10%
0%
-10%
10%
0%
C19C19
1.
NOTE:
sheet C1.
See Finished Grade Detail on higher than existing ground.
Finished grade profile to be 6"
Begin pavement widening
230+46.34
End pavement widening
234+16.94
A see D Series
Pullout Area 3, 5+
P r o te c t in p la c e
E x is ti n g
C
M P
.6
X
C M
P
C le a n e x is ti n g
.1
Protect in place
Existing 24" CMP
Ephraim Canyon Rd LC
N
H
R E
E
AT
FOETAT
U
N
C I
L E
S
LAN
I G
N E
ISSEFORP
O
D E
S
10500197-2202
ERIN JAMES
Wetland - 15
.453
NATIONAL FOREST
MANTI-LASAL
S E
C T I O
N
S E
C T I O
N
NATIONAL FOREST
MANTI-LASAL
STATE PROJECT
P
M d e n p w p p w ic s w o r k in g D p ln
E C .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
UT UT FLAP 2496(1)
60'30'0
Scale in Feet
CEphraim Canyon Rd L
Ephraim Canyon Rd
D1
68.96' Rt.
95+34.87, ATV PARKING AREA LAYOUT
13.00' Rt.
98+81.62, 98+61.69, 50.40' Rt.
End concrete curb
98+61.69, 29.30' Rt.
Existing boulders
Remove and Reset
Existing Fence
Do Not Impact 3.
Existing boulders
Remove and Reset3.
approved by CO.
ditch to be
Alignment of
Outside TCE Limits
Do Not Work
13.00' Rt.
94+51.67, layout sheet
See ATV Turnaround
Pullout Area 1, ATV Turnaround
5.
4.
3.
2.
1.
NOTES:
striping.
See V Series for signing and section.
roadway mainline pavement
Pave ATV Parking Area to match verified and approved by CO.
Quantity and location to be field
Geotextile Type C non-woven.
Riprap 18" thick, use Class 2, Profile Detail on Sheet C1.
than existing ground. See
Finished grade to be 6" higher
Taper Detail
See Detail A for Curb
Begin concrete curb
94+75.40, 23.00' Rt.
1.5'
Flowline
CURB TAPER
DETAIL A
Symbol, typ.
Pavement Marking
Non-Mountable Curb
Portland Cement Concrete N
H
R E
E
AT
FOETAT
U
N
C I
L E
S
LAN
I G
N E
ISSEFORP
O
D E
S
10500197-2202
ERIN JAMES
Waters of the US - 6
Grade
Finished
Proposed
Wetland - 7
27.37' Rt.
95+05.25, .5
48.75' Rt.
95+01.23, 135°0'0"
3°
'6 .2
.8
17.00' Lt.
97+67.63, 17.00' Lt.
97+09.63, 2.
0'
R
R
58'
58'
A
M d e n p w p p w ic s w o r k in g D p ln
E C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
UT UT FLAP 2496(1)
.453
NATIONAL FOREST
MANTI-LASAL
NATIONAL FOREST
MANTI-LASAL
+00
Ephraim Canyon Rd
60'30'0
Scale in Feet
CEphraim Canyon Rd L
D3
0'
R
96+14.43, 13.00' Lt.
98+55.89, 13.00' Lt.
PT = 98+36.89, 24.78' Lt.
46.34' Lt.
PC = 98+04.93,
72.96' Lt.
PT = 97+73.85, 74.22' Lt.
PC = 97+03.57,
R
97+50
PULLOUT AREA 1
ATV TURNAROUND
3.
2.
1.
NOTES:
striping.
Turnaround Pullout Area 1
See Sheet D1 for ATV
Profile Detail on Sheet C1.
than existing ground. See
Finished grade to be 6" higher mainline pavement section.
Pave pullout to match roadway
Elev = 6854.33'
97+40.00, 60.00' Lt.
Elev = 6854.56'
97+40.00, 30.00' Lt.
Elev = 6854.56'
97+40.00, 30.00' Lt.
Elev = 6860.66'
98+00.00, 30.00 Lt.
N
H
R E
E
AT
FOETAT
U
N
C I
L E
S
LAN
I G
N E
ISSEFORP
O
D E
S
10500197-2202
ERIN JAMES
N
H
R E
E
AT
FOETAT
U
N
C I
L E
S
LAN
I G
N E
ISSEFORP
O
D E
S
10500197-2202
Wetland - 7
A
M d e n p w p p w ic s w o r k in g D p ln
E C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
UT UT FLAP 2496(1)
.463
5 7
60'30'0
Scale in Feet
CEphraim Canyon Rd L
Ep hr ai m C an yo n
Rd
D6
OPTION X
226+00
PULLOUT AREA 3
R
12.76' Lt.
225+14.28, 13.00' Lt.
226+54.59, 33.74' Lt.
225+49.27, PC =
33.84' Lt.
226+19.13, PT =
2.
1.
NOTES:
Profile Detail on Sheet C1.
than existing ground. See
Finished grade to be 6" higher mainline pavement section.
Pave pullout to match roadway
Elev = 7931.11'
225+65, 23.00' Lt.
Elev = 7933.73'
226+05, 23.00' Lt.
N
H
R E
E
AT
FOETAT
U
N
C I
L E
S
LAN
I G
N E
ISSEFORP
O
D E
S
10500197-2202
Wetland - 15
| A01_A |
| A01_Sheets |
| B01_Sheets |
| B02_Sheets |
| C01_Sheets |
| D01_Sheets |
| E-G_Sheets |
| T01_Sheets |
| V01_Sheets |
| Z01_Sheets |
File details come from the government source that posted it.