Roof Replacement at Pasco (PSC) Air Traffic Control Tower (ATCT)
Solicitation number
697DCK-19-R-00093
Issued by

About this file

Attachment J-1 PSC ATCT Roof Replacement Statement of Work (pdf)

View the file

Other files

File Type Posted
Attachment J-1 PSC ATCT Roof Statement of Work..pdf PDF
Business Declaration Form.pdf PDF
Attachment J-2 Wage Determination.pdf PDF
Site Visit Log.pdf PDF
Attachment J-3 Past Performance Survey.pdf PDF
697DCK-19-R-00093.pdf PDF
Attachment J-1a Drawing PSC-D-ATCT-A001.pdf PDF
697DCK-19-R-00093.pdf PDF
Attachment J-1 PSC ATCT Roof Statement of Work..pdf PDF
Attachment J-1a Drawing PSC-D-ATCT-A001.pdf PDF
Business Declaration Form.pdf PDF
Attachment J-3 Past Performance Survey.pdf PDF
Attachment J-2 Wage Determination.pdf PDF
Attachment J-2 Wage Determination.pdf PDF
Attachment J-1a Drawing PSC-D-ATCT-A001.pdf PDF
697DCK-19-R-00093.pdf PDF
Attachment J-1 PSC ATCT Roof Statement of Work..pdf PDF
Attachment J-3 Past Performance Survey.pdf PDF
Business Declaration Form.pdf PDF
Attachment J-3 Past Performance Survey.pdf PDF
697DCK-19-R-00093.pdf PDF
Attachment J-1a Drawing PSC-D-ATCT-A001.pdf PDF
Business Declaration Form.pdf PDF
Attachment J-2 Wage Determination.pdf PDF
Attachment J-2 Wage Determination.pdf PDF
Attachment J-3 Past Performance Survey.pdf PDF
Attachment J-1a Drawing PSC-D-ATCT-A001.pdf PDF
Attachment J-1 PSC ATCT Statement of Work.pdf PDF
697DCK-19-R-00093.pdf PDF
Business Declaration Form.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Aviation Administration

AJW-2W15D

INFRASTRUCTURE SUPPORT CENTER

WESTERN SERVICE AREA

JCN 1305170 and JCN 902078

PSC ROOF REPLACEMENT

PROJECT

Pasco, WA

SEPTEMBER 2018

Scope of Work

FINAL

PSC – ROOF REPLACEMENT PROJECT

FEDERAL AVIATION ADMINISTRATION INFRASTRUCTURE SUPPORT CENTER

TABLE OF CONTENTS

SUMARRY OF WORK

1.0 GENERAL

1.1 SCOPE

1.2 APPLICABLE DOCUMENTS

1.3 DEFINITIONS

1.4 CONSTRUCTION CONDITIONS

1.5 SAFETY

2.0 CONTRACTOR-FURNISHED MATERIAL AND EQUIPMENT

2.1 MATERIAL DELIVERIES

2.2 STORAGE AND PROTECTION

2.3 PERTINENT INFORMATION

3.0 EXECUTION

3.1 WORK SEQUENCE

3.2 CONTRACTOR USE OF PREMISES

FEDERAL AVIATION ADMINISTRATION INFRASTRUCTURE SUPPORT CENTER

SUMMARY OF WORK

1.0 GENERAL

1.1 SCOPE

The selected Contractor must furnish all labor, equipment, materials, and supervision for the demolition and installation associated with the Roof Replacement Project at Pasco (PSC) Air Traffic Control Tower (ATCT) located in Pasco, WA. This includes, but is not limited to, abatement of asbestos containing materials, removal of existing roofing membrane and decking materials, checking for leaks and repairing as found, and installing new roofing membrane and decking materials. Prior to “installation,” all of the equipment and material must be reviewed and accepted by a FAA representative.

The following items are a summary of the project and are provided solely for the purpose of describing the general nature of the work. The Contractor is responsible for accomplishing all items of work identified in the applicable drawings, specifications, and provisions of the contract.

A. General

1. The Contracting Officer (CO) assigned to this contract is the only individual with authority to contractually bind the FAA. All communications, authorizations, approvals, changes, modifications, etc. involving this contract must be with and through the CO. Any action not approved by the CO must not bind the FAA.

2. Contracting Officers Technical Representative (COR) - The Contracting Officer (CO) will assign a Contracting Officers Technical Representative (COR) to oversee the work on the project and act as a technical point of contact. A letter stating the COR’s responsibilities and authority will be issued when a COR is assigned.

3. A site visit will be held on December 19, 2018 at 10:00 am. To attend the site visit email Katie Fogle at katherine.fogle@faa.gov by December 17, 2018.

4. The total contract time for this project must not exceed 75 calendar days

5. All work must be performed between 8:00 a.m. and 5:00 p.m., five days per week, “Monday through Friday,” except that no work must be performed on Federal Holidays. All work schedules must be coordinated with the COR.

6. The Contractor must obtain the approval of the COR each day prior to beginning the next day’s work activity. The COR may suspend all work activity in the event that outdoor weather conditions pose a threat of damage to equipment or the building interior.

mailto:Katherine.fogle@faa.gov

FEDERAL AVIATION ADMINISTRATION INFRASTRUCTURE SUPPORT CENTER

7. Access to the site must be coordinated through the CO/COR. The Contractor must provide the CO/COR with a list of personnel after award. The Contractor must maintain the security integrity of the building at all times. Contractor personnel will be escorted by FAA employees while at the project site, and may be subject to security investigation by FAA.

8. All work must comply with OSHA safety requirements.

9. All work must be coordinated with the FAA and be accomplished on a “Not to interfere with FAA operations” basis with the facility.

10. Construction material must be stored only in FAA approved areas.

11. Construction staging must be allowed only in the FAA approved areas.

12. The Contractor must provide all temporary services required for construction.

Sanitary facilities/water are not available at the site. The Contractor must provide a temporary “Johnny on the Spot” – type sanitary facility for the duration of the contract. The facility shall be kept clean, secured as necessary to keep it from blowing over, and will be serviced weekly. Contractor shall arrange for pick-up immediately following final approval of completed work.

13. The Contractor must clean up and restore the site grounds to the surrounding condition after the work has been performed. Damage to existing buildings, grounds, drainage, paving, or utilities, caused by the Contractor’s activities, or that of his employees or subcontractors must be repaired to their pre-construction condition. The Contractor must pay all costs of repairs. After notice to proceed and prior to the commencement of construction, the Contractor and COR must conduct joint inspections of the existing areas affected by the construction. Existing damage or defects must be noted and will be used as the basis for determination of damages caused by the Contractor’s operations. The Contractor must clean work and non-work areas of any material, which falls from equipment.

14. A Safety Plan must be submitted to the Project Engineer for approval.

15. Contractor is responsible for the integrity of the envelope building, daily.

16. Contractor must maintain a distance of 42” between the roof and the top of the perimeter railing.

17. Prior to demobilization from the site, FAA’s COR(s) and project’s foreman must review the completed work. All defects noted noncompliance with the project’s bid documents will be itemized in a punch list. These items must be corrected immediately by the Installer prior to demobilization to the satisfaction of the FAA’s

COR.

a. The noted deficiencies must be repaired or replaced to a condition free of damage and deterioration at the time of Substantial Completion, to FAA’s COR’s Acceptance of the Completed Project, according to project bid documents, and/or according to the project warranty requirements.

b. All warranties as required for the project of this specification must be submitted for approval prior to final payment.

FEDERAL AVIATION ADMINISTRATION INFRASTRUCTURE SUPPORT CENTER

B. Work Description

B-1 Roofing Demolition Remove existing roofing materials as detailed below. Drawing PSC-D-ATCT-A001 (Attachment J-1a) has detailed views showing the roofing system, etc. and can be used as reference.

Dispose of existing materials in a manner that meets the guidelines outlined in this document. Remove gutters and downspouts from each roofing section. Splash blocks should also be removed and will be replaced. Special precautions must be taken to ensure the air terminals, lightning roof conductors, etc. and their anchors are not damaged during any roofing work.

1. Details 1 and 2: Remove the EPDM and foam insulation down to the hot mopped vapor retarder layer. Inspect these areas during demolition for additional damage. If leaking is suspected to have penetrated thru the hot mopped vapor barrier, the gypsum board and steel deck below must be inspected. Coordinate these inspections with the RE.

2. Detail 3: Remove the EPDM.

B-2 Presumed Asbestos-Containing Materials

1. Existing roofing materials are presumed Category 1 non-friable ACM according to 40 CFR 61, Subpart M.

2. The contractor must prepare CAT I asbestos abatement specifications and project designs. The specifications and designs must be prepared by an EPA or state certified project designer. Specifications must be site specific and provide sufficient information to enforce the contract documents.

Specifications and project design must include detailed procedures to be used by the abatement contractor to safely and thoroughly abate the asbestos while assuring the safety and health of employees in the facility.

FEDERAL AVIATION ADMINISTRATION INFRASTRUCTURE SUPPORT CENTER

3. A designated competent person must supervise all work and must perform perimeter-area surveillance during each work shift. No asbestos dust must be visible. Perimeter monitoring must show that clearance levels are met or that perimeter-area levels are not higher than background levels.

4. All abatement must be performed by an abatement contractor, licensed in the State of Washington, using workers who have been trained according to EPA requirements by state accredited training providers.

5. The contractor must submit a written asbestos abatement plan that must comply with the requirements of the project specifications, and be compatible with the current facility asbestos abatement contingency plan (if applicable), Federal, state, and local requirements, and other applicable FAA orders and guidelines.

6. All asbestos waste generated must be segregated, stored, transported, and disposed of in accordance with all applicable Federal, state, and local requirements. ACM/PACM waste must be stored inside leak-proof containers in designated areas until properly transported to an approved disposal site.

The containers must be properly labeled and stored in such a manner as to reduce the potential for accidental disturbance.

7. The waste hauling company must be licensed, per applicable state requirements, to transport ACM/PACM waste.

8. All ACM/PACM waste must be disposed of at a site currently approved to accept asbestos waste materials in accordance with Federal, state, and local requirements. The transporter must be required to provide a completed waste shipment record to the FAA within 30 days after removal of the waste from the site. If the completed waste shipment record is not received back from the disposal site within 35 days, the FAC will contact the disposal site and the waste hauler to determine the status of the shipment

9. All required notifications and transportation/disposal documentation must be completed by the contractor and copies provided to the FAA. Written notification to Washington DEQ, payment of a notification fee and any required waiting period must be included.

FEDERAL AVIATION ADMINISTRATION INFRASTRUCTURE SUPPORT CENTER

B-3 Roofing Installation Drawing PSC-D-ATCT-A001 can be used as a reference for design of the following roofing installation items:

1. If required, patch or replace the existing metal deck, gypsum board, and vapor barrier with material matching in weight, thickness, quality, and makeup, or with FAA approved material. If welding is performed, appropriate fire safety precautions must be taken.

2. Install insulation to meet R-values and slope as detailed on drawing PSC- ATCT-A001. Preformed roof insulation must be manufactured or approved for use by the roofing manufacturer.

3. Installation of PVC roof must comply with the manufacturer's approved instructions except as otherwise specified. If discretion is required, the RE will be immediately contacted for their approval. Roof material will be grey, have 80 mil thickness, be shown to have chemical resistance properties to jet fuel and kerosene, and installed per the manufacturers specifications.

Wherever possible, seal vents/pipes using prefabricated boots. The Contractor must show certification by the manufacturer to perform installation for the specified PVC roofing system.

4. Install flashing to match the existing conditions with material matching in weight, thickness, quality, and makeup, or with FAA approved material.

Flashing must also match existing color, or be white and have a matted texture to match the roof.

5. Any fasteners necessary for sheet-metal flashing must be corrosion-resistant steel annular-ring type nails, or screws. Fasteners for anchoring the roofing membrane must be as approved by the membrane manufacturer and identical to those used to obtain the wind uplift rating.

6. Replace all gutters, downspouts, roof drain covers and splash blocks with material matching that of existing in weight, thickness, quality, and makeup, or with FAA approved material.

7. Reinstall air terminals, lightning roof conductors, etc. to match their original orientation/position. Materials applied to roofing membrane must be approved by the membrane manufacturer.

8. Replace all wooden walking platforms with walking pads.

9. Install railing around roof hatch that complies with OSHA Construction Industry Standards.

C. Materials The Contractor must furnish all labor, equipment, materials, and supervision required to perform this work. All applications of construction materials must be accomplished in accordance with the Washington State Department of Transportation Standard Specifications for Road, Bridge, and Municipal Construction, 2016 edition, unless otherwise noted. All materials must be approved by the Project Engineer or FAA representative prior to application. A materials list for submittal will be provided by the Project Engineer for this project.

1.2 APPLICABLE DOCUMENTS

A. Applicable Documents - All FAA, Military, Federal, State, and industrial codes or standards, specifications, and contract drawings referenced in this and the following divisions form a part of this specification and are applicable only to the extent they were used as a basis of this design. All references to codes, standards, specifications, and construction drawings refer to the latest editions (and any supplements) in effect on the date of the contract.

B. Applicable Publications - The publications listed below form a part of this specification to the extent referenced. The publications are referenced to in the text by basic designation only.

1. Code of Federal Regulations (CFR):

a. OSHA General Industry Safety and Health Standards (29 CFR 1910), OSHA Construction Industry Standards (29 CFR 1926). OSHA 2202 is a condensed version of 29 CFR 1926. Each is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington DC 20402.

b. National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).

2. Federal Standard (313A): Preparation and the Submission of Material Safety Data Sheets.

3. FAA-C-1217G, Interior Electrical Work

4. FAA-STD-019F, Lightning and Surge Protection, Grounding, Bonding and Shielding

5. FAA Job Order 3900.63: Air Traffic Organization Fall Protection

6. FAA Job Order 6010.7A: Joint Acceptance Inspection

7. List of Drawings: These listed drawings are for information only, expressing existing conditions and construction details. The contractor must verify dimensions, locations, and sizes on the applicable drawings prior to installation. (Additional Drawings are at the site for review)

a. PSC-D-ATCT-A001

1.3 DEFINITIONS

A. Federal Aviation Administration (FAA) - The terms "Federal Aviation Administration" (FAA) and "government" as used herein denote the "owner".

B. Project Engineer (PE) - The term "Project Engineer (PE)” as used herein denotes the

"Government’s representative".

C. Contracting Officer (CO) - The term "Contracting Officer" (CO) as used herein denotes the person designated to act for the Government in the performance of this contract.

D. Resident Engineer (RE) - The term "Resident Engineer" (RE) as used herein denotes the representative of the Contracting Officer at the job site. The term is synonymous with the FAA terms "Contracting Officer's Technical Representative" (COTR).

E. Contractor and Subcontractor - The term "Contractor" as used herein denotes the firm who will perform and complete the work required by the Contract. The term "subcontractor" as used herein denotes the person or firm retained by the Contractor to perform a particular unit of work required by the Contractor. Subcontractors must be required to meet all specifications required of the Contractor.

PAGE

1.4 CONSTRUCTION CONDITIONS

A. Pre-construction Conference - The Contractor must attend a pre-construction conference at the time and location specified by the RE. Requirements for material disposal, security and safety will be discussed. Compliance with these procedures while on site is mandatory.

B. Submittals – Safety plans and precautions, samples, certificates, reports, catalog cuts, letters, shop drawings, maintenance and operations manuals, manufacturers installation procedures, etc. required must be submitted to the Project Engineer and approved before work commences.

a. Preconstruction Submittals- Within ten (10) days from the award of the contract and prior to the start of the work, submit the following items for review and permanent file.

1) Product Data- Submittals are required for any new material that will be installed as a part of this project that has not been specifically listed above as approved for use.

2) Safety Health Plan- Detailing fall protection for all work associated with the roof or any elevated areas.

3) Qualification Data: For Installer

b. Submittals at Completion of Work- Within 14 days of completion, provide the following information:

1) All Operation and Maintenance Data for materials installed.

2) Special Warranty: Manufacturer’s standard or customized form, without monetary limitation, in which manufacturer agrees to repair or replace components of the new membrane roofing system that fail in materials or workmanship within specified warranty period:

(a) Special warranty for roofing includes membrane roofing, base flashings, roof insulation, fasteners, cover boards, roofing accessories, and other components of membrane roofing system.

(b) Warranty for roofing must be a no dollar limit for labor and materials.

(c) Warranty Period: Twenty (20) years from date of Substantial Completion.

PAGE

C. Conflict Resolution - The Contractor must meet standards, specifications, and drawings as specified herein. The specifications and drawings must rule in all cases.

Specifications must govern over drawings. If any conflict should exist between site drawings (location-specific drawings) and standard drawings (drawings not referring to a particular location), the site drawings must govern. In the event of dimensional discrepancies or omissions, the Contractor must field verify and correct the information, and notify the RE. No work must be done until agreement has been made with the RE.

D. Inspection

1. Access for Inspection - The Contractor must allow the RE complete access to all portions of the work. Portions of the work buried, enclosed, or disguised, must be inspected by the RE before being obscured by the next operation of the Contractor.

In all cases, the RE must be informed accordingly and given access to the work.

Work obscured before inspection and acceptance by the RE, may, at the option of the RE be opened for inspection at no additional cost to Government.

The RE will inspect all work in progress up to completion and final Contractor’s Acceptance Inspection (CAI) including all materials, tools, and equipment. Such inspection may extend to all or a part of the work for the preparation, fabrication or manufacture of the materials to be used. The RE will notify the Contractor of any non-compliance with the contract specifications and/or drawings, and may reject workmanship or materials accordingly.

2. Contractor's Acceptance Inspection (CAI) - After substantial completion of all the

Contractor's work, a CAI will be conducted between the Contractor and Government.

The RE will review the contract documents and verify that the Contractor has completed all required work. If work remains to be completed, an itemized list will be prepared, and the contractor at no additional cost to the Government must complete the remaining tasks correctly. A Joint Acceptance Inspection (JAI) requires FAA personnel to be present. It may be held concurrently with the CAI.

E. Project Coordination - The Contractor must be required to coordinate his/her construction activities with the FAA through the RE or Project Engineer. Failure to notify and obtain the necessary approval may result in a rescheduling of the work. Failure to notify and obtain the necessary approval may result in a rescheduling of the work. If weather conditions or aircraft operations preclude a scheduled shutdown of an existing FAA facility, the Contractor must reschedule the work.

F. Layout of Work - The Contractor must field verify measurements and work from the established base lines and bench marks indicated on the drawings and must be responsible for all measurements in connection therewith. The Contractor must furnish, at his/her own expense, all templates, platforms, equipment, tools, materials, and labor as may be required in laying out any part of the work from the base lines and bench marks previously established. The Contractor will be held responsible for the execution of the work as detailed in the plans and specifications. It must be the responsibility of the Contractor to maintain and preserve all marks previously established until authorized to remove them.

G. Permits, Inspection, Licenses, Certificates - The Contractor must obtain and pay fees for permits, inspections, licenses, or certificates required by Federal, State and City/Town officials as necessary to perform the work, prior to starting construction, and in a timely manner to avoid delays in starting the job. The Contractor must submit evidence that they have obtained all required permits, inspections, licenses, and/or certificates.

H. Compliance with Local and Other Codes - The Contractor must comply with local and other codes and standards. Where the requirements of the specifications and drawings exceed those of the local or other codes, the Contractor must comply with the requirements of the specifications and drawings.

I. Stop Work Orders - When the Contractor or subcontractors are notified by the RE of any non-compliance with the provisions of the contract and the action(s) to be taken, the Contractor must correct the unsafe or unhealthy condition. Life threatening or other serious violations must be corrected immediately. Non-serious violations must be corrected within 24 hours of the non-compliance notice. The RE may stop the work with a “stop work order” if the Contractor fails to comply promptly with all or any part of the work being performed. When, in the opinion of the RE, satisfactory corrective action has been taken to correct the unsafe and unhealthy condition, the Contractor may resume work. The Contractor must not be allowed any extension of time or compensation for damages by reason of or in connection with such work stoppage.

J. Protection of Existing Vegetation, Improvements and Structures - The Contractor must take all precautions necessary to protect the existing facilities, equipment, buildings, foundations, vegetation, etc., during construction. Any areas damaged by the Contractor or any subcontractors, must be repaired or replaced to their original conditions by the Contractor at no additional cost to the government. Repairs must be approved by the RE and must match to original finish. The Contractor must provide all temporary covers, enclosures, barricades, etc., required to protect the existing facilities.

K. Schedules

1. Schedule - The Contractor must, within ten (5) calendar days from date of award of contract, submit to the CO for approval a practical project schedule. The schedule must show the order in which the Contractor proposes to carry out the work, the date on which he/she will start the several salient features (including procurement of materials, plant and equipment) and the contemplated dates for completing the work.

The schedule must be in the form of a progress chart of suitable scale to indicate the approximate percentage of work scheduled for completion at any time. The Contractor must enter on the chart the actual progress at such intervals as directed by the CO. The project schedule must include a milestone schedule for payments.

The milestones should be stated with requested reimbursement for each milestone (based upon actual costs, overhead and profit).

2. Progress Schedule - The Contractor, if requested by the CO, must submit a progress schedule at such intervals as directed by the CO. If the Contractor fails to submit a progress schedule within three (3) business days, the CO may withhold approval of progress payment estimates until the Contractor submits the required progress schedule.

3. Hours of Work – Must be approved by the RE, all work must be accomplished during normal business hours specified by the RE. No work is allowed on weekends and Federal holidays unless approved by the RE in writing.

L. Site Access - Access to the site will be via a pre-determined route identified and agreed upon at the pre-construction conference.

M. Special Permits - The Contractor must obtain and submit evidence of all necessary permits for the work. The Contractor must abide by all requirements dictated by the city, state, federal, airport authority or municipality for such permits without any additional cost to the government.

N. Waste Disposal - The Contractor must provide on-site containers for the collection of construction waste materials, debris and rubbish and their daily removal from the site.

Any spillage on access and haul routes must be cleaned up immediately. All spoil, waste and debris removed from the work site and not specified for reuse or identified as salvageable items, or identified as contaminated contents must be disposed of off site in areas authorized by the applicable County, State and/or Local agencies and in accordance with current rules and regulations governing the disposal of such waste. The Contractor, at no additional cost to the government, must pay disposal fees and miscellaneous charges. Copies of all documentation of the disposal of any fuel or hazardous wastes will be submitted to the RE.

O. Cleanup - The work site must be kept clean and orderly during the progress of work.

After final inspection, but before final acceptance of the work, all exterior surfaces of the equipment must be cleaned of dirt, mud, or oil accumulations. All debris must be removed from the general site area.

P. Warranties - Documentation for the labor and material warranties must be provided to the government upon completion of the project. Warranties must provide for repair or replacement of the work, if leaking is caused by defects in materials or workmanship related to this project. Warranty must include 5-year check on the building, and must include but will not be limited to the cost of travel, man power, and repairs at the expense of the contractor. Upon the satisfactory upgrades being made, the contractor must offer a similar 5-year warranty in which they will return and complete the same process.

Warranty must continue through the life of the building.

1.5 SAFETY

OSHA and FAA safety standards will be enforced. In keeping with such standards, the Contractor must, at a minimum, provide:

A. Safety Plan - The Contractor must have and submit a Safety Plan with the purpose of maintaining a safe working environment for construction workers employed on site. The safety plan must require a statement that the current Occupation Safety and Health Act (OSHA) regulations on safety in the construction industry, OSHA Title 29, Part 1910 and Part 1926, as well as FAA safety regulations are followed. The plan will be used by the RE to insure that the work is accomplished in accordance with accepted safety practices.

B. Trained Personnel - Personnel must be properly trained in the usage of all equipment for which they will be required to use during the Contract. The RE may request documentation or other evidence of training at any time. Personnel without adequate training will be prohibited from using such equipment.

C. Safety Data Sheets - The Contractor must have Safety Data Sheets (SDS) conforming to

Federal Standard 313A, written by the manufacturer, for all materials containing chemicals or other substances which may pose a hazard. One (1) copy of each SDS must be submitted to the RE and one (1) copy of each SDS must be kept on file at the job site at all times. The Contractor and subcontractors will be prohibited from handling any material which does not have an applicable SDS on file at the site until such SDS arrives on site.

D. Safety Equipment - The Contractor must provide safety equipment including, but not limited to, a Red Cross approved First-Aid kit and the appropriate number of annually inspected, charged fire extinguishers with the proper NFPA rating.

E. HAZCOM Program - The Contractor must have a hazard communications

(HAZCOM) program. The Contractor and each subcontractor must submit a copy of their HAZCOM program as well as a copy of their current OSHA 200 form, if requested.

F. Work Practices - Although OSHA regulations and the Contractor's Safety Plan will usually apply, the RE may consider certain work practices to be unsafe in accordance with Public Law 91-596, Part 5a and 5b. The RE may stop any operation which is in violation of the OSHA standards or fails to comply with the safety plan or other safe work practices.

G. Designated Foreman - When any construction activity is conducted at the site, the presence of a designated, competent contractor’s foreman is required at the job site. The foreman must be qualified and capable of organizing and coordinating all activities of the Contractor and his subcontractors, and keeping a safe job site.

H. Work Force - The Contractor must at all times, when construction activities are conducted, have a substantial number of workers for each task to proceed expeditiously and without generating delay, for lack of man-power.

2.0 CONTRACTOR-FURNISHED MATERIAL AND EQUIPMENT

2.1 MATERIAL DELIVERIES

All material deliveries made under this contract must be arranged for delivery to the Contractor's material staging area. This area must be located as determined at the pre-construction conference. Materials must be delivered to the jobsite in the manufacturer's original unopened packages, clearly marked with the manufacturer's name, brand name, and description of contents. Time limited materials must be used before shelf life expires. Materials must be stored in clean, dry areas. Storage temperatures must be as specified by the manufacturer. A maximum of one day's supply of materials may be stored on the roof when distributed so as not to exceed the roof live load limit. These materials must be kept dry and clean until application.

2.2 STORAGE AND PROTECTION

The Contractor, through the RE, must secure from FAA all necessary clearances for storage areas on site, including any time limitations upon the use of such areas. The storage and protection of Contractor material and construction areas must be the sole responsibility of the Contractor. The Contractor must provide at their own expense all fencing, shelters and security personnel as may be necessary for the protection of the material and equipment, including in the case of inclement weather.

2.3 PERTINENT INFORMATION

Any pertinent information listed about the contractor-furnished material and equipment must be submitted to the RE.

3.0 EXECUTION

3.1 WORK SEQUENCE

While the FAA will attempt to perform work during ideal weather conditions, the Contractor must provide temporary storage for their products that meet specifications if weather conditions deem it necessary.

Period of Performance: Work must be performed between March 15, 2019 and June 30th, 2019.

3.2 CONTRACTOR USE OF PREMISES

A. Use of the Site - Do not disturb portions of the site beyond the areas in which work is required.

B. Driveways and Entrances: Keep driveways and entrances serving the premises clear and available to the Government, the Government’s employees, and emergency vehicles at all time. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

C. Use of the Existing Building - Maintain the existing building in a watertight condition throughout the construction period. Repair damage caused by construction operations.

Take all precautions necessary to protect the building during the construction period.

END OF SECTION

SUMMARY OF WORK
1.0 GENERAL
1.1 SCOPE
A. General
B. Work Description
B-2 Presumed Asbestos-Containing Materials
B-3 Roofing Installation
C. Materials
1.2 APPLICABLE DOCUMENTS
1.3 DEFINITIONS
1.4 CONSTRUCTION CONDITIONS
D. Inspection
K. Schedules
1.5 SAFETY
2.0 CONTRACTOR-FURNISHED MATERIAL AND EQUIPMENT
2.1 MATERIAL DELIVERIES
2.2 STORAGE AND PROTECTION
2.3 PERTINENT INFORMATION
3.0 EXECUTION
3.1 WORK SEQUENCE
3.2 CONTRACTOR USE OF PREMISES
END OF SECTION