697DCK-26-R-00330.pdf
PDF 720 KB Posted
- Attached to
- CDC ARSR HVAC Replacement Federal contract opportunity
- Solicitation number
- 697DCK-26-R-00330
About this file
This is a Negotiated Screening Information Request (SIR) for construction services issued by the Federal Aviation Administration (FAA), Regional Acquisitions office, to solicit proposals for an HVAC Replacement project at the Cedar City Long Range Radar (ARSR) site near Cedar City, Utah. The solicitation number is 697DCK-26-R-00330, with proposals due August 13, 2026, at 3:00 PM ET. The estimated total contract value ranges from $250,000 to $500,000, and this is a total set-aside for small business concerns performing work under NAICS code 238220 (Plumbing, Heating, and Air Conditioning Contractors). The contract requires the selected contractor to furnish all labor, products, equipment, materials, supervision, permits, and insurance necessary for demolition and installation of the HVAC replacement system in accordance with the Statement of Work (CDC HVAC SOW dated 5/1/26), specifications (CDC-D-ARSR-M001), and project drawings. The contractor must begin work within 5 calendar days of receiving notice to proceed and complete all work within 60 calendar days. Performance and payment bonds equal to 100 percent of the contract price are required within 5 calendar days of award.
The FAA will use a Lowest Priced Technically Acceptable (LPTA) source selection approach. Proposals must include signed solicitation documents, completed pricing section, representations and certifications, proof of adequate bonding and insurance (general public liability of at least $500,000 per occurrence/$100,000 per person, and workers' compensation/employer liability of at least $100,000), and technical responses addressing relevant experience (minimum three contracts over five years valued at $250,000 or more with similar scope), statement of understanding, equipment and materials descriptions, and schedule. An optional site visit is scheduled for July 30, 2026, at 10:00 AM at Brian Head, Utah (FR 277/Blowhard Road), requiring advance notice by July 27, 2026. Questions regarding the solicitation must be submitted by August 4, 2026, at 2:00 PM EST. Proposals that fall outside the estimated value range must include detailed cost breakdowns. The contract will include various federal requirements including Davis-Bacon Act wage determinations (UT20260073), property protection, safety and health standards, payment by electronic invoice submission via the Delphi eInvoicing portal, and compliance with multiple FAA and federal acquisition regulations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-26-R-00330 0002.pdf | ||
| RFIs - 697DCK-26-R-00330 - CDC ARSR HVAC Replacement.pdf | ||
| 697DCK-26-R-00330 0001.pdf | ||
| Wage Determination - UT20260073 05182026.pdf | ||
| CDC HVAC SOW.pdf | ||
| CDC-D-ARSR-M001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF
SEALED BID (IFB)
9. FOR
INFORMATION CALL
PAGES
697DCK-26-R-00330
FEDERAL AVIATION ADMINISTRATION
AAQ-500 - REGIONAL ACQUISITIONS
1701 COLUMBIA AVENUE
COLLEGE PARK GA 30337
Marc.Lemay@faa.gov AND Suzanne.T-CTR.Huggins@faa.gov
WA-26-06507
AAQ510ATL-AFN
Suzanne Huggins CTR 404-305-5745
07/09/2026
08/13/2026
5 60 AMS Clause 3.2.2.3-71
1. CDC HVAC SOW, 5/1/26
2. CDC-D-ARSR-M001, 5/1/26
3. Wage Determination, UT20260073 05/18/2026
The total estimated contract value range for this project is between $250,000 and $500,000.
Bids/proposals that are priced below or above this value range must include a cost breakdown.
This is a total set-aside for small business concerns that perform work under the NAICS code 238220:
Plumbing, Heating, and Air Conditioning Contractors.
1 63
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. AWARD DATE31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
20b. SIGNATURE 20c. OFFER DATE
Continued...
AMENDMENT
NUMBER
DATE.
FEDERAL AVIATION ADMINISTRATION
AAQ-500 - REGIONAL ACQUISITIONS
1701 COLUMBIA AVENUE
COLLEGE PARK GA 30337
AAQ510ATL-AFN
Marc R. LeMay
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
ITEM NO.
(A)
QUANTITY
(C)
697DCK-26-R-00330
Delivery: 60 Days After Notice to Proceed
Delivery Location Code: S698402F
S698402F
698402 DOT FAA WWT25
CEDAR BREAKS SSC CEDAR CITY ARSR
2248 KITTYHAWK DR F
CEDAR CITY UT 847218321 US
00001 The selected Contractor shall furnish all labor, product, equipment, materials, supervision, and any other costs for the demolition and installation associated with the
HVAC Replacement project at the Cedar City
(CDC) Long Range Radar (ARSR) site located near
Cedar City, UT in accordance with the statement of work, specifications and project drawings described in Section J.
Electronic & IT: 03
Section B - Supplies or Services/Prices Section B - Schedule
The selected Contractor shall furnish all labor, product, equipment, materials, supervision, and any other costs for the demolition and installation associated with the HVAC Replacement project at the Cedar City (CDC) Long Range Radar (ARSR) site located near Cedar City, UT in accordance with the statement of work, specifications and project drawings described in Section J.
TOTAL PRICE: _________________________
The total estimated contract value range for this project is outlined on Page 1 (Box 10). Bids/proposals that are priced below or above this value range must include a cost breakdown.
Clause List
The remainder of this page has been intentionally left blank.
Section C - Description/Specifications Scope of Work
All work will be completed in accordance with attachments in Section J.
Clause List
Section D - Packaging and Marking Clause List
D - SECTION D - N/A
There are no applicable Section D clauses.
Section E - Inspection and Acceptance Clause List
3.10.4-10 INSPECTION OF CONSTRUCTION (SEP 2009)
Section F - Deliveries or Performance Clause List
3.10.1-11 GOVERNMENT DELAY OF WORK (APR 1996)
3.10.1-24 NOTICE OF DELAY (MAR 2009)
SA13 HOLIDAYS
The following Federal holidays are observed by the Federal Aviation Administration.
New Year's Day January 1st
Martin Luther King's Birthday Third Monday in January
Presidents Day Third Monday in February
Memorial Day Last Monday in May
Juneteenth June 19th
Independence Day July 4th
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day November 11th
Thanksgiving Day Fourth Thursday in November
Christmas Day December 25th
Section G - Contract Administration Data Clause List
3.10.1-23 CONTRACTING OFFICER'S REPRESENTATIVE-CONSTRUCTION CONTRACTS (APR
2012)
(a) The Contracting Officer may appoint other Government personnel to accomplish certain contract administration matters. While there shall be various titles and divisions of duties for these individuals, generically they are known as Contracting Officer's Representatives (CORs). The Contracting Officer will provide written notice of COR appointment(s), setting forth the authorities and limitations, to the Contractor within five (5) calendar days prior to the notice to proceed. COR duties may include, but are not limited to:
(1) Perform as the authorized representative of the Contracting Officer for technical matters, including interpretation of specifications and drawings, and inspection and review of work performed.
(2) Perform as the authorized representative of the Contracting Officer for administrative matters, including reviewing payments, and updated delivery schedules.
(b) These representatives are authorized to act for the Contracting Officer in all specifically delegated matters pertaining to the contract, except:
(1) contract modifications that change the contract price or cost, technical requirements or time for performance, unless delegated field change order authority;
(2) suspension or termination of the Contractor's right to proceed, either for default or for convenience;
(3) final decisions on any matters subject to appeal, e.g., disputes under the "Contract Disputes" clause; and
(4) final acceptance under the contract.
(End of clause)
Section H - Special Contract Requirements Clause List
3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020)
(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:
(1) Contracts written on paper and contracts in electronic form;
(2) Pen-and-ink signatures and electronic signatures; and
(3) Other legally-required written records and the same information in electronic form.
(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.
(c) Certain documents may need to be provided or maintained in original form, such as large-scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.
(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract.
(e) Contractors must not digitally sign any documents with software that uses the Secure Hash Algorithm 1 (SHA- 1). All digitally signed documents and contracts sent to the FAA must use a SHA-256 or higher hash algorithm. This is based on the National Institute of Standards and Technology (NIST) Policy Statement on Hash Functions dated August 5, 2015. Further guidance on the use of SHA-256 is in NIST Special Publication (SP) 800-57 Part 1, section
5.6.2 as amended and SP 800-131A, Revision 1 dated November 6, 2015. Additional guidance on the use of SHA-3 is in NIST SP 800-185 as amended.
(f) Contractors do not have to update documents previously digitally signed using SHA-1 hash algorithms unless the document requires updating. The FAA and contractors may continue to use SHA-1 for the following applications:
Verifying old digital signatures and time stamps, generating and verifying hash-based message authentication codes (HMACs), key derivation functions (KDFs), and random bit/number generation.
(End of Clause)
FAA0002 PRESIDENTIAL DIRECTIVE COMPLIANCE (FEB 2025)
FAA shall comply with all Presidential directives. If any clause, provision, term, or condition in this SIR or contract is inconsistent with any Executive Order or Presidential Memoranda issued on or after January 20, 2025, or implementing guidance thereof, FAA will take action it deems appropriate and as permitted by law to correct any such inconsistency to include finding a provision or clause invalid. Applicable Executive Orders include, but are not limited to:
- Executive Order 14148 of January 20, 2025, Initial Recissions of Harmful Executive Orders and Actions.
- Executive Order 14151 of January 20, 2025, Ending Radical and Wasteful Government DEI Programs and Preferencing.
- Executive Order 14154 of January 20, 2025, Unleashing American Energy.
- Executive Order 14168 of January 20, 2025, Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government
- Executive Order 14173 of January 21, 2025, Ending Illegal Discrimination and Restoring Merit-Based Opportunity.
Section I - Contract Clauses Clause List
3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:
https://fast.faa.gov/contractclauses.cfm.
(End of clause)
3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023)
3.2.2.3-42 DIFFERING SITE CONDITIONS (APR 2024)
3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 2024)
3.2.2.3-45 MATERIAL AND WORKMANSHIP (JUL 2024)
3.2.2.3-46 SUPERVISING THE CONTRACT WORK (JUL 2024)
3.2.2.3-47 PERMITS AND RESPONSIBILITIES (JUL 2024)
3.2.2.3-48 OTHER CONTRACTS (JUL 2024)
3.2.2.3-49 PROTECTING EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,
AND IMPROVEMENTS (JUL 2024)
3.2.2.3-51 OPERATIONS AND STORAGE AREAS (JUL 2024)
3.2.2.3-52 USE AND POSSESSION BEFORE THE PROJECT IS COMPLETE (JUL 2024)
3.2.2.3-53 CLEANING UP AND ROADWAY MAINTENANCE (JUL 2024)
3.2.2.3-54 PREVENTING ACCIDENTS (JUL 2024)
3.2.2.3-55 AVAILABILITY AND USE OF UTILITY SERVICES (JUL 2024)
3.2.2.3-58 LAYOUT OF WORK (JUL 2024)
3.2.2.3-62 PRECONSTRUCTION CONFERENCE (JUL 2024)
3.2.2.3-66 CONTRACTOR'S DAILY LOG (JUL 2024)
3.2.2.3-68 SAFETY AND HEALTH (OCT 2014)
3.2.2.3-83 PROHIBITION AGAINST CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (OCT 2015)
3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2023)
3.2.2.7-8 DISCLOSURE OF TEAM ARRANGEMENTS (APR 2008)
3.2.4-4 FIXED-PRICE CONTRACTS WITH ECONOMIC PRICE ADJUSTMENT-LABOR AND
MATERIAL (JUL 2024)
3.2.5-1 OFFICIALS NOT TO BENEFIT (OCT 2024)
3.2.5-3 GRATUITIES OR GIFTS (OCT 2024)
3.2.5-4 CONTINGENT FEES (OCT 2024)
3.2.5-5 ANTI-KICKBACK PROCEDURES (OCT 2024)
3.2.5-8 WHISTLEBLOWER PROTECTION FOR CONTRACTOR EMPLOYEES (APR 2024)
3.3.1-9 INTEREST (APR 2023)
3.3.1-15 ASSIGNMENT OF CLAIMS (JUL 2018)
3.3.1-19 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2021)
3.3.1-20 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS
(OCT 2012)
3.3.1-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD
MANAGEMENT (OCT 2024)
3.4.1-7 NOTICE TO PROCEED (OCT 2019)
3.4.2-8 FEDERAL, STATE, AND LOCAL TAXES - FIXED PRICE CONTRACT (APR 2025)
3.5-4 PATENT INDEMNITY - CONSTRUCTION CONTRACTS (JAN 2009)
3.6.1-1 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2019)
3.6.1-15 POST-AWARD SMALL BUSINESS PROGRAM RE-REPRESENTATION (JUL 2023)
3.6.2-1 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT-OVERTIME
COMPENSATION (OCT 2018)
3.6.2-2 CONVICT LABOR (APR 2025)
3.6.2-12 EQUAL OPPORTUNITY FOR VETERANS (APR 2022)
3.6.2-13 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (APR 2022)
3.6.2-16 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (APR 2025)
3.6.2-18 DAVIS BACON ACT (APR 2025)
3.6.2-19 WITHHOLDING-LABOR VIOLATIONS (APR 2025)
3.6.2-20 PAYROLLS AND BASIC RECORDS (APR 2025)
3.6.2-21 APPRENTICES AND TRAINEES (APR 2025)
3.6.2-22 SUBCONTRACTS (LABOR STANDARDS) (APR 2025)
3.6.2-39 TRAFFICKING IN PERSONS (OCT 2024)
3.6.2-46 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (APR 2025)
3.6.3-8 ALTERNATIVES TO PRODUCTS CONTAINING OZONE DEPLETING SUBSTANCES
AND HYDROFLUOROCARBONS (APR 2025)
3.6.3-13 AFFIRMATIVE PROCUREMENT OF RECYCLED CONTENT AND PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS (OCT 2024)
3.6.3-17 EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (OCT 2024)
3.6.3-24 ASBESTOS NESHAP COMPLIANCE (OCT 2024)
3.6.3-25 AEROSOLS (OCT 2024)
3.6.3-26 FOAMS (OCT 2024)
3.6.4-5 FAA BUY AMERICAN PREFERENCE - STEEL AND MANUFACTURED GOODS (APR
2022)
3.6.4-10 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JAN 2010)
3.6.6-1 DRUG FREE WORKPLACE (APR 2023)
3.6.6-2 SEAT BELT USE BY CONTRACTOR EMPLOYEES (APR 2023)
3.6.6-3 CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE DRIVING (JUL 2023)
3.8.9-2 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (JUL 2023)
3.9.1-1 CONTRACT DISPUTES (JAN 2020)
3.9.1-2 PROTEST AFTER AWARD (AUG 1997)
3.10.1-7 BANKRUPTCY (APR 1996)
3.10.1-8 SUSPENSION OF WORK (SEP 1998)
3.10.1-20 WARRANTY-CONSTRUCTION (JUL 1996)
3.10.1-25 NOVATION AND CHANGE-OF-NAME AGREEMENTS (OCT 2007)
3.10.1-28 CHANGES REQUIRED BY AMS (JAN 2024)
3.10.3-3 GOVERNMENT PROPERTY CONSOLIDATED FACILITIES (OCT 2018)
3.10.4-23 CONTRACTOR AND SUBCONTRACTOR COMPLIANCE WITH FASTENER ACT (NOV
1997)
3.10.6-6 DEFAULT (FIXED PRICE CONSTRUCTION) (OCT 1996)
3.11-62 PREFERENCE FOR PRIVATELY OWNED U.S. FLAG COMMERCIAL VESSELS (APR
2025)
3.13-14 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (APR 2025)
3.2.2.3-41 PERFORMING WORK (APR 2024)
The Contractor must perform, using its own organization, work equivalent to at least twenty-five (25) percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if the Contractor requests a reduction and the CO determines that it would be to the FAA's advantage to do so.
(End of clause)
3.2.2.3-50 PROPERTY PROTECTION (JUL 2024)
(a) The Contractor must construct and maintain any temporary fences, gates and other facilities needed to preserve crops, control livestock, and protect property. Before cutting a fence, the Contractor must take necessary precautions to prevent livestock from straying. The Contractor must prevent loss of tension in or damage to adjacent portions of the fence. The Contractor must immediately replace all fencing and gates cut, removed, damaged, or destroyed with new materials to the original standard. Undamaged gates may be reused.
(b) The Contractor must comply with the property owner's requests to leave gates open or closed.
(c) The Contractor must use all necessary precautions to avoid destroying surveying markers such as section corners, witness trees, property corners, mining claim markers, bench markers, triangulation stations, and the like. If the Contractor must destroy any marker, the Contractor must first notify the agency responsible for the marker, as well as the Contracting Officer's (CO) representative, and replace the markers.
(d) The Contractor must use care to prevent unnecessary damage to property in or near the work area caused by the Contractor's work. Unnecessary damage is that which the Contractor can avoid through efficient and careful performance of the work, considering the Contractor's land rights. If the Contractor damages any property, the Contractor must at once notify the owner or custodian and make or arrange to make prompt and full restitution.
(e) Maps and specifications the FAA provides may not give the location of all water supply, drainage, irrigation, and other underground facilities. Before entering a tract of land for contract purposes, the Contractor must determine from the property owner (or other reasonably available source) the location of any irrigation system, domestic water system, source of water, and drainage system existing on the property, whether serving that property or other property. The Contractor must avoid damaging or obstructing these facilities or polluting water supplies.
(f) The Contractor must hold the FAA harmless from any and all suits, actions, and claims for damages, including environmental impairment, to property arising from any of the Contractor's acts or omissions, the Contractor's subcontractors, or any of the Contractor's employees or subcontractor employees, in any way related to the work or operations under this contract.
(g) The Contractor must indemnify and hold harmless the property owners or parties lawfully in possession against all claims or liabilities asserted by third parties, including all governmental agencies, resulting directly or indirectly from the Contractor's wrongful or negligent acts or omissions.
(End of clause)
3.2.2.3-50 PROPERTY PROTECTION (JUL 2024) - ALTERNATE I (JUL 2024)
(a) The Contractor must construct and maintain any temporary fences, gates and other facilities needed to preserve crops, control livestock, and protect property. Before cutting a fence, the Contractor must take necessary precautions to prevent livestock from straying. The Contractor must prevent loss of tension in or damage to adjacent portions of the fence. The Contractor must immediately replace all fencing and gates cut, removed, damaged, or destroyed with new materials to the original standard. Undamaged gates may be reused.
(b) The Contractor must comply with the property owner's requests to leave gates open or closed.
(c) The Contractor must use all necessary precautions to avoid destroying surveying markers such as section corners, witness trees, property corners, mining claim markers, bench markers, triangulation stations, and the like. If the Contractor must destroy any marker, the Contractor must first notify the agency responsible for the marker, as well as the Contracting Officer's (CO) representative, and replace the markers.
(d) The Contractor must use care to prevent unnecessary damage to property in or near the work area caused by the Contractor's work. Unnecessary damage is that which the Contractor can avoid through efficient and careful performance of the work, considering the Contractor's land rights. If the Contractor damages any property, the Contractor must at once notify the owner or custodian and make or arrange to make prompt and full restitution.
(e) Maps and specifications the FAA provides may not give the location of all water supply, drainage, irrigation, and other underground facilities. Before entering a tract of land for contract purposes, the Contractor must determine from the property owner (or other reasonably available source) the location of any irrigation system, domestic water system, source of water, and drainage system existing on the property, whether serving that property or other property. The Contractor must avoid damaging or obstructing these facilities or polluting water supplies.
(f) The Contractor must hold the FAA harmless from any and all suits, actions, and claims for damages, including environmental impairment, to property arising from any of the Contractor's acts or omissions, the Contractor's subcontractors, or any of the Contractor's employees or subcontractor employees, in any way related to the work or operations under this contract.
(g) The Contractor must indemnify and hold harmless the property owners or parties lawfully in possession against all claims or liabilities asserted by third parties, including all governmental agencies, resulting directly or indirectly from the Contractor's wrongful or negligent acts or omissions.
(h) Managing and disposing of hazardous wastes and materials may expose the Contractor and the FAA to short-and long-term liabilities. To reduce these possible liabilities the Contractor must be fully aware of the hazards and regulatory requirements associated with the hazardous materials involved in this project. The Contractor must use qualified personnel to handle and transport hazardous materials.
(i) Before commencing work, the Contractor must:
(1) Do an environmental assessment of the work the contract requires, identifying tasks which involve using, handling or transporting hazardous materials or wastes. The following work items are known to involve such substances: Lead.
(2) Submit an environmental plan identifying and dealing with each specific task involving the wastes. The plan must be specific enough to demonstrate a thorough understanding of the environmental risks and the appropriate method for dealing with them. The plan must also list the required permits and reference the regulations that govern the activities needed to deal with the materials or wastes.
(3) Meet with the CO's representatives during the preconstruction conference to discuss and to develop a mutual understanding on implementing the plan.
(4) The CO may require other tasks to be added to the plan. If the CO considers the Contractor's planned methods for dealing with the risks insufficient, the CO may require the Contractor to revise the plan. Work involving hazardous materials or wastes must not start until the FAA has approved the plan. The FAA review of the plan does not relieve the Contractor of liability for environmental law and regulatory compliance.
3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (JUL 2024)
(a) If either the specifications or the drawings (but not both) mention tasks, the Contractor must assume that the tasks are in both. If the drawings and specifications differ, the specifications govern. If there is a discrepancy in the figures, in the drawings, or in the specifications, the Contractor must submit the matter promptly to the Contracting Officer (CO), who will promptly determine which governs, and notify the Contractor in writing. Any adjustment made by the Contractor without the CO's determination is at the Contractor's own risk and expense. As needed, the CO will provide necessary detailed drawings and other information, unless otherwise provided.
(b) Wherever in the specifications or the drawings, the FAA uses "directed," "required," "ordered," "designated," "prescribed," or similar words, they refer to the CO's requirements. Similarly, "approved," "acceptable," "satisfactory," or similar words refer to the CO's approval, unless otherwise expressly stated. The Contractor must have a complete set of plans and specifications on-site and available for the FAA's use.
(c) Where the FAA uses "as shown," "as indicated," "as detailed," or similar words, they refer to the drawings accompanying this contract, unless stated otherwise. The word "provided" means "provided and installed."
(d) Omissions from the drawings and specifications or the erroneous description of details of work which are necessary to carry out the intent of the drawings and specifications, or which are customarily performed, does not relieve the Contractor from performing those omitted or erroneously described details of the work. The Contractor must perform them as if fully and correctly set forth and described in the drawings and specifications.
(e) The Contractor must check all drawings the FAA provides before starting work and must promptly notify the CO of any discrepancies. In general, the Contractor should follow figures marked on drawings, rather than scale measurements. In general, large-scale drawings have precedence over small-scale drawings. The Contractor must compare all drawings and verify the figures before laying out the work. If the Contractor does not verify the figures, the Contractor will be responsible for any errors that might have been avoided had it verified them.
(f) "Shop drawings" means drawings, the Contractor or any subcontractor submit to the FAA under a construction contract, showing in detail the proposed fabrication and assembly of structural elements and the installation (that is, form, fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials the Contractor provided to explain in detail specific portions of the work the contract requires.
The FAA may duplicate, use, and disclose in any manner and for any purpose shop drawings you deliver under this contract.
(g) If this contract requires material offers (for example, shop drawings, catalog cuts, certificates of conformance), the Contractor must coordinate all of its offers, and review them for accuracy, completeness, and compliance with contract requirements. The Contractor must provide evidence that it approves the submittals. If the Contractor submits materials to the FAA without this evidence, the FAA may return them and ask the Contractor to resubmit the materials. The CO will indicate whether he or she approves or disapproves the offer, and if the CO does not approve it as submitted, will indicate the reasons for rejecting it. Any work done before the CO's approval is at the Contractor's risk. The CO's approval does not relieve the Contractor from responsibility for any errors or omissions in the submittals, nor from responsibility for complying with the contract requirements, except as described under (h).
(h) If the submittals vary from the contract requirements, the Contractor must describe the variations in writing, separate from the submittal, when it submits them. Send this description, a copy of the offer, and a proposal to incorporate it into the contract directly to the CO. If the CO approves a variation, the CO must issue an appropriate contract modification, unless the variation is minor or does not involve a change in price or in time of performance.
(i) The Contractor must submit to the CO for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. The CO will keep three sets (unless otherwise indicated) of all offers and will return one set to the Contractor.
(j) The Contractor must insert this clause, with appropriate changes in the designation of the parties, in all subcontracts.
(End of clause)
3.2.2.3-71 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (JUL 2024)
The Contractor must (a) begin work under this contract within five (5) calendar days after the date the Contractor receives the notice to proceed, (b) perform the work diligently, and (c) complete the entire work ready for use not later than sixty (60). The time stated for completion must include final cleanup of the premises.
(End of clause)
3.2.5-7 DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (OCT 2024)
(a) Definitions.
(1) "The Act," as used in this clause, means section 1352, title 31, United States Code.
(2) "Agency," as used in this clause, means executive agency, within the meaning of 5 U.S.C. 101, 102, and 104(I), and any wholly owned Government corporation within the meaning of 31 U.S.C. 9101.
(3) "Covered Federal action," as used in this clause, means any of the following Federal actions:
(i) The awarding of any Federal contract.
(ii) The making of any Federal grant.
(iii) The making of any Federal loan.
(iv) The entering into of any cooperative agreement.
(v) The extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(4) "Indian tribe" and "tribal organization," as used in this clause, have the meaning provided in section 4 of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 5304) and include Alaskan Natives.
(5) "Influencing or attempting to influence," as used in this clause, means making, with the intent to influence, any communication to or appearance before an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with any covered Federal action.
(6) "Local government," as used in this clause, means a unit of government in a State and, if chartered, established, or otherwise recognized by a State for the performance of a governmental duty, including a local public authority, a special district, an intrastate district, a council of governments, a sponsor group representative organization, and any other instrumentality of a local government.
(7) "Officer or employee of an agency," as used in this clause, includes the following individuals who are employed by an agency:
(i) An individual who is appointed to a position in the Government under title 5, United States Code, including a position under a temporary appointment.
(ii) A member of the uniformed services, as defined in subsection 101(3), title 37, United States Code.
(iii) A special Government employee, as defined in section 202, title 18, United States Code.
(iv) An individual who is a member of a Federal advisory committee, as defined by the Federal Advisory Committee Act, title 5, United States Code, appendix 2.
(8) "Person," as used in this clause, means an individual, corporation, company, association, authority, firm, partnership, society, State, and local government, regardless of whether such entity is operated for profit, or not for profit. This term excludes an Indian tribe, tribal organization, or any other Indian organization with respect to expenditures specifically permitted by other Federal law.
(9) "Reasonable compensation," as used in this clause, means, with respect to a regularly employed officer or employee of any person, compensation that is consistent with the normal compensation for such officer or employee for work that is not furnished to, not funded by, or not furnished in cooperation with the Federal Government.
(10) "Reasonable payment," as used in this clause, means, with respect to professional and other technical services, a payment in an amount that is consistent with the amount normally paid for such services in the private sector.
(11) "Recipient," as used in this clause, includes the Contractor and all subcontractors. This term excludes an Indian tribe, tribal organization, or any other Indian organization with respect to expenditures specifically permitted by other Federal law.
(12) "'Regularly employed," as used in this clause, means, with respect to an officer or employee of a person requesting or receiving a Federal contract, an officer or employee who is employed by such person for at least 130 working days within 1 year immediately preceding the date of the submission that initiates agency consideration of such person for receipt of such contract. An officer or employee who is employed by such person for less than 130 working days within 1 year immediately preceding the date of the submission that initiates agency consideration of such person must be considered to be regularly employed as soon as the officer or employee is employed by such person for 130 working days.
(13) "State," as used in this clause, means a State of the United States, the District of Columbia, the Commonwealth of Puerto Rico, a territory or possession of the United States, an agency or instrumentality of a State, and multi-State, regional, or interstate entity having governmental duties and powers.
(b) Prohibitions. The offeror, by signing its offer, hereby certifies to the best of his or her knowledge and belief that:
(1) No Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress on his or her behalf in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment or modification of any Federal contract, grant, loan, or cooperative agreement;
(2) If any funds other than Federal appropriated funds (including profit or fee received under a covered Federal action) have been paid, or will be paid, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress on his or her behalf in connection with the screening information request (SIR), the offeror must complete and submit, with its offer, OMB Standard Form LLL, Disclosure of Lobbying Activities, to the Contracting Officer; and
(3) The offeror will include the language of this clause in all subcontract awards at any tier and require that all recipients of subcontract awards in excess of $150,000 must disclose accordingly.
(4) This certification and disclosure is a prerequisite for making or entering into this contract imposed by the Act. Any person who makes a prohibited expenditure or fails to file or amend a disclosure form, must be subject to a civil penalty of not less than $10,000 and not more than $100,000, for each such failure.
(c) The prohibitions of the Act do not apply under the following conditions:
(1) Agency and legislative liaison by its own employees.
(i) The prohibition on the use of appropriated funds, in subparagraph (b)(1) of this clause, does not apply in the case of a payment of reasonable compensation made to an officer or employee of a person requesting or receiving a covered Federal action if the payment is for agency and legislative liaison activities not directly related to a covered Federal action.
(ii) For purposes of subdivision (c)(1)(i) of this clause, providing any information specifically requested by an agency or Congress is permitted at any time.
(iii) The following agency and legislative liaison activities are permitted at any time where they are not related to a specific solicitation for any covered Federal action:
(A) Discussing with an agency the qualities and characteristics (including individual demonstrations) of the person's products or services, conditions or terms of sale, and service capabilities.
(B) Technical discussions and other activities regarding the application or adaptation of the person's products or services for an agency's use.
(iv) The following agency and legislative liaison activities are permitted where they are prior to the Screening Information Request (SIR) of any covered Federal action:
(A) Providing any information not specifically requested but necessary for an agency to make an informed decision about initiation of a covered Federal action;
(B) Technical discussions regarding the preparation of an unsolicited proposal prior to its official submission; and
(C) Capability presentations by persons seeking awards from an agency pursuant to the provisions of a law authorizing such actions;
(2) Professional and technical services.
(i) The prohibition on the use of appropriated funds, in subparagraph (b)(1) of this clause, does not apply in the case of:
(A) A payment of reasonable compensation made to an officer or employee of a person requesting or receiving a covered Federal action or an extension, continuation, renewal, amendment, or modification of a covered Federal action, if payment is for professional or technical services rendered directly in the preparation, submission, or negotiation of submittal/offer or application for that Federal action or for meeting requirements imposed by or pursuant to law as a condition for receiving that Federal action.
(B) Any reasonable payment to a person, other than an officer or employee of a person requesting or receiving a covered Federal action or an extension, continuation, renewal, amendment, or modification of a covered Federal action if the payment is for professional or technical services rendered directly in the preparation, submission, or negotiation of any submittal/offer or application for that Federal action or for meeting requirements imposed by or pursuant to law as a condition for receiving that Federal action. Persons other than officers or employees of a person requesting or receiving a covered Federal action include consultants and trade associations.
(ii) For purposes of subdivision (c)(2)(i) of this clause, 'professional and technical services' must be limited to advice and analysis directly applying any professional or technical discipline. For example, drafting of a legal document accompanying a submittal/offer by a lawyer is allowable.
Similarly, technical advice provided by an engineer on the performance or operational capability of a piece of equipment rendered directly in the negotiation of a contract is allowable. However, communications with the intent to influence made by a professional (such as a licensed lawyer) or a technical person (such as a licensed accountant) are not allowable under this section unless they provide advice and analysis directly applying their professional or technical expertise and unless the advice or analysis is rendered directly and solely in the preparation, submission or negotiation of a covered Federal action. Thus, for example, communications with the intent to influence made by a lawyer that do not provide legal advice or analysis directly and solely related to the legal aspects of his or her client's submittal/offer, but generally advocate one proposal over another are not allowable under this section because the lawyer is not providing professional legal services.
Similarly, communications with the intent to influence made by an engineer providing an engineering analysis prior to the preparation or submission of a submittal/offer are not allowable under this section since the engineer is providing technical services but not directly in the preparation, submission or negotiation of a covered Federal action.
(iii) Requirements imposed by or pursuant to law as a condition for receiving a covered Federal award include those required by law or regulation and any other requirements in the actual award documents.
(iv) The reporting requirements herein must not apply with respect to payments of reasonable compensation made to regularly employed officers or employees of a person.
(3) Only those communications and services expressly authorized by paragraphs (c)(1) and (2) of this clause are permitted under this clause.
(d) Disclosure.
(1) If the Contractor, who requests or receives from an agency a Federal contract, has made or has agreed to make any payment using non-appropriated funds (to include profits from any Covered Federal action), to any person for the purpose of influencing or attempting to influence an officer or employee of any Agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress on his or her behalf in connection with a Covered Federal action, the Contractor must file with that agency a disclosure form, OMB Standard Form LLL, Disclosure of Lobbying Activities..
(2) The Contractor must file a disclosure form at the end of each calendar quarter in which there occurs any event that materially affects the accuracy of the information contained in any disclosure form previously filed by such person under subparagraph (d)(1) of this clause. An event that materially affects the accuracy of the information reported includes:
(i) A cumulative increase of $25,000 or more in the amount paid or expected to be paid for influencing or attempting to influence a covered Federal action; or
(ii) A change in the person(s) or individual(s) influencing or attempting to influence a covered Federal action; or
(iii) A change in the officer(s), employee(s), or Member(s) contacted to influence or attempt to influence a covered Federal action.
(3) The Contractor must require the certification, and if required, a disclosure form by any person who requests or receives any subcontractor exceeding $150,000 under the Federal contract.
(4) All subcontractor disclosure forms must be forwarded from tier to tier until received by the prime Contractor. The prime Contractor must submit all disclosures to the Contracting Officer at the end of the calendar quarter in which the disclosure form is submitted by the subcontractor.
(e) Agreement. The Contractor agrees not to make any payment prohibited by this clause.
(f) Penalties.
(1) Any person who makes an expenditure prohibited under paragraph (b) of this clause or fails to file or amend the disclosure form to be filed or amended by paragraph (b) must be subject to civil penalties as provided for by 31 U.S.C. 1352. An imposition of a civil penalty does not prevent the Government from seeking any other remedy that may be applicable.
(2) Contractors may rely without liability on the representations made by their subcontractors in the certification and in the disclosure form.
(g) Cost allowability. Nothing in this clause makes allowable or reasonable any costs which would otherwise be unallowable or unreasonable. Conversely, costs made specifically unallowable by the requirements in this clause will not be made allowable under any other provision.
(End of clause)
3.3.1-2 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (OCT 2024)
(a) The FAA will pay the Contractor the contract price as provided in this contract.
(b) The FAA will make financing payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer (CO), on estimates of work accomplished that meets the standards of quality established under the contract, as approved by the CO. The Contractor must furnish a breakdown of the total contract price showing the amount included therein for each principal category of the work, which must substantiate the payment amount requested in order to provide a basis for determining financing payments, in such detail as requested by the CO. In the preparation of estimates, the CO may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site may also be taken into consideration if --
(1) Consideration is specifically authorized by this contract; and
(2) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.
(c) Along with each request for financing payments, the contractor must furnish the following certification, or payment will not be made:
I hereby certify, to the best of my knowledge and belief, that-
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) Payments to subcontractors and suppliers have been made from previous payments received under the contract, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of chapter 39 of Title 31, United States Code; and
(3) This request for financing payments does not include any amounts that the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract.
(Name) (Title) (Date)
(d) If the Contractor, after making a certified request for financing payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the unearned amount), the Contractor must-
(1) Notify the CO of such performance deficiency;
(2) Be obligated to pay the FAA an amount (computed by the CO in the manner provided in "Interest" clause) equal to interest on the unearned amount from the date of receipt of the unearned amount until-
(i) The date the Contractor notifies the CO that the performance deficiency has been corrected; or
(ii) The date the Contractor reduces the amount of any subsequent certified request for financing payments by an amount equal to the unearned amount.
(e) If the CO finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the CO will authorize payment to be made in full. However, if satisfactory progress has not been made, the CO may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the CO may retain from previously withheld funds and future financing payments that amount the CO considers adequate for protection of the FAA and will release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment will be made for the completed work without retention of a percentage.
(f) All material and work covered by financing payments made will, at the time of payment, become the sole property of the FAA, but this will not be construed as--
(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or
(2) Waiving the right of the FAA to require the fulfillment of all the terms of the contract.
(g) In making these financing payments, the FAA will, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) above will not apply to that portion of financing payments attributable to bond premiums.
(h) The FAA will pay the amount due the Contractor under this contract after-
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed voucher; and
(3) Presentation of release of all claims against the FAA arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned.
(i) Notwithstanding any provision of this contract, financing payments will not exceed 80 percent on work accomplished on undefinitized contract actions. A contract action is any action resulting in a contract, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the "Changes" clause, or funding and other administrative changes.
(End of clause)
3.3.1-31 PROGRESS PAYMENTS (JUL 2018) - ALTERNATE I (JUL 2018)
Substitute the following paragraphs(a)(1) and (a)(2) in the basic clause
Progress payments will be made to the Contractor when requested as work progresses, but not…
This is the start of the file's text. The full file is on GovTribe.