Amend 2 Attach 2 Round 2-RESPONSES.docx
DOCX document 3 MB Posted
- Attached to
- Samuel's Hall Renovation Project Federal contract opportunity
- Solicitation number
- 693JF719B000006
About this file
This is a pre-solicitation notice for a construction project to renovate Samuel's Hall at the United States Merchant Marine Academy. The project includes hazardous materials abatement, demolition of building interiors down to the envelope, infill construction of teaching and support spaces including mechanical, electrical and plumbing systems, and select additional elements. The solicitation will be issued on August 1, 2019 via the Federal Business Opportunities website seeking fixed-price bids due around November 1, 2019. The total small business set-aside project is estimated at $10 million to $36.5 million and must be completed within 365 days of the notice to proceed. Interested parties should register at FBO.gov for solicitation updates and amendments.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB # 693JF719B000006 - Samuels Hall Renovation Question & Answer Form
Attachment 5- ROUND 2 Q&A
| # |
| IFB Section |
| Question |
| Response |
| Change to IFB? |
| Description of Change |
| Technical/ Contractual |
| 1 |
| SECTION 01 40 25 |
| Please clarify whether the requirement of SECTION 01 40 25 – QUALITY CONTROL TESTING FOR AIR BARRIER SYSTEMS is applicable for the whole building or the new addition only? If it’s for the whole building, please confirm that the project design have accounted for an air barrier system for the 6 surfaces of the existing building. |
| This requirement is only for the new addition. |
| No |
| N/A |
| Technical |
| 2 |
| section 01 40 25 |
| Please clarify whether the testing agency required by specification section 01 40 25 “QUALITY CONTROL TESTING FOR AIR BARRIER SYSTEMS” is hired by the contractor or the government? |
| The testing agency will be hired by the Government. Disregard the words “… hired by the Contractor…” in SS 014025:1.2-C and “Contractor’s…” in SS 014025:1.6-A |
| No |
| N/A |
| Technical |
| 3 |
| SECTION 01 41 00 |
| Paragraph 1.4 of SECTION 01 41 00 – STRUCTURAL TESTING LABORATORY SERVICES calls “cost for special inspections as a separate line in the Contract Sum”, however bid schedule have one line item only, please clarify. |
| The cost does not need to be provided as a separate line item in the bid, but will be required to be a separate line item in the awarded Contractor’s schedule of values. |
| No |
| N/A |
| Technical |
| 4 |
| SECTION 01 40 00 |
| Please clarify if the government or the contractor would pay for special inspections. |
| The contractor shall pay for standard installation inspections and submit the reports to the Government. Quality Assurance inspections will be furnished/paid for by the Government. |
| No |
| N/A |
| Technical |
| 5 |
| SECTION 01 50 00 |
| SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS, calls for the “Exterior laydown area shall be enclosed on all sides by a solid, 8’-0” high barrier, painted navy blue”, please provide location and size of the planed lay down area. |
| The location of the laydown area will be determined after NTP at the kickoff meeting with the awarded contractor. |
| No |
| N/A |
| Technical |
| 6 |
| SECTION 01 50 00 |
| SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS, calls for “A soundproof interior barrier partition shall be constructed in order to separate the Bridge Simulator area from the construction area.” please provide a plan and an elevation of the proposed partition with details of construction and required openings, with the STC rate of that partition. |
| See attached sketch. |
| No |
| N/A |
| Technical |
| 7 |
| SECTION 01 59 50 |
| SECTION 01 59 50 - SAFETY AND HEALTH para 3.5/A.1, requires “During renovation, sprinklers must be either operational or, when taken out of service, a full time fire watch must be employed”, please clarify the fire watch requirements. Also provide a plan of existing sprinkler system. |
| Disregard SS 015950:3.5-A1 and A2. No Firewatch is required. |
As per SS 015950:3.5-A3, fire extinguishers are required through the construction zone throughout construction.
| No |
| N/A |
| Technical |
| Is “Buy American Act” or Buy America” applicable to this project |
| Yes |
| No |
| N/A |
| Technical |
| 9 |
| SECTION 01 60 00 |
| On SECTION 01 60 00 - PRODUCT REQUIREMENTS, para 2.1 B.1.c state “Basis of Design: Where a Specification paragraph or subparagraph titled "Basis of Design" includes a product designation, provide the product designated, or request a Substitution of a compliant product by a named or other manufacturer.” |
Does this project have sole source products or manufacturers? We didn’t see any J&A.
| There are no Sole Source products on federal government projects. Multiple manufacturers or a basis of design is provided for all products in the specifications. Substitutions are permitted, but the substitution procedures laid out in SS 012500 must be adhered to. |
| No |
| N/A |
| Technical |
| 10 |
| SECTION 01 70 00 |
| SECTION 01 70 00 - EXECUTION REQUIREMENTS, para 1.3 F calls for “All cutting of façade for structural connections and welding of the structural connections to the building must be completed during off-hours”, please confirm that working off-hours are allowed, as this was listed as a restriction on the SOW. |
| Work can be done during normal working hours. Any noisy, dangerous, shutdown-requiring, etc. work shall be coordinated with the COR. |
| No |
| N/A |
| Technical |
| 11 |
| Section 02 82 00 |
| Para 1.1 /B of Section 02 82 00 states that “All stated quantities and locations of Asbestos Containing Materials (ACMs) are provided for informational purposes only. They are not bid quantities or exact locations. Estimated quantities and drawings are for information only and shall not be used as a sole source for determining the scope of the abatement. Contractor shall verify all project conditions and material quantities prior to bidding the project.” |
Abatement scope can’t be unlimited!
Please advise how we are to verify quantities without performing a survey of the site and taking samples for all suspected ACM.
| Hazmat Report is attached. |
| No |
| N/A |
| Technical |
| 12 |
| SECTION 02 82 00 |
| Para 3.6/ A of SECTION 02 82 00 state that “The results of June/July 2016 asbestos investigation are provided in the Hazardous Waste Assessment report attached to this specification.” |
Please provide a copy of this report.
| Hazmat Report is attached. |
| No |
| N/A |
| Technical |
| 13 |
| SECTION 02 82 00 |
| Para 5.2 of SECTION 02 82 00 state that “A. Payment for asbestos removal shall be made at the contract unit price bid for each of the various materials”. |
However, the bid schedule doesn’t call for unit prices, please clarify?
| There are no unit prices on the bid schedule. Please provide the cost to abate the hazardous materials quantified in the attached Hazmat Report. |
| No |
| N/A |
| Technical |
| 14 |
| section 03 30 00 |
| Para 1.7/A of section 03 30 00 calls for “A qualified installer who employs on Project personnel qualified as ACI- certified Flatwork Technician and Finisher and a supervisor who is an ACI-certified Concrete Flatwork Technician.” |
This requirement is excessive for the small size of flat concrete work required on this project.
Please advice if this can be relieved?
Only one of either the technician or the site supervisor is required to have ACI certification as a Concrete Flatwork Finisher (CFF) for quality control.
| No |
| N/A |
| Technical |
| 15 |
| section 03 30 00 |
| Please advise where the material specified on paragraphs 2.9 A (Repair Underlayment) & B (Repair Overlayment) of section 03 30 00 are to be used? |
| There are no specific locations indicated. The specification is provided in the event it is required for work during construction. |
| No |
| N/A |
| Technical |
| 16 |
| section 05 12 00 |
| Para 1.8 of specification section 05 12 00 STRUCTURAL STEEL FRAMING calls for “AISC-Certified Plant, Category STD” and “AISC-Certified Erector” and “AISC's Sophisticated Paint Endorsement P3 or to SSPC-QP 3” which seems excessive for the size of steel work and will add more cost to the project. |
Please advice if these can relieved.
The plant must be AISC-certified. In lieu of a certified plant, the contractor will be required to provide a special inspection within the plant.
An AISC-certified erector is not required, but if another erector is chosen, said erector must provide evidence of 10 years of successful steel project erections.
Painter qualifications and the execution of the work must adhere to SS 09 90 00 as well as SS 05 12 00-2.8.
| No |
| N/A |
| Technical |
| 17 |
| section 05 12 00 |
| Para 2.10/A of specification section 05 12 00 STRUCTURAL STEEL FRAMING calls for “Owner will engage a qualified testing agency to perform shop tests and inspections.” However, Para 2.10/E calls for “Prepare test and inspection reports”, which is again repeated on para 3.6. |
Please clarify who is responsible for testing and inspection.
| The contractor shall pay for standard installation inspections and submit the reports to the Government. Quality Assurance inspections will be furnished/paid for by the Government. |
| No |
| N/A |
| Technical |
| 18 |
| SW-105 |
| Drawing SW-105 calls for “Reset gas meter to proposed grade”. However, P-102 doesn’t call for such work! Please clarify. |
| The note on SW-105 should read, “Reset gas meter to proposed grade if necessary.” |
| No |
| N/A |
| Technical |
| 19 |
| Site Visit |
| Please provide a copy of all site visits attendance sheets |
| Attendance List Included |
| No |
| N/A |
| Contractual |
| 20 |
| Site visit |
| During site visit, the Servers center were called out to remain in place and operational. |
Please advise how are we perform new work in that location without moving such equipment?
Also, please confirm that power and HVAC that serve this space and its equipment is not to be demolished.
| The servers and equipment will not remain in place. The entire area will be demolished and servers moved to a different location in the building. The Main Data Center must remain operational. The means and methods are chosen by the contractor. The kickoff meeting with the awarded contractor will include discussions of the methods and procedures that the contractor foresees. The government will perform the actual moving of equipment to a temporary location. |
| No |
| N/A |
| Technical |
| 21 |
| Site visit |
| We noticed that the Simulator is fed with power, communication and HVAC from the rest of the building, please advise how are we to keep this simulator in service during construction although all supporting systems are to be demolished. |
| The full bridge simulator is believed to be fed from dedicated mechanical and electrical equipment below it on 0 Deck. Contractor to confirm. Additionally, temporary power must be provided to the building during construction as the transformer and generator are being replaced. |
Contractor to determine means and methods.
| No |
| N/A |
| Technical |
| 22 |
| Site Visit |
| We notice during site visit that access to the simulator is only thru the stair building to be demolished and thru the corridor that to have its asbestos floor abated, please confirm that simulator have other means of access than the stair and corridor that will have active construction. |
| Means of Egress will be discussed at the kickoff meeting with the awarded contractor. Egress must be retained while the building is occupied. The contractor will provide a construction wall that allows for egress during occupancy. The sequencing of work, means, methods and procedures will be discussed at the kickoff meeting. |
| No |
| N/A |
| Technical |
| 23 |
| A-104 ROOF PLAN |
| ON DRAWING A-104 ROOF PLAN, ROOFING SCHEDULE IS GIVEN WITH PARAPET CAP MATERIAL. SHOULD THE CONTRACTOR REPLACE THE EXISTING PRECAST CONCRETE PARAPET CAP WITH NEW ? |
| Existing precast concrete parapet caps are to remain. |
| No |
| N/A |
| Technical |
| 24 |
| Room Finish Schedule A-903 / Ceiling Plan |
| In Drawing A-903, It shows in the Finish schedule that most of the ceilings are Exposed ceilings. Just to make sure that are most of the ceilings exposed? Or are they ACT ceiling? |
| Ceilings are represented on Reflected Ceiling Plans and Finish schedules accurately. |
| No |
| N/A |
| Technical |
| 25 |
| Window |
| What is the material of window ? Are they Hollow metal or aluminum ? Also there are no jamb section details called out on the elevations |
| Drawings A-803 and A-901 and the specifications have details of the windows, including material. Windows are Aluminum (Basis of Design: Kawneer Trifab 451-7). Storefront basis if design: Kawneer 1600 Wall System 1. |
| No |
| N/A |
| Technical |
*Note: Bidder only needs to fill out the highlighted columns: Company, IFB Section (please include the section, paragraph, and page number that your question refers to), and Question. Bidder may add additional rows, if necessary. Please do not add/remove columns or change column width. Please keep this document in MS Word format.
Pages from 19.03.27_Samuels Hall Renovation- Bid Set_Sealed.pdf
EXISTING WEEP HOLE
EXISTING MASONRY WALL
EXISTING CAST STONE
LINTEL TO REMAIN
NEW FLASHING
BLOCKING AS REQUIRED
EXISTING CAST STONE
TO REMAIN
METAL SILL
NEW ALUMINUM WINDOW
MFG: KAWNEER
BASIS OF DESIGN: TRIFAB 451-7
SOLID SURFACE
2"
EXISTING (ASSUMED) FLASHING
1"
3 4"
Existing T.O. 2nd FL Window Elev. + 33'-10"
Existing T.O. 1st FL Window Elev. + 20'-10"
Existing B.O. 2nd FL Window Elev. + 26'-9"
Existing B.O. 1st FL Window Elev. + 13'-9"
FLASHING
8" GWB
VAPOR BARRIOR
CONTINUOUS SEALANT AT
WINDOW PERIMETER
NEW FLASHING
EXISTING CONCRETE
WATER PROOFING MEMBRANE TIE
INTO WINDOW PRIMARY SEAL
NEW ALUMINUM WINDOW
MFG: KAWNEER
BASIS OF DESIGN: TRIFAB 451-7
SOLID SURFACE
THIN BRICK VENEER GALV. MTL
LATH W/ SCRATCH AND FINISH COAT
1'-31 4"
3 4"
RIGID INSULATION ON 'Z'
FURRING
SETTING PIN IN EPOXY ADHESIVE
SEALANT W/ BACKER ROD
4" PRESSURE TREATED SHIM
PLYWOOD
PRECAST CONCRETE SILL
DRIP EDGE
THIN BRICK VENEER
WEATHER RESISTANT BARRIER
GWB ON WOOD
FURRING
CORNER BEAD
VAPOR BARRIOR
ROLLER SHADE
FASCIA W/ CLG.
MTD. ENDCAPS
31 2"
CL
Existing T.O. Slab Elev. + 36'-0"
CURTAIN WALL WITH
INSULATED GLAZING
SPANDREL PANEL
CURTAIN WALL ANCHOR ATTACHED
TO EDGE OF FLOOR SLAB
F.O. CURTAIN WALL
E.O.S
SLOPE 18" PER FT
(2) LAYERS 12" PLYWOOD NAILER
2X PRESSURE TREATED BLOCKING
EPDM COUNTER FLASHING
EXTENDED ABOVE PLYWOOD NAILER
EPDM MEMBRANE FULLY ADHERED
8" COVERBOARD
6" TAPERED INSULATION
T.O. Roof Parapet Elev. + 36'-0"
6"
2'- 0"
SEALANT WITH
BACKER ROD
KAWNEER 1600 WALL
SYSTEM 1
VAPOR BARRIER
T.O. Steel Elev. + 35'-6"
SILL WITH PRESSURE
PLATE AND SHEER BLOCK
SILL FLASHING BY CWALL MFG
CONCRETE CURB
Existing F.F. 1st Deck Elev. + 10'-0"
2" RIGID INSULATION
8" EXTERIOR GRADE GWB
ALUM. SOFFIT PANEL
POUR STOP TO EXTEND
4" ABOVE FIN. FLOOR
B.O. DESIGN:
KAWNEER 1600
1'- 9"
CONCRETE SLAB
SEE STRUCTURAL
Elev. + 9'-6"
1" Existing F.F. 1st & 2nd Deck Elev. + 10'-0" & +23'-0"
B.O. DESIGN: KAWNEER 1600
SPANDREL PANEL 2'-
41 4"
POUR STOP TO EXTEND 4" ABOVE
FIN. FLOOR; FACTORY PRIMED,
PAINTED @ EXPOSED FACES
Elev. + 9'-6" & +22'-6"
(2) 1-5/8" BACK TO BACK
STUDS WITH INSULATION
@ 16" O.C.
3-5/8" MTL STUDS
@ 16" O.C.
8" EXTERIOR GRADE GWB
ALUM. SOFFIT PANEL
WIRE TIES SECURE TO
DECK
2X PRESURE TREATED
BLOCKING
ALUMINUM STOREFRONTS
SEALANT
KAWNEER 1600 W/ EXPANSION
2X CONTINUOUS BLOCKING
THIN BRICK VENEER METAL
LATH AND MORTAR
CONTINUOUS WATERPROOFING
8" EXTERIOR GYP. SHEATHING
8" MTL STUDS W/ BATT
INSULATION
2" RIGID INSULATION R-13
CONT. SEALANT @ CWALL
PERIMETER
F.O. WINDOW
1'-3"
F.O. WINDOW
DATE:
P l a n
N o
S c e
D t r j
C i b
A h
E g
EDUARDO GUZMAN, R.A.
N.Y. License: 032575-1
DCM Architecture and Engineering expressly reserves its common law copyright and other property rights to these plans. All designs, specifications and drawings are the property of DCM Architecture and Engineering which are to be used only as issued for this project. They shall not be used on any other project in full or in part, without first obtaining the expressed written approval and consent of DCM Architecture and Engineering. These documents shall not be transferred to any unauthorized third party without the same consent.
Do not scale drawings: Contractors shall verify all dimensions prior to construction, and bring any discrepancies to the attention of the Architect.
The Contractor shall make no structural changes or substitutions without the written approval of the Architect.
R v s w
I f
DRAWN BY: CHK BY:
ROBERT BENSON, P.E.
N.Y. License: 085477-1
339 N Front Street, Camden NJ 08102
Telephone: 856.479.9101 info@dcm-ae.com
Facsimile: 856.757.0082 www.DCM-AE.com
SAMUELS HALL
RENOVATION
United States Merchant Marine Academy
300 Steamboat Road
Kings Point, NY 11024
US Department of Transportation /
Maritime Administration
1200 New Jersey Avenue S.E.
Washington, DC 20590
BID SET
NOV. 06, 2018
DCM 16-609
URBAN ENGINEERS
Two Penn Plaza, Suite 1103 NY 10121
212.736.9100 (ph) 212.736.9101 (fax)
CP DM
KEY PLAN:
A-803
WINDOW DETAILS
ARCH E 1/2" = 1'-0"
1 WINDOW @ EXISTING MASONRY
SECTION VIEW 3/A-403, 2/A-602 A-803
2 WINDOW @ 0 DECK
SECTION VIEW 2/A-602
7 TYPICAL CURTAIN WALL @ BASE
SECTION VIEW 3/A-600
6 TYPICAL CURTAIN WALL @ SLAB
SECTION VIEW 3/A-600, 3/A-602
3 TYPICAL CURTAIN WALL @ ROOF
SECTION VIEW 3/A-600
4 CURTAIN WALL @ ENTRANCE
PLAN VIEW 2/A-700 A-803
5B TYP. CURTAIN WALL @ ENTRANCE
SECTION VIEW 1/A-602
5A TYP. CURTAIN WALL @ CANTILEVER
SECTION VIEW
6" 12"4"2"
SCALE : 1-1/2" = 1'-0"
06" 12"4"2"
0 6" 12"4"2"
5" 1 2"
M
AX
RESILIENT TRANSITION STRIPREDUCER STRIP
12C 12D
CONCRETE SLAB, WOOD OR
TERRAZZO FINISH
REDUCER STRIP COLOR AS
SELECTED BY ARCHITECT
VINYL OR SHEET FLOORING
VINYL OR SHEET FLOORING OVER
CONCRETE SLAB
TRANSITION STRIP COLOR AS
SELECTED BY ARCHITECT
CARPET
HSS 8x4
1" THIN BRICK VENEER
W18x46
(2) MC18x42.7
EQEQ
SF2SF1
S-1
CW2CW2
CW4
2'-103 4"2'-103
4"2'-43 4" 3'-31
8"3'-21 2"3'-01
2" 2'-103 4" 2'-103
4" 2'-37 8" 3'-101
2"3'-101 2"3'-4" 3'-41
4" 3'-41
4" 3'-15
8"
7'- 5"
MOVABLE PARTITION TYPES
MP-1 MP-2 MP-3 MP-4 MP-5
EXPANDABLE HANDLE ACCESS HOLE
HAND PULL "L"
EXPANDABLE HANDLE
ACCESS HOLE
HAND PULL "R"
HAND PULL "R"
CW5
0"U
CW7CW7
NOTE: PACK H.M. FRAME JAMB
STUDS w/ SOUND ATTENUATION
BATTS AS PER PARTITION TYPE
8" JAMB TYPE J1: 35
8" STUD w/ 5 8 " GWB BOTH SIDES
5 8"
8" JAMB TYPE J2: 6" CMU
2"2"5 8"
NOTE: PACK H.M. FRAME JAMB
STUDS w/ SOUND ATTENUATION
BATTS AS PER PARTITION TYPE
8" HEAD TYPE H1: 35
8" STUDS w/ 5 8" GWB BOTH SIDES
8" JAMB TYPE J3: 4" CMU + 7 8" FURRING + 5 8" GWB
2"2"
J2
J3
H1
H.M. FRAME
SEALANT AT BOTH SIDES
BOXED HEADER
H.M. FRAME
GROUT FILLED CMU CELL
JAMB ANCHORS, MIN. 3 PER SIDE
H.M. FRAME, GROUT FILLED
H.M. FRAME, GROUT FILLED
WOOD BLOCKING
8" GWB ON 7 8" METAL FURRING
13 8"
8" JAMB TYPE J4: 6" CMU
2 14"
J4
H.M. DOUBLE EGRESS FRAME,
GROUT FILLED
2 14"5 8"
25 8"
@ 8" CMU
@ 6" CMU
@ 3
" STUD + GWB PARTITION
J1
@ 6" STUD + GWB PARTITION
8" 6" CMU
8" @ 8" CMU
8" 5
H2 H3
H
T
Y
Y b
8" CMU LINTEL
SEALANT
AT BOTH SIDES
4" H.M. DOOR HEAD
H.M. JAMB BEYOND
4" H.M. HEADER
STEEL ANGLE LINTEL, REFER
TO STRUCTURAL GENERAL
NOTES FOR STEEL SIZES
8" GWB ON 7 8" METAL FURRING
8" 5
H4
6" CMU LINTEL
2 14"5 8"
H.M. DOUBLE EGRESS FRAME,
2 14"
25 8"
CW6
F 7"
7"
SE
SC
HE
DU
LE
INS
UL
AT
ED
TE
MP
ER
ED
GL
AS
EQ.EQ.
SEE
SCHED.
3'-
E N
OT
E 1
'D' NOT USED
E N
OT
E 1
3'-
BA
4"2"
SCHEDULE
8" 2'-
SCHED.
SEE SCHED. SEE SCHED.
SCHED.10" 8"
SEE SCHEDULE
1'-
SEE SCHEDULE
EQ EQ
1'-8"
5'-
5'-
DOOR SIGNAGE
12"x18" METAL LOUVER;
REFER TO SPECIFICATION
SECT. 10200
DOOR TYPES
SEE SCHEDULE 2"
5 6
SEE SCHEDULE2" 2"2"
G
3'-0"
1'-0"
2" 2" 2"SEE
2" 2" SEE SCHEDULE 2"
CH/DM DM
ARCH E1 1/8" = 1'-0"
A-901
SF-1 SF-2 CW4 CW2 CW1
= SAFETY GLAZING
= PREFINISHED SPANDREL PANEL
= FIRE RATED
4'-211 16"
CW3
FED
CA
3'-1013
1'-3 3
11'-9 5
9'-4 3
9'-51
7'-3" 21
7'-3"5'-83 8" 5'-83
8"6'-10 7
11'-05
1'-113
11'-6"
2'-2"
7'-51
7'-51
1'-101
3'-85 8" 6' 3'-85
8" 3'-85
29'-11 9
3'-85 8"3'-85
8" 3'-85
8'
19'-8"
EXISTING M.O. (V.I.F)EXISTING M.O. (V.I.F)
3'-4" 4'-8 9
6' 101 2"101
9'-111
7'
2'-111
10'-31
8'-4"
7'-111
7'
1'-97 8" 21
11 9
6'-0"
10'
1'-8"1'-8"
6'-93
3'-101
6'-10" 10'-4"
10'-4"
4'-7"
6'-10"
1'-6"
8'-5"
7'-13
3'-1"
5'-10"
3'-81
4'
3'
J
CW6
10'-81
4'-45
10'-10"
4'-315 16" 4'-37
8" 4'-33
3'-1013 16" 3'-1013
16" 3'-8 3 16" 3'-615
1'-3 3 16" 21
7'-6 9
9'-71
44'-8 3 16"17'-117
1'-8 3
B
K
L M
8'-2" 12'-2"
1'-6" 3'-10" 3'-10"
B1
C1
SAME AS EXTERIOR WINDOW EXCEPT
WITH NON-OPERABLE PANES.
4'-9"
1'-63
4" 5'-4"4'-1"1'-11" 2' 3'-8"1'-11" 1'-11"
5'-4"2' 2'
2'
FINISHED FLOOR PLANE
CW7
8'
3'-7"
13'-83
2'-2"
6'-6"
4" 4'-1"1'-11"
10'
4" 5'-4"2'
3'-111
N O
2'-11"
2'-81
2'-1 7
3'LEGEND
ABBREVIATIONS
= PAINTED
= FACTORY FINISH TO MATCH ARCHITECTS PAINT CHOICE
= ALUMINUM
= WOOD
PT
FF
AL
WD
DATE:
a a l a t o j e c i e n l l a b o r a t c h i t e c g i n e e
N.Y. License: 032575-1 a g
DCM Architecture and Engineering expressly reserves its common law copyright and other property rights to these plans. All designs, specifications and drawings are the property of DCM Architecture and Engineering which are to be used only as issued for this project. They shall not be used on any other project in full or in part, without first obtaining the expressed written approval and consent of DCM Architecture and Engineering. These documents shall not be transferred to any unauthorized third party without the same consent.
Do not scale drawings: Contractors shall verify all dimensions prior to construction, and bring any
The Contractor shall make no structural changes or substitutions without the written approval of the Architect.
v i s i o w
I n f
DRAWN BY: CHK BY:
N.Y. License: 085477-1
339 N Front Street, Camden NJ 08102
Telephone: 856.479.9101 info@dcm-ae.com
Facsimile: 856.757.0082 www.DCM-AE.com
RENOVATION
United States Merchant Marine Academy
300 Steamboat Road
US Department of Transportation /
Maritime Administration
1200 New Jersey Avenue S.E.
Washington, DC 20590
BID SET
NOV. 06, 2018
DCM 16-609
URBAN ENGINEERS
Two Penn Plaza, Suite 1103 NY 10121
212.736.9100 (ph) 212.736.9101 (fax)
DOOR, WINDOW, MP
FRAME
TYPE
DOOR
NUMBER
DOOR LOCATION
FIRE RATING IN
MIN. / LABEL
WIDTH THKHEIGHT FINISHTYPE MAT'L
HEAD
DETAIL
JAMB
PAINTMAT'L FINISH
DOOR DESCRIPTION
STAIR TOWER 1
INSTRUCTOR ROOM 103
A 1 PT
3'-0" 7'-0"
1-3/4"
A 5
MECHANICAL ROOM 102
CLASSROOM 2 105
CLASSROOM 3 106
CLASSROOM 4 108
CLASSROOM 5 111
VESTIBULE DOOR 101
CLASSROOM 6 112
INSTRUCTOR ROOM 113
JANITOR'S CLOSET 114
CLASSROOM 7 116
CLASSROOM 8 117
COMMONS C ENTRY 2 C103
STAIR TOWER 2
LOBBY ENTRY 201
LECTURE HALL 202
LECTURE HALL 202 6'-0"
AUTOMATION SYSTEMS LAB 204
JANITOR'S CLOSET 207
STORAGE 208
MDC ROOM 209
SIM LAB MTL3 ROOM 301
SIM LAB MTL2 ROOM 302
SIM LAB MTL1 ROOM 303
TGS (SMDSS) ROOM 305
IT ADMIN 310
INL SERVER ROOM 309
4'-0"
DOOR SCHEDULE
ST-1-100
CLASSROOM 1 104
THE FORUM 107
THE FORUM 107
107.1
WC WOMEN 109
WC MEN 110
STORAGE 115
ST-2-100
COMMONS C ENTRY C103
C103.2
C103
STAIR TOWER 1ST-1-200
LECTURE HALL 202202
202.1
202.2
202.3
202.4
202.5 LECTURE HALL 202
WC WOMEN 205
WC MEN 206
FULL MISSION I 212
FULL MISSION II 210
STORAGE 214214
ST-2-200
ST-1-300
WC WOMEN 306
WC MEN 307
SIM LAB INL 2 RM. 315315
SIM LAB INL 1 RM. 314
COMMONS B C302C302
ST-2-300
5'-0"
O
U
E ST-1-400
400 MECHANICAL ROOM 400
MECHANICAL ROOM 401
7'-0"
8'-0"
F ALUM. FF 4/A-803 SF- ALUM. FF
E WD H2ST J2 2 HM FF
ALUM
90 MIN.
45 MIN.
F
ALUM.
ST
5B/A-803
H2
SF-2
SF-2
HM
H1 J1
H2 J2
CW-1
ALUM
H1H1
H3
J3
J2 2
A90 MIN.
HM PT
PAINT
THRESHOLD
JANTIOR'S CLOSET 308
OFFICE 311
OFFICE 312
OFFICE 313
STORAGE 317
HVAC CLOSET 316316 1 HM PT3'-0"
7'-0" 1-3/4" A WD
C103.1 COMMONS C LOBBY C103 6'-0"
7'-0" 1-3/4" F ALUM. FF H2 J2 SF-2 ALUM. FF
ME ROOM 318318
3'-0" 7'-0"STAIR TOWER 1ST-1-100.1 HM1-3/4" 90 MIN. A ST H2 J2 1 HM PT
3'-0" 7'-0" 1-3/4" A WD H1 J1 1 HM PT
201.1 LOBBY 201 6'-0" 1-3/4" F ALUM FF 5B/A-803 4/A-803 SF-37'-2"
PAINT TO BE PT-5
PAINT TO BE PT-4
SIM LAB MFMS STORAGE 213A213.1 3'-0" 7'-0" 1-3/4" A WD H1 J1 1 HM PTPT PAINT TO BE PT-5
6'-0"FULL MISSION II 210210.1 7'-0" 1-3/4" C WD H1 J1 3 HM PTPT PAINT TO BE PT-5
VBSS CONTROL 216216 3'-0"
7'-0" 1-3/4" A WD H2 J2 2 HM PTPT PAINT TO BE PT-4
VBSS DEBRIEF 217217 3'-0" 7'-0" 1-3/4" A WD H2 J2 2 HM PTPT PAINT TO BE PT-4
STORAGE 218218 3'-0" 7'-0" 1-3/4" A WD H1 J1 1 HM PTPT PAINT TO BE PT-5
ME ROOM 219219 3'-0"
7'-0" 1-3/4" A WD H1 J1 1 HM PTPT PAINT TO BE PT-5
MINI BRIDGE 215215 3'-0"
7'-0" 1-3/4" A WD H1 J1 6 HM PTPT PAINT TO BE PT-4
SIM LAB MFMS 213213 3'-0"
7'-0" 1-3/4" A WD H2 J2 6 HM PTPT
CLASSROOM 5 111 3'-0"111.1 7'-0" 1-3/4" A WD H2 J2 2 HM PTPT PAINT TO BE PT-4
INSTRUCTOR'S ROOM 211211 2'-10"
7'-0" 1-3/4" A WD H1 J1 1 HM PTPT PAINT TO BE PT-5
INSTRUCTOR'S ROOM 211211.1 2'-10" 7'-0" 1-3/4" A WD H1 J1 1 HM PTPT PAINT TO BE PT-5
INSTRUCTOR'S ROOM 211211.2 2'-10" 7'-0" 1-3/4" A WD H1 J1 1 HM PTPT PAINT TO BE PT-5
IT ADMIN CLOSET 6'-0"310.1 7'-0" 1-3/4" HMC WD H1 J1 3 PTPT PAINT TO BE PT-5
HVAC CLOSET 319319 3'-0" 7'-0" 1-3/4" A WD H1 J1 1 HM PTPT PAINT TO BE PT-5
6'-6"
1'-6"
1'-8" 1'-8"
8'-6"
5'-8"
2" 2"
4'-8"
8'-6"
8'-3"
5'
8'-3"
Q
2'-4"
2'-4"
EXISTING M.O. (V.I.F)
EXISTING M.O. (V.I.F) EXISTING M.O. (V.I.F)
M.O.
3'-3"
4'-3"
3'-51
= BLAST RESISTANT GLAZING- FRAGMENT RETENTION FILM
4" 4'-1"1'-11"
U
10'-4"
4" 5'-4"2' 2'
4'-01
1 03.27.2019 EMERGENCY/SECURITY
image3.emf
H-102-10.31.19.pdf image1.emf
19.10.14 TEMP PARTITION SKETCH.PDF
EXIST. CEIL.
+9'-0" (V.I.F.)
3/4" = 1'-0"
TEMPORARY CONSTR. BARRIERT1
2'-6" MIN.
60°
HEAD
BASE
CONT. 12" MAX ACOUSTICAL /
SOUND OR SMOKE SEALANT (TYP.)
BOTTOM STUD TRACK
GWB CONT. TO DECK
DEEP LEG DEFLECTION TRACK
(2) LAYERS 5 8" TYPE 'X' GWB
APPLY DOUBLE SIDED,
CONTINUOUS FOAM TAPE
UNDER FLOOR TRACK
3-5/8" DIAG. KICKERS AT EACH STUD
NOTE: 2 LAYERS 58" GYPSUM
WALLBOARD (TYPE X)
REQUIRED ON BOTH SIDES
OF PARTITION
3-5/8" METAL STUDS @ 24" O.C.
PLAN
3 5 8" METAL STUD @ 24" O.C.
3 12" FRICTION-FIT ACOUSTIC BATT
3 12" FRICTION-FIT ACOUSTIC BATT
EXISTING CONCRETE SLAB
339 North Front Street, Camden, NJ 08102 Telephone: (856) 479-9101 Facsimile: (856) 757-0082 info@dcm-ae.com www.DCM-AE.com
Do not scale drawings; Contractor shall verify all dimensions prior to construction and shall bring any
Sketch Name: Date:
Scale: Drawing Ref.
Sketch No.:
PSK −
RENOVATION
United States Merchant Marine Academy 300 Steamboat Rd.
DCML 16-609
19.10.14
---3/4" = 1'-0"
OCT. 14, 2019
WIDTH INSUL. SOUND
STUD OVERALL Y/N RATING TEST
3-5/8" 6-1/8" Y STC-54 RAL-TL-11-176
Sheets and Views
Sketch Letter (8.5x11) image2.emf