Remove and replace existing mooring lines Federal contract opportunity
Solicitation number
6933A221Q000019
Issued by
Department of Transportation

View the file

Other files for this federal contract opportunity

Other files attached to Remove and replace existing mooring lines, newest first.
File Type Posted
6933A221Q000019-0002.pdf PDF
Cape Chalmers - Mooring Proposal.docx DOCX document
6933A221Q000019-0001.pdf PDF
Heavy Weather Plan CAPE CHALMERS.PDF PDF
Mooring Line Certs.pdf PDF
SOW FY21 4.3 Remove and replace 3 Existing Damaged Mooring Lines.pdf PDF
Wage Determination.pdf PDF
Combined sysnopsis-solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

6933A221Q000019 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

6933A2

NORFOLK VA 23505

7737 HAMPTON BLVD BLDG 19 STE 300

DIVISION OF ATLANTIC OPERATIONS

MARITIME ADMINISTRATION

05/27/20210003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/27/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment is being issued to answer final questions submitted by potential offerors.

Please note the date and time of the extension as well as be sure to provide a signed copy of all amendments with your quote.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JACQUELINE M. BYRD

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

6/17/2021 jacqueline.byrd J Byrd

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

6933A221Q000019/0003

LIST OF CHANGES:

Bids due date : 21-JUN-21 changed to 25-JUN-21

Solicitation due time : 15:00 PM changed to 12:00

PM

Period of Performance: 06/16/2021 to 08/31/2021

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Questions and Answers

The following answers are from additional questions submitted. No further questions will be entertained.

1) What position are the lines? Bow, Spring, Stern, etc.

Spring lines (forward and aft bow)

2) What is the length of the line needed?

400 feet, 12 strands, 3-inch diameter, Amsteel Blue (162,000-180,000 Breaking Strength)

3) Are eyes required on both ends?

Yes

4) What size eye, if any, is needed?

Medium (4 feet diameter)

Please provide the load capacity of Pier Q so that we are can determine if a crane is able to safely operate on the deck.

Attachment is provided which hopefully can be of assistance.

Note: The COR also stated the following additional information “since my arrival in FLETC

CHS in 2014 there has been two 25 Ton telescopic mobile cranes, 2 one ton dually GOVT pickup trucks and three GOVT passenger vehicles on Pier Q at the same time without incident. At any rate, vehicles are only allowed on the pier for official business only to drop off or collect personnel, equipment or material. No POV’s are allowed on Pier Q”.

JeraldRoper Highlight