Remove and replace existing mooring lines Federal contract opportunity
Solicitation number
6933A221Q000019
Issued by
Department of Transportation

View the file

Other files for this federal contract opportunity

Other files attached to Remove and replace existing mooring lines, newest first.
File Type Posted
6933A221Q000019-0003.pdf PDF
6933A221Q000019-0001.pdf PDF
Cape Chalmers - Mooring Proposal.docx DOCX document
Mooring Line Certs.pdf PDF
Heavy Weather Plan CAPE CHALMERS.PDF PDF
SOW FY21 4.3 Remove and replace 3 Existing Damaged Mooring Lines.pdf PDF
Combined sysnopsis-solicitation.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

6933A221Q000019 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

6933A2

NORFOLK VA 23505

7737 HAMPTON BLVD BLDG 19 STE 300

DIVISION OF ATLANTIC OPERATIONS

MARITIME ADMINISTRATION

05/27/20210002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/27/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment is being issued to include a revised scope of work. Due date of 21-JUN-21 remains the same.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JACQUELINE M. BYRD

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

6/9/2021 jacqueline.byrd J Byrd

1. SCOPE:

1.1. Title: CAPE CHALMERS FY21 4.3 Remove 3 Each Existing Damaged Mooring Lines and

Replace with New Sampson Amsteel Blue 4-inch diameter Mooring Line or Equivalent;

accomplish

1.2 Location:

1.2.1 Throughout Mooring Stations (Port Side Stations)

2. REFERENCES:

2.1. Sampson Amsteel Blue 4-inch Diameter Mooring Line

2.2. Heavy Weather Plan

3. REQUIREMENTS:

3.1. DESCRIPTION. S.S. CAPE CHALMERS was a Combination Bulk and General Cargo Liner, constructed in 1963. It is decommissioned and is now a training vessel for the Federal Law

Enforcement Training Center (FLETC) moored at pier Quebec in North Charleston, SC. The vessel is approximately 500 feet long supported with 110VAC electrical power and ships lighting provided from the pier. Lighting throughout the inside of the ship is limited with some spaces containing only emergency lighting. Air conditioning is limited and is provided by stand-alone remote control operated A/C units/heat pumps.

4. SCOPE OF WORK:

4.3 Remove 3 each existing damaged mooring line located in 1.2.1, procure and install new Sampson

Amsteel Blue 4-inch diameter or equivalent mooring line, template from existing Shipboard condition.

4.3.1 New mooring lines shall have tightly sealed chaffing guards installed on each mooring line where the new mooring line is in contact with metal, concrete or any other material foreign to the mooring line.

4.3.1.1 Each mooring line is to have a chock CHAFE-GUARD

sized for each mooring line.

4.3.1.2 Each mooring line eye is to have a Pro-Guard Eye Rope Protector w/ chock CHAFE-GUARD sized for each line.

4.3.1.3 Chaffing guard material shall be made of marine grade leather 0.25” thick or equivalent.

4.3.1.4 Each new mooring line shall be installed and made up taught and secure under the guidance of the assigned COR.

4.3.1.5 Contractor shall furnish tools, crane services, material, equipment and personnel required to accomplish the requirements of this Work Item.

4.3.2 Disturbed surfaces shall be prepared, preserved and painted incidental to work including adjacent surfaces affected by welding, scraping, sanding, interference removal and interference installation. Painting shall include surface preparation. Finish color shall match existing and original surface as well as surrounding area.

4.3.2.1 Contractor shall remove and install each interference required to accomplish the requirements of this Work Item.

4.3.2.1.2 Submit one legible copy of a condition report in electronic media or hard copy to the CONTRACTING OFFICER'S REPRESENTATIVE listing the requirements of 4.3 through 4.3.2.1.2.

5. REQUIREMENTS:

5.1 The Contractor shall utilize a simple Lockout/Tagout system that is easily understandable to the CONTRACTING OFFICER’s Representative. No live circuits or unsafe transits shall be left unattended.

5.2 The Contractor shall comply with "gas free", “safe for hot work” and “safe for personnel entry” requirements in tanks, on tank tops, in bilges, voids, CHT, sealed compartments, inner bottoms and other locations where required.

5.3 When engaged in hot work, the Contractor shall provide the appropriate number of fire watches, firefighting equipment, personal protective equipment (PPE) and safety equipment.

5.4 The Contractor shall provide crane and rigging services as required to accomplish this

Work Item.

5.5 The Contractor shall provide and Contractor personnel shall wear the appropriate personal protective equipment (PPE) and safety equipment required to accomplish this Work

Item.

5.6 The Contractor shall dispose of waste, fluids, liquids and debris generated as a result of work accomplished in this Work Item in accordance with Federal, State and local regulations.

5.7 Cost of accomplishing this Work Item, including parts and material, shall be included in the total price/cost of this Work Item.

5.8 Material edges in the way of removals shall be faired and cleaned to receive new coatings.

5.9 Each surface shall be faired to receive new materials.

5.10 Remove and install each interference and removal required to accomplish this Work

Item, using manufacturer’s technical specifications as guidance.

5.11 New work and disturbed surfaces shall be prepared, preserved and painted incidental to work including adjacent surfaces affected by welding, scraping, sanding, interference removal and interference installation. Painting shall include surface preparation. Finish color shall match existing and original surface as well as surrounding area.

5.12 Inspections shall be accomplished and each installation and modification shall be proven satisfactory by the CONTRACTING OFFICER’s REPRESENTATIVE.

5.13 Training may be in progress during the work period. The Contractor shall not in any way interfere with or hinder training. The Contractor may schedule work hours outside of training hours with the approval of the FLETC Security Officer.

5.14 When Contractor personnel arrive at Pier Q for work in this Work Item, the

Contractor shall telephone FLETC CHS Security at 843-974-6303 and request Pier Q be opened for Contractor access.

5.15 When the last Contractor employee departs Pier Q he or she shall telephone FLETC

CHS Security at 843-974-6303 and request access to Pier Q be closed.

6. PERFORMANCE PERIOD:

6.1 The Contractor Period of Performance to accomplish work in this Work Item shall be IAW the Contracting Officer. The CONTRACTING OFFICER may adjust the work start date and work period with respect to training events of FLETC.

6.2 Deviation from time schedule is permitted only with written permission of the

CONTRACTING OFFICER.

6.3 Performance period for completion of Work Item is IAW schedule published by the Contracting Officer (See 6.1).

7. NOTES:

7.1 CONTRACTING OFFICER’s REPRESENTATIVE (COR): Jerry Bradley, USDOT MARAD DAO, AOG STBD (MAR615.3X), SOG Norfolk, 2000 Bainbridge Avenue, Building 1, Office 143, North Charleston, SC 29406-2607, gerald.w.bradley@dot.gov , John.Beck@dot.gov BlackBerry: (409) 284-1509, Fax:(843) 740- 6637.

7.2 FLETC Charleston Security Officer: Rob Ware, 2000 Bainbridge Avenue, Building One, Room 218, North Charleston, SC 29406-2607, Office: (843) 746-5973, e-mail:

robert.v.ware@fletc.dhs.gov

7.2.1 Prior to beginning work, the Contractor shall ensure company personnel and company vehicles are vetted and issued the required security clearances, badges and passes from FLETC Security Department for accessing FLETC, Pier Quebec and CAPE

CHALMERS.

7.2.1.1 Citizens of the United States who are of foreign birth shall require a minimum of thirty days to be vetted by FLETC prior to receiving passes or badges.

mailto:gerald.w.bradley@dot.gov mailto:John.Beck@dot.gov mailto:robert.v.ware@fletc.dhs.gov

7.2.1.2 Non-United States Citizens may take thirty days or longer for FLETC to authorize access in the facility

7.2.1.3 Five working days in advance of the Ship Check date the

Contracting Officer shall notify the FLETC Security Officer electronically or by hard copy of each prospective contractor by name and personnel planning to attend the Ship Check.

7.2.1.4 Five working days in advance of the Contractor

beginning work in this Work Item the Contracting Officer shall notify the FLETC Security Officer electronically or by hard copy the name of the Contractor and each Contractor employee who shall work in this

Work Item.

7.2.1.5 Contractor shall ensure each company vehicle operator requiring access in FLETC or CAPE CHALMERS is in possession of a current valid driver’s license and does not have any current wants, warrants, or open court cases.

7.2.1.6 Contractor shall ensure Contractor personnel requiring access in FLETC or CAPE CHALMERS do not have any current wants, warrants or open court cases.

7.2.2 FLETC Security shall be the Government approving agent for

Contractor badge applications, issuing personnel security passes/badges and vehicle passes.

7.2.3 Two forms of Government ID, a valid driver’s license, vehicle registration and proof of vehicle insurance is required when arriving at FLETC

Security to obtain Contractor security badge and Contractor vehicle pass.

7.2.3.1 Citizens of the United States who are of foreign birth shall require a minimum of thirty days to be vetted by FLETC prior to receiving passes or badges.

7.2.3.2 Non-United States Citizens may take longer than thirty days for FLETC to authorize access.

7.3 Prior to start work date and while work is in progress in CAPE CHALMERS, the

Contractor shall provide the COR with a work schedule to include names of Contractor personnel onboard, their assigned job and location. In addition, the Contractor shall submit to the COR the work days, including hours of work each day, projected work outside normal working hours and projected weekend work.

7.3.1 The Contractor shall receive permission in writing from the FLETC

Security Officer a minimum of three working days in advance should the Contractor require working in CAPE CHALMERS or access to Pier Quebec outside the normal working hours of 0730 through 1600 MON through FRI. This requirement includes weekends and Federal Holidays.

7.3.1.1 The Contractor shall provide to the FLETC Security Officer and the COR the name of each employee and a list of each vehicle, including vehicle license plate number, working in CAPE CHALMERS or accessing Pier

Quebec.

7.4 The Contractor shall not use any Government services, Government tools, Government material, Government equipment or Government parts to accomplish the requirements of this Work Item.

7.5 The Contractor shall keep the work area clean and free of matter foreign to the equipment or space. Allowable matter foreign to the equipment or space: None.

7.6 The Contractor shall maintain air condition boundaries, watertight boundaries and weather boundaries at all times.

7.7 When Contractor personnel arrive at Pier Q for work in this Work Item, the

Contractor shall telephone FLETC CHS Security at 843-974-6303 and request Pier Q be opened for Contractor access.

7.8 When the Contractor departs CAPE CHALMERS the Contractor shall telephone FLETC

CHS Security at 843-974-6303 and request access to Pier Q be closed.