This proposal document is submitted by Pierce County, Washington for Program No. 6927 involving the dry-docking, repairs, and improvements to the M/V Steilacoom II ferry vessel. The project encompasses comprehensive vessel maintenance and upgrades to be performed in accordance with detailed Plans and Specifications. The scope of work includes structural repairs, system overhauls, and facility improvements necessary to maintain the ferry's operational capability and safety standards. The proposal outlines the contractor's approach to executing the drydocking work, including project scheduling, resource allocation, and quality assurance measures to ensure completion within established timelines and budget parameters.
The proposal documents the contractor's pricing structure, methodology for cost estimation, and proposed payment schedule aligned with project milestones. It addresses the contractor's qualifications, experience with similar maritime vessel maintenance projects, and compliance with Washington State and Pierce County procurement requirements. The document includes details regarding project financing, funding sources, and any applicable set-asides or preferences. Additional information covers the contractor's management plan, safety protocols for vessel drydocking operations, and commitment to project delivery standards established by Pierce County for this critical ferry system infrastructure maintenance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6927_Contract.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL AND CONTRACT FORMS
FOR
M/V STEILACOOM II
2027 DRYDOCKING
PROGRAM NO. 6927
BID OPENING DATE:
Date: WEDNESDAY, JULY 15, 2026 Bid Delivery Time: 1:00 p.m.
Bid Opening Time: 1:00 p.m., or as soon thereafter as possible
PROPOSAL
TO THE PIERCE COUNTY DIRECTOR OF PLANNING & PUBLIC WORKS
TACOMA, WASHINGTON
This certifies that the undersigned has examined the location of
M/V STEILACOOM II
2027 Drydocking Program No. 6927
ITEM QUANTITY ITEM DESCRIPTION UNIT PRICE UNIT TOTAL AMOUNT
NO. at $ . ct $ . ct
STANDARD ITEMS
1 LUMP SUM
Take Control and Dry Dock M/V STEILACOOM II at LS LUMP SUM .
2 LUMP SUM Dock and Sea Trials at LS LUMP SUM .
3 5 DAY Lay Days at . per DAY .
4 5 DAY Berthing Days at . per DAY .
5 100 HR Hourly Billing Rate at . per HR .
6 $ 11,800 DOLLAR Additional Materials at 1 . 00 per EST $ 11,800 . 00
7 LUMP SUM
Open, Clean, and Certify Gas Free: Bilges, Holds and Enclosed Areas at LS LUMP SUM .
8 LUMP SUM
Sea Valves & Sea Water Cooling System Inspections & Maintenance at LS LUMP SUM .
9 LUMP SUM Zinc Anode Replacements at LS LUMP SUM .
10 LUMP SUM
Sewage System - Clean, Inspect, and Perform Maintenance at LS LUMP SUM .
11 LUMP SUM
Fuel Oil Tanks - Empty, Gas Free, Clean, and Inspect at LS LUMP SUM .
12 LUMP SUM
Hull Inspections for Underwater Inspection In Lieu of Dry Docking (UWILD) at LS LUMP SUM .
13 LUMP SUM
High-Pressure Water Wash - Hull Below DLWL at LS LUMP SUM .
14 LUMP SUM
High-Pressure Water Wash - Hull Above DLWL at LS LUMP SUM .
and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which payment will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be completed with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.
Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.
Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.
6927 Proposal 5-27-26.xlsx P 1 5/27/2026
15 LUMP SUM High-Pressure Water Wash - Superstructure at LS LUMP SUM .
16 500 S.F. Spot Cleaning and - Hull Below DLWL at . per S.F .
17 250 S.F. Spot Cleaning and - Hull Above DLWL at . per S.F .
18 650 S.F. Spot Cleaning and - Superstructure at . per S.F .
19 1650 S.F. Spot Cleaning and - Voids and Bilges at . per S.F .
20 LUMP SUM Painting - Hull Below DLWL at LS LUMP SUM .
21 LUMP SUM Painting - Hull Above DLWL at LS LUMP SUM .
22 LUMP SUM Painting - Superstructure at LS LUMP SUM .
23 350 S.F. Car Deck Non-Skid Spot Repair at . per S.F .
24 100 S.F. Exterior Deck Paint Spot Repair at . per S.F .
25 LUMP SUM Exterior Deck Painting at LS LUMP SUM .
26 LUMP SUM
Tail Shaft, Line Shaft, and Propeller Removals and Inspections at LS LUMP SUM .
27 1 EACH Tail Shaft Repairs (Optional) at . per EACH .
28 1 EACH Tail Shaft Bearing Replacement (Optional) at . per EACH .
29 1 EACH Tail Shaft Fiberglass Liner Renwal (Optional) at . per EACH .
30 LUMP SUM Rudder Removals and Inspections at LS LUMP SUM .
31 1 EACH Rudder Removals (Optional) at . per EACH .
32 LUMP SUM Marine Gear Inspections & Maintenance at LS LUMP SUM .
33 LUMP SUM
Water Cooling, Fire Pump, and Bilge Suction Systems Inspeciton and Maintenance at LS LUMP SUM .
34 LUMP SUM Inspect and Rehabilitate Steering System at LS LUMP SUM .
NON STANDARD ITEMS
35 LUMP SUM CPP Overhaul at LS LUMP SUM .
36 LUMP SUM Main Engine Gauge Replacement (Optional) at LS LUMP SUM .
ITEM QUANTITY ITEM DESCRIPTION UNIT PRICE UNIT TOTAL AMOUNT
NO. at $ . ct $ . ct
Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.
P 2 5/27/2026
37 LUMP SUM
Install Fuel Meters on Generator Engines (Optional) at LS LUMP SUM .
38 LUMP SUM Repair Passenger Cabin Flooring at LS LUMP SUM .
39 LUMP SUM Sea Water Cooling Strainer Replacement at LS LUMP SUM .
40 LUMP SUM Steering Hose Renewal at LS LUMP SUM .
41 LUMP SUM Passenger Cabin Window Repair (Optional) at LS LUMP SUM .
42 LUMP SUM Clean and Inspect Waste Oil Tank at LS LUMP SUM .
43 LUMP SUM
Sea Water Valve Inspection and Repair (Optional) at LS LUMP SUM .
44 8 EACH Pad Eye Installation at . per EACH .
45 LUMP SUM Engine Exhaust Inspection and Repair at LS LUMP SUM .
46 LUMP SUM
Sea Water Cooling System Manintenance (Optional) at LS LUMP SUM .
47 10 S.F. Steel Repair (Optional) at . per S.F .
48 $ 5,000 DOLLAR Apprenticeship Incentive/Penalty at 1 . 00 per EST $ 5,000 . 00
CONTRACT TOTAL $ .
ITEM QUANTITY ITEM DESCRIPTION UNIT PRICE UNIT TOTAL AMOUNT
NO. at $ . ct $ . ct
Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.
P 3 5/27/2026
M/V Steilacoom II 2027 Drydocking Program No. 6927 _25WORD.SPC\6927_Local Pack.docx P 4 4/17/26
Proposal--Continued
The bidder is hereby advised that by signature of this proposal he/she is deemed to have acknowledged all requirements and signed all certificates contained herein.
The undersigned hereby agrees to pay not less than the prevailing rates of wages in accordance with the requirements of the special provisions for this project.
A proposal guaranty in an amount of five percent (5%) of the total bid, based upon the approximate estimate of quantities at the above prices and in the form as indicated below, is attached hereto:
CASH IN THE AMOUNT OF
CASHIER'S CHECK
CERTIFIED CHECK ($_________) PAYABLE TO PIERCE COUNTY
PROPOSAL BOND TREASURER IN THE AMOUNT OF 5% OF THE BID
Receipt is hereby acknowledged of addendum(s) No.(s) _____, _____, and _____.
PROPOSAL MUST BE SIGNED
SIGNATURE OF AUTHORIZED OFFICIAL(S)
By: By:
(Print Name) (Print Name)
FIRM NAME
ADDRESS
Street City State Zip
PHONE FAX E-MAIL
The following information is required per RCW 39.04.350
Contractor’s License No. Contractor’s UBI No.
Industrial Insurance Account No. Excise Tax No.
Employment Security Account No.
Signed and sworn to (or affirmed) before me this day of , 20____.
Notary Public in and for the State of Washington
Residing at My Appointment Expires
Note: (1) This proposal form is not transferable, and any alteration of the firm’s name entered hereon without prior permission from the County will be cause for considering the proposal irregular and subsequent rejection of the bid.
(2) Please refer to Section 1-02.6 of the Standard Specifications, re: “Preparation of Proposal.”
Program No. 6927 _25WORD.SPC\6927_Local Pack.docx P 5 4/17/26
PIERCE COUNTY PLANNING & PUBLIC WORKS
PROPOSAL BOND
KNOW ALL MEN BY THESE PRESENTS, That we of as principal, and the a corporation duly organized under the laws of the State of and authorized to do business in the State of Washington, as surety, are held and firmly bound unto Pierce County, State of Washington, in the full and penal sum of five (5) percent of the total amount of the bid proposal of said principal for the work hereinafter described, pursuant to and in compliance with the provisions of RCW 36.77.030, for the payment of which, well and truly to be made, we bind our heirs, executors, administrators and assigns, and successors and assigns, firmly by these presents.
The conditions of this bond are such, that whereas the principal herein is hereby submitting his/her or its sealed proposal for the following public works construction, to wit:
said bid and proposal, by reference thereto, being made a part hereof.
NOW, THEREFORE, if said proposal bid by said principal be accepted, and the contract be awarded to said principal, said principal shall duly make and enter into and execute said contract and shall furnish bond as required by RCW 36.77.040 within ten (10) days after notice of the award, exclusive of the day of notice, then this obligation shall be null and void, otherwise it shall remain and be in full force and effect.
IN TESTIMONY WHEREOF, the principal and the surety have caused these presents to be signed and sealed this __________________ day of __________________________, 20___.
Principal
Surety
Attorney-in-fact
P 6
Pierce County Subcontractor List Prepared in compliance with RCW 39.30.060 as amended
To Be Submitted with the Bid Proposal Project Name ____________________________________________________________________________________________
Failure to list subcontractors with whom the bidder, if awarded the contract, will directly subcontract for performance of the work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical, as described in Chapter 19.28 RCW or naming more than one subcontractor to perform the same work will result in your bid being non-responsive and therefore void.
Subcontractor(s) with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical as described in Chapter 19.28 RCW must be listed below. The work to be performed is to be listed below the subcontractor(s) name.
To the extent the Project includes one or more categories of work referenced in RCW 39.30.060, and no subcontractor is listed below to perform such work, the bidder certifies that the work will either (i) be performed by the bidder itself, or (ii) be performed by a lower tier subcontractor who will not contract directly with the bidder.
Subcontractor Name ____________________________________________________________________________________
Work to be performed ____________________________________________________________________________________
Subcontractor Name ____________________________________________________________________________________
Work to be performed ____________________________________________________________________________________
Subcontractor Name ____________________________________________________________________________________
Work to be performed ____________________________________________________________________________________
Subcontractor Name ____________________________________________________________________________________
Work to be performed ____________________________________________________________________________________
Subcontractor Name ____________________________________________________________________________________
Work to be performed ____________________________________________________________________________________
*Bidders are notified that it is the opinion of the enforcement agency that PVC or metal conduit, junction boxes, etc., are considered electrical equipment and therefore considered part of electrical work, even if the installation is for future use and no wiring or electrical current is connected during the project.
DOT Form 271-015A Revised 06/2020
Tacoma Mall Plaza 2702 South 42nd Street Suite 109 Tacoma, WA 98409
Pierce County Planning & Public Works
Program No. 6927 _25WORD.SPC\6927_Local Pack.docx P 7 4/17/26
CERTIFICATION OF NONSEGREGATED FACILITIES
The contractor certifies that no segregated facilities are maintained and will not be maintained during the execution of this contract at any of contractor’s establishments.
The contractor further certifies that none of the contractor’s employees are permitted to perform their services at any location under the contractor’s control during the life of this contract where segregated facilities are maintained. The contractor certifies further segregated facilities will not be maintained or provided for employees at any of the contractor’s establishments, and that employees will not be permitted to perform their services at any location, under the contractor's control, where segregated facilities are maintained.
The contractor agrees that a breach of this certification is a violation of the Equal Opportunity clause in this contract. As used in this certification, the term “segregated facilities” means any waiting rooms, work area, rest rooms and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, creed, color or national origin, because of habit, local custom, or otherwise.
The contractor agrees that identical certifications from proposed contractors will be obtained prior to the award of any subcontracts. Contractor will retain a copy of any subcontractor’s certification and will send original to Contract Compliance Division.
NON-COLLUSION AND DEBARMENT AFFIDAVIT
State of Washington, County of
As an authorized representative of the firm of , I do hereby certify that said person(s), firm, association or corporation has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted.
I further certify that, except as noted below, the firm, association or corporation or any person in a controlling capacity associated therewith or any position involving the administration of federal funds; is not currently under suspension, debarment, voluntary exclusion, or determination of eligibility by any federal agency;
has not been suspended, debarred, voluntarily excluded or determined ineligible by any federal agency within the past three (3) years; does not have a proposed debarment pending; and has not been indicted, convicted or had a civil judgment rendered against said person, firm, association or corporation by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past three years.
I further acknowledge that by signing the signature page of the proposal, I am deemed to have signed and have agreed to the provisions of this affidavit.
Note: Exceptions will not necessarily result in denial of award but will be considered in determining bidder responsibility. For any exception noted, indicate above to whom it applies, initiating agency, and dates of action. Providing false information may result in criminal prosecution or administrative sanctions.
“A suspending or debarring official may grant an exception permitting a debarred, suspended, or excluded person to participate in a particular transaction upon a written determination by such official stating the reason(s) for deviating from the Presidential policy established by Executive Order 12549...” (49CFR Part 29 Section 29.215).
Program No. 6927 _25WORD.SPC\6927_Local Pack.docx P 8 4/17/26
Proposal for Incorporating Recycled Materials into the Project
In compliance with a new law that went into effect January 1, 2016 (SHB1695), the Bidder shall propose below, the total percent of construction aggregate and concrete materials to be incorporated into the Project that are recycled materials. Calculated percentages must be within the amounts allowed in Section 9-03.21(1)E, Table on Maximum Allowable Percent (By Weight) of Recycled Material, of the Standard Specifications.
Proposed total percentage: _____________________________ percent.
Note: Use of recycled materials is highly encouraged within the limits shown above, but does not constitute a Bidder Preference, and will not affect the determination of award, unless two or more lowest responsive Bid totals are exactly equal, in which case proposed recycling percentages will be used as a tie-breaker, per the APWA GSP in Section 1-02.6 of the Special Provisions. Regardless, the Bidder’s stated proposed percentages will become a goal the Contractor should do its best to accomplish. Bidders will be required to report on recycled materials actually incorporated into the Project, in accordance with the APWA GSP in Section 1-06.6 of the Special Provisions.
Bidder Name:
Signature of Authorized Official:
Date:
Program No. 6927 _25WORD.SPC\6927_Local Pack.docx P 9 4/17/26
CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES
The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (July 15th, 2026), the bidder is not a “willful” violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction.
I declare under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct.
Bidder’s Business Name
Signature of Authorized Official*
Printed Name
Title
Date City State
Check One:
Sole Proprietorship ☐ Partnership ☐ Joint Venture ☐ Corporation ☐
State of Incorporation, or if not a corporation, State where business entity was formed:
If a co-partnership, give firm name under which business is transacted:
* If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner.
P 10
DRY DOCK CERTIFICATION
(Bidder to fill in all blanks)
M/V STEILACOOM II
2027 DRY-DOCKING
Program No. 6927
I, ___________________________________________________, hereby certify as follows:
(1) That I am a duly authorized representative of ___________________________________ _________________________________________ which is submitting a bid for the dry docking of the Pierce County Ferry M/V Steilacoom II.
(2) That the bidder has the following dry dock(s) capable of dry docking the vessel covered in this contract:
(3) That the dry dock(s) listed in (2) above, will be used for the performance of the dry dock work.
(4) That the dry dock(s) listed in (2) will be available for use so that the required items of work to be accomplished in this contract may be done without delay or postponement, as shown on the proposal.
(5) That the Dockmaster in charge of docking/undocking evolutions is professionally qualified, through training and experience, to conduct these evolutions in a safe and reliable manner. A resume of the dockmaster’s training and experience upon which I have based my certification of “dockmaster” will be submitted to the Pierce County representative if so required by him/her.
(6) That the dry dock operating procedures are in accordance with good marine practice for the particular vessel to be docked/undocked and that these procedures will be followed during all docking/undocking operations.
(signature of authorized representative) (date of signature)
(typed name of authorized representative) (title of authorized representative
File details come from the government source that posted it. Updated .