File Type Posted
BID_Abstract_-_SF_1409_-Corrected.pdf PDF
BID_Abstract_-_SF_1409.pdf PDF
6923G219B000001_Amd_1.pdf PDF
SOW_Gibbs_Hall_Auditorium_Upgrade_-Rev1.pdf PDF
Picture_File.pdf PDF
SOW_Gibbs_Hall_Auditorium_Upgrade.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

MMAPR520719000084

USMERCHANT MARINE ACADEMY

DIVISION OF PROCUREMENT

300 STEAMBOAT ROAD

KINGS POINT NY 11024-1699

MARAD-00095

AMIT NARINE 516-726-6032

6923G219B000001 x

02/05/2019

6923G219B000001

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THE

STATEMENT OF WORK AND DRAWINGS.

READ ALL DOCUMENTS TO THIS SOLICITATION PRIOR TO COMPLETING AND

RETURNING ANY FORMS TO THIS OFFICE.

ENTER PRICE ON PAGE 2 IN BLACK INK OR TYPEWRITER AND FOR OPTIONS PAGE 3 BLOCK F.

A BID PACKAGE THAT FAILS TO CONTAIN THE FOLLOWING WILL RESULT IN THE BID BEING

CONSIDERED NONRESPONSIVE AND, THEREFORE, NOT BEING CONSIDERED FOR AWARD:

1. ALL REQUIRED ENTRIES IN BLOCKS 14 THRU 17, BID SCHEDULE;

2. SECTION K REPS, CERTS, & STATEMENT OF BIDDERS (UNLESS INCLUDED OR COMPLETED

ELECTRONICALLY THROUGH ONLINE REPRESENTATION AND CERTIFICATION AND AN ACTIVE SAM

REGISTRATION AT HTTPS://WWW.SAM.GOV/SAM/;

3. ALL ATTACHMENTS WHICH REQUIRE FILL-IN INFORMATION.

ENSURE THAT SF1442 IS COMPLETED, SIGNED & DATED.

ACKNOWLEDGE ALL AMENDMENTS IF APPLICABLE.

SEE SECTION L FOR SITE VISIT/PRE-BID CONFERENCE INFORMATION.

THE MAGNITUDE OF THE CONSTRUCTION IS $25,000 - $100,000.

THIS ACQUISITION IS RESTRICTED TO SMALL BUSINESS ONLY. APPLICABLE NAICS IS 236220.

SIZE STANDARD IS $36.5 MILLION. BIDS FROM THOSE FIRMS NOT CONSIDERED TO BE SMALL

BUSINESS WILL BE DEEMED NON-RESPONSIVE.

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 60 calendar days and complete it within ________________ ________________ calendar days after receiving

IAW FAR 52.111-10

03/11/2019

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USMERCHANT MARINE ACADEMY

DIVISION OF PROCUREMENT

300 STEAMBOAT ROAD

KINGS POINT NY 11024-1699

MARAD-00095

Maxmillian Diah

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 47

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G219B000001

Contractor shall furnish all labor, tools, equipment, material and supervision to perform construction at Gibbs Hall in accordance with the

Statement of Work (SOW).

SOW Title: Gibbs Hall Auditorium Upgrade.

Upon Award, all samples must be submitted for approval prior to purchasing.

Delivery: 60 Days After Notice to Proceed

Delivery Location Code: MARAD-00095

USMERCHANT MARINE ACADEMY PROCURE

US DOTMARITIME ADMINISTRATION

300 STEAMBOAT ROAD

KINGS POINT NY 11024-1699 USA

FOB: Destination

00001 Renovations to lecture hall in Gibbs Hall.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

6923G219B000001 Page 4 of 47

Davis-Bacon Act Wage Determination

General Decision Number: NY190012 01/04/2019 NY12

Superseded General Decision Number: NY20180012

State: New York

Construction Types: Building, Heavy, Highway and Residential

Counties: Nassau and Suffolk Counties in New York.

BUILDING CONSTRUCTION PROJECTS, RESIDENTIAL CONSTRUCTION

PROJECTS (including single family homes and apartments up to and including 4 stories), HEAVY CONSTRUCTION PROJECTS, HIGHWAY

CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded

(and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/04/2019

ASBE0012-001 01/01/2018

Rates Fringes

Asbestos Workers/Insulator

Includes application of

6923G219B000001 Page 5 of 47 all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.....................$ 70.47 35.25

HAZARDOUS MATERIAL HANDLER.......$ 39.00 12.75

BOIL0005-001 01/01/2017

BOILERMAKER......................$ 55.23 33%+24.12+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial

Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve

* BRNY0001-001 07/01/2018

BRICKLAYER.......................$ 61.37 27.87

MASON - STONE....................$ 62.67 30.59

CARP0290-001 07/01/2018

Carpenters:

Building

Nassau County (Portion of county that lies west of

Seaford Creek and south of the Southern State

Parkway)...................$ 52.50 46.28

Nassau County (Remainder of County) and Suffolk

County.....................$ 49.38 32.01

Heavy & Highway.............$ 44.51 26.55

Residential.................$ 39.23 25.12

CARP0740-001 07/01/2018

MILLWRIGHT.......................$ 52.70 52.61

CARP1556-008 07/01/2018

DIVERS TENDERS..............$ 48.24 50.07

DIVERS......................$ 67.94 50.07

6923G219B000001 Page 6 of 47

DOCKBUILDERS................$ 53.63 50.07

PILEDRIVERMAN...............$ 53.63 50.07

CARP1556-011 07/01/2018

TIMBERMEN...................$ 49.10 49.37

CARP2287-003 07/01/2014

CARPENTER

Soft Floor Layers...........$ 49.88 43.40

* ELEC0025-001 10/27/2018

ELECTRICIAN......................$ 52.00 16%+25.83

ELEC0025-002 04/28/2018

Electricians:

Maintenance Unit............$ 43.20 12%+$17.76

Telephone Unit..............$ 37.48 16%+$18.64

Wiring for single or multiple family dwellings and apartments up to and including 3 stories.........$ 28.65 13%+12.14

ELEC1049-002 04/02/2017

Line Construction:

Substation and Switching structures pipe type cable installation and maintenance jobs or projects; Railroad electrical distribution/ transmission systems maintenance (when work is not performed by railroad employees) Overhead and

Underground transmission/distribution line work. Fiber optic, telephone cable and equipment;

Groundman..................$ 32.31 21.94

Heavy Equipment Operator...$ 43.08 25.27

6923G219B000001 Page 7 of 47

Lineman & Cable Splicer....$ 53.85 28.62

Material Man...............$ 46.85 25.91

ELEV0001-002 03/17/2018

ELEVATOR MECHANIC

Elevator Constructor........$ 64.48 42.103+a+b

Modernization and Repair....$ 50.49 40.399+a+b

a. PAID HOLIDAYS: New Year's Day, Good Friday, President's

Day, Memorial Day, Independence Day, Labor Day, Columbus

Day, Veteran's Day, Thanksgiving Day, Friday after

Thanksgiving, and Christmas Day.

b. PAID VACATION: An employee who has worked less than 5 years shall receive vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;

an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.

ENGI0138-001 06/01/2018

BUILDING CONSTRUCTION

Power equipment operators:

GROUP 1.....................$ 62.53 36.90+a

GROUP 2.....................$ 59.27 36.90+a

GROUP 3.....................$ 57.09 36.90+a

GROUP 4.....................$ 42.98 36.90+a

GROUP 5.....................$ 41.03 36.90+a

NOTES:

Hazmat premiums:

Level A 3.50

Level B 2.50

Level C 1.50

Level D 1.00

Oiler on truck cranes with boom length of 100 ft. or more

.25

a. Paid Holidays: New Year's Day, Lincoln's Birthday, Washington's Birthday or President's Day (in lieu of

Lincoln's or Washington's Birthday), Good Friday, Memorial

6923G219B000001 Page 8 of 47

Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Christmas Day or days celebrated as such.

Any holiday that falls on a Saturday will be celebrated on

Friday.

POWER EQUIPMENT OPERATOR CASSIFICATIONS

GROUP 1: Asphalt spreader, backhoe crawler capacity over cater- piller 225 and lomatsu 300, Boiler (thermoplastic), Cherry picker, over 50 tons, CMI or maxim spreader, concrete pump (with oiler), crane (crawler truck), crane

(on barge), crane (stone setting), crane (structural steel), crane (with clam shell), derrick, dragline, dredge, gradall, grader, hoist (3 drum), loading machine (bucket) cap of 10 yds or over micro-trap, with compressor (negative air machine), milling machine, large pile driver, power winch, Stone setting/structural steel, power winch (truck mounted/stone steel) powerhouse, road paver scoop, carry-all, scraper in tandem shovel, sideboom tractor, sideboom tractor (used in tank work), stone spreader (self propelled tank work), zamboni (ice machine)

GROUP 2: Backhoe, boom truck, bulldozer, Chery picker, conveyor (multi), dinky locomotive, forklift, hoist, 2 drum, loading machine, loading machine (front end) mechanical compactors, (machine drawn), mulch machine

(machine-fed), mechanic, power winch, other than stone/structural steel, power winch (truck mounted other than stone steel) pump (hydraulic, with boring machine), roller, (asphalt), scoop (carry-all scraper), tower crane

(maintenance man), trenching machine

GROUP 3: Compressor (structural steel), Compressor (2 or more in battery), concrete finishing machine, concrete spreader, conveyor, curb machine (asphalt or concrete), curing machine, fireman, hoist (1 drum), micro-trap, (self contained, negative air machine), pump (4 inches or over), pump (hydraulic), pump (jet), pump (submersible), pump

(well point), pulvi-mixer, ridge cutter, roller (dirt), striping machine, vac-all, welding and burning, welding machine (pile work), welding machine (structural steel)

GROUP 4: Compressor, compressor (on crane), compressor (pile work), compressor (stone setting), concrete breaker, concrete saw or cutter, forklift (walk behind, power operated), generator-pile work, generator, hydra hammer, mechanical compactors (hand operated), oiler (truck crane), pin puller, portable heaters, powerbroom, power buggies, pump (double action diaphragm), pump (gypsum), trench machine (hand), welding machine

GROUP 5: Batching plant (on site of job), generator (small), mixer (with skip), mixer (2 small with or without skip), mixer (2 bag or over, with or without skip), mulch machine, oiler, pump (centrifugal, up to 3 inches), root cutter, stump chipper, tower crane (oiler), tractor (caterpillar or wheel vibrator)

6923G219B000001 Page 9 of 47

ENGI0138-002 08/01/2018

HEAVY & HIGHWAY

Power equipment operators:

GROUP 1.....................$ 66.00 37.15+a

GROUP 2.....................$ 61.60 37.15+a

GROUP 3.....................$ 59.37 37.15+a

GROUP 4.....................$ 44.88 37.15+a

GROUP 5.....................$ 42.92 37.15+a

GROUP 6.....................$ 37.33 12.35+a

NOTES:

Hazmat premiums:

Level A 3.50

Level B 2.50

Level C 1.50

Level D 1.00

Truck and Crawler Cranes long boom premiums:

boom lengths (including jib) 100-149 ft 1.00 boom lengths (including jib) 150-249 ft 1.50 boom lengths (including jib) 250-349 ft 2.00 boom lengths (including jib) 350 ft 3.00

Cranes using clamshell buckets .25

Front end loader 10 yds and above .25

Oiler on truck cranes with boom length of 100 ft. or more .25

a. Paid Holidays: New Years Day, Lincoln's Birthday, Washington's Birthday or Presidents Day (in lieu of

Lincoln's or Washington's Birthday, Good Friday, Memorial

Day, Independence Day, Labor Day, Columbus Day, Veteran's

Day, Thanksgiving Day, Christmas Day or days celebrated as such. Any holiday that falls on Saturday will be celebrated on Friday.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt spreader, backhoe crawler (capacity over caterpiller 225 and komatsu 300), boiler (thermoplastic), boring machine (post hole), cherry picker (over 50 ton), CMI or maxim spreader, concrete pump, with oiler, crane

(crawler truck), crane (on barge), crane (stone setting) crane (structural steel), crane (with clam shell), derrick, dragline, dredge, gradall, grader, hoist (3 drums), loading machine (bucket) capacity of 10 yards or over, micro-trap

(with compressor-negative air machine), milling machine

(large), piledriver, power winch (stone setting structural steel), power winch (truck mounted/stone steel), 6923G219B000001 Page 10 of 47 power-house, road paver, scoop, carry all (scraper in tandem), shovel, sideboom tractor, sideboom tractor (used in tank work), stone spreader (self-propelled), tank work, tower crane

GROUP 2: Bulldozer, Backhoe, Boom Truck, Boring machine/augur, Cherrypicker, Conveyor (multi), Dinky

Locomotive, Forklift, Hoist (2 drum), Loading Machine, Loading Machine (front end), Mechanical Compactor (machine drawn), Mechanic, Mulch Machine (machine- fed), Power Winch

(other than stone/structural steel), Power Winch (truck mounted/other than stone steel), Pump Hydraulic (with boring machine), Roller (asphalt), Scoop (carry-all, scraper), Tower Crane (maintenance man), Trenching Machine, Vermeer Cutter, Work Boat

GROUP 3: Curb Machine (asphalt or concrete), Maintenance

Engineer (small equipment), Maintenance engineer

(well-point) Mechanic (fieldman), Micro-Trap (self contained, negative air machine), Milling Machine (small), Pulvi-mixer, Pump (4 inches or over), Pump Hydraulic, Pump

Jet, Pump Submersible, Pump (well point), Roller Dirt, Vac-All, Welding and burning, Compressor (structural steel), Compressor (2 or more battery), Concrete Finishing

Machine, Concrete Spreader, Conveyor, Curing Machine, Fireman, Hoist (one drum), Ridge Cutter, Striping Machine, Welding Machine (pile work), Welding Machine (structural

Steel).

GROUP 4: Compressor, Compressor on crane, Compressor (pile work), Compressor (stone setting), Concrete Breaker, Concrete Saw or Cutter, Fork Lift (walk behind, power operated), Generator- Pile Work, Generator, Hydra Hammer, Mechanical Compactors (hand operated), Oiler (truck crane), Pin Puller, Portable Heaters, Powerbroom, Power buggies, Power Grinders, Pump (double action diaphragm), Pump gypsum, Pump (single action 1 to 3 inches), Trench

Machine hand, Welding Machine

GROUP 5: Batching Plant (on site of job), Generator (small), Grinder, Mixer (with skip), Mixer (2 small with or without skip), Mixer (2 bag or over, with or without skip), Mulch

Machine, Oiler, Pump (centrifugal, up to 3 inches), Root

Cutter, Stump Chipper, Tower Crane (oiler), Track Tamper (2 engineers, each), Tractor (caterpillar or wheel), Vibrator, Work boat (deckhand), GROUP 6: Well drillers

IRON0046-003 07/01/2018

IRONWORKER

METALLIC LATHERS AND

REINFORCING IRONWORKERS.....$ 56.28 22.62

6923G219B000001 Page 11 of 47

IRON0197-001 07/01/2018

IRONWORKER

STONE DERRICKMAN............$ 49.34 39.46

IRON0361-001 07/01/2018

IRONWORKER (STRUCTURAL)..........$ 50.70 75.42

IRON0580-001 07/01/2018

IRONWORKER, ORNAMENTAL...........$ 44.65 53.62

LABO0066-001 07/01/2017

BUILDING

Laborers:

Laborers....................$ 36.75 31.94

Plasterers Tenders..........$ 36.75 31.94

LABO0078-001 12/01/2016

LABORERS

BUILDING CONSTRUCTION

ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &

HAZARDOUS WASTE LABORERS

(Hazardous Waste, Hazardous Materials, Biochemical and Mold

Remediation, HVAC, Duct

Cleaning, Re-spray

Fireproofing, etc).........$ 36.00 16.20

LABO1298-001 06/01/2018

HEAVY & HIGHWAY

Laborers:

Asphalt Rakers; Formsetters.$ 44.68 33.47+a

Asphalt Shovelers, Roller

6923G219B000001 Page 12 of 47

Boys & Tampers..............$ 43.36 33.47+a

Regular Laborers............$ 39.35 33.47+a

A. FOOTNOTES:

Laborers working in a hazardous material hot zone shall receive an additional 20% premium.

Where the contract provides for night work outside the regular hours of work, the employees shall be paid at straight time plus a 30% night work premium for the 8 hours worked during the night.

Firewatch work performed after regular hours shall be paid an additional 10% premium. Second and Third Shift work will be paid at a 30% premium.

Contractor requesting laborers certified for hazardous material work and/or employed on hazardous material shall be required to pay an additional 10% premium.

PAIN0009-002 05/01/2018

PAINTER

GLAZIERS....................$ 29.05 18.88

Painters, Drywall Finishers.$ 45.70 27.67

Spray, Scaffold, Sandblasting................$ 48.70 27.67

PAIN0806-010 10/01/2018

Painters:

Structural Steel and Bridge..$ 49.50 41.88

PAIN1974-002 06/28/2018

Painters:

DRYWALL TAPERS/POINTERS.....$ 47.82 25.21

PLAS0262-003 08/01/2018

PLASTERER........................$ 45.58 26.52

PLAS0780-001 07/01/2018

CEMENT MASON/CONCRETE FINISHER...$ 51.97 33.56

6923G219B000001 Page 13 of 47

PLUM0200-001 11/01/2018

PLUMBER

BUILDING CONSTRUCTION:......$ 52.48 38.55

RESIDENTIAL CONSTRUCTION:...$ 29.96 13.41

PLUM0638-001 12/28/2016

PLUMBER

SERVICE FITTERS.............$ 26.30 2.55

SPRINKLER FITTERS,

STEAMFITTERS................$ 61.81 48.30

Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.

ROOF0154-001 05/01/2017

ROOFER...........................$ 40.00 35.62

SHEE0028-002 07/31/2014

SHEET METAL WORKER

BUILDING CONSTRUCTION.......$ 50.91 36.70

RESIDENTIAL CONSTRUCTION....$ 27.22 16.48

TEAM0282-002 07/01/2017

TRUCK DRIVER.....................$ 39.685 41.84+a

FOOTNOTES:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial

6923G219B000001 Page 14 of 47

Day, Independence Day, Labor Day, Columbus Day, Election

Day, Veterans' Day (Armistice Day), Thanksgiving Day, Day after Thanksgiving and Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of

6923G219B000001 Page 15 of 47 the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can

6923G219B000001 Page 16 of 47 be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

6923G219B000001 Page 17 of 47

Table of Contents:

A. SOLICITATION/CONTRACT FORM

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2012)

52.236-5 Material and Workmanship. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.246-21 Warranty of Construction. (MAR 1994)

52.248-3 Value Engineering - Construction. (OCT 2010)

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)

52.225-11 -- Buy American—Construction Materials under Trade Agreements

Buy American--Construction Materials Under Trade Agreements (May 2014)

52.236-1 Performance of Work by the Contractor (Apr 1984)

52.232-16 -- Progress Payments (Apr2012)

B. SUPPLIES OR SERVICES/PRICES

C. DESCRIPTION/SPECIFICATIONS

D. PACKAGING AND MARKING

E. INSPECTION AND ACCEPTANCE

52.223-3 Hazardous Material Identification and Material Safety Data. (JAN 1997)

52.246-12 Inspection of Construction. (AUG 1996)

F. DELIVERIES OR PERFORMANCE

52.211-13 Time Extensions. (SEP 2000)

52.211-12 Liquidated Damages - Construction. (SEP 2000)

52.247-34 F. O. B Destination. (Nov 1991)

G. CONTRACT ADMINISTRATION DATA

G.1 INVOICE REQUIREMENTS

G.2 ADDRESS OF CORRESPONDENCE

G.3 CONTRACTING OFFICER'S REPRESENTATIVE

H. SPECIAL CONTRACT REQUIREMENTS

52.225-25 Prohibition on Contracting with Entities Engaging in Sanctioned Activities Relating to

Iran--Representation and Certification. (DEC 2012)

52.242-15 -- Stop-Work Order (Aug. 1989)

52.242-14 Suspension of Work. (APR 1984)

I. CONTRACT CLAUSES

52.203-3 Gratuities. (APR 1984)

52.203-5 Covenant Against Contingent Fees. (MAY 2014)

52.203-7 Anti-Kickback Procedures. (MAY 2014)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010)

52.203-13 Contractor Code of Business Ethics and Conduct. (APR 2010)

52.204-7 System for Award Management. ( JUL 2013)

52.204-9 Personal Identity Verification of Contractor Personnel. (JAN 2011)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUL 2013)

52.215-2 Audit and Records - Negotiation. (OCT 2010)

52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997)

52.219-6 Notice of Total Small Business Set-Aside. (NOV 2011)

52.219-14 Limitations on Subcontracting (Nov 2011)

6923G219B000001 Page 18 of 47

52.222-3 Convict Labor. (JUN 2003)

52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (MAY 2014)

52.222-6 Construction Rate Requirements (MAY 2014)

52.222-7 Withholding of Funds. (MAY 2014)

52.222-8 Payrolls and Basic Records. (MAY2014)

52.222-9 Apprentices and Trainees. (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)

52.222-11 Subcontracts (Labor Standards). (MAY 2014)

52.222-12 Contract Termination - Debarment. (MAY 2014)

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.

(MAY2014)

52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011)

52.223-6 Drug-Free Workplace. (MAY 2001)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (AUG 2011)

52.223-19 Compliance with Environmental Management Systems. (May 2011)

52.224-1 Privacy Act Notification. (APR 1984)

52.224-2 Privacy Act. (APR 1984)

52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)

52.227-1 Authorization and Consent. (DEC 2007)

52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)

52.227-17 Rights in Data--Special Works. (DEC 2007)

52.228-3 Workers' Compensation Insurance (Defense Base Act). (JULY 2014)

52.228-5 Insurance - Work on a Government Installation. (JAN 1997)

52.228-14 Irrevocable Letter of Credit. (NOV 2014)

52.229-3 Federal, State, and Local Taxes. (FEB 2013)

52.229-4 Federal, State, and Local Taxes (State and Local Adjustments). (FEB 2013)

52.232-12 Advance Payments. (MAY 2001)

52.232-18 Availability of Funds. (APR 1984)

52.232-23 Assignment of Claims. (MAY 2014)

52.232-24 Prohibition of Assignment of Claims. (MAY 2014)

52.232-27 Prompt Payment For Construction Contracts. (MAY 2014)

52.232-33 Payment by Electronic Funds Transfer – System for Award Management. (JULY 2013)

52.232-36 Payment by Third Party. (MAY 2014)

52.232-37 Multiple Payment Arrangements. (MAY 1999)

52.232-40 Providing Accelerated Payment to Small Business Subcontractors (DEC 2013)

52.233-1 Disputes. (MAY 2014)

52.233-3 Protest after Award. (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)

52.236-2 Differing Site Conditions. (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR

1984)

52.236-12 Cleaning Up. (APR 1984)

52.236-13 Accident Prevention. (NOV 1991)

52.236-14 Availability and Use of Utility Services. (APR 1984)

52.236-15 Schedules for Construction Contracts. (APR 1984)

52.236-16 Quantity Surveys. (APR 1984)

52.236-17 Layout of Work. (APR 1984)

52.236-21 Specifications and Drawings for Construction. (FEB 1997)

6923G219B000001 Page 19 of 47

52.236-26 Preconstruction Conference. (FEB 1995)

52.242-1 Notice of Intent to Disallow Costs. (APR 1984)

52.242-13 Bankruptcy. (JUL 1995)

52.243-4 Changes. (JUN 2007)

52.243-5 Changes and Changed Conditions. (APR 1984)

52.245-1 Government Property. (APR 2012)

52.245-9 Use and Charges. (APR 2012)

52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels. (FEB 2006)

52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012)

52.249-10 Default (Fixed-Price Construction). (APR 1984)

52.250-1 Indemnification Under Public Law 85-804. (APR 1984)

52.253-1 Computer Generated Forms. (JAN 1991)

52.244-2 Subcontracts (OCT 2010)

52.228-15 Performance and Payment Bonds - Construction. (OCT 2010)……………………………...….41

52.228-1 Bid Guarantee (Sep 1996)

52.243-7 Notification of Changes. (APR 1984)

52.252-6 Authorized Deviations in Clauses. (APR 1984)

Insurance Limits (Local Clause)

J. LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

K. REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS

52.204-8 Annual Representations and Certifications (DEC 2014)

52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for

Construction. (FEB 1999)

52.222-27 Affirmative Action Compliance Requirements for Construction. (APR2015)

52.222-36 Equal Opportunity for Workers with Disabilities. (JUL 2014)

52.222-50 Combating Trafficking in Persons. (MARCH 2015)

52.222-54 Employment Eligibility Verification. (AUG 2013)

L. INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

52.214-34 Submission of Offers in the English Language. (APR 1991) 52.214-35 Submission of Offers in U.S.Currency. (APR 1991) 52.233-2 Service of Protest.(SEP 2006)

L.11NSTRUCTION TO OFFERORS

52.216-1--Type of Contract (Apr 1984)

M. EVALUATION FACTORS FOR AWARD

6923G219B000001 Page 20 of 47

A. SOLICITATION/CONTRACT FORM

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil

(End of clause)

52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2012)

52.236-5 Material and Workmanship. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.246-21 Warranty of Construction. (MAR 1994)

52.248-3 Value Engineering - Construction. (OCT 2010)

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days after receiving notice to proceed. The time stated for completion shall include final cleanup of the premises.

52.225-11 -- Buy American—Construction Materials under Trade Agreements.

Buy American--Construction Materials Under Trade Agreements (May 2014)

(a) Definitions. As used in this clause--

“Caribbean Basin country construction material” means a construction material that--

(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is— http://farsite.hill.af.mil/

6923G219B000001 Page 21 of 47

(i) A commercial item (as defined in paragraph (1) of the definition at FAR

2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.

However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material

(whether or not such costs are paid to a domestic firm), and any applicable duty

(whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit.

Cost of components does not include any costs associated with the manufacture of the construction material.

“Designated country” means any of the following countries:

(1) A World Trade Organization Government Procurement Agreement country

(Armenia, Aruba, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech

Republic, Denmark. Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, 6923G219B000001 Page 22 of 47

Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, or United Kingdom);

(2) A Free Trade Agreement country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);

(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or

(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St. Vincent and the

Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).

“Designated country construction material” means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United

States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic: or

(ii) The construction material is a COTS item.

“Free Trade Agreement country construction material means” a construction material that--

(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.

6923G219B000001 Page 23 of 47

“Foreign construction material” means a construction material other than a domestic construction material.

“Least developed country construction material” means a construction material that--

(1) Is wholly the growth, product, or manufacture of a least developed country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.

“United States” means the 50 States, the District of Columbia, and outlying areas.

“WTO GPA country construction material” means a construction material that--

(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.

(b) Construction materials.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.50-5(a)(2)). In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements (FTAs) apply to this acquisition. Therefore, the Buy American restrictions are waived for designated country construction materials.

(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.

(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:_____none_______________ (4) The Contracting

Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that--

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the restrictions of the

6923G219B000001 Page 24 of 47

Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the

United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Statute.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for

Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph

(d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such

6923G219B000001 Page 25 of 47 determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the

Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy

American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars) *

Item 1

Foreign construction material

Domestic construction material

Item 2

Foreign construction material

Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]

[Include other applicable supporting information. ]

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

6923G219B000001 Page 26 of 47

52.236-1 Performance of Work by the Contractor (Apr 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least fifty (50) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of Clause)

52.232-16 -- Progress Payments (Apr2012)

The Government will make progress payments to the Contractor when requested as work progresses, but not more frequently than monthly in amounts of $2,500 or more approved by the Contracting Officer, under the following conditions:

(a) Computation of amounts.

(1) Unless the Contractor requests a smaller amount, the Government will compute each progress payment as 80 percent of the Contractor’s total costs incurred under this contract whether or not actually paid, plus financing payments to subcontractors (see paragraph (j) of this clause), less the sum of all previous progress payments made by the Government under this contract. The Contracting Officer will consider cost of money that would be allowable under FAR 31.205-10 as an incurred cost for progress payment purposes.

(2) The amount of financing and other payments for supplies and services purchased directly for the contract are limited to the amounts that have been paid by…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.