620A4-22-202 Drawings .pdf

PDF 6 MB Posted

Attached to
Y1DZ--Emergency Concrete Deck Repair Bldg. 16
Solicitation number
36C24224Q0947
Issued by

About this file

This document appears to be a set of 100% Construction Drawings for an Emergency Repair of Failing Concrete Decking project at Building 16 of the VA Medical Center in Castle Point, New York. The project is solicitation number 36C24224Q0947, with an Opportunity ID of 555bdb2ef0ae41268653720c35cadcd3.

The drawings provide detailed plans, sections, and details for the structural repair work, including slab removal and replacement, asbestos abatement, and infection control measures. Key elements include a site plan, floor plans, slab removal and rigging plans, replacement slab details, and architectural notes and finishes. The project is being managed by the Department of Veterans Affairs, Veterans Integrated Service Network 2. No other specific contracting details are provided in this document set.

View the file

Other files

File Type Posted
S02 - Specifications Final.pdf PDF
36C24224Q0947_1.docx DOCX document
Limitations in Subcontracting Certification.docx DOCX document
FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx DOCX document
36C24224Q0947 SBSA.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOODED AREA

WOODED

AREA

WOODED AREA

WOODED

AREA

WOODED AREA

DEBRI PILE

W O

O D

ED

A

R

EA

h u d so n r iv er

PO

N

D

R O

U T

E

D

OLD CASTLE POINT ROAD

C A

ST

L

E P

O

IN

T R

O A

D

CA

ST

LE PO

IN

T

RO

A D

R O

U T

E

D

WOODED AREA

o ld c a st le p o in t r o a d old castle point road south river road so uth r iv er r o ad south river road ca st le la n d d ri ve cast le la nd d riv e so uth r iv er r o ad castle po in t ro ad administrative circle a d m in

.c ir c le ad m in ist ra ti ve c ir cl e admin ist rative c ircle c ir c le ad m in is tr at iv e se rv ic e ro ad se rv ic e ro ad se rvic e r oad se rvic e r oad service road a d m in is t r a t iv e c ir c le

ENGINEERING LLP

FE PROJECT NO: 21-412

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

620A4-22-202

Project Director

OCTOBER 25, 2022 RDFRevisions: Date:

EMERGENCY REPAIR OF FAILING

CONCRETE DECKING

100% CONSTRUCTIONS

DOCUMENTS

ZR

3 Van Wyck Lane Suite 2 Wappingers Falls, New York (845)-223-3202

Revised Per 65% Comments 11/29/22 Revised Per 100% Comments 3/15/23

PROJECT TITLE:

DRAWING LISTBUILDING LOCATION MAP

VAMC PROJECT No. - 620A4-22-202

EMERGENCY REPAIR

FAILING CONCRETE DECKING IN BUILDING 16

V.A. MEDICAL CENTER

CASTLE POINT N.Y. 12511

DEPARTMENT OF VETERANS AFFAIRS

16-SS-100 STRUCTURAL: BASEMENT FLOOR PLAN

GI-001 TITLE SHEET WITH INDEX TO DRAWINGS

SHEET #: DRAWING #: DRAWING TITLE

16-SS-001 STRUCTURAL: NOTES, SYMBOLS, + ABBREVIATIONS

16-HA-100

16-SS-101 STRUCTURAL: 1ST FLOOR REMOVAL PLAN

RAMP LOCATION

STRUCTURAL

16-SS-102

16-SS-103

ASBESTOS ABATEMENT

16-AS-001 ARCHITECTURAL: NOTES, ABBREVIATIONS, DETAILS, & SCHEDULES

ARCHITECTURAL

STRUCTURAL: 1ST FLOOR SLAB REMOVAL DETAILS

STRUCTURAL: 1ST FLOOR SLAB REPLACEMENT DETAILS

16-HA-001 ASBESTOS ABATEMENT: DIAGRAMS + NOTES

ASBESTOS ABATEMENT: BASEMENT + FIRST FLOOR PLANS

CIVIL

16-GS-100 SITE PLAN: EXISTING CONDITIONS

GI-002 ICRA + GENERAL NOTES2

16-AS-100 ARCHITECTURAL: BASEMENT + FIRST FLOOR PLANS12

FIRST FLOOR ICRA PLAN2

ENGINEERING LLP

FE PROJECT NO: 21-412

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

620A4-22-202

Project Director

OCTOBER 25, 2022 RDFRevisions: Date:

EMERGENCY REPAIR OF FAILING

CONCRETE DECKING

100% CONSTRUCTIONS

DOCUMENTS

ZR

KEY PLAN:

3 Van Wyck Lane Suite 2 Wappingers Falls, New York (845)-223-3202

Revised Per 65% Comments 11/29/22 Revised Per 100% Comments 3/15/23

BASEMENT FLOOR ICRA PLAN1

TGE

Description of Required Infection Control Precautions by Class

During Construction Project Upon Completion of

1. Execute work by methods to minimize raising duct rrom construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.C la ss I

1. Provide active means to prevent airborne dust from dispersing into atmosphere.

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents.

5. Place dust mat at entrance and exit of work area.

6. Remove or isolate HVAC system in areas where work is being performed.

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.

4. Remove isolation of HVAC system in areas where work is being performed.C la ss

II

1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with

HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

4. Contain construction waste before transport in tightly covered containers.

5. Cover transport receptacles or carts. Tape covering unless solid lid.

6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by the owner's Safety

Section and Infection Control Department, and thoroughly cleaned by the owner's Environment

Services Department.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transportation in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering unless solid lid.

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

C la ss

IV

C la ss

II

I

1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with

HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

4. Contain construction waste before transport in tightly covered containers.

5. Cover transport receptacles or carts. Tape covering unless solid lid.

6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by the owner's Safety

Section and Infection Control Department, and thoroughly cleaned by the owner's Environment

Services Department.

1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety

Department and Infection Control Department, and thoroughly cleaned by the owner’s Environmental

Services Department.

2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

3. Vacuum work area with HEPA filtered vacuums.

4. Wet mop area with disinfectant.

5. Remove isolation of HVAC system in areas where work is being performed.

NOTES:

PATIENT RISK GROUP FOR "TYPE D" CONSTRUCTION

LOW RISK GROUP

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP Class IV

Class III / IV

Class IV Class IV

LOW RISK (CLASS IV)

HIGH RISK (CLASS IV)

LOW RISK (CLASS IV)

TEMPORARY SIGNAGE KEYED NOTES:

PHASING PLAN - CONCEPT

TEMPORARY CONSTRUCTION

PARTITION WALL DETAIL3

HIGH RISK

(CLASS IV)

NOTE:

FE PROJECT NO: 21-412

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

620A4-22-202

Project Director

OCTOBER 25, 2022 RDFRevisions: Date:

EMERGENCY REPAIR OF FAILING

CONCRETE DECKING

100% CONSTRUCTIONS

DOCUMENTS

ZR

Revised Per 65% Comments 11/29/22 Revised Per 100% Comments 3/15/23

TGE

N

S

W

E

Egan Environmental Consulting, Inc.

ASBESTOS ABATEMENT: FIRST FLOOR PLAN2

FE PROJECT NO: 21-412

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

620A4-22-202

Project Director

OCTOBER 25, 2022 RDFRevisions: Date:

EMERGENCY REPAIR OF FAILING

CONCRETE DECKING

100% CONSTRUCTIONS

DOCUMENTS

ZR

KEY PLAN:

3 Van Wyck Lane Suite 2 Wappingers Falls, New York (845)-223-3202

Revised Per 65% Comments 11/29/22 Revised Per 100% Comments 3/15/23

ASBESTOS ABATEMENT: BASEMENT CEILING PLAN1

ASBESTOS ABATEMENT LEGEND ASBESTOS-CONTAINING MATERIALS QUANTITY TABLE

TGE

Egan Environmental Consulting, Inc.

WOODED

AREA

administrative circle a d m in

.c ir c le ad m in ist ra ti ve c ir cl e admin ist rative c ircle c ir c le se rv ic e ro ad se rv ic e ro ad a d m in is t r a t iv e c ir c le

EXISTING CONDITIONS

ENGINEERING LLP

FE PROJECT NO: 21-412

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

620A4-22-202

Project Director

OCTOBER 25, 2022 RDFRevisions: Date:

EMERGENCY REPAIR OF FAILING

CONCRETE DECKING

100% CONSTRUCTIONS

DOCUMENTS

ZR

3 Van Wyck Lane Suite 2 Wappingers Falls, New York (845)-223-3202

Revised Per 65% Comments 11/29/22 Revised Per 100% Comments 3/15/23

RAMP SECTION A-A

KEY PLAN:

RAMP SECTION B-B

DEMOLITION PLAN

10' TEMPORARY CONSTRUCTION FENCING DETAIL

WITH DOUBLE MAN GATE DETAIL

TEMPORARY CONSTRUCTION PARTITION

NOTE:

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

620A4-22-202

Project Director

OCTOBER 25, 2022 RDFRevisions: Date:

EMERGENCY REPAIR OF FAILING

CONCRETE DECKING

100% CONSTRUCTIONS

DOCUMENTS

ZR

KEY PLAN:

3 Van Wyck Lane Suite 2 Wappingers Falls, New York (845)-223-3202

Revised Per 65% Comments 11/29/22 Revised Per 100% Comments 3/15/23

” ¾”

¾” mday Stamp

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

620A4-22-202

Project Director

OCTOBER 25, 2022 RDFRevisions: Date:

EMERGENCY REPAIR OF FAILING

CONCRETE DECKING

100% CONSTRUCTIONS

DOCUMENTS

ZR

KEY PLAN:

3 Van Wyck Lane Suite 2 Wappingers Falls, New York (845)-223-3202

Revised Per 65% Comments 11/29/22 Revised Per 100% Comments 3/15/23

BASEMENT FLOOR PLAN1

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

620A4-22-202

Project Director

OCTOBER 25, 2022 RDFRevisions: Date:

EMERGENCY REPAIR OF FAILING

CONCRETE DECKING

100% CONSTRUCTIONS

DOCUMENTS

ZR

KEY PLAN:

3 Van Wyck Lane Suite 2 Wappingers Falls, New York (845)-223-3202

Revised Per 65% Comments 11/29/22 Revised Per 100% Comments 3/15/23

SUGGESTED 1ST FLOOR SLAB REMOVAL PLAN1

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

620A4-22-202

Project Director

OCTOBER 25, 2022 RDFRevisions: Date:

EMERGENCY REPAIR OF FAILING

CONCRETE DECKING

100% CONSTRUCTIONS

DOCUMENTS

ZR

KEY PLAN:

3 Van Wyck Lane Suite 2 Wappingers Falls, New York (845)-223-3202

Revised Per 65% Comments 11/29/22 Revised Per 100% Comments 3/15/23

SUGGESTED CONCRETE RAMP REMOVAL PLAN2SUGGESTED 1ST FLOOR SLAB RIGGING PLAN1

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

620A4-22-202

Project Director

OCTOBER 25, 2022 RDFRevisions: Date:

EMERGENCY REPAIR OF FAILING

CONCRETE DECKING

100% CONSTRUCTIONS

DOCUMENTS

ZR

KEY PLAN:

3 Van Wyck Lane Suite 2 Wappingers Falls, New York (845)-223-3202

Revised Per 65% Comments 11/29/22 Revised Per 100% Comments 3/15/23

SECTION THROUGH NEW SLAB1

1ST FLOOR SLAB REPLACEMENT DETAIL2

ABBREVIATIONSGENERAL SYMBOLS ARCHITECTURAL LINE TYPES

NOTES:

FINISH SCHEDULE

GENERAL NOTES:

ENGINEERING LLP

FE PROJECT NO: 21-412

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

620A4-22-202

Project Director

OCTOBER 25, 2022 RDFRevisions: Date:

EMERGENCY REPAIR OF FAILING

CONCRETE DECKING

100% CONSTRUCTIONS

DOCUMENTS

ZR

KEY PLAN:

3 Van Wyck Lane Suite 2 Wappingers Falls, New York (845)-223-3202

Revised Per 65% Comments 11/29/22 Revised Per 100% Comments 3/15/23

DOOR INFILL PARTITION

ARCHITECTURAL: FIRST FLOOR PLAN2

FE PROJECT NO: 21-412

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

620A4-22-202

Project Director

OCTOBER 25, 2022 RDFRevisions: Date:

EMERGENCY REPAIR OF FAILING

CONCRETE DECKING

100% CONSTRUCTIONS

DOCUMENTS

ZR

KEY PLAN:

3 Van Wyck Lane Suite 2 Wappingers Falls, New York (845)-223-3202

Revised Per 65% Comments 11/29/22 Revised Per 100% Comments 3/15/23

ARCHITECTURAL: BASEMENT CEILING PLAN1

ARCHITECTURAL: EXISTING 1ST FLOOR HALLWAY CONDITIONS4ARCHITECTURAL: EXISTING BASEMENT CEILING CONDITIONS3

Sheets and Views
GI-001-GI-001
GI-002-GI-002
16-HA-001-16-HA-001
16-HA-100-16-HA-100
16-GS-100-16-GS-100
16-SS-001 - 16-SS-103-16-SS-001
16-SS-001 - 16-SS-103-16-SS-100
16-SS-001 - 16-SS-103-16-SS-101
16-SS-001 - 16-SS-103-16-SS-102
16-SS-001 - 16-SS-103-16-SS-103
16-AS-001-1-AS-001
16-AS-100-16-AS-100

File details come from the government source that posted it. Updated .