620A4-15-105 Bldg.15H and 21A Elevator Drawings.pdf

PDF 26 MB Posted

Attached to
Y1DZ--Replace elevator & roof 15H 21A
Solicitation number
36C24222B0018
Issued by

About this file

This notice is for a federal solicitation seeking elevator and roof replacement services at two buildings on the Castle Point Campus of the VA Hudson Valley Health Care System in Wappingers Falls, New York. The solicitation will replace elevators, elevator equipment, and roofs covering approximately 19,000 square feet in total across buildings 15H and 21A. Services required include demolition, asbestos abatement, various construction trades, equipment installation and commissioning, with a projected completion date of 730 calendar days from notice to proceed. This procurement is set aside for Service Disabled Veteran Owned Small Businesses, with a response deadline and award date to be included in the solicitation releasing on or around December 23, 2021. Responses must be submitted electronically.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STAGING AREA MH-100

MH-101 BUILDING 21 MECHANICAL: FLOOR PLANS

BUILDING 15H MECHANICAL: FLOOR PLANS

GI-001 BUILDING 15H & 21: COVER & INDEX OF DRAWINGS.

SHEET #:

AS-105

Fi le

N am e:

C

:\U se rs \z r\A pp

D at a\ Lo ca l\T em p\

A cP ub lis h_

\(1

) G I-0

.d w g

(L ay ou t:

(1

) G I-0

D at e:

T ue , N ov

2,

- 1 0:

A

M

N am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

DRAWING #: DRAWING TITLE

GI-001

AS-108

MH-001 BUILDING 15H & 21 MECHANICAL: SYMBOLS, ABBREVIATIONS & NOTES

WPB

ES-101 BUILDING 21 ELECTRICAL: FLOOR PLANS

ES-001 BUILDING 15H & 21 ELECTRICAL: SYMBOLS, SCHEDULES, ABBREVIATIONS & NOTES

AS-103 ARCHITECTURAL - BUILDING 21: ROOF REPLACEMENT PLAN.

AS-104 ARCHITECTURAL - BUILDING 21: ROOF REPLACEMENT DETAILS.

AS-107

ARCHITECTURAL - BUILDING 15H: ELEVATOR DETAILS.

HA-101 ASBESTOS ABATEMENT AND LEAD PAINT REMOVAL: BUILDING 21

FX-001 BUILDING 15H & 21 FIRE PROTECTION: SYMBOLS, SCHEDULES, ABBREVIATIONS & NOTES

FX-100 BUILDING 15H FIRE PROTECTION: FLOOR PLANS

ES-100 BUILDING 15H ELECTRICAL: FLOOR PLANS

FX-101 BUILDING 21 FIRE PROTECTION: FLOOR PLANS

FA-001 BUILDING 15H & 21 FIRE ALARM: SYMBOLS, SCHEDULES, ABBREVIATIONS & NOTES

FA-100 BUILDING 15H FIRE ALARM: FLOOR PLANS

AS-109

ASBESTOS ABATEMENT:

ARCHITECTURAL:

MECHANICAL:

ELECTRICAL:

FIRE PROTECTION SPRINKLER:

FIRE ALARM:

AS-001 ARCHITECTURAL - BUILDING 15H & 21: NOTES, SYMBOLS & ABBREVIATIONS.

AS-101 ARCHITECTURAL - BUILDING 15H: ROOF REPLACEMENT PLAN.

AS-102 ARCHITECTURAL - BUILDING 15H: ROOF REPLACEMENT DETAILS.

GENERAL:

AS-106

ARCHITECTURAL - BUILDING 15H: ELEVATOR PLANS.

ARCHITECTURAL - BUILDING 21: REFERENCE DRAWINGS AND DETAILS.

ARCHITECTURAL - BUILDING 21: ELEVATOR PLANS.

ARCHITECTURAL - BUILDING 15H & 21: ELEVATOR DETAILS.

BUILDING 15H & 21: COVER &

INDEX OF DRAWINGS.

FA-101 BUILDING 21 FIRE ALARM: FLOOR PLANS

GI-002 BUILDING 15H & 21: SAFETY & GENERAL NOTES & DETAILS

LEGEND:

STAGING AREA

Fi le

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\( 2)

G I-0

.d ou t:

(2

) G I-0

D at e:

T ue , N ov

2,

- 1 0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

GI-002

2WPB

BUILDING 15H & 21: SAFETY &

GENERAL NOTES AND DETAILS

SAFETY NOTES:

GENERAL NOTES:

SITE SAFETY & PROPOSED STAGING PLAN

8' TEMPORARY CONSTRUCTION FENCING DETAIL

WITH DOUBLE MAN GATE DETAIL

TEMPORARY CONSTRUCTION PARTITION

LO

W

ER RO

O

F

CONNECTING

CORRIDOR

ROOF

ELEVATOR

LOBBY ROOF

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

LO

BBY

CONNECTING

CORRIDOR

E.M.S.

CLOSET

B 150

CO

NNECTING

CO

RRIDO

R

02-

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

M

ECH. RM

Fi le

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\( 3)

H A

-1

.d ou t:

(2 ) H

A -0

D at e:

T ue , N ov

2,

- 1 0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

HA-101

3AH

ASBESTOS ABATEMENT AND LEAD

PAINT REMOVAL: BUILDING 21

BUILDING 21 - ROOF ABATEMENT PLAN

GENERAL NOTES:

1. Asbestos abatement shall be performed in accordance with the specification and applicable regulations. Personnel holding current New York State Department of Labor (NYSDOL) asbestos handler's certificates shall perform the work. Additionally, the Contractor must employ NYSDOL certified supervisors to be on the work site for all abatement activities. The contractor must be currently licensed by the NYSDOL. All certificates and licenses are to be readily available for verification by the Veterans Affairs Medical Center.

2. Contractor is responsible for removal and disposal of all asbestos-containing materials and asbestos-contaminated materials within the specified areas.

3. Contractor is responsible for verification of all quantities of asbestos-containing materials.

4. Contractor is responsible for precleaning any existing asbestos contamination, dust and debris within the removal areas.

5. Contractor is responsible for maintaining the integrity of building finishes. The Contractor shall repair any and all damages caused by abatement activities or his personnel.

ASBESTOS ABATEMENT NOTES:

1. The Contractor is to remove the ACM's in accordance with New York State Department of Labor (NYSDOL) Industrial Code Rule 56 (12 NYCRR Part 56), the VAMC specification and applicable federal regulations (USEPA and OSHA). Where there is an overlap the most stringent regulation shall apply.

2. The roof flashing cement of the Building 21 elevator lobby roof and lower machine room roof contains asbestos and must be removed.

3. Asbestos roof flashing cement is present under the counter flashing on the brick and mortar. This flashing must be removed without damaging the underlying structure.

Asbestos roof flashing cement must be removed from these materials and where ever else it is encountered. The roofing flashing abatement shall include the removal and disposal of all layers of roof flashing. The roof flashing shall be removed down to the structural substrate.

4. Roof flashing removal shall be performed in accordance with 12 NYCRR Part 56 Section 56-11.6 (Exterior Project Removal of Non-friable ACM Roofing). The asbestos abatement contractor shall coordinate his work with the general contractor so that the building is not left open to water damage and inclement weather. The work area shall be an area demarcated with “Danger-Asbestos” signs and red warning tape placed at a minimum distance of 25' in every direction. Only certified workers and authorized visitors shall be permitted in the work area during asbestos abatement activities. Asbestos abatement activities and general contracting work shall not be permitted to occur at the same time in an asbestos abatement work area. Simultaneous general contracting work shall occur at least 25' away from the asbestos abatement work on the outside of the building. Outdoor work areas shall not require clearance air samples. The outdoor work areas will be considered abated when there is no visible debris or dust remaining and the VPIH has performed a successful visual inspection.

5. The contractor shall coordinate the location of his remote personnel and waste decontamination unit(s), and waste dumpster with the V.A. Engineer at the preconstruction meeting.

6. The contractor shall be responsible for any and all damages resulting from asbestos abatement activities.

7. All utilities, mechanical systems and piping shall be locked out and tagged before the contractor is to begin abatement activities. Mechanical and electrical systems, which cannot be locked out and tagged, shall be protected and supported throughout asbestos abatement activities.

8. The contractor shall comply with all regulations concerning OSHA fall protection.

9. HVAC intakes and exhaust, vents and drains that can not be shutoff or sealed with two (2) layers of 6-mil plastic sheeting must be extended using an airtight rigid sheathing to a minimum height of ten feet (10') above the work area during roof abatement.

Egan Environmental Consulting, Inc.

BUILDING 21 - ELEVATOR MACHINE ROOM LEAD PAINT REMOVAL PLAN

Fi le

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\( 4)

A S

-0

.d ou t:

(3 ) A

S -0

D at e:

T ue , N ov

2,

- 1 0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

SL

KEY PLAN-BUILDING 15H

KEY PLAN-BUILDING 21

"GENERAL" NOTES:

PROJECT SCOPE OF WORK

AS-001

ARCHITECTURAL - BUILDING 15H & 21:

NOTES, SYMBOLS & ABBREVIATIONS.

ABBREVIATIONS

GENERAL SYMBOLS

ARCHITECTURAL LINE TYPES

GENERAL SPECIFICATIONS:

²

LEGEND :

le

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\( 5)

A S

-1

.d ou t:

(4 ) A

S -1

D at e:

T ue , N ov

2,

- 1 0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

AS-101

5ZR

ARCHITECTURAL - BUILDING 15H:

ROOF REPLACEMENT PLAN.

ROOF PLAN

ELEVATOR SHAFT & LOBBY ROOF PLAN

PARAPET RAILING DETAIL

GENERAL NOTES:

KEYED NOTE:

PHASING NOTES:

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\( 6)

A S

-1

.d ou t:

(5 ) A

S -1

D at e:

T ue , N ov

2,

- 1 0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

AS-102

6SL

ARCHITECTURAL - BUILDING 15H:

ROOF REPLACEMENT DETAILS.

TYPICAL EPDM ROOFING DETAIL

ROOF DRAIN DETAIL

EQUIPMENT CURB DETAIL

VENT DETAIL - NEW

3B

PITCH POCKET DEMO/NEW DETAIL

EXHAUST/ SUPPLY FAN CURB DETAIL

BASE FLASHING /PARAPET DETAIL

BASE FLASHING DETAIL

DOOR BULKHEAD DETAIL

VENT DETAIL - DEMO

3A

GENERAL NOTES:

SCUPPER INSTALLATION DETAIL

ROOF REPLACEMENT AT ROOF REPLACEMENT AT

ROOF REPLACEMENT AT

ROOF REPLACEMENT AT

ROOF REPLACEMENT AT

4" BEAD SPACING ADHESIVE INSULATION/

COVERBOARD ATTACHMENT DETAIL

B B

A

B

A

A

SECURSEAL DRIP EDGE FASCIA

A

A

EPDM MEMBRANE SPLICES

A

A

B B

B

PRE-MOLDED PRESSURE SENSITIVE PIPE SEAL

PARAPET/WALL DETAIL

LO

W

ER RO

O

F

CONNECTING

CORRIDOR

ROOF

ELEVATOR

LOBBY ROOF

Fi le

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\( 7)

A S

-1

.d ou t:

(6 ) A

S -1

D at e:

T ue , N ov

2,

- 1 0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

AS-103

7WPB

ARCHITECTURAL - BUILDING 21:

ROOF REPLACEMENT PLAN.

BUILDING 21 ROOF PLAN

TYP. SHINGLED ROOF SECTION

2A

TYP. B.U.R. ROOF REPLACEMENT DETAIL

TYP. SHINGLED HIP ROOF DETAIL

2D

TYP. SHINGLE INSTALLATION DETAIL

2C

GUTTER DETAIL

2B

GENERAL NOTES:

ENLARGED VIEW - RIDGE

TYP. ROOF ANCHOR DETAIL

2E

NOTE:

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\( 8)

A S

-1

.d ou t:

(7 ) A

S -1

D at e:

T ue , N ov

2,

- 1 0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

AS-104

8ZR

ARCHITECTURAL - BUILDING 21:

ROOF REPLACEMENT DETAILS.

DEMO DRIP EDGE DETAIL

2A

DETAIL AT ROOF/WALL INTERSECTION

NOTE:

PARTIAL SECTION

EXHAUST VENT DETAIL

NEW DRIP EDGE DETAIL

2B

ROOF DRAIN DETAIL

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\( 9)

A S

-1

.d ou t:

(8 ) A

S -1

D at e:

T ue , N ov

2,

- 1 0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

AS-105

9WPB

ARCHITECTURAL - BUILDING 15H:

ELEVATOR PLANS.

ARCHITECTURAL: BLDG. 15H - GROUND FLOOR PLAN

ARCHITECTURAL: BLDG. 15H - FIRST FLOOR PLAN

ARCHITECTURAL: BLDG. 15H - SECOND FLOOR PLAN

NOTE:

ARCHITECTURAL: BLDG. 15H -THIRD FLOOR PLAN

NOTES: (APPLY TO ALL DEMOLITION AND RECONSTRUCTION WORK)

BUILDING 15H ELEVATOR RENOVATION SCHEDULE

Keyed

Cab Sill

Pit Electric Outlet , Light and Emergency Stop Switch

Machine Room Electric Outlet - GFI

Machine Room Work Lights (Replace existing Fixtures)

Hydraulic Oil Replacement

Existing to remain - clean and polish.

Provide and install new GFI receptacle in the machine room. Refer to specifications for more information.

Drain and dispose of existing hydraulic oil as per the V.A.'s "green" disposal requirements included in the project specifications. Clean and flush existing reservoir, hydraulic lines, pistons and pumps and install new hydraulic fluid as per the elevator equipment manufacturers requirements.

Provide and install a pit light and switch, GFI receptacle, and emergency stop switch such as produced by "Quality Elevator Products" models "PWLG" & "PS2" or approved equal. Provide additional stop switches per specification 14 24 10 section 2.4.

Replace 2 lamp surface mounted fluorescent fixtures with LED, listed for wet locations such as produced by "Lightolier" model "to be determined" or approved equal. Reuse existing homerun and switch extend feeders as necessary and dispose of existing fixture. Unless noted otherwise, all new lights to be installed 7'-0" above finished floor.

Item Description

NOTES:

28 Temporary Partitions and Doors for elevator #1 & #2. Elevator work shall be phased such that one elevator is in service at all times. Install and remove temporary partitions as require. Provide 2 hour fire rated temporary gypsum partition and 1-1/2 hour fire rated door and jamb during all demolition and construction work. Provide store room lock function hardware in accordance with VA standards hardware and keyed. Provide keys to VA COR and fire department. Install partition as to not interfere with public access to elevator call buttons. Provide 90-minute fire rated and labeled doors with self closing door closer. Provide 36x18 "Sticky" surface floor mats to remove dirt and debris from shoes on both sides of construction doors and at machine room doors.

29 Oil Scavenger Replace existing oil scavenger system including motor, pump, tank and supply and return lines. Remove existing lines from Schavenger P. System to power unit.

HYDRAULIC PISTON SHAFT & CYLINDER REPAIR NOTES:

32 Buffer Springs and Supports Replace Existing

33 Replace Hydraulic Jack Remove and replace existing hydraulic jack-cylinder and piston assembly. Inspect and re-bore existing casing as required. Install PVC containment liner.

36 Car top safety rail Provide top of car hand rail with top middle and toe kick rails.

37 Car exhaust fan Replace Existing exhaust fan

39 Existing Camera Existing camera to remain. Disconnect and re-connect as required for interior renovations.

Remove and replace existing door panelsHoistway Doors

Hoistway Entrance Frame Re-cover existing entrance frames

40 Pit Ladder Replace existing ladder with new OSHA approved "D" rung ladder. Field measure & submit shop drawings for approval.

41 Pit And Shaft Light Fixtures Replace Existing with LED fixtures

42 CAR Ceilings, Walls, And Floors Replace Existing Finishes in CAR. This includes ceilings, walls, and floors - see details. Remove and reinstall existing VA signage.

25 Machine Room - Fire Extinguisher

24 Machine Room - Paint Machine Room Floors, Walls, and Ceiling

Degrease, clean, and paint all surfaces. See drawings and specifications for additional details.

MOUNTING HEIGHTS OF FIRE EXTINGUISHERS

Provide new surface mounted fire extinguisher cabinet. See detail on 5/AS-105.

43 "INCASE OF FIRE" SIGNAGE Provide "IN CASE OF FIRE" Signage at all elevator lobby floors. see detail 6/AS-105. Remove existing.

"IN CASE OF FIRE" SIGNAGE DETAIL

C L G

D R O P

T O E K

IC

K

Fi le

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\(

) A S

-1

.d ou t:

(9 ) A

S -1

D at e:

T ue , N ov

2,

- 1 0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

AS-106

10AH

ARCHITECTURAL - BUILDING 15H:

ELEVATOR DETAILS.

CAB CEILING PLAN

Ceiling:

Layer 1:

Layer 2:

Layer 3:

Finish Selection

FLOOR4: REPLACE EXISTING VCT-1 & VCT-2

REPLACE

REFURBISH

CAB WALLS

CLAD OR REPLACE EXISTING STAINLESS STEEL

WITH MIN. 12-GAUGE STAINLESS STEEL

REPLACE EXISTING SOLID SURFACE LAMINATE

(RE-COVER)

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

LO

BBY

CONNECTING

CORRIDOR

E.M.S.

CLOSET

B 150

CO

NNECTING

CO

RRIDO

R

02-

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

M

ECH. RM

ELEVATO

R

LO

BBY

E.M.S.

CLOSET

CONN.

CORRIDOR

LO

W

ER RO

O

F

CO

NNECTING

CO

RRIDO

R

RO

O

F

NODE 02

ROOF

CONNECTING

CORRIDOR

ROOF

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

LO

W

ER RO

O

F

CONNECTING

CORRIDOR

ROOF

ELEVATOR

LOBBY ROOF

ELEV. LO

BBY

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

LO

BBY

CONNECTING

CORRIDOR

E.M.S.

CLOSET

B 150

CO

NNECTING

CO

RRIDO

R

02-

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

M

ECH. RM

Fi le

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\(

) A S

-1

.d ou t:

(1 0)

A S

-1

D at e:

T ue

, N ov

2,

- 1

0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

AS-107

11ZR

ARCHITECTURAL - BUILDING 21:

ELEVATOR PLANS.

ARCHITECTURAL: BLDG. 21 - BASEMENT FLOOR PLAN

ARCHITECTURAL: BLDG. 21 - FIRST FLOOR PLAN

ARCHITECTURAL: BLDG. 21 - SECOND FLOOR PLAN

NOTE:

ARCHITECTURAL: BLDG. 21 - ROOF PLAN

NOTES: (APPLY TO ALL DEMOLITION AND RECONSTRUCTION WORK)

BUILDING 21 ELEVATOR RENOVATION SCHEDULE

Keyed

1 Hydraulic Heavy Duty Solid State Starter

2 Elevator Controller and Selector System

4 Hoistway Wiring, Traveling Cables, and Positioning System

Firefighters Service Key Switch (All floors & cab)

Car Door Clutch, Header, Hanger Track, Gate Switch, Rollers and Automatic Operator

Car Door Proximity Edge Detection System

9 Car Button Station

Car Travel Lanterns, 13 Hoistway Door Interlocks

Hoistway Door Reconditioning

Hoistway Door Equipment & Motorized Operator

Cab Sill

Pit Electric Outlet , Light and Emergency Stop Switch

Machine Room Electric Outlet - GFI

Machine Room Circuit Breaker Panel

Machine Room - Main Line Disconnect

Machine Room - Paint Machine & Motor Room Floor, walls and ceiling. Paint Elevator pit up to 5'-0" A.F.F.

Machine Room - Fire Extinguisher

Machine Room Work Light (Replace existing Fixtures)

Hydraulic Oil Replacement

12 Hall Button Station, Hoistway Access, Hall Button Fixtures and Digital Hall Position Indicators.

Replace the existing motor starter with a new heavy duty solid state motor starter as per the project specifications. Include with elevator controller

Replace the existing hydraulic elevator car control system with a new "V2" system such as produced by "Smartrise Engineering Inc (Irving, TX)." or approved equal. Control system shall be non-proprietary.

Elevator #1 shall have battery backup lowering device and elevator #2 shall have N.O. and N.C. contacts for emergency power signal from generator and N.O. and N.C. power pre-transfer contacts from generator. See additional requirements on drawings and written specifications.

Replace all existing hoisting wiring and associated Traveling cables and positioning system with new such as produced by "Smartrise" or approved equal. Refer to specifications for additional information.

Provide and install new elevator recall module such as produced by "Medco R63C-FS prodcuts" with firefighters emergency key box model FEOK1 as those are VAHVHC standards. Provide all appurtenances needed for a complete and operable system. Refer to specifications for more information. Coordinate with

COR.

Replace the existing car door clutch, header, hanger track, gate switch, rollers, reopening devices and automatic operator with new such as produced by Quality Elevator Products" or approved equal. Operator shall be closed loop type. (See #16 below for further information)

Provide and Install a proximity edge detection system such as produced by "Janus" model "Pana-40 Plus" or approved equal where already installed complete the installation and adjust the sensors. Provide complete operational systems in every aspect.

Provide and Install S.S. car button station by "MAD Elevator Inc." or approved equal with digital indicator such as produced by "Julius Blum & Co. Inc." "Julius Collection" or approved equal. Low profile blue illumin., BS classic push button, #4 stainless steel plate finish. Where call lockouts are specified or required, they shall be Corbin Russwin cylinders.

10 Auxiliary Car Button Station Provide and Install a auxiliary car button station such as produced by "MAD Elevator Inc." or approved equal.

Match #9 above. See written specifications for further details. Where call lockouts are specified or required, they shall be Corbin Russwin cylinders.

Provide and Install S.S. Travel lanterns, wall button stations and digital hall position indicators Giotto 4.3" such as produced by "MAD Elevator Inc." or approved equal. Where call lockouts are specified or required, they shall be Corbin Russwin cylinders.

Provide and Install S.S. Hall button station for hoistway access such as produced by "MAD Elev Inc." or approved equal. Include new access limit switches. Hall lanterns shall have ADA arrows and Giotto 4.3" position indication of all floors. Where call lockouts are specified or required, they shall be Corbin Russwin cylinders.

Completely overhaul and recondition existing hoistway door interlocks. Overhaul shall include but not be limited to new contacts, wiring, springs, keepers and rollers.

Completely overhaul and recondition all hoistway door related equipment including but not limited to gibs, rollers, release assemblies and closures. Remove and replace door panels.

Provide and Install new top and bottom slow down limits. Refer to specifications for more information. In addition to the work required by Item #13. Provide and install new interlock operators and associated appurtenances. Door operator shall be Mover II as manufactured by Gal Vantage Company. (VVVF) Closed loop type

Replace existing with new.

Provide and install new GFI receptacle in the machine room. Refer to specifications for more information.

Provide and install new 3-phase, surface mounted power panel. See electrical drawings for further information.

Replace the existing 3-phase main line, fused disconnect switch with new lockable shunt trip circuit breaker.

Coordinate amperage and AIC rating with existing equipment manufacturer. See electrical drawings for further information.

Degrease, clean and paint elevator pit and machine room floor. Remove rust, degrease, clean and paint concrete and steel up to 5'-0"A.F.F.. Refer to specifications and drawings for more information.

Provide and install a fire extinguisher cabinet for the machine room . Refer to detail 5/AS-105 for more information.

Drain and dispose of existing hydraulic oil as per the V.A.'s "green" disposal requirements included in the project specifications. Clean and flush existing reservoir, hydraulic lines, pistons and pumps and install new hydraulic fluid as per the elevator equipment manufacturers requirements.

1. SUPPLY AND INSTALL ALL EQUIPMENT (OR APPROVED EQUAL) AS NOTED.

2. ALL EQUIPMENT SHALL BE INSTALLED IN COMPLIANCE WITH ALL APPLICABLE CODES INCLUDING BUT NOT LIMITED TO

V.A., NYS, ASME A17.1 AND A17.2, NFPA 13,70,72,101 AND 252 AND ADA REQUIREMENTS.

3. REFER TO DRAWING AS-108 & AS-109 FOR ADDITIONAL DETAILS.

4. REFER TO WRITTEN SPECIFICATIONS FOR FURTHER DETAILS AND ADDITIONAL WORK.

5. RELOCATE BUILDING PHONE CABLING FROM EXISTING TO BE DEMOLISHED ELEVATOR CONTROL PANELS TO NEW.

FURNISH AND INSTALL NEW EMERGENCY PHONE CABLING FROM ELEVATOR

CABS TO NEW ELEVATOR CONTROLLERS. CONNECT TO EXISTING EMERGENCY

PHONE SYSTEM. TEST AND CONFIRM OPERATION DURING START-UP. PHONE

SYSTEM SHOULD REPORT TO OPERATOR IN BUILDING 16, MONDAY TO FRIDAY

8:00 AM TO 4:30 PM AND OUTSIDE THESE HOURS, THEY ARE FORWARDED TO

THE MMA OFFICE IN 15E BASEMENT. COORDINATE WITH COR.

Provide and install a pit light and switch, GFI receptacle, and emergency stop switch such as produced by "Quality Elevator Products" models "PWLG" & "PS2" or approved equal. Provide emergency stop switches per specification 1424 10 section 2.4.

Replace 2 lamp surface mounted fluorescent fixture with LED type, listed for wet locations such as produced by "Lightolier" model "to be determined" or approved equal. Reuse existing homerun and switch extend feeders as necessary and dispose of existing fixture. Unless noted otherwise, all new lights to be installed 7'-0" above finished floor.

Item Description

NOTES:

28 Temporary Partitions and Doors for elevator #1 & #2. Elevator work shall be phased such that one elevator is in service at all times. Install and remove temporary partitions as require. Provide 2 hour fire rated temporary gypsum partition and 1-1/2 hour fire rated door and jamb during all demolition and construction work. Provide store room lock function hardware in accordance with VA standards hardware and keyed. Provide keys to VA COR and fire department. Install partition as to not interfere with public access to elevator call buttons. Provide 90-minute fire rated and labeled doors with self closing closer. Provide 36X18 "Sticky" surface floor mats to remove dirt and debris from shoes on both sides of construction doors and at machine room doors.

29 Oil Scavenger Replace existing oil scavenger system including motor, pump, tank and supply and return lines. Remove existing lines from Scavenger Pump System to power unit.

30 Hydraulic piping Isolation and Overspeed valve Replace existing overspeed and manual shutoff valve. adjust per specifications. Replace existing hydraulic piping and isolation coupling.

31 Hydraulic Power Unit Replace existing power unit with submerged motor and pump type including tank, control valve, solenoids, muffler, and isolation coupling. Units to have right or left hand piping connections as required for installation.

Provide with solid state starter. 5,000 LBS capacity, 3,850 LBS cab weight, 100 FPM, 208V/3 Phase, Pump:

Circor (IMO) A4PIC-236 (or approved equal), 159.5GPM at 350PSIG, 40HP, 3,400RPM, 93 FPM, with 6-1/2" plunger, Working Pressure: 160 psi minimum, Full Load Pressure: 340 PSI, Relief Pressure: 500 psi.

Motor: 200 Volt/3 Phase/40 HP, Duty: 80 STS/HR, 30% Run Time, Service Factor: Special, Tank Size: 48"W x 23"D x 48"H Tank Capacity: 76 transferable/122 gallon permanent. Quality elev. products model SK-48 or approved equal. Shunt Trip Circuit: See electrical drawings. Control valve shall be on top outside tank.

Provide containment pan per specifications

HYDRAULIC PISTON SHAFT & CYLINDER REPAIR NOTES:

32 Buffer Springs and Supports Replace Existing

33 Replace Hydraulic Jack Remove and replace existing 6-1/2" hydraulic jack-cylinder and plunger assembly with new 6-1/2" unit.

Inspect and re-bore existing casing as required. Install PVC containment liner.

34 Car top inspection station Replace Existing with "Smart Connect" inspection box pre-wired via CAT-5 cable to hydraulic controller as manufactured by "Smartrise" or approved equal

35 Alarm Bell Replace Existing including in above.

36 Car top safety rail Provide top of car hand rail with top middle and toe kick rails.

37 Car exhaust fan Replace Existing exhaust fan

38 Audio Voice System (not required) Provide new audio voice system activated by stopping at floor - see specifications.

39 Existing Camera Existing camera to remain - Provide cabling in travel cable. Disconnect and re-connect.

40 Pit Ladder Replace existing ladders (two required) with new OSHA approved ''D" ring ladder. Field measure and submit shop drawings for approval see 1/AS-108.

41 Pit And Shaft Light Fixtures Replace Existing and install additional LED light fixtures. New conduit cable and switching.

42 CAR Ceilings, Floors & Walls Replace Existing finishes in CAR. This includes interior ceilings, walls, and floors - See Details. Remove and reinstall existing VA signage.

18 Hoistway Entrance Re-cover existing entrance frames

ARCHITECTURAL: BLDG. 21 - FIRST FLOOR PLAN DEMO PLAN

T O E K

IC

K

Fi le

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\(

) A S

-1

.d ou t:

(1 1)

A S

-1

D at e:

T ue

, N ov

2,

- 1

0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

AS-108

12WPB

ARCHITECTURAL - BUILDING 21:

REFERENCE DRAWINGS AND

DETAILS.

CAB CEILING PLAN - EXISTING

CAB WALLS - EXISTING

BUILDING 21 SECTION

Ceiling:

Layer 2:

Layer 3:

Finish Selection - Existing

FLOOR4:

REMOVE

REMOVE

REMOVE

REMOVE

Layer 1: REMOVE

CAB FRONT ELEVATION - REFURBISHED

CAB REAR ELEVATION - REFURBISHED

NOTES:NOTES:

T

T

Fi le

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\(

) A S

-1

.d ou t:

(1 2)

A S

-1

D at e:

T ue

, N ov

2,

- 1

0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

AS-109

13ZR

ARCHITECTURAL - BUILDING 15H & 21:

ELEVATOR DETAILS.

NOTES:

NOTES:

TYPICAL HOISTWAY AND ELEVATOR ENTRANCES (BUILDING #21)

TYPICAL ELEVATOR CAR INTERIOR (BUILDING #21)

ELEVATOR CAR CONTROL BUTTONS (BUILDING #21)

SIZE OF ELEVATOR VISIBLE SIGNS (BUILDING #21)

ON ELEVATOR HOISTWAY ENTRANCES

TYPICAL ELEVATOR PIT CONSTRUCTION FLOOR PLAN

TYPICAL ELEVATOR HOISTWAY SECTION SCHEMATIC

WELL CASING AND PLUNGER

NOTE:

MAIN CAR OPERATING PANEL (BUILDING #21)

AUXILLARY CAR OPERATING PANEL (BUILDING #21)

NOTE:

TYPICAL TERMINAL UP HALL STATION W/FS (BUILDING #21)

NOTE:

INTERMEDIATE HALL STATION (BUILDING #21)

TACTILE CHARACTERS

LANTERN - CAB INTERIOR (BUILDING #21)

NOTE:

T

4 4

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\(

) M H

-0

.d ou t:

(1 5)

H M

-0

D at e:

T ue

, N ov

2,

- 1

0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

MH-001

14AH

BUILDING 15H & 21 MECHANICAL:

SYMBOLS, ABBREVIATIONS & NOTES.

GENERAL NOTES:

ABBREVIATIONSDUCTWORK SYMBOLS

GENERAL SYMBOLS

PIPING SYMBOLS

HVAC LINE TYPESHVAC DEMOLITION NOTES: VALVE SYMBOLS

PLUMBING LINE TYPES

ENERGY RECOVERY NOTES:

ENERGY RECOVERY SCHEDULE

HEAT PUMP SPLIT SYSTEM SCHEDULE

HEAT PUMP SPLIT SYSTEM NOTES:

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\(

) M H

-1

.d ou t:

(1 6)

M H

-1

D at e:

T ue

, N ov

2,

- 1

0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

MH-100

15WPB

BUILDING 15H MECHANICAL:

FLOOR PLANS

BLDG. 15H - GROUND FLOOR PLAN

BLDG. 15H - FIRST FLOOR PLAN

BLDG. 15H - SECOND FLOOR PLAN

BLDG. 15H - THIRD FLOOR PLAN

BLDG. 15H - ELEVATOR MACHINE ROOM PLAN - DEMOLITION

KEYED NOTE:NOTE:

ELEVATOR SUMP PUMP DETAIL

ELEVATOR SUMP PUMP SCHEDULE

ELEV. LO

BBY

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

LO

BBY

CONNECTING

CORRIDOR

E.M.S.

CLOSET

B 150

CO

NNECTING

CO

RRIDO

R

02-

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

M

ECH. RM

ELEVATO

R

LO

BBY

E.M.S.

CLOSET

CONN.

CORRIDOR

LO

W

ER RO

O

F

CO

NNECTING

CO

RRIDO

R

RO

O

F

NODE 02

ROOF

CONNECTING

CORRIDOR

ROOF

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

E.M.S.

CLOSET

B 150

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

M

ECH. RM

Fi le

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\(

) M H

-1

.d ou t:

(1 7)

H M

-1

D at e:

T ue

, N ov

2,

- 1

0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

MH-101

16WPB

BUILDING 21 MECHANICAL:

FLOOR PLANS

BLDG. 21 - BASEMENT FLOOR PLAN

BLDG. 21 - FIRST FLOOR PLAN - DEMOLITION

BLDG. 21 - SECOND FLOOR PLAN

BLDG. 21 - ENLARGED ELEVATOR MACHINE MECHANICAL FLOOR PLAN

BLDG. 21 - ELEVATOR MACHINE MECHANICAL ROOM INTERIOR ELEVATION

SECTION THROUGH LOUVER

ELEVATOR SUMP PUMP DETAIL

ELEVATOR SUMP PUMP SCHEDULE

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\(

) E S

-0

.d ou t:

(1 6)

E S

-0

D at e:

T ue

, N ov

2,

- 1

0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

ES-001

17ZR

BUILDING 15H & 21 ELECTRICAL:

SYMBOLS, SCHEDULES,

ABBREVIATIONS & NOTES.

DISCONNECT DS-1

BLDG. 21 ONE LINE DIAGRAM

ELECTRICAL GENERAL NOTES: ELECTRICAL DEMOLITION NOTES:

GENERAL SYMBOLS

POWER SYMBOLS

¾

S

ABBREVIATIONSLIGHTING SYMBOLS

DISCONNECT DS-1A &1B

DISCONNECT DS-1

DISCONNECT DS-2A &2B

¾

LEGEND AND SCHEDULE OF LIGHTING EQUIPMENT

BLDG. 21 TELEPHONE ONE-LINE DIAGRAM

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\(

) E S

-1

.d ou t:

(1 9)

E S

-1

D at e:

T ue

, N ov

2,

- 1

0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

ES-100

18WPB

BUILDING 15H ELECTRICAL:

FLOOR PLANS

BLDG. 15H - GROUND FLOOR PLAN

BLDG. 15H - FIRST FLOOR PLAN

BLDG. 15H - SECOND FLOOR PLAN

BLDG. 15H - THIRD FLOOR PLAN

BLDG. 15H - ELEVATOR MACHINE ROOM PLAN

VIEW FROM ELEVATOR DOOR

BLDG. 15H - ELEVATION OF ELEVATOR SHAFT

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

LO

BBY

CONNECTING

CORRIDOR

E.M.S.

CLOSET

B 150

CO

NNECTING

CO

RRIDO

R

02-

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

M

ECH. RM

ELEVATO

R

LO

BBY

E.M.S.

CLOSET

CONN.

CORRIDOR

LO

W

ER RO

O

F

CO

NNECTING

CO

RRIDO

R

RO

O

F

NODE 02

ROOF

CONNECTING

CORRIDOR

ROOF

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

CONNECTING

E.M.S.

CLOSET

B 150

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

M

ECH. RM

Fi le

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\(

) E S

-1

.d ou t:

(1 9)

E S

-1

D at e:

T ue

, N ov

2,

- 1

0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

ES-101

19ZR

BUILDING 21 ELECTRICAL:

FLOOR PLANS

BLDG. 21 - BASEMENT FLOOR PLAN

BLDG. 21 - FIRST FLOOR PLAN - DEMOLITION

BLDG. 21 - SECOND FLOOR PLAN

BLDG. 21 - ENLARGED ELEVATOR MACHINE FLOOR PLAN

VIEW FROM ELEVATOR DOOR

BLDG. 21 - ELEVATION OF ELEVATOR SHAFT

BUILDING #21 EXISTING POWER PANEL - (20-B1-150)

NOTES:

BUILDING #21 REPLACEMENT POWER PANEL - (20-B1-150)

NOTES:

BLDG. 21 - TUNNEL AND BASEMENT FLOOR PLAN

FX-001

20ZR

BUILDING 15H & 21 FIRE PROTECTION:

SYMBOLS, ABBREVIATIONS & NOTES.

LEGEND AND SCHEDULE OF FIRE PROTECTION EQUIPMENT

FIRE PROTECTION SYSTEM NOTES:

SPRINKLER DEMOLITION NOTES:

FIRE PROTECTION LINE TYPES

PIPING SYMBOLS

GENERAL SYMBOLS

ABBREVIATIONS

FIRE PROTECTION SYMBOLS

Fi le

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\(

) F X

-0

.d ou t:

(2 1)

F X

-0

D at e:

T ue

, N ov

2,

- 1

0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\(

) F X

-1

.d ou t:

(2 2)

F X

-1

D at e:

T ue

, N ov

2,

- 1

0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

FX-100

21WPB

BUILDING 15H FIRE PROTECTION:

FLOOR PLANS

BLDG. 15H - GROUND FLOOR PLAN

BLDG. 15H - FIRST FLOOR PLAN

BLDG. 15H - SECOND FLOOR PLAN

BLDG. 15H - THIRD FLOOR PLAN

BLDG. 15H - ELEVATOR MACHINE ROOM FIRE SPRINKLER PLAN

KEYED NOTES:

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

LO

BBY

CONNECTING

CORRIDOR

E.M.S.

CLOSET

B 150

CO

NNECTING

CO

RRIDO

R

02-

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

M

ECH. RM

ELEVATO

R

LO

BBY

E.M.S.

CLOSET

CONN.

CORRIDOR

LO

W

ER RO

O

F

CO

NNECTING

CO

RRIDO

R

RO

O

F

NODE 02

ROOF

CONNECTING

CORRIDOR

ROOF

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

E.M.S.

CLOSET

B 150

ELEVATO

R

NO

. 01

ELEVATO

R

NO

. 02

ELEVATO

R

M

ECH. RM

Fi le

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\(

) F X

-1

.d ou t:

(2 3)

F X

-1

D at e:

T ue

, N ov

2,

- 1

0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

FX-101

22ZR

BUILDING 21 FIRE PROTECTION:

FLOOR PLANS

BLDG. 21 - BASEMENT FLOOR PLAN

BLDG. 21 - FIRST FLOOR PLAN

BLDG. 21 - SECOND FLOOR PLAN

BLDG. 21 - ENLARGED ELEVATOR MACHINE FIRE SPRINKLER FLOOR PLAN

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\(

) F A

-0

.d ou t:

(2 4)

F A

-0

D at e:

T ue

, N ov

2,

- 1

0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management

EDF

BUILDING 15H AND 21 ELEVATOR REPLACEMENT

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS

620A4-15-105

15H AND 21

2511-2-21

VA HUDSON VALLEY HEALTH CARE SYSTEM

CASTLE POINT CAMPUS 41 Castle Point Road

WAPPINGERS FALLS, NY 12590

ROUTE 9D, CASTLE POINT NY 12511

100% WORKING DRAWINGS -

FOR BID 11-2-21

FA-001

23ZR

BUILDING 15H & 21 FIRE ALARM:

SYMBOLS, ABBREVIATIONS & NOTES.

LEGEND AND SCHEDULE OF FIRE ALARM EQUIPMENT

FIRE ALARM NOTES:

NOTES:

NOTES:

Elevator Type Sprinklers Smoke Det. Heat Det. See *

Hydraulic Passenger or Service Elevator Baseline:

(See Note C)

M ac hi ne

R oo m

To p of H oi st w ay

Ho ist w ay

P it

M ac hi ne

R oo m

To p of H oi st w ay

Ho ist w ay

P it

M ac hi ne

R oo m

To p of H oi st w ay

Ho ist w ay

P it

S S S S

S

S

S

S

S

H

H

FIRE ALARM INTERFACE WITH ELEVATORS NOTES:

N am e:

F

:\2

9\

-1

V A

C P

5H

E le va to r R ep la ce m en t\(

) F A

-1

.d ou t:

(2 5)

F A

-1

D at e:

T ue

, N ov

2,

- 1

0:

am e:

z r)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofREV # DATEREVISION DESCRIPTION

ENGINEERING LLPFE PROJECT NO: 19-145

22 Mulberry St., Suite 2A,…

This is the start of the file's text. The full file is on GovTribe.