620A4-15-105 Bldg.15H and 21A Elevator Drawings.pdf
PDF 26 MB Posted
- Attached to
- Y1DZ--Replace elevator & roof 15H 21A
- Solicitation number
- 36C24222B0018
About this file
This notice is for a federal solicitation seeking elevator and roof replacement services at two buildings on the Castle Point Campus of the VA Hudson Valley Health Care System in Wappingers Falls, New York. The solicitation will replace elevators, elevator equipment, and roofs covering approximately 19,000 square feet in total across buildings 15H and 21A. Services required include demolition, asbestos abatement, various construction trades, equipment installation and commissioning, with a projected completion date of 730 calendar days from notice to proceed. This procurement is set aside for Service Disabled Veteran Owned Small Businesses, with a response deadline and award date to be included in the solicitation releasing on or around December 23, 2021. Responses must be submitted electronically.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers 2 2-8-22.docx | DOCX document | |
| 36C24222B0018 0002 Bldg 15H and 21A Bid Extension.pdf | ||
| Asbestos and Lead Paint Survey Report.pdf | ||
| 36C24222B0018 00001 BLDG 15H and 21A.pdf | ||
| 36C24222B0018 Project RFI Questions and Answers.docx | DOCX document | |
| 533050 21oS1 NHCU Elevators.pdf | ||
| Site Visit Sign-in - Bldg. 15H and 21A.pdf | ||
| 533050 21o02 NHCU Elevators.pdf | ||
| 620A4-15-105 SOW (FULL).docx | DOCX document | |
| Wage Determination - Dutchess County.pdf | ||
| 620A4-15-105 Specifications.pdf | ||
| 36C24222B0018_1.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STAGING AREA MH-100
MH-101 BUILDING 21 MECHANICAL: FLOOR PLANS
BUILDING 15H MECHANICAL: FLOOR PLANS
GI-001 BUILDING 15H & 21: COVER & INDEX OF DRAWINGS.
SHEET #:
AS-105
Fi le
N am e:
C
:\U se rs \z r\A pp
D at a\ Lo ca l\T em p\
A cP ub lis h_
\(1
) G I-0
.d w g
(L ay ou t:
(1
) G I-0
D at e:
T ue , N ov
2,
- 1 0:
A
M
N am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
DRAWING #: DRAWING TITLE
GI-001
AS-108
MH-001 BUILDING 15H & 21 MECHANICAL: SYMBOLS, ABBREVIATIONS & NOTES
WPB
ES-101 BUILDING 21 ELECTRICAL: FLOOR PLANS
ES-001 BUILDING 15H & 21 ELECTRICAL: SYMBOLS, SCHEDULES, ABBREVIATIONS & NOTES
AS-103 ARCHITECTURAL - BUILDING 21: ROOF REPLACEMENT PLAN.
AS-104 ARCHITECTURAL - BUILDING 21: ROOF REPLACEMENT DETAILS.
AS-107
ARCHITECTURAL - BUILDING 15H: ELEVATOR DETAILS.
HA-101 ASBESTOS ABATEMENT AND LEAD PAINT REMOVAL: BUILDING 21
FX-001 BUILDING 15H & 21 FIRE PROTECTION: SYMBOLS, SCHEDULES, ABBREVIATIONS & NOTES
FX-100 BUILDING 15H FIRE PROTECTION: FLOOR PLANS
ES-100 BUILDING 15H ELECTRICAL: FLOOR PLANS
FX-101 BUILDING 21 FIRE PROTECTION: FLOOR PLANS
FA-001 BUILDING 15H & 21 FIRE ALARM: SYMBOLS, SCHEDULES, ABBREVIATIONS & NOTES
FA-100 BUILDING 15H FIRE ALARM: FLOOR PLANS
AS-109
ASBESTOS ABATEMENT:
ARCHITECTURAL:
MECHANICAL:
ELECTRICAL:
FIRE PROTECTION SPRINKLER:
FIRE ALARM:
AS-001 ARCHITECTURAL - BUILDING 15H & 21: NOTES, SYMBOLS & ABBREVIATIONS.
AS-101 ARCHITECTURAL - BUILDING 15H: ROOF REPLACEMENT PLAN.
AS-102 ARCHITECTURAL - BUILDING 15H: ROOF REPLACEMENT DETAILS.
GENERAL:
AS-106
ARCHITECTURAL - BUILDING 15H: ELEVATOR PLANS.
ARCHITECTURAL - BUILDING 21: REFERENCE DRAWINGS AND DETAILS.
ARCHITECTURAL - BUILDING 21: ELEVATOR PLANS.
ARCHITECTURAL - BUILDING 15H & 21: ELEVATOR DETAILS.
BUILDING 15H & 21: COVER &
INDEX OF DRAWINGS.
FA-101 BUILDING 21 FIRE ALARM: FLOOR PLANS
GI-002 BUILDING 15H & 21: SAFETY & GENERAL NOTES & DETAILS
LEGEND:
STAGING AREA
Fi le
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\( 2)
G I-0
.d ou t:
(2
) G I-0
D at e:
T ue , N ov
2,
- 1 0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
GI-002
2WPB
BUILDING 15H & 21: SAFETY &
GENERAL NOTES AND DETAILS
SAFETY NOTES:
GENERAL NOTES:
SITE SAFETY & PROPOSED STAGING PLAN
8' TEMPORARY CONSTRUCTION FENCING DETAIL
WITH DOUBLE MAN GATE DETAIL
TEMPORARY CONSTRUCTION PARTITION
LO
W
ER RO
O
F
CONNECTING
CORRIDOR
ROOF
ELEVATOR
LOBBY ROOF
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
LO
BBY
CONNECTING
CORRIDOR
E.M.S.
CLOSET
B 150
CO
NNECTING
CO
RRIDO
R
02-
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
M
ECH. RM
Fi le
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\( 3)
H A
-1
.d ou t:
(2 ) H
A -0
D at e:
T ue , N ov
2,
- 1 0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
HA-101
3AH
ASBESTOS ABATEMENT AND LEAD
PAINT REMOVAL: BUILDING 21
BUILDING 21 - ROOF ABATEMENT PLAN
GENERAL NOTES:
1. Asbestos abatement shall be performed in accordance with the specification and applicable regulations. Personnel holding current New York State Department of Labor (NYSDOL) asbestos handler's certificates shall perform the work. Additionally, the Contractor must employ NYSDOL certified supervisors to be on the work site for all abatement activities. The contractor must be currently licensed by the NYSDOL. All certificates and licenses are to be readily available for verification by the Veterans Affairs Medical Center.
2. Contractor is responsible for removal and disposal of all asbestos-containing materials and asbestos-contaminated materials within the specified areas.
3. Contractor is responsible for verification of all quantities of asbestos-containing materials.
4. Contractor is responsible for precleaning any existing asbestos contamination, dust and debris within the removal areas.
5. Contractor is responsible for maintaining the integrity of building finishes. The Contractor shall repair any and all damages caused by abatement activities or his personnel.
ASBESTOS ABATEMENT NOTES:
1. The Contractor is to remove the ACM's in accordance with New York State Department of Labor (NYSDOL) Industrial Code Rule 56 (12 NYCRR Part 56), the VAMC specification and applicable federal regulations (USEPA and OSHA). Where there is an overlap the most stringent regulation shall apply.
2. The roof flashing cement of the Building 21 elevator lobby roof and lower machine room roof contains asbestos and must be removed.
3. Asbestos roof flashing cement is present under the counter flashing on the brick and mortar. This flashing must be removed without damaging the underlying structure.
Asbestos roof flashing cement must be removed from these materials and where ever else it is encountered. The roofing flashing abatement shall include the removal and disposal of all layers of roof flashing. The roof flashing shall be removed down to the structural substrate.
4. Roof flashing removal shall be performed in accordance with 12 NYCRR Part 56 Section 56-11.6 (Exterior Project Removal of Non-friable ACM Roofing). The asbestos abatement contractor shall coordinate his work with the general contractor so that the building is not left open to water damage and inclement weather. The work area shall be an area demarcated with “Danger-Asbestos” signs and red warning tape placed at a minimum distance of 25' in every direction. Only certified workers and authorized visitors shall be permitted in the work area during asbestos abatement activities. Asbestos abatement activities and general contracting work shall not be permitted to occur at the same time in an asbestos abatement work area. Simultaneous general contracting work shall occur at least 25' away from the asbestos abatement work on the outside of the building. Outdoor work areas shall not require clearance air samples. The outdoor work areas will be considered abated when there is no visible debris or dust remaining and the VPIH has performed a successful visual inspection.
5. The contractor shall coordinate the location of his remote personnel and waste decontamination unit(s), and waste dumpster with the V.A. Engineer at the preconstruction meeting.
6. The contractor shall be responsible for any and all damages resulting from asbestos abatement activities.
7. All utilities, mechanical systems and piping shall be locked out and tagged before the contractor is to begin abatement activities. Mechanical and electrical systems, which cannot be locked out and tagged, shall be protected and supported throughout asbestos abatement activities.
8. The contractor shall comply with all regulations concerning OSHA fall protection.
9. HVAC intakes and exhaust, vents and drains that can not be shutoff or sealed with two (2) layers of 6-mil plastic sheeting must be extended using an airtight rigid sheathing to a minimum height of ten feet (10') above the work area during roof abatement.
Egan Environmental Consulting, Inc.
BUILDING 21 - ELEVATOR MACHINE ROOM LEAD PAINT REMOVAL PLAN
Fi le
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\( 4)
A S
-0
.d ou t:
(3 ) A
S -0
D at e:
T ue , N ov
2,
- 1 0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
SL
KEY PLAN-BUILDING 15H
KEY PLAN-BUILDING 21
"GENERAL" NOTES:
PROJECT SCOPE OF WORK
AS-001
ARCHITECTURAL - BUILDING 15H & 21:
NOTES, SYMBOLS & ABBREVIATIONS.
ABBREVIATIONS
GENERAL SYMBOLS
ARCHITECTURAL LINE TYPES
GENERAL SPECIFICATIONS:
²
LEGEND :
le
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\( 5)
A S
-1
.d ou t:
(4 ) A
S -1
D at e:
T ue , N ov
2,
- 1 0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
AS-101
5ZR
ARCHITECTURAL - BUILDING 15H:
ROOF REPLACEMENT PLAN.
ROOF PLAN
ELEVATOR SHAFT & LOBBY ROOF PLAN
PARAPET RAILING DETAIL
GENERAL NOTES:
KEYED NOTE:
PHASING NOTES:
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\( 6)
A S
-1
.d ou t:
(5 ) A
S -1
D at e:
T ue , N ov
2,
- 1 0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
AS-102
6SL
ARCHITECTURAL - BUILDING 15H:
ROOF REPLACEMENT DETAILS.
TYPICAL EPDM ROOFING DETAIL
ROOF DRAIN DETAIL
EQUIPMENT CURB DETAIL
VENT DETAIL - NEW
3B
PITCH POCKET DEMO/NEW DETAIL
EXHAUST/ SUPPLY FAN CURB DETAIL
BASE FLASHING /PARAPET DETAIL
BASE FLASHING DETAIL
DOOR BULKHEAD DETAIL
VENT DETAIL - DEMO
3A
GENERAL NOTES:
SCUPPER INSTALLATION DETAIL
ROOF REPLACEMENT AT ROOF REPLACEMENT AT
ROOF REPLACEMENT AT
ROOF REPLACEMENT AT
ROOF REPLACEMENT AT
4" BEAD SPACING ADHESIVE INSULATION/
COVERBOARD ATTACHMENT DETAIL
B B
A
B
A
A
SECURSEAL DRIP EDGE FASCIA
A
A
EPDM MEMBRANE SPLICES
A
A
B B
B
PRE-MOLDED PRESSURE SENSITIVE PIPE SEAL
PARAPET/WALL DETAIL
LO
W
ER RO
O
F
CONNECTING
CORRIDOR
ROOF
ELEVATOR
LOBBY ROOF
Fi le
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\( 7)
A S
-1
.d ou t:
(6 ) A
S -1
D at e:
T ue , N ov
2,
- 1 0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
AS-103
7WPB
ARCHITECTURAL - BUILDING 21:
ROOF REPLACEMENT PLAN.
BUILDING 21 ROOF PLAN
TYP. SHINGLED ROOF SECTION
2A
TYP. B.U.R. ROOF REPLACEMENT DETAIL
TYP. SHINGLED HIP ROOF DETAIL
2D
TYP. SHINGLE INSTALLATION DETAIL
2C
GUTTER DETAIL
2B
GENERAL NOTES:
ENLARGED VIEW - RIDGE
TYP. ROOF ANCHOR DETAIL
2E
NOTE:
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\( 8)
A S
-1
.d ou t:
(7 ) A
S -1
D at e:
T ue , N ov
2,
- 1 0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
AS-104
8ZR
ARCHITECTURAL - BUILDING 21:
ROOF REPLACEMENT DETAILS.
DEMO DRIP EDGE DETAIL
2A
DETAIL AT ROOF/WALL INTERSECTION
NOTE:
PARTIAL SECTION
EXHAUST VENT DETAIL
NEW DRIP EDGE DETAIL
2B
ROOF DRAIN DETAIL
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\( 9)
A S
-1
.d ou t:
(8 ) A
S -1
D at e:
T ue , N ov
2,
- 1 0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
AS-105
9WPB
ARCHITECTURAL - BUILDING 15H:
ELEVATOR PLANS.
ARCHITECTURAL: BLDG. 15H - GROUND FLOOR PLAN
ARCHITECTURAL: BLDG. 15H - FIRST FLOOR PLAN
ARCHITECTURAL: BLDG. 15H - SECOND FLOOR PLAN
NOTE:
ARCHITECTURAL: BLDG. 15H -THIRD FLOOR PLAN
NOTES: (APPLY TO ALL DEMOLITION AND RECONSTRUCTION WORK)
BUILDING 15H ELEVATOR RENOVATION SCHEDULE
Keyed
Cab Sill
Pit Electric Outlet , Light and Emergency Stop Switch
Machine Room Electric Outlet - GFI
Machine Room Work Lights (Replace existing Fixtures)
Hydraulic Oil Replacement
Existing to remain - clean and polish.
Provide and install new GFI receptacle in the machine room. Refer to specifications for more information.
Drain and dispose of existing hydraulic oil as per the V.A.'s "green" disposal requirements included in the project specifications. Clean and flush existing reservoir, hydraulic lines, pistons and pumps and install new hydraulic fluid as per the elevator equipment manufacturers requirements.
Provide and install a pit light and switch, GFI receptacle, and emergency stop switch such as produced by "Quality Elevator Products" models "PWLG" & "PS2" or approved equal. Provide additional stop switches per specification 14 24 10 section 2.4.
Replace 2 lamp surface mounted fluorescent fixtures with LED, listed for wet locations such as produced by "Lightolier" model "to be determined" or approved equal. Reuse existing homerun and switch extend feeders as necessary and dispose of existing fixture. Unless noted otherwise, all new lights to be installed 7'-0" above finished floor.
Item Description
NOTES:
28 Temporary Partitions and Doors for elevator #1 & #2. Elevator work shall be phased such that one elevator is in service at all times. Install and remove temporary partitions as require. Provide 2 hour fire rated temporary gypsum partition and 1-1/2 hour fire rated door and jamb during all demolition and construction work. Provide store room lock function hardware in accordance with VA standards hardware and keyed. Provide keys to VA COR and fire department. Install partition as to not interfere with public access to elevator call buttons. Provide 90-minute fire rated and labeled doors with self closing door closer. Provide 36x18 "Sticky" surface floor mats to remove dirt and debris from shoes on both sides of construction doors and at machine room doors.
29 Oil Scavenger Replace existing oil scavenger system including motor, pump, tank and supply and return lines. Remove existing lines from Schavenger P. System to power unit.
HYDRAULIC PISTON SHAFT & CYLINDER REPAIR NOTES:
32 Buffer Springs and Supports Replace Existing
33 Replace Hydraulic Jack Remove and replace existing hydraulic jack-cylinder and piston assembly. Inspect and re-bore existing casing as required. Install PVC containment liner.
36 Car top safety rail Provide top of car hand rail with top middle and toe kick rails.
37 Car exhaust fan Replace Existing exhaust fan
39 Existing Camera Existing camera to remain. Disconnect and re-connect as required for interior renovations.
Remove and replace existing door panelsHoistway Doors
Hoistway Entrance Frame Re-cover existing entrance frames
40 Pit Ladder Replace existing ladder with new OSHA approved "D" rung ladder. Field measure & submit shop drawings for approval.
41 Pit And Shaft Light Fixtures Replace Existing with LED fixtures
42 CAR Ceilings, Walls, And Floors Replace Existing Finishes in CAR. This includes ceilings, walls, and floors - see details. Remove and reinstall existing VA signage.
25 Machine Room - Fire Extinguisher
24 Machine Room - Paint Machine Room Floors, Walls, and Ceiling
Degrease, clean, and paint all surfaces. See drawings and specifications for additional details.
MOUNTING HEIGHTS OF FIRE EXTINGUISHERS
Provide new surface mounted fire extinguisher cabinet. See detail on 5/AS-105.
43 "INCASE OF FIRE" SIGNAGE Provide "IN CASE OF FIRE" Signage at all elevator lobby floors. see detail 6/AS-105. Remove existing.
"IN CASE OF FIRE" SIGNAGE DETAIL
C L G
D R O P
T O E K
IC
K
Fi le
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\(
) A S
-1
.d ou t:
(9 ) A
S -1
D at e:
T ue , N ov
2,
- 1 0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
AS-106
10AH
ARCHITECTURAL - BUILDING 15H:
ELEVATOR DETAILS.
CAB CEILING PLAN
Ceiling:
Layer 1:
Layer 2:
Layer 3:
Finish Selection
FLOOR4: REPLACE EXISTING VCT-1 & VCT-2
REPLACE
REFURBISH
CAB WALLS
CLAD OR REPLACE EXISTING STAINLESS STEEL
WITH MIN. 12-GAUGE STAINLESS STEEL
REPLACE EXISTING SOLID SURFACE LAMINATE
(RE-COVER)
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
LO
BBY
CONNECTING
CORRIDOR
E.M.S.
CLOSET
B 150
CO
NNECTING
CO
RRIDO
R
02-
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
M
ECH. RM
ELEVATO
R
LO
BBY
E.M.S.
CLOSET
CONN.
CORRIDOR
LO
W
ER RO
O
F
CO
NNECTING
CO
RRIDO
R
RO
O
F
NODE 02
ROOF
CONNECTING
CORRIDOR
ROOF
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
LO
W
ER RO
O
F
CONNECTING
CORRIDOR
ROOF
ELEVATOR
LOBBY ROOF
ELEV. LO
BBY
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
LO
BBY
CONNECTING
CORRIDOR
E.M.S.
CLOSET
B 150
CO
NNECTING
CO
RRIDO
R
02-
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
M
ECH. RM
Fi le
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\(
) A S
-1
.d ou t:
(1 0)
A S
-1
D at e:
T ue
, N ov
2,
- 1
0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
AS-107
11ZR
ARCHITECTURAL - BUILDING 21:
ELEVATOR PLANS.
ARCHITECTURAL: BLDG. 21 - BASEMENT FLOOR PLAN
ARCHITECTURAL: BLDG. 21 - FIRST FLOOR PLAN
ARCHITECTURAL: BLDG. 21 - SECOND FLOOR PLAN
NOTE:
ARCHITECTURAL: BLDG. 21 - ROOF PLAN
NOTES: (APPLY TO ALL DEMOLITION AND RECONSTRUCTION WORK)
BUILDING 21 ELEVATOR RENOVATION SCHEDULE
Keyed
1 Hydraulic Heavy Duty Solid State Starter
2 Elevator Controller and Selector System
4 Hoistway Wiring, Traveling Cables, and Positioning System
Firefighters Service Key Switch (All floors & cab)
Car Door Clutch, Header, Hanger Track, Gate Switch, Rollers and Automatic Operator
Car Door Proximity Edge Detection System
9 Car Button Station
Car Travel Lanterns, 13 Hoistway Door Interlocks
Hoistway Door Reconditioning
Hoistway Door Equipment & Motorized Operator
Cab Sill
Pit Electric Outlet , Light and Emergency Stop Switch
Machine Room Electric Outlet - GFI
Machine Room Circuit Breaker Panel
Machine Room - Main Line Disconnect
Machine Room - Paint Machine & Motor Room Floor, walls and ceiling. Paint Elevator pit up to 5'-0" A.F.F.
Machine Room - Fire Extinguisher
Machine Room Work Light (Replace existing Fixtures)
Hydraulic Oil Replacement
12 Hall Button Station, Hoistway Access, Hall Button Fixtures and Digital Hall Position Indicators.
Replace the existing motor starter with a new heavy duty solid state motor starter as per the project specifications. Include with elevator controller
Replace the existing hydraulic elevator car control system with a new "V2" system such as produced by "Smartrise Engineering Inc (Irving, TX)." or approved equal. Control system shall be non-proprietary.
Elevator #1 shall have battery backup lowering device and elevator #2 shall have N.O. and N.C. contacts for emergency power signal from generator and N.O. and N.C. power pre-transfer contacts from generator. See additional requirements on drawings and written specifications.
Replace all existing hoisting wiring and associated Traveling cables and positioning system with new such as produced by "Smartrise" or approved equal. Refer to specifications for additional information.
Provide and install new elevator recall module such as produced by "Medco R63C-FS prodcuts" with firefighters emergency key box model FEOK1 as those are VAHVHC standards. Provide all appurtenances needed for a complete and operable system. Refer to specifications for more information. Coordinate with
COR.
Replace the existing car door clutch, header, hanger track, gate switch, rollers, reopening devices and automatic operator with new such as produced by Quality Elevator Products" or approved equal. Operator shall be closed loop type. (See #16 below for further information)
Provide and Install a proximity edge detection system such as produced by "Janus" model "Pana-40 Plus" or approved equal where already installed complete the installation and adjust the sensors. Provide complete operational systems in every aspect.
Provide and Install S.S. car button station by "MAD Elevator Inc." or approved equal with digital indicator such as produced by "Julius Blum & Co. Inc." "Julius Collection" or approved equal. Low profile blue illumin., BS classic push button, #4 stainless steel plate finish. Where call lockouts are specified or required, they shall be Corbin Russwin cylinders.
10 Auxiliary Car Button Station Provide and Install a auxiliary car button station such as produced by "MAD Elevator Inc." or approved equal.
Match #9 above. See written specifications for further details. Where call lockouts are specified or required, they shall be Corbin Russwin cylinders.
Provide and Install S.S. Travel lanterns, wall button stations and digital hall position indicators Giotto 4.3" such as produced by "MAD Elevator Inc." or approved equal. Where call lockouts are specified or required, they shall be Corbin Russwin cylinders.
Provide and Install S.S. Hall button station for hoistway access such as produced by "MAD Elev Inc." or approved equal. Include new access limit switches. Hall lanterns shall have ADA arrows and Giotto 4.3" position indication of all floors. Where call lockouts are specified or required, they shall be Corbin Russwin cylinders.
Completely overhaul and recondition existing hoistway door interlocks. Overhaul shall include but not be limited to new contacts, wiring, springs, keepers and rollers.
Completely overhaul and recondition all hoistway door related equipment including but not limited to gibs, rollers, release assemblies and closures. Remove and replace door panels.
Provide and Install new top and bottom slow down limits. Refer to specifications for more information. In addition to the work required by Item #13. Provide and install new interlock operators and associated appurtenances. Door operator shall be Mover II as manufactured by Gal Vantage Company. (VVVF) Closed loop type
Replace existing with new.
Provide and install new GFI receptacle in the machine room. Refer to specifications for more information.
Provide and install new 3-phase, surface mounted power panel. See electrical drawings for further information.
Replace the existing 3-phase main line, fused disconnect switch with new lockable shunt trip circuit breaker.
Coordinate amperage and AIC rating with existing equipment manufacturer. See electrical drawings for further information.
Degrease, clean and paint elevator pit and machine room floor. Remove rust, degrease, clean and paint concrete and steel up to 5'-0"A.F.F.. Refer to specifications and drawings for more information.
Provide and install a fire extinguisher cabinet for the machine room . Refer to detail 5/AS-105 for more information.
Drain and dispose of existing hydraulic oil as per the V.A.'s "green" disposal requirements included in the project specifications. Clean and flush existing reservoir, hydraulic lines, pistons and pumps and install new hydraulic fluid as per the elevator equipment manufacturers requirements.
1. SUPPLY AND INSTALL ALL EQUIPMENT (OR APPROVED EQUAL) AS NOTED.
2. ALL EQUIPMENT SHALL BE INSTALLED IN COMPLIANCE WITH ALL APPLICABLE CODES INCLUDING BUT NOT LIMITED TO
V.A., NYS, ASME A17.1 AND A17.2, NFPA 13,70,72,101 AND 252 AND ADA REQUIREMENTS.
3. REFER TO DRAWING AS-108 & AS-109 FOR ADDITIONAL DETAILS.
4. REFER TO WRITTEN SPECIFICATIONS FOR FURTHER DETAILS AND ADDITIONAL WORK.
5. RELOCATE BUILDING PHONE CABLING FROM EXISTING TO BE DEMOLISHED ELEVATOR CONTROL PANELS TO NEW.
FURNISH AND INSTALL NEW EMERGENCY PHONE CABLING FROM ELEVATOR
CABS TO NEW ELEVATOR CONTROLLERS. CONNECT TO EXISTING EMERGENCY
PHONE SYSTEM. TEST AND CONFIRM OPERATION DURING START-UP. PHONE
SYSTEM SHOULD REPORT TO OPERATOR IN BUILDING 16, MONDAY TO FRIDAY
8:00 AM TO 4:30 PM AND OUTSIDE THESE HOURS, THEY ARE FORWARDED TO
THE MMA OFFICE IN 15E BASEMENT. COORDINATE WITH COR.
Provide and install a pit light and switch, GFI receptacle, and emergency stop switch such as produced by "Quality Elevator Products" models "PWLG" & "PS2" or approved equal. Provide emergency stop switches per specification 1424 10 section 2.4.
Replace 2 lamp surface mounted fluorescent fixture with LED type, listed for wet locations such as produced by "Lightolier" model "to be determined" or approved equal. Reuse existing homerun and switch extend feeders as necessary and dispose of existing fixture. Unless noted otherwise, all new lights to be installed 7'-0" above finished floor.
Item Description
NOTES:
28 Temporary Partitions and Doors for elevator #1 & #2. Elevator work shall be phased such that one elevator is in service at all times. Install and remove temporary partitions as require. Provide 2 hour fire rated temporary gypsum partition and 1-1/2 hour fire rated door and jamb during all demolition and construction work. Provide store room lock function hardware in accordance with VA standards hardware and keyed. Provide keys to VA COR and fire department. Install partition as to not interfere with public access to elevator call buttons. Provide 90-minute fire rated and labeled doors with self closing closer. Provide 36X18 "Sticky" surface floor mats to remove dirt and debris from shoes on both sides of construction doors and at machine room doors.
29 Oil Scavenger Replace existing oil scavenger system including motor, pump, tank and supply and return lines. Remove existing lines from Scavenger Pump System to power unit.
30 Hydraulic piping Isolation and Overspeed valve Replace existing overspeed and manual shutoff valve. adjust per specifications. Replace existing hydraulic piping and isolation coupling.
31 Hydraulic Power Unit Replace existing power unit with submerged motor and pump type including tank, control valve, solenoids, muffler, and isolation coupling. Units to have right or left hand piping connections as required for installation.
Provide with solid state starter. 5,000 LBS capacity, 3,850 LBS cab weight, 100 FPM, 208V/3 Phase, Pump:
Circor (IMO) A4PIC-236 (or approved equal), 159.5GPM at 350PSIG, 40HP, 3,400RPM, 93 FPM, with 6-1/2" plunger, Working Pressure: 160 psi minimum, Full Load Pressure: 340 PSI, Relief Pressure: 500 psi.
Motor: 200 Volt/3 Phase/40 HP, Duty: 80 STS/HR, 30% Run Time, Service Factor: Special, Tank Size: 48"W x 23"D x 48"H Tank Capacity: 76 transferable/122 gallon permanent. Quality elev. products model SK-48 or approved equal. Shunt Trip Circuit: See electrical drawings. Control valve shall be on top outside tank.
Provide containment pan per specifications
HYDRAULIC PISTON SHAFT & CYLINDER REPAIR NOTES:
32 Buffer Springs and Supports Replace Existing
33 Replace Hydraulic Jack Remove and replace existing 6-1/2" hydraulic jack-cylinder and plunger assembly with new 6-1/2" unit.
Inspect and re-bore existing casing as required. Install PVC containment liner.
34 Car top inspection station Replace Existing with "Smart Connect" inspection box pre-wired via CAT-5 cable to hydraulic controller as manufactured by "Smartrise" or approved equal
35 Alarm Bell Replace Existing including in above.
36 Car top safety rail Provide top of car hand rail with top middle and toe kick rails.
37 Car exhaust fan Replace Existing exhaust fan
38 Audio Voice System (not required) Provide new audio voice system activated by stopping at floor - see specifications.
39 Existing Camera Existing camera to remain - Provide cabling in travel cable. Disconnect and re-connect.
40 Pit Ladder Replace existing ladders (two required) with new OSHA approved ''D" ring ladder. Field measure and submit shop drawings for approval see 1/AS-108.
41 Pit And Shaft Light Fixtures Replace Existing and install additional LED light fixtures. New conduit cable and switching.
42 CAR Ceilings, Floors & Walls Replace Existing finishes in CAR. This includes interior ceilings, walls, and floors - See Details. Remove and reinstall existing VA signage.
18 Hoistway Entrance Re-cover existing entrance frames
ARCHITECTURAL: BLDG. 21 - FIRST FLOOR PLAN DEMO PLAN
T O E K
IC
K
Fi le
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\(
) A S
-1
.d ou t:
(1 1)
A S
-1
D at e:
T ue
, N ov
2,
- 1
0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
AS-108
12WPB
ARCHITECTURAL - BUILDING 21:
REFERENCE DRAWINGS AND
DETAILS.
CAB CEILING PLAN - EXISTING
CAB WALLS - EXISTING
BUILDING 21 SECTION
Ceiling:
Layer 2:
Layer 3:
Finish Selection - Existing
FLOOR4:
REMOVE
REMOVE
REMOVE
REMOVE
Layer 1: REMOVE
CAB FRONT ELEVATION - REFURBISHED
CAB REAR ELEVATION - REFURBISHED
NOTES:NOTES:
T
T
Fi le
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\(
) A S
-1
.d ou t:
(1 2)
A S
-1
D at e:
T ue
, N ov
2,
- 1
0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
AS-109
13ZR
ARCHITECTURAL - BUILDING 15H & 21:
ELEVATOR DETAILS.
NOTES:
NOTES:
TYPICAL HOISTWAY AND ELEVATOR ENTRANCES (BUILDING #21)
TYPICAL ELEVATOR CAR INTERIOR (BUILDING #21)
ELEVATOR CAR CONTROL BUTTONS (BUILDING #21)
SIZE OF ELEVATOR VISIBLE SIGNS (BUILDING #21)
ON ELEVATOR HOISTWAY ENTRANCES
TYPICAL ELEVATOR PIT CONSTRUCTION FLOOR PLAN
TYPICAL ELEVATOR HOISTWAY SECTION SCHEMATIC
WELL CASING AND PLUNGER
NOTE:
MAIN CAR OPERATING PANEL (BUILDING #21)
AUXILLARY CAR OPERATING PANEL (BUILDING #21)
NOTE:
TYPICAL TERMINAL UP HALL STATION W/FS (BUILDING #21)
NOTE:
INTERMEDIATE HALL STATION (BUILDING #21)
TACTILE CHARACTERS
LANTERN - CAB INTERIOR (BUILDING #21)
NOTE:
T
4 4
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\(
) M H
-0
.d ou t:
(1 5)
H M
-0
D at e:
T ue
, N ov
2,
- 1
0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
MH-001
14AH
BUILDING 15H & 21 MECHANICAL:
SYMBOLS, ABBREVIATIONS & NOTES.
GENERAL NOTES:
ABBREVIATIONSDUCTWORK SYMBOLS
GENERAL SYMBOLS
PIPING SYMBOLS
HVAC LINE TYPESHVAC DEMOLITION NOTES: VALVE SYMBOLS
PLUMBING LINE TYPES
ENERGY RECOVERY NOTES:
ENERGY RECOVERY SCHEDULE
HEAT PUMP SPLIT SYSTEM SCHEDULE
HEAT PUMP SPLIT SYSTEM NOTES:
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\(
) M H
-1
.d ou t:
(1 6)
M H
-1
D at e:
T ue
, N ov
2,
- 1
0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
MH-100
15WPB
BUILDING 15H MECHANICAL:
FLOOR PLANS
BLDG. 15H - GROUND FLOOR PLAN
BLDG. 15H - FIRST FLOOR PLAN
BLDG. 15H - SECOND FLOOR PLAN
BLDG. 15H - THIRD FLOOR PLAN
BLDG. 15H - ELEVATOR MACHINE ROOM PLAN - DEMOLITION
KEYED NOTE:NOTE:
ELEVATOR SUMP PUMP DETAIL
ELEVATOR SUMP PUMP SCHEDULE
ELEV. LO
BBY
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
LO
BBY
CONNECTING
CORRIDOR
E.M.S.
CLOSET
B 150
CO
NNECTING
CO
RRIDO
R
02-
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
M
ECH. RM
ELEVATO
R
LO
BBY
E.M.S.
CLOSET
CONN.
CORRIDOR
LO
W
ER RO
O
F
CO
NNECTING
CO
RRIDO
R
RO
O
F
NODE 02
ROOF
CONNECTING
CORRIDOR
ROOF
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
E.M.S.
CLOSET
B 150
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
M
ECH. RM
Fi le
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\(
) M H
-1
.d ou t:
(1 7)
H M
-1
D at e:
T ue
, N ov
2,
- 1
0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
MH-101
16WPB
BUILDING 21 MECHANICAL:
FLOOR PLANS
BLDG. 21 - BASEMENT FLOOR PLAN
BLDG. 21 - FIRST FLOOR PLAN - DEMOLITION
BLDG. 21 - SECOND FLOOR PLAN
BLDG. 21 - ENLARGED ELEVATOR MACHINE MECHANICAL FLOOR PLAN
BLDG. 21 - ELEVATOR MACHINE MECHANICAL ROOM INTERIOR ELEVATION
SECTION THROUGH LOUVER
ELEVATOR SUMP PUMP DETAIL
ELEVATOR SUMP PUMP SCHEDULE
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\(
) E S
-0
.d ou t:
(1 6)
E S
-0
D at e:
T ue
, N ov
2,
- 1
0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
ES-001
17ZR
BUILDING 15H & 21 ELECTRICAL:
SYMBOLS, SCHEDULES,
ABBREVIATIONS & NOTES.
DISCONNECT DS-1
BLDG. 21 ONE LINE DIAGRAM
ELECTRICAL GENERAL NOTES: ELECTRICAL DEMOLITION NOTES:
GENERAL SYMBOLS
POWER SYMBOLS
¾
S
ABBREVIATIONSLIGHTING SYMBOLS
DISCONNECT DS-1A &1B
DISCONNECT DS-1
DISCONNECT DS-2A &2B
¾
LEGEND AND SCHEDULE OF LIGHTING EQUIPMENT
BLDG. 21 TELEPHONE ONE-LINE DIAGRAM
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\(
) E S
-1
.d ou t:
(1 9)
E S
-1
D at e:
T ue
, N ov
2,
- 1
0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
ES-100
18WPB
BUILDING 15H ELECTRICAL:
FLOOR PLANS
BLDG. 15H - GROUND FLOOR PLAN
BLDG. 15H - FIRST FLOOR PLAN
BLDG. 15H - SECOND FLOOR PLAN
BLDG. 15H - THIRD FLOOR PLAN
BLDG. 15H - ELEVATOR MACHINE ROOM PLAN
VIEW FROM ELEVATOR DOOR
BLDG. 15H - ELEVATION OF ELEVATOR SHAFT
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
LO
BBY
CONNECTING
CORRIDOR
E.M.S.
CLOSET
B 150
CO
NNECTING
CO
RRIDO
R
02-
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
M
ECH. RM
ELEVATO
R
LO
BBY
E.M.S.
CLOSET
CONN.
CORRIDOR
LO
W
ER RO
O
F
CO
NNECTING
CO
RRIDO
R
RO
O
F
NODE 02
ROOF
CONNECTING
CORRIDOR
ROOF
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
CONNECTING
E.M.S.
CLOSET
B 150
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
M
ECH. RM
Fi le
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\(
) E S
-1
.d ou t:
(1 9)
E S
-1
D at e:
T ue
, N ov
2,
- 1
0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
ES-101
19ZR
BUILDING 21 ELECTRICAL:
FLOOR PLANS
BLDG. 21 - BASEMENT FLOOR PLAN
BLDG. 21 - FIRST FLOOR PLAN - DEMOLITION
BLDG. 21 - SECOND FLOOR PLAN
BLDG. 21 - ENLARGED ELEVATOR MACHINE FLOOR PLAN
VIEW FROM ELEVATOR DOOR
BLDG. 21 - ELEVATION OF ELEVATOR SHAFT
BUILDING #21 EXISTING POWER PANEL - (20-B1-150)
NOTES:
BUILDING #21 REPLACEMENT POWER PANEL - (20-B1-150)
NOTES:
BLDG. 21 - TUNNEL AND BASEMENT FLOOR PLAN
FX-001
20ZR
BUILDING 15H & 21 FIRE PROTECTION:
SYMBOLS, ABBREVIATIONS & NOTES.
LEGEND AND SCHEDULE OF FIRE PROTECTION EQUIPMENT
FIRE PROTECTION SYSTEM NOTES:
SPRINKLER DEMOLITION NOTES:
FIRE PROTECTION LINE TYPES
PIPING SYMBOLS
GENERAL SYMBOLS
ABBREVIATIONS
FIRE PROTECTION SYMBOLS
Fi le
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\(
) F X
-0
.d ou t:
(2 1)
F X
-0
D at e:
T ue
, N ov
2,
- 1
0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\(
) F X
-1
.d ou t:
(2 2)
F X
-1
D at e:
T ue
, N ov
2,
- 1
0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
FX-100
21WPB
BUILDING 15H FIRE PROTECTION:
FLOOR PLANS
BLDG. 15H - GROUND FLOOR PLAN
BLDG. 15H - FIRST FLOOR PLAN
BLDG. 15H - SECOND FLOOR PLAN
BLDG. 15H - THIRD FLOOR PLAN
BLDG. 15H - ELEVATOR MACHINE ROOM FIRE SPRINKLER PLAN
KEYED NOTES:
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
LO
BBY
CONNECTING
CORRIDOR
E.M.S.
CLOSET
B 150
CO
NNECTING
CO
RRIDO
R
02-
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
M
ECH. RM
ELEVATO
R
LO
BBY
E.M.S.
CLOSET
CONN.
CORRIDOR
LO
W
ER RO
O
F
CO
NNECTING
CO
RRIDO
R
RO
O
F
NODE 02
ROOF
CONNECTING
CORRIDOR
ROOF
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
E.M.S.
CLOSET
B 150
ELEVATO
R
NO
. 01
ELEVATO
R
NO
. 02
ELEVATO
R
M
ECH. RM
Fi le
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\(
) F X
-1
.d ou t:
(2 3)
F X
-1
D at e:
T ue
, N ov
2,
- 1
0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
FX-101
22ZR
BUILDING 21 FIRE PROTECTION:
FLOOR PLANS
BLDG. 21 - BASEMENT FLOOR PLAN
BLDG. 21 - FIRST FLOOR PLAN
BLDG. 21 - SECOND FLOOR PLAN
BLDG. 21 - ENLARGED ELEVATOR MACHINE FIRE SPRINKLER FLOOR PLAN
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\(
) F A
-0
.d ou t:
(2 4)
F A
-0
D at e:
T ue
, N ov
2,
- 1
0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
CONSULTANTS: ARCHITECT/ENGINEERS:DESIGN APPROVED W/ COMMENTS: PROF. SEAL: Office of Construction and Facilities Management
EDF
BUILDING 15H AND 21 ELEVATOR REPLACEMENT
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS
620A4-15-105
15H AND 21
2511-2-21
VA HUDSON VALLEY HEALTH CARE SYSTEM
CASTLE POINT CAMPUS 41 Castle Point Road
WAPPINGERS FALLS, NY 12590
ROUTE 9D, CASTLE POINT NY 12511
100% WORKING DRAWINGS -
FOR BID 11-2-21
FA-001
23ZR
BUILDING 15H & 21 FIRE ALARM:
SYMBOLS, ABBREVIATIONS & NOTES.
LEGEND AND SCHEDULE OF FIRE ALARM EQUIPMENT
FIRE ALARM NOTES:
NOTES:
NOTES:
Elevator Type Sprinklers Smoke Det. Heat Det. See *
Hydraulic Passenger or Service Elevator Baseline:
(See Note C)
M ac hi ne
R oo m
To p of H oi st w ay
Ho ist w ay
P it
M ac hi ne
R oo m
To p of H oi st w ay
Ho ist w ay
P it
M ac hi ne
R oo m
To p of H oi st w ay
Ho ist w ay
P it
S S S S
S
S
S
S
S
H
H
FIRE ALARM INTERFACE WITH ELEVATORS NOTES:
N am e:
F
:\2
9\
-1
V A
C P
5H
E le va to r R ep la ce m en t\(
) F A
-1
.d ou t:
(2 5)
F A
-1
D at e:
T ue
, N ov
2,
- 1
0:
am e:
z r)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofREV # DATEREVISION DESCRIPTION
ENGINEERING LLPFE PROJECT NO: 19-145