6130-12-422-2040_POSTING RD.pdf

PDF 10 KB Posted

Attached to
DRY AIR UNIT
Solicitation number
70Z08524Q39027B00
Issued by

About this file

This document appears to be an overhaul description for a federal contract opportunity related to a power supply for the WMSL's TRS-3D 75 radar. The key details are:

The overhaul requirements include the National Stock Number (NSN), Part Number (PN), and CAGE code for the power supply, as well as the estimated repair lead time of 16 months after receipt of order. Specific packaging and marking requirements are provided, including individual packaging, labeling, and cushioning to prevent damage during shipping. The power supply shall be packaged in a wooden crate. The warranty requires the contractor to guarantee the item against defects that lead to failure for up to two years after delivery to the Coast Guard. Acceptance will be at the destination, contingent upon verification of no transit damage, completeness of the order, and conformance to packaging/marking requirements.

The related federal contract opportunity is for a "Dry Air Unit" with Solicitation Number 70Z08524Q39027B00, issued by the Department of Homeland Security US Coast Guard. The attached documents likely contain additional details about the required products or services.

View the file

Other files

File Type Posted
SOLE SOURCE SOLICITATION.docx DOCX document
12-329-8398_POSTING RD.pdf PDF
CLIN Structure.xlsx XLSX spreadsheet
01-644-4575_POSTING RD.pdf PDF
FARCLAUSES01JAN2024.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERHAUL DESCRIPTION

FOR OFFICIAL USE ONLY

ITEM NAME POWER SUPPLY

STOCK NUMBER 6130-12-422-2040

PART NUMBER 54.1155.350.00

USED ON WMSLTRS-3D 75 RADAR

Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.

OVERHAUL REQUIREMENTS:

NSN: 6130-12-422-2040

PN: 54.1155.350.00

ITEM: POWER SUPPLY

CAGE: D1901

OEM: HENSOLDT

QTY PER HULL: 3

ESTIMATED REPAIR LEAD TIME: 16 MONTHS ARO

REPAIR REQUIREMENTS: REFER TO REPAIR SPECS DOCUMENT; A COPY WILL BE PROVIDED

TO THE OEM BY THE KS / KO

PACKAGING SPECS:

1.) MIL-STD-20731E - REFER TO METHOD 10. PACKAGING SHOULD BE APPROPRIATE TO

PART SIZE, WEIGHT, AND MUST WITHSTAND MULTIPLE WORLDWIDE SHIPMENTS IN VARIOUS

SHIPPING CONDITIONS / CLIMATES. PART MUST BE APPROPRIATELY SECURED, AND

CUSHIONED BY FOAM OR BUBBLE WRAP TO PREVENT EXCESSIVE MOVEMENT AND DAMAGE

DURING SHIPPING.

1.A) ELECTROSTATIC DISCHARGE (ESD) ITEMS TO COMPLY WITH METHOD 41, PARAGRAPH

3.7; 5.2.4.1 & TABLE J-IA IAW MIL-PRF-81705E (**ONLY IF APPLICABLE TO PART**)

2.) INDIVIDUALLY PACKAGED AND LABELED IAW MIL-STD-129P CH.4, REQUIRED ID

MARKING EX: PARAGRAPH 4.1 FIGURE 1 - MARKINGS SHALL COMPLY WITH PACK TYPE /

MATERIALS AS REFERENCED IN DOCUMENT. LABELS: IAW MIL-STD-129P W/ CHANGE 4,

PARAGRAPH 4.1 IDENTIFICATION MARKINGS; BARCODING IS NOT REQUIRED. (PG.21).

2.A) VISIBLY MARK / LABEL ALL ELECTRONIC EQUIPMENT WITH "STORE INDOORS ONLY"

WARNING. ITEMS THAT ARE NOT INDIVIDUALLY PACKAGED, AND / OR LABELED WITH THE

REQUIRED FORMAT WILL BE RETUREND TO THE VENDOR FOR REPACKAGING.

3) THE POWER SUPPLY SHALL BE PACKAGED IN A WOODEN CRATE IN ACCORDANCE WITH

ASTM D3951-18 (2023) THE SHIPPING CONTAINER (INCLUDING ANY NECESSARY

BLOCKING, BRACING, CUSHIONING, OR WATER RESISTANCE).

END USE: WMSL'S TRS-3D 75 RADAR

WARRANTY:

X A. Standard Manufacturer's Warranty

B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.

Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after

SHELF LIFE CD 0

days after installation for a period of up to two (2) years after delivery to Coast Guard.

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

OVERHAUL DESCRIPTION

PACKAGING AND MARKING FOR SHIPMENT:

X

A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:

NATIONAL STOCK NUMBER

ITEM NAME

PART NUMBER

GOVERNMENT ORDER NUMBER

6130-12-422-2040

POWER SUPPLY

54.1155.350.00

PRESERVATION / PACKAGING:

A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

X B. See Attachments

B. See Attachments

And the words: "Coast Guard SFLC Material, Condition "A"

File details come from the government source that posted it. Updated .