610-22-519 - DRAWINGS.pdf
PDF 1 MB Posted
- Attached to
- Z1DA--Replace Windows and Doors 610-22-519 Federal contract opportunity
- Solicitation number
- 36C25022B0023
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25022B0023 0004.docx | DOCX document | |
| 36C25022B0023 0003.docx | DOCX document | |
| 36C25022B0023 0002.docx | DOCX document | |
| 610-22-519 DRAWINGS.pdf | ||
| 36C25022B0023 0001.docx | DOCX document | |
| Contractor Certification Regarding Safety and Environmental.docx | DOCX document | |
| RFI Form.docx | DOCX document | |
| 610-22-519 - SPECS.pdf | ||
| VAAR 852 219 77.docx | DOCX document | |
| Wage Determination.pdf | ||
| 36C25022B0023_1.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Approved: Medical Center Director
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot
B
A
C
D
E th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
D
UN
I T E D STAT ES OF A M ERIC
A
SR
IA
FF
A
SNARETEVFOTNEMTRAPE
Approved: Medical Center Assoc. Director
Approved: Engineering Department Zachary I. McDaniel
Drawing Title
F
610-22-519
Various
22-100M 1 310-15-2021
Marion, IN
Z.McDaniel B.Coleman
Cover Sheet Anthony Colon
NORTHERN INDIANA HEALTH CARE SYSTEMS,
VETERANS ADMINISTRATION
1700 E. 38TH. STREET MARION, INDIANA 46953
PROJECT # 610-22-519
REPLACE WINDOWS AND DOORS, VARIOUS BUILDINGS
Replace Windows and Doors, Various Buildings
Michael E. Hershman
M
IS
SI
SS
IN
EW
A
RI
VE
R
NATIO
NAL CEM
ETARY
NATIONAL CEMETARY
N
ATIO
N
AL C
EM
ETAR
Y
65 114
N
ATIO
N
AL C
EM
ETAR
Y
COMPOUND
MATERIAL
COMPOUND
51 52
(2) 30,000
GAL. U.S.T.
T516
9 8
1301 / 733002 / 72
3001 / 69
ES / 3004
MB / 3
G01
3003 / 83
T504
E 38TH ST.
E 38TH ST. E 38TH ST. E 38TH ST.
S LIN
C
O
LN
BLVD
41 97
177 49
HA7
HA8
R.T.
HA9
HA1
DIESEL
HA6
HA3
HA4
WATER ST.
WATER ST.
M
CM
AH
O
N
AV
E.
CO
TT
AG
E
RD
CO
TT
AG
E
RD
BLACK RD.
WATER ST.
RAILROAD AVE.
BL
AC
K
RD
BL
AC
K
RD
EA
RT
HF
ILL
HA2 HA5
HA10
HA11
GRAY
R
D.
G R
AY
R
D
. STEELE CIRCLE
MCMAHON AVE.
MAIN ENTRANCE
MCMAHON AVE.
IN
DIA
NA
AV
E.
INDIANA AVE.
INDIANA AVE.
STEELE CIRCLE
BLACK RD.
BLACK RD. BLACK RD.
BLACK RD.
BL
AC
K R
D
BLACK RD.
G R
AY
R
D
ORCHARD AVE.
ORCHARD AVE.
ORCHARD AVE.
RIVER RD.
O
RCHARD AVE.
NELSON ST.
NELSON ST.
S LIN
C
O
LN
BLVD
S LIN
C
O
LN
BLVD
CHAPMAN AVE.
CHAPMAN AVE.
CHAPMAN AVE.
M
ISSISSIN
EW
A R
D
KUDER PL. KUDER PL.
NATIONAL CEMETERY
MAIN ENTRANCE
HYDE RD.
H
YD
E R D
H
YD
E R D
M
AR
IO
N
R D
M
AR
IO
N
R D
HYD
E
RD.
IR
W
IN
D
R
IR
W
IN
D
R
CHAPMAN AVE.
CHAPMAN AVE.
CHAPM
AN AVE.
STEELE C
IR
C
LE
NELSON ST.
SHORT ST.
M
EC
H
AN
IC
S AVE.
WATER ST.
SH
O
RT
S
T.
FLO
W
ER ST.
FLO
W
ER
ST.
RIVER RD.
RAILROAD AVE.
M
EC
H
AN
IC
S AVE.
VINE RD.
VINE RD.
DOCTOR'S RD.
D O
C
TO
R 'S R
D
D
IX R
D
D
IX R
D
AutoCAD SHX Text N
GENERAL NOTES:
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot
B
A
C
D
E th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
D
UN
I T E D STAT ES OF A M ERIC
A
SR
IA
FF
A
SNARETEVFOTNEMTRAPE
Approved: Medical Center Assoc. Director
Approved: Engineering Department
Drawing Title
F
Various
2 3
Marion, IN
COURTYARD
AREAWAY #4
P-1
AREAWAY
#2
AREAWAY
#1
Building 15
COURTYARD
Building 16 Building 17
Building 124 Building 138
Building 172
Building 174
Bu ild in g
Building 185
MECHANICAL
COURTYARD
Atrium
MODELNUMBERTRADENAMEPRODUCTMATERIALMODELNUMBERTRADENAMEPRODUCTMATERIALMODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
K-4386ANGLESEYC_TOILETSVITREOUS CHINAK-4386ANGLESEYC_TOILETSVITREOUS CHINA
PI
PE
C H
AS
E
MATERIALPRODUCTTRADENAMEMODELNUMBER
MATERIALPRODUCTTRADENAMEMODELNUMBER
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL MATERIALPRODUCTTRADENAMEMODELNUMBER MATERIALPRODUCTTRADENAMEMODELNUMBER
MATERIALPRODUCTTRADENAMEMODELNUMBER
MATERIALPRODUCTTRADENAMEMODELNUMBER
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MATERIALPRODUCTTRADENAMEMODELNUMBER MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MATERIALPRODUCTTRADENAMEMODELNUMBER
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MATERIALPRODUCTTRADENAMEMODELNUMBER MATERIALPRODUCTTRADENAMEMODELNUMBER MATERIALPRODUCTTRADENAMEMODELNUMBER
Note: This site drawing is of the 1st.
floor level and some door locations vary from the basement and the 1st.
floor. See schedule for details.
1. THE CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING ALL OF THE MATERIALS, LABOR, EQUIPMENT AND SUPERVISION NECESSARY FOR THE COMPLETION OF REMOVING OLD DOORS AND WINDOWS AND REINSTALLING NEW DOORS AND WINDOWS.
2. THE CONTRACTOR SHALL FOLLOW ALL APPLICABLE VAMC REGULATIONS, OSHA STANDARDS AND INTERIM LIFE SAFETY
MEASURES.
3. THE CONTRACTOR SHALL HAVE ON THE JOB AT ALL TIMES DURING THE PROGRESS A FORMAN, SUPERINTENDENT OR OTHER COMPETENT REPRESENTATIVE TO WHOM ORDERS AND INSTRUCTIONS MAY BE GIVEN. HIS/HER NAME IS TO BE CERTIFIED TO THE VA AND ANY ORDERS GIVEN TO SUCH REPRESENTATIVE SHALL HAVE THE SAME FORCE AND EFFECT AS IF GIVEN DIRECTLY TO THE CONTRACTOR. A PHONE NUMBER WHERE A RESPONSIBLE PERSON CAN BE REACHED AFTER HOURS SHALL BE PROVIDED.
4. THE WORK PREFORMED IN THIS CONTRACT SHALL BE CAREFULLY COORDINATED WITH THE PROJECT ENGINEER (COR) AND A WORK SCHEDULE SHALL BE SUBMITTED BY THE CONTRACTOR FOR APPROVAL, PRIOR TO THE START OF ANY WORK. DEMOLISHED AREAS SHALL BE REPAIRED WITHIN 2 WORKING DAYS OF THEIR REMOVAL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR A SCHEDULE ALLOWING A MINIMUM OF SEVEN (7) DAYS ADVANCED NOTICE OF THE PLANNED START OF WORK/CONSTRUCTION
ACTIVITIES.
5. THE CONTRACTOR WILL BE ALLOWED TO WORK AFTER THE CLOSE OF REGULAR BUSINESS BY APPROVAL ONLY FROM THE
PROJECT MANAGER (COR).
6. WORK AREAS SHALL BE ROPED OFF AROUND WORK SITES. THE CONTRACTOR SHALL BE RESPONSIBLE TO BLOCK OFF AREAS AS REQUIRED, FURNISHING THE NECESSARY BARRICADES AND SIGNS. NO MORE THAN ONE ENTRANCE INTO THE BUILDING MAY BE
BLOCKED UNLESS APPROVED BY THE PROJECT ENGINEER (COR).
7. THE CONTRACTOR WILL BE RESPONSIBLE FOR TAKING EXACT MEASUREMENTS, FOR ALL MEASUREMENTS ARE APPROXIMATE.
8. ALL DOORS AND WINDOWS SHALL BE INSTALLED PLUMB, LEVEL AND FUNCTION PROPERLY AND LATCH SECURELY. ALL DOORS
AND WINDOWS SHALL BE FINISHED ACCORDING TO THE DOOR & WINDOW SCHEDULE.
9. ALL NEWLY INSTALLED DOORS AND WINDOWS MUST BE MOUNTED SECURELY AND SHALL BE INSULATED AND SEALED PROPERLY
AROUND THE PERIMETER OF THE FRAME.
10. DOOR HARDWARE WILL BE INSTALLED BY THE CONTRACTOR AND FUNCTION PROPERLY. THE HARDWARE SHALL BE ABLE TO
ACCEPT A STANLEY BEST SEVEN PIN CORE. THE CORE WILL BE PROVIDED BY THE V.A.
11. THE CONTRACTOR SHALL KEEP THE WORK STATION CLEAN AND FREE FROM OBSTRUCTIONS AT ALL TIMES. UPON FINAL
CLEAN-UP, THE CONTRACTOR SHALL REMOVE ALL DEBRIS, RUBBISH AND EXCESS MATERIAL FROM THE STATION.
12. TOOLS AND EQUIPMENT SHALL BE SECURED ANYTIME WORKERS ARE NOT IN THE IMMEDIATE AREA.
13. ALL EXTERIOR DOOR FRAMES MUST HAVE A 1/2" ALUMINUM SADDLE THRESHOLD AND SET IN A BED OF SEALANT, VINYL WEATHER
STRIPPING, NYLON BRUSH DOOR SWEEP AND A DOOR CAP.
14. SEE HARDWARE SPECS FOR COMPLETE HARDWARE INFORMATION. ALL PANIC HARDWARE SHALL BE LOCKABLE DUAL FUNCTION
WITH A MORTIS STYLE LOCK.
15. ALL EXTERIOR DOORS WITH WINDOWS AND WINDOWS SHALL BE LOW-E DOUBLE PANE TEMPERED GLASS FILLED WITH ARGON
GAS.
16. IT WILL BE THE CONTRACTORS RESPONSIBILITY TO PROTECT THE SURROUNDING WALLS, FLOORS AND CEILING AROUND THE
DOOR AND WINDOW OPENINGS. IF DAMAGE OCCURS, IT SHALL BE REPAIRED AT THE CONTRACTORS OWN EXPENSE.
17. THIS PROJECT SHALL BE CONDUCTED IN SUCH A PHASE OF ONE ENTRY WAY AT A TIME. 100% COMPLETION IS REQUIRED BEFORE
MOVING ON TO THE NEXT SCHEDULED DOOR.
Zachary I. McDaniel 22-100M
10-15-2021 Z.McDaniel B.Coleman
General Notes Anthony Colon
Replace Windows and Doors, Various Buildings
Michael E. Hershman
Building 54
Building T504
Building T516
10 11
W H
EE
LC
H
AI
R R
AM
P
Building 49
13 14 15 16
Windows x9
Windows x2Windows x3 Windows x6
610-22-519
AutoCAD SHX Text
MECHANICAL CHASE #3
AutoCAD SHX Text
MECHANICAL CHASE #2
AutoCAD SHX Text
MECHANICAL CHASE #1
AutoCAD SHX Text N
DOOR TYPE:FRAME TYPE:
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot
B
A
C
D
E th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
D
U N
I T E D S TAT ES OF A MERIC
A
SR
IA
FF
A
SNARETEVFOTNEMTRAPE
Approved: Medical Center Assoc. Director
Approved: Engineering Department
Drawing Title
F
Various
3 3
Marion, IN Zachary I. McDaniel
22-100M 10-15-2021 Z.McDaniel B.Coleman
Architectural Sheet Anthony Colon
Replace Windows and Doors, Various Buildings
Michael E. Hershman
2"
2"
2"
2"
2"
Basemt. Fl.
El. 828'-4"
Top of Opening El. 836'-4"
8"x4"x1 2" Steel Lintel
8"x10"x16" C.M.U.
Steel Door Frame
12"
A
6"
3'-6"
WINDOW GRIDS SHALL
BE INSTALLED BETWEEN
THE PAINS. TYP.
EDB
H
A B C
F G
WINDOW TYPE:
A
610-22-519
| 610-22-519 - 22-100M - 1 Cover Sheet |
| Sheets and Views |
| Model |
| 610-22-519 - 22-100M - 2 General Notes |
| Sheets and Views |
| Model |
| 610-22-519 - 22-100M - 3 Architectural Sheet |
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .