610-22-519 DRAWINGS.pdf

PDF 2 MB Posted

Attached to
Z1DA--Replace Windows and Doors 610-22-519 Federal contract opportunity
Solicitation number
36C25022B0023
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Replace Windows and Doors 610-22-519, newest first.
File Type Posted
36C25022B0023 0004.docx DOCX document
36C25022B0023 0003.docx DOCX document
36C25022B0023 0002.docx DOCX document
36C25022B0023 0001.docx DOCX document
Contractor Certification Regarding Safety and Environmental.docx DOCX document
610-22-519 - SPECS.pdf PDF
610-22-519 - DRAWINGS.pdf PDF
VAAR 852 219 77.docx DOCX document
Wage Determination.pdf PDF
36C25022B0023_1.docx DOCX document
RFI Form.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Approved: Medical Center Director

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department Zachary I. McDaniel

Drawing Title

F

610-22-519

Various

22-100M 1 310-15-2021

Marion, IN

Z.McDaniel B.Coleman

Cover Sheet Anthony Colon

NORTHERN INDIANA HEALTH CARE SYSTEMS,

VETERANS ADMINISTRATION

1700 E. 38TH. STREET MARION, INDIANA 46953

PROJECT # 610-22-519

REPLACE WINDOWS AND DOORS, VARIOUS BUILDINGS

Replace Windows and Doors, Various Buildings

Michael E. Hershman

M

IS

SI

SS

IN

EW

A

RI

VE

R

NATIO

NAL CEM

ETARY

NATIONAL CEMETARY

N

ATIO

N

AL C

EM

ETAR

Y

65 114

N

ATIO

N

AL C

EM

ETAR

Y

COMPOUND

MATERIAL

COMPOUND

51 52

(2) 30,000

GAL. U.S.T.

T516

9 8

1301 / 733002 / 72

3001 / 69

ES / 3004

MB / 3

G01

3003 / 83

T504

E 38TH ST.

E 38TH ST. E 38TH ST. E 38TH ST.

S LIN

C

O

LN

BLVD

41 97

177 49

HA7

HA8

R.T.

HA9

HA1

DIESEL

HA6

HA3

HA4

WATER ST.

WATER ST.

M

CM

AH

O

N

AV

E.

CO

TT

AG

E

RD

CO

TT

AG

E

RD

BLACK RD.

WATER ST.

RAILROAD AVE.

BL

AC

K

RD

BL

AC

K

RD

EA

RTH

FI

LL

HA2 HA5

HA10

HA11

GRAY

R

D.

G R

AY

R

D

. STEELE CIRCLE

MCMAHON AVE.

MAIN ENTRANCE

MCMAHON AVE.

IN

DIA

NA

AV

E.

INDIANA AVE.

INDIANA AVE.

STEELE CIRCLE

BLACK RD.

BLACK RD. BLACK RD.

BLACK RD.

BL

AC

K R

D

BLACK RD.

G R

AY

R

D

ORCHARD AVE.

ORCHARD AVE.

ORCHARD AVE.

RIVER RD.

O

RCHARD AVE.

NELSON ST.

NELSON ST.

S LIN

C

O

LN

BLVD

S LIN

C

O

LN

BLVD

CHAPMAN AVE.

CHAPMAN AVE.

CHAPMAN AVE.

M

ISSISSIN

EW

A R

D

KUDER PL. KUDER PL.

NATIONAL CEMETERY

MAIN ENTRANCE

HYDE RD.

H

YD

E R D

H

YD

E R D

M

AR

IO

N

R D

M

AR

IO

N

R D

HYD

E

RD.

IR

W

IN

D

R

IR

W

IN

D

R

CHAPMAN AVE.

CHAPMAN AVE.

CHAPM

AN AVE.

STEELE C

IR

C

LE

NELSON ST.

SHORT ST.

M

EC

H

AN

IC

S AVE.

WATER ST.

SH

O

RT

S

T.

FLO

W

ER ST.

FLO

W

ER

ST.

RIVER RD.

RAILROAD AVE.

M

EC

H

AN

IC

S AVE.

VINE RD.

VINE RD.

DOCTOR'S RD.

D O

C

TO

R 'S R

D

D

IX R

D

D

IX R

D

AutoCAD SHX Text N

GENERAL NOTES:

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Various

2 3

Marion, IN

COURTYARD

AREAWAY #4

P-1

AREAWAY

#2

AREAWAY

#1

Building 15

COURTYARD

Building 16 Building 17

Building 124 Building 138

Building 172

Building 174

Bu ild in g

Building 185

MECHANICAL

COURTYARD

Atrium

MODELNUMBERTRADENAMEPRODUCTMATERIALMODELNUMBERTRADENAMEPRODUCTMATERIALMODELNUMBERTRADENAMEPRODUCTMATERIAL

MODELNUMBERTRADENAMEPRODUCTMATERIAL

K-4386ANGLESEYC_TOILETSVITREOUS CHINAK-4386ANGLESEYC_TOILETSVITREOUS CHINA

PI

PE

C H

AS

E

MATERIALPRODUCTTRADENAMEMODELNUMBER

MATERIALPRODUCTTRADENAMEMODELNUMBER

MODELNUMBERTRADENAMEPRODUCTMATERIAL

MODELNUMBERTRADENAMEPRODUCTMATERIAL

MODELNUMBERTRADENAMEPRODUCTMATERIAL MATERIALPRODUCTTRADENAMEMODELNUMBER MATERIALPRODUCTTRADENAMEMODELNUMBER

MATERIALPRODUCTTRADENAMEMODELNUMBER

MATERIALPRODUCTTRADENAMEMODELNUMBER

MODELNUMBERTRADENAMEPRODUCTMATERIAL

MATERIALPRODUCTTRADENAMEMODELNUMBER MODELNUMBERTRADENAMEPRODUCTMATERIAL

MODELNUMBERTRADENAMEPRODUCTMATERIAL

MODELNUMBERTRADENAMEPRODUCTMATERIAL

MATERIALPRODUCTTRADENAMEMODELNUMBER

MODELNUMBERTRADENAMEPRODUCTMATERIAL

MATERIALPRODUCTTRADENAMEMODELNUMBER MATERIALPRODUCTTRADENAMEMODELNUMBER MATERIALPRODUCTTRADENAMEMODELNUMBER

Note: This site drawing is of the 1st.

floor level and some door locations vary from the basement and the 1st.

floor. See schedule for details.

1. THE CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING ALL OF THE MATERIALS, LABOR, EQUIPMENT AND SUPERVISION NECESSARY FOR THE COMPLETION OF REMOVING OLD DOORS AND WINDOWS AND REINSTALLING NEW DOORS AND WINDOWS.

2. THE CONTRACTOR SHALL FOLLOW ALL APPLICABLE VAMC REGULATIONS, OSHA STANDARDS AND INTERIM LIFE SAFETY

MEASURES.

3. THE CONTRACTOR SHALL HAVE ON THE JOB AT ALL TIMES DURING THE PROGRESS A FORMAN, SUPERINTENDENT OR OTHER COMPETENT REPRESENTATIVE TO WHOM ORDERS AND INSTRUCTIONS MAY BE GIVEN. HIS/HER NAME IS TO BE CERTIFIED TO THE VA AND ANY ORDERS GIVEN TO SUCH REPRESENTATIVE SHALL HAVE THE SAME FORCE AND EFFECT AS IF GIVEN DIRECTLY TO THE CONTRACTOR. A PHONE NUMBER WHERE A RESPONSIBLE PERSON CAN BE REACHED AFTER HOURS SHALL BE PROVIDED.

4. THE WORK PREFORMED IN THIS CONTRACT SHALL BE CAREFULLY COORDINATED WITH THE PROJECT ENGINEER (COR) AND A WORK SCHEDULE SHALL BE SUBMITTED BY THE CONTRACTOR FOR APPROVAL, PRIOR TO THE START OF ANY WORK. DEMOLISHED AREAS SHALL BE REPAIRED WITHIN 2 WORKING DAYS OF THEIR REMOVAL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR A SCHEDULE ALLOWING A MINIMUM OF SEVEN (7) DAYS ADVANCED NOTICE OF THE PLANNED START OF WORK/CONSTRUCTION

ACTIVITIES.

5. THE CONTRACTOR WILL BE ALLOWED TO WORK AFTER THE CLOSE OF REGULAR BUSINESS BY APPROVAL ONLY FROM THE

PROJECT MANAGER (COR).

6. WORK AREAS SHALL BE ROPED OFF AROUND WORK SITES. THE CONTRACTOR SHALL BE RESPONSIBLE TO BLOCK OFF AREAS AS REQUIRED, FURNISHING THE NECESSARY BARRICADES AND SIGNS. NO MORE THAN ONE ENTRANCE INTO THE BUILDING MAY BE

BLOCKED UNLESS APPROVED BY THE PROJECT ENGINEER (COR).

7. THE CONTRACTOR WILL BE RESPONSIBLE FOR TAKING EXACT MEASUREMENTS, FOR ALL MEASUREMENTS ARE APPROXIMATE.

8. ALL DOORS AND WINDOWS SHALL BE INSTALLED PLUMB, LEVEL AND FUNCTION PROPERLY AND LATCH SECURELY. ALL DOORS

AND WINDOWS SHALL BE FINISHED ACCORDING TO THE DOOR & WINDOW SCHEDULE.

9. ALL NEWLY INSTALLED DOORS AND WINDOWS MUST BE MOUNTED SECURELY AND SHALL BE INSULATED AND SEALED PROPERLY

AROUND THE PERIMETER OF THE FRAME.

10. DOOR HARDWARE WILL BE INSTALLED BY THE CONTRACTOR AND FUNCTION PROPERLY. THE HARDWARE SHALL BE ABLE TO

ACCEPT A STANLEY BEST SEVEN PIN CORE. THE CORE WILL BE PROVIDED BY THE V.A.

11. THE CONTRACTOR SHALL KEEP THE WORK STATION CLEAN AND FREE FROM OBSTRUCTIONS AT ALL TIMES. UPON FINAL

CLEAN-UP, THE CONTRACTOR SHALL REMOVE ALL DEBRIS, RUBBISH AND EXCESS MATERIAL FROM THE STATION.

12. TOOLS AND EQUIPMENT SHALL BE SECURED ANYTIME WORKERS ARE NOT IN THE IMMEDIATE AREA.

13. ALL EXTERIOR DOOR FRAMES MUST HAVE A 1/2" ALUMINUM SADDLE THRESHOLD AND SET IN A BED OF SEALANT, VINYL WEATHER

STRIPPING, NYLON BRUSH DOOR SWEEP AND A DOOR CAP.

14. SEE HARDWARE SPECS FOR COMPLETE HARDWARE INFORMATION. ALL PANIC HARDWARE SHALL BE LOCKABLE DUAL FUNCTION

WITH A MORTIS STYLE LOCK.

15. ALL EXTERIOR DOORS WITH WINDOWS AND WINDOWS SHALL BE LOW-E DOUBLE PANE TEMPERED GLASS FILLED WITH ARGON

GAS.

16. IT WILL BE THE CONTRACTORS RESPONSIBILITY TO PROTECT THE SURROUNDING WALLS, FLOORS AND CEILING AROUND THE

DOOR AND WINDOW OPENINGS. IF DAMAGE OCCURS, IT SHALL BE REPAIRED AT THE CONTRACTORS OWN EXPENSE.

17. THIS PROJECT SHALL BE CONDUCTED IN SUCH A PHASE OF ONE ENTRY WAY AT A TIME. 100% COMPLETION IS REQUIRED BEFORE

MOVING ON TO THE NEXT SCHEDULED DOOR.

Zachary I. McDaniel 22-100M

10-15-2021 Z.McDaniel B.Coleman

General Notes Anthony Colon

Replace Windows and Doors, Various Buildings

Michael E. Hershman

Building 54

Building T504

Building T516

10 11

W H

EE

LC

H

AI

R R

AM

P

Building 49

13 14 15 16

Windows x9

Windows x2Windows x3 Windows x6

610-22-519

AutoCAD SHX Text

MECHANICAL CHASE #3

AutoCAD SHX Text

MECHANICAL CHASE #2

AutoCAD SHX Text

MECHANICAL CHASE #1

AutoCAD SHX Text N

DOOR TYPE:FRAME TYPE:

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Various

3 3

Marion, IN Zachary I. McDaniel

22-100M 10-15-2021 Z.McDaniel B.Coleman

Architectural Sheet Anthony Colon

Replace Windows and Doors, Various Buildings

Michael E. Hershman

2"

2"

2"

2"

2"

Basemt. Fl.

El. 828'-4"

Top of Opening El. 836'-4"

8"x4"x1 2" Steel Lintel

8"x10"x16" C.M.U.

Steel Door Frame

2"

A

6"

3'-6"

WINDOW GRIDS SHALL

BE INSTALLED BETWEEN

THE PAINS. TYP.

EDB

H

A B C

F G

WINDOW TYPE:

A

610-22-519

610-22-519 - 22-100M - 1 of 3
Sheets and Views
Model
610-22-519 - 22-100M - 2 of 3
Sheets and Views
Model
610-22-519 - 22-100M - 3 of 3
Sheets and Views
Model

File details come from the government source that posted it. Updated .