6 - Ktr Price Schedule.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Yakama Building Automation Controls Federal contract opportunity
- Solicitation number
- 75H70126Q00001
About this file
The file is a pricing schedule for the Yakama Building Automation Controls solicitation (Solicitation Number: 75H70126Q00001) issued by the Department of Health and Human Services Indian Health Service. The pricing schedule includes line items for materials/equipment and labor, with categories such as software license, UPS battery, UI design, HVAC integration hardware, and BAS technician services.
The detailed pricing schedule shows zero-dollar values for all line items, including a 3% TERO tax allocation. The total proposed amount is currently $0.00, suggesting this may be a preliminary or placeholder document. The opportunity appears to be focused on building automation controls for the Yakama facility, with specific technical requirements for hardware, software, and technical support services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1 - SOW Yakama BAS Upgrade.docx | DOCX document | |
| 8 - US DOL WD WA20250119 Dated 9-26-2025.pdf | ||
| 5 - ICRA Construction Matrix 2.0 Assessment Yakama BAS.pdf | ||
| 4 - ILSM.pdf | ||
| 2 - Yakama Map.png | PNG image | |
| 3 - As-builts.pdf | ||
| B01 75H70126Q00001 - Rev.pdf | ||
| 7 - Pre-Quote Inquiry Form.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Scope | Quanity | Unit | Cost/Unit | Cost |
| 1. Materials/ Equipment | ||||
| Software License | 1 | Each | $ - 0 | $0.00 |
| UPS Battery | 1 | Each | $ - 0 | $0.00 |
| UI Design | 1 | Each | $ - 0 | $0.00 |
| HVAC Integration Hardware | 1 | Each | $ - 0 | $0.00 |
| Subtotal Materials: | $0.00 |
| 2. Labor | ||||
| BAS Technician | 300 | Hour | $ - 0 | $ - 0 |
| Staff Training | 1 | Session | $ - 0 | $ - 0 |
| Subtotal Labor: | $0.00 | |||
| Total Materials + Labor (1+2) | $0.00 |
| 3. Estimate Adjustments | ||
| TERO Tax | 3.00% | $0.00 |
| Bond | 0.00% | $0.00 |
| Insurance | 0.00% | $0.00 |
| Totals | $0.00 |
Total Proposed Amount (1+2+3+4) - Rounded $0.00