6-G4. REQUIRED CERTIFICATION OF UNDERSTANDING.pdf

PDF 122 KB Posted

Attached to
COLLIER PARKWAY AT LIVINGSTON ROAD INTERSECTION IMPROVEMENTS State and local contract opportunity
Solicitation number
IFB-KM-26-005
Issued by
Pasco County, Florida

About this file

This document is a Certification of Understanding form related to National Pollutant Discharge Elimination System (NPDES) and Pollution Prevention Control Plan (PPCP) requirements for a county-level construction project. The form requires a bidder to certify their understanding of the General NPDES Permit conditions governing storm water discharge activities from a specific construction site.

The certification obligates the bidder to hold the county harmless for any violations of the NPDES permit conditions and the Storm Water Pollution Prevention Control Plan associated with the project. By signing this document, the authorized representative of the bidding company acknowledges full comprehension of environmental compliance requirements and assumes responsibility for adhering to all related regulations during the construction process.

View the file

Other files for this state and local contract opportunity

Other files attached to COLLIER PARKWAY AT LIVINGSTON ROAD INTERSECTION IMPROVEMENTS, newest first.
File Type Posted
13-I. POST AWARD DOCUMENTS.pdf PDF
16-E4. ACOE Permit.pdf PDF
3-E3. SWFWMD ERP.pdf PDF
4-G1. REQUIRED BID BOND.pdf PDF
11-E. PROJECT SPECIFIC SPECIAL CONDITIONS-SPECIAL PROVISIONS-TECH SPECS-PERMITS-REPORTS.X.pdf PDF
18-E5. Drainage Design Report.pdf PDF
5-G3. REQUIRED CONFLICT OF INTEREST DISCLOSURE.pdf PDF
7-D. SPECIAL CONDITIONS.pdf PDF
1-A. ADVERTISEMENT PAGE.pdf PDF
10-E2. Pasco County Testing Specifications 2006.pdf PDF
12-C. GENERAL CONDITIONS.pdf PDF
14-E7. B2 UWS.pdf PDF
9-H. AGREEMENT.pdf PDF
15-E6. Geotech Report.pdf PDF
17-E1. FINAL PLANS.pdf PDF
19-F. BID PROPOSAL-OFFEROR FORM.pdf PDF
2-B. INSTRUCTIONS TO BIDDERS.pdf PDF
8-G2. REQUIRED FLORIDA TRENCH SAFETY ACT CERTIFICATION AND DISCLOSURE STATEMENT.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CERTIFICATION OF UNDERSTANDING

(NPDES AND PPCP)

On behalf of the BIDDER named below, I am authorized, and do hereby certify, under penalty of perjury, that I understand the terms and conditions of the General National Pollutant Discharge Elimination System (NPDES) Permit that authorizes the storm water discharge activity from the construction site identified as part of this certification.

Furthermore, I am authorized, and hereby certify, that the BIDDER will hold the COUNTY harmless for any and all violations of the General NPDES Permit conditions and the Storm Water Pollution Prevention Control Plan in connection with this Project.

NAME OF BIDDER

BY:

PRINTED NAME:

TITLE:

DATE:

NAME OF BIDDER:
PRINTED NAME:
undefined:
undefined_2:

File details come from the government source that posted it. Updated .