6-G4. REQUIRED CERTIFICATION OF UNDERSTANDING.pdf
PDF 122 KB Posted
- Attached to
- COLLIER PARKWAY AT LIVINGSTON ROAD INTERSECTION IMPROVEMENTS State and local contract opportunity
- Solicitation number
- IFB-KM-26-005
- Issued by
- Pasco County, Florida
About this file
This document is a Certification of Understanding form related to National Pollutant Discharge Elimination System (NPDES) and Pollution Prevention Control Plan (PPCP) requirements for a county-level construction project. The form requires a bidder to certify their understanding of the General NPDES Permit conditions governing storm water discharge activities from a specific construction site.
The certification obligates the bidder to hold the county harmless for any violations of the NPDES permit conditions and the Storm Water Pollution Prevention Control Plan associated with the project. By signing this document, the authorized representative of the bidding company acknowledges full comprehension of environmental compliance requirements and assumes responsibility for adhering to all related regulations during the construction process.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 13-I. POST AWARD DOCUMENTS.pdf | ||
| 16-E4. ACOE Permit.pdf | ||
| 3-E3. SWFWMD ERP.pdf | ||
| 4-G1. REQUIRED BID BOND.pdf | ||
| 11-E. PROJECT SPECIFIC SPECIAL CONDITIONS-SPECIAL PROVISIONS-TECH SPECS-PERMITS-REPORTS.X.pdf | ||
| 18-E5. Drainage Design Report.pdf | ||
| 5-G3. REQUIRED CONFLICT OF INTEREST DISCLOSURE.pdf | ||
| 7-D. SPECIAL CONDITIONS.pdf | ||
| 1-A. ADVERTISEMENT PAGE.pdf | ||
| 10-E2. Pasco County Testing Specifications 2006.pdf | ||
| 12-C. GENERAL CONDITIONS.pdf | ||
| 14-E7. B2 UWS.pdf | ||
| 9-H. AGREEMENT.pdf | ||
| 15-E6. Geotech Report.pdf | ||
| 17-E1. FINAL PLANS.pdf | ||
| 19-F. BID PROPOSAL-OFFEROR FORM.pdf | ||
| 2-B. INSTRUCTIONS TO BIDDERS.pdf | ||
| 8-G2. REQUIRED FLORIDA TRENCH SAFETY ACT CERTIFICATION AND DISCLOSURE STATEMENT.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CERTIFICATION OF UNDERSTANDING
(NPDES AND PPCP)
On behalf of the BIDDER named below, I am authorized, and do hereby certify, under penalty of perjury, that I understand the terms and conditions of the General National Pollutant Discharge Elimination System (NPDES) Permit that authorizes the storm water discharge activity from the construction site identified as part of this certification.
Furthermore, I am authorized, and hereby certify, that the BIDDER will hold the COUNTY harmless for any and all violations of the General NPDES Permit conditions and the Storm Water Pollution Prevention Control Plan in connection with this Project.
NAME OF BIDDER
BY:
PRINTED NAME:
TITLE:
DATE:
| NAME OF BIDDER: |
| PRINTED NAME: |
| undefined: |
| undefined_2: |
File details come from the government source that posted it. Updated .