6-G. CBI Form 3.pdf
PDF 245 KB Posted
- Attached to
- CFD Entry Level Testing and Promotional Process Administration Services State and local contract opportunity
- Solicitation number
- 269- 2026- 208
- Issued by
- Mecklenburg County, Charlotte City, North Carolina
About this file
This is a Subcontractor/Supplier Utilization Commitment Form (CBI Form 3) issued by the City of Charlotte, North Carolina, for use in the Charlotte Fire Department's Entry Level Testing and Promotional Process Administration Services contract opportunity. The form must be submitted at the time of proposal opening and serves as a certification of the proposer's commitment to utilize Minority/Women/Small Business Enterprises (M/W/SBEs) and other subcontractors and suppliers throughout all tiers of the contract. Proposers are required to list all M/W/SBEs they intend to use, including a description of work or materials and corresponding NIGP codes, as well as all non-M/W/SBE subcontractors and suppliers with their respective descriptions and NIGP commodity codes. The form includes designated fields for the MWBE, MBE, MSBE, WBE, MWSBE, and SBE goals applicable to the specific project.
Within three business days of receiving a request from the City, proposers must submit a separate Letter of Intent (CBI Form 4) executed by both the M/W/SBE and the proposer for each M/W/SBE listed on the form; failure to meet this deadline will result in the proposed M/W/SBE utilization not being counted toward the contract goal. Proposers must maintain the stated level of M/W/SBE participation throughout the contract duration, comply with replacement and termination procedures if changes are necessary, and ensure all subcontractors and suppliers are registered with the City of Charlotte's vendor database. The signature of an authorized official certifies compliance with all provisions of the CBI Policy and Administrative Procedures Manual, with failure to properly document such compliance constituting grounds for proposal rejection.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 9-I. BYRD ANTI-LOBBYING CERTIFICATION.pdf | ||
| 2-K. Pricing Worksheet - RFP 269-2026-208.xlsx | XLSX spreadsheet | |
| 5-F. Exceptions Form.pdf | ||
| 11-B. RFP 269-2026-208 - CFD Entry Level Testing and Promotional Process.pdf | ||
| 4-E. References Form.pdf | ||
| 7-J. Companys Background Response Additional Questions - RFP 269-2026-208.docx | DOCX document | |
| 8-H. CERTIFICATION REGARDING DEBARMENT.pdf | ||
| 10-C. Sample Services Contract - RFP 269-2026-208.docx | DOCX document | |
| 1-A. Bonfire Instructions Procurement Portal FINAL.pdf | ||
| 3-D. Proposal Submission Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version 06-2023
CBI FORM 3: Subcontractor / Supplier Utilization Commitment This form MUST be submitted at the time of Proposal Opening. Copy this CBI Form 3 as needed.
Failure to properly complete and submit Form 3 with the Proposal constitutes grounds for rejection of the Proposal.
Per Section 3.5 of the CBI Administrative Procedures Manual, the Subcontractor/Supplier Utilization Commitment (CBI Form 3), captures information regarding the MWSBEs and other subcontractors and suppliers that the Proposer intends to use on the Contract FOR ALL TIERS.
M/W/SBEs must satisfy the requirements of Section 2 of the CBI Administrative Procedures Manual in order to count the work they intend to perform on the contract with its own current workforces towards the Contract Goal, and must list themselves below.
Proposer Name:
Project Name:
MWBE Goal: MBE Goal:
MSBE Goal: WBE Goal:
MWSBE Goal: SBE Goal:
List below all M/W/SBEs that you intend to use on this Contract. NOTE: You will only receive credit for M/W/SBEs that are currently certified with the City as of the Proposal Opening Date.
M/W/SBE Vendor Name (Non-Hauling Services) Description of work / materials NIGP Code
CBI FORM 3: Subcontractor / Supplier Utilization Commitment
List below all non-M/W/SBEs (subcontractors and suppliers) that you intend to use on this Contract
Vendor Name Description of work / materials NIGP Commodity Code
Version 06-2023
Letters of Intent submitted upon notice from the City Per Section 3.5 of the CBI Administrative Procedures Manual, within three (3) Business Days after receiving a request from the City (or within such longer time as may be communicated by the City in writing), Proposers must submit a separate Letter of Intent (CBI Form 4) for each M/W/SBE listed on CBI Form 3. Each Letter of Intent must be executed by both the M/W/SBE and the Proposer. The City shall not count proposed M/W/SBE utilization for which it has not received a Letter of Intent by this deadline. The Proposer is still obligated to pay the M/W/SBE the full amount listed on the Contract with the M/W/SBE regardless of what percentage is actually counted towards the M/W/SBE Goal.
Adding subcontractors or suppliers after submitting this form Nothing in this certification shall be deemed to preclude you from entering into subcontracting arrangements after submission of this form. However, per the CBI Administrative Procedures Manual, you must comply with the following:
• You must maintain the level of M/W/SBE participation stated in the Contract throughout the duration of the Contract, except as specifically allowed in Section 5
• If you need to terminate or replace a M/W/SBE, you must comply with Section 5.3
• If the scope of work on the Contract increases, or if you elect to subcontract any portion of work not identified on this form as being subcontracted, then you must comply with Section 5.4
• A Letter of Intent (CBI Form 4) must also be submitted for each M/W/SBE you add subsequent to contract award.
All Subcontractors and Suppliers must be registered with the City of Charlotte.
Pursuant to the City’s Vendor Registration Policy, each subcontractor or supplier (non-MBE/SBE, WBEs, SBEs and MBEs) that you use on this contract must be registered in the City’s vendor database.
Signature Your signature below indicates that the undersigned firm certifies and agrees that:
(a) It has complied with all provisions of the CBI Policy and Administrative Procedures Manual; and,
(b) Failure to properly document such compliance in the manner and within the time periods established by the CBI Policy and
Administrative Procedures Manual shall constitute grounds for rejection of your proposal.
Signature of Authorized Official Printed Name Title Submittal Date
File details come from the government source that posted it. Updated .