6-26-22 Attachment C Plans.pdf

PDF 3 MB Posted

Attached to
Terminal Building Standby Generator Project
Solicitation number
26-22
Issued by
Brazoria County, Amarillo City, Texas

About this file

This file contains the architectural and engineering plans for the Terminal Building Standby Generator Project at Texas Gulf Coast Regional Airport in Brazoria County, Angleton, Texas. The project is being undertaken by Brazoria County and involves the installation of a 300 kilowatt diesel-powered standby generator system to provide backup power to the airport terminal and Fixed Base Operator (FBO) support hangar. The plans include civil, electrical, and structural design details prepared by KSA Engineering, a Pape-Dawson company, with the civil work designed by Craig H. Phipps, P.E. and electrical systems designed by R. Cole Ferguson, P.E. The project scope encompasses the installation of a Kohler 300REOZJ or approved equivalent diesel generator with a weather and sound enclosure mounted on a reinforced concrete foundation, a 48-hour diesel sub-base fuel tank, generator maintenance concrete pads, and new automatic transfer switches (ATS-1 and ATS-2) to manage power distribution between utility service and generator output. The electrical infrastructure includes new three-inch conduit pathways, 400-amp and 200-amp disconnect breakers, and connections to existing electrical panels within the terminal building and hangar facilities.

The construction plans establish comprehensive requirements for contractor operations at the active airport facility, including a mandatory 72-hour advance notice to the airport and engineer before commencing construction activities, issuance of a Notice to Airmen (NOTAM), and strict adherence to airport security protocols. The contractor is responsible for obtaining all necessary permits from the City of Angleton and Brazoria County prior to construction, providing their own project office and temporary facilities, and bearing all costs associated with utility locating, dewatering, site restoration, and repair of any damage to existing airport infrastructure. Environmental compliance requirements include investigation for migratory birds and nesting activity, proper handling of hazardous waste, and adherence to wetlands protection regulations. The plans indicate construction must minimize disruption to airport operations, with all utility interruptions coordinated with a minimum 72-hour advance notice and electric service interruptions restricted to 10:00 p.m. to 6:00 a.m. hours. The generator foundation design requires over-excavation to a minimum of four feet below existing grade with compaction to 95 percent standard Proctor specifications, and the contractor must verify all underground utility locations before excavation begins. Upon project completion, all temporary work areas, haul routes, and stockpile locations must be restored to original or better condition at no additional cost to the owner.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCATION MAP

PROJECT

LOCATION

COUNTY JUDGE

L.M. "MATT" SEBESTA, JR

COUNTY COMMISIONERS

JAY BURRIDGE PRECINCT 1

RYAN CADE PRECINCT 2

STACY ADAMS PRECINCT 3

DAVID LINDER PRECINCT 4

COUNTY CLERK

JOYCE HUDMAN

DIRECTOR OF AVIATION

JEFF BILYEU, A.A.E.

VICINITY MAP

TEXAS GULF COAST REGIONAL AIRPORT

BRAZORIA COUNTY ~ ANGLETON, TEXAS

TERMINAL BUILDING

STANDBY GENERATOR PROJECT

T

EX

AS

G

UL

F

CO

AS

T

RE

GI

ON

AL

A

IR

PO

RT

T

ER

MI

NA

L B

UI

LD

IN

G

ST

AN

DB

Y

GE

NE

RA

TO

R

PR

OJ

EC

T

A

NG

LE

TO

N, T

EX

AS

(B

RA

ZO

RI

A

CO

UN

TY

\\ksa.net\gateway\Projects\104132\008 CAD\30 Sheets\02 Civil\104132-C-GI-0001-COVR.dwg : KSA COVER SHEET

OCTOBER 2025

ISSUED FOR BID

a Pape-Dawson company

Q

2107 CityWest Boulevard, Third Floor Houston, TX 77042

T. 281-494-3252 www.ksaeng.com

INDEX OF SHEETS

CIVIL

C01 COVERSHEET / INDEX OF SHEETS

C02 PROJECT LAYOUT

C03 GENERATOR FOUNDATION DETAILS

C04 GENERATOR MAINTENANCE CONCRETE DETAILS

ELECTRICAL

EG100 STANDBY GENERATOR OVERALL PLAN

EG101 STANDBY GENERATOR LAYOUT PLAN

EG201 ELECTRICAL ONE-LINE DIAGRAM

EG202 ELECTRICAL ELEVATIONS

a Pape-Dawson company

TBPE FIRM REGISTRATION No. F-1356

SUBMITTED BY:

CRAIG H. PHIPPS, P.E.

SENIOR VICE PRESIDENT CIVIL

ELECTRICAL

TBPE FIRM REGISTRATION No. F-6864

SUBMITTED BY:

R. COLE FERGUSON, P.E.

PROJECT ENGINEER

MH

M H

C.

O.

W M

C.

O.

C.

O.

C.

O.

C.

O.

C.

O.

C.

O.

C.

O.

PR

O

JE

C

T

LA

YO

U

T

C02

LEGEND

EXISTING FEATURES

EXIST. BUILDING / STRUCTURES

AIRPORT PROPERTY LINE

BENCHMARK - TEMPORARY

BENCHMARK - IRON RODIR

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-1356

SHEET NO.

M

AR

K R

EV

IS

IO

N

D

AT

E

\\K

SA

.N

ET

\G

AT

EW

AY

\P R

O

JE

C

TS

\1

2\

C

AD

\3

SH

EE

TS

\0

C

IV

IL

\ 1

2-

C -L

O -0

2-

PR

O

J.

D

W G

PR

O

JE

C T

LA

YO

U T

| 8 /1

9/

1:

P M

LA

ST

S

AV

ED

B Y:

N M

IK

EL

L

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

N M

TE

XA

S G

U

LF

C O

AS

T

R

EG

IO

N

AL

A

IR

PO

R T

TE

R

M

IN

AL

B

U

IL

D

IN

G S

TA

N

D

BY

G

EN

ER

AT

O R

P R

O

JE

C T

BR

AZ

O R

IA

C

O U

N

TY

, T

EX

AS

T

EX

AS

G

UL

F

CO

AS

T

RE

GI

ON

AL

A

IR

PO

RT

T

ER

MI

NA

L B

UI

LD

IN

G

ST

AN

DB

Y

GE

NE

RA

TO

R

PR

OJ

EC

T

AN

GL

ET

ON

, T

EX

AS

(B

RA

ZO

RI

A

CO

UN

TY

D C

M

/0

3/

C ity W es t B ou le va rd

, T hi rd F lo or

H ou st on

, T X

T.

1-

4-w w w .k sa en g.

co m a Pa pe -D aw so n co m pa ny

20 20 40

GRAPHIC SCALE IN FEET

TERMINAL BUILDING

EXISTING HANGAR

TERMINAL BUILDING

PARKING LOT

AIRPORT WAY

SECURITY FENCE

GENERATOR COORDINATES

NO. NORTHING EASTING

13604869.2080 3098977.5177

13604868.6001 3098958.1973

13604874.0174 3098958.0268

13604874.6253 3098977.3473

NOTE: THE COORDINATES ABOVE ARE

BASED ON A KOHLER INDUSTRIAL DIESEL

GENERATOR SET WHOSE L=18' - 4" AND

W = 4' - 5". PLEASE ADVISE ENGINEER IF

THERE ARE ANY CHANGES TO THE

DIMENSIONS STATED ABOVE SO THAT

UPDATED COORDINATES CAN BE

PROVIDED.

20.0'58.4'

15.0'

SIDEWALK

SANITARY SEWER LINE

OIL WATER SEPARATOR

STORM WATER

GRATE INLET

PROPOSED GENERATOR

EXISTING WATER LINE

GENERAL NOTES:

1. CONSTRUCTION EQUIPMENT AND VEHICLES SHALL NOT EXCEED 15 MPH WITHIN THE AIRPORT PROPERTY. ANY PERSONNEL

WHO EXCEED THE AFOREMENTIONED SPEED LIMIT WILL BE BANNED FROM THE AIRPORT INDEFINITELY.

2. THE CONTRACTOR MUST PROVIDE A MINIMUM OF 72 HOURS NOTICE TO THE AIRPORT AND ENGINEER, PRIOR TO BEGINNING

CONSTRUCTION ACTIVITIES. A NOTICE TO AIRMEN (NOTAM) SHALL BE ISSUED.

3. VEHICLE IDENTIFICATION AND PARKING: (A) CONTRACTOR VEHICLES AND EQUIPMENT SHALL BE IDENTIFIED BY FLAGS

AND/OR AMBER FLASHING LIGHTS. (B) EMPLOYEE PARKING SHALL ONLY BE IN THE CONTRACTOR'S STAGING AND STORAGE

AREA.

4. ALL EQUIPMENT AND MATERIALS SHALL BE STORED IN THE CONTRACTORS STAGING AND STORAGE AREA WHEN NOT IN USE.

EQUIPMENT AND MATERIALS SHALL NOT ENCROACH UPON ACTIVE OPERATIONAL AREAS. MINIMUM CLEARANCES SHALL BE MAINTAINED ON RUNWAYS IN ACCORDANCE WITH PART 77 OF THE FEDERAL AVIATION REGULATIONS.

5. ALL EXCAVATIONS, OPEN TRENCHES AND STOCKPILED MATERIAL AT THE CONSTRUCTION SITE SHALL BE PROMINENTLY MARKED WITH FLAGS AND LIGHT UNITS ACCEPTABLE TO THE ENGINEER DURING HOURS OF RESTRICTED VISIBILITY OR

DARKNESS.

6. AIRPORT SECURITY IS OF UTMOST IMPORTANCE. THE CONTRACTOR SHALL SUPPLY HIS OWN LOCK FOR ACCESS GATES, AND SHALL KEEP THE GATES LOCKED OR GUARDED AT ALL TIMES, EXCEPT FOR THE BRIEF PERIOD REQUIRED FOR PASSAGE

OF AUTHORIZED VEHICLES OR EQUIPMENT.

7. EACH CONSTRUCTION AREA SHALL BE SHAPED TO ALLOW DRAINAGE OF SURFACE WATER DURING EACH WORK OPERATION.

THE CONTRACTOR SHALL PUMP SURFACE WATER IMMEDIATELY FROM EACH CONSTRUCTION AREA AFTER EACH RAIN. THE

COST OF DEWATERING SHALL BE SUBSIDIARY TO CONSTRUCTION ACTIVITIES.

8. STOCKPILE LOCATION SHALL BE ADJUSTED IN THE FIELD AND COORDINATED WITH THE ENGINEER. STOCKPILE SHALL NOT CREATE ANY PONDING OF WATER OR ALTER DRAINAGE PATTERNS OF THE AIRPORT PROPERTY EXCEPT AS SHOWN IN

THESE PLANS.

9. ALL WASTE OR SPOIL MATERIAL SHALL BE DISPOSED OF OFF THE AIRPORT PROPERTY BY THE CONTRACTOR, UNLESS

OTHERWISE NOTED.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO AIRPORT FACILITIES INCLUDING BUT NOT LIMITED TO EXISTING PAVEMENTS, UNDERGROUND CABLES, LIGHTS, SIGNS, BUILDINGS, PIPELINES, ETC. ENCOUNTERED DURING CONSTRUCTIONS. ALL REPAIRS MUST BE MADE TO EQUAL OR BETTER QUALITY AND IN COMPLIANCE WITH CITY OF ANGLETON, BRAZORIA COUNTY, AIRPORT MANAGEMENT, AND THE ENGINEER. ALL REPAIR AND REPLACEMENT COSTS SHALL

BE AT THE EXPENSE OF THE CONTRACTOR.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND ACQUIRING AN ACCEPTABLE WATER SOURCE AS REQUIRED FOR CONSTRUCTION. CITY WATER IS AVAILABLE ON AIRPORT PROPERTY NEAR THE CONSTRUCTION SITE. CONTACT THE CITY OF ANGLETON FOR REQUIREMENTS FOR USING CITY WATER. THE CONTRACTOR SHOULD CHECK WITH THE CITY OF ANGLETON PRIOR TO PREPARING BID IN ORDER TO DETERMINE ANY COST FOR WATER USED. NO DIRECT PAY PROVIDED IN

BID PROPOSAL.

12. ALL TRAFFIC CONTROL DEVICES AND WARNING SIGNS SHALL BE IN ACCORDANCE WITH TEXAS MANUAL ON UNIFORM

TRAFFIC CONTROL DEVICES. NO DIRECT PAY.

13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING HIS OWN PROJECT OFFICE, TOILET FACILITIES AND OTHER NECESSARY BUILDINGS OR SHELTERS. THE AIRPORT WILL NOT PROVIDE FACILITIES TO THE CONTRACTOR DURING

CONSTRUCTION.

14. THE CONTRACTOR, ON BEHALF OF THE OWNER, WILL OBTAIN ALL PERMITS REQUIRED BY THE CITY OF ANGLETON AND/OR

BRAZORIA COUNTY, TEXAS PRIOR TO STARTING CONSTRUCTION.

15. THE CONTRACTOR SHALL ANTICIPATE ALL UNDERGROUND OBSTRUCTIONS SUCH AS, BUT NOT LIMITED TO, WATER MAINS, GAS LINES, STORM AND SANITARY SEWERS, TELEPHONE OR ELECTRIC LIGHT OR POWER DUCTS, CONCRETE, AND DEBRIS.

ANY SUCH LINES OR OBSTRUCTIONS INDICATED ON THE DRAWINGS SHOW ONLY THE APPROXIMATE LOCATIONS AND SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR. THE OWNER AND ENGINEER WILL ENDEAVOR TO FAMILIARIZE THE CONTRACTOR WITH ALL KNOWN UTILITIES AND OBSTRUCTIONS, BUT THIS SHALL NOT RELIEVE THE CONTRACTOR FROM FULL RESPONSIBILITY IN ANTICIPATING ALL UNDERGROUND OBSTRUCTIONS WHETHER OR NOT SHOWN ON THE DRAWINGS.

16. THE CONTRACTOR SHALL AT HIS OWN EXPENSE, MAINTAIN IN PROPER WORKING ORDER AND WITHOUT INTERRUPTION OF SERVICE ALL EXISTING UTILITIES AND SERVICES WHICH MAY BE ENCOUNTERED IN THE WORK. WITH THE CONSENT OF THE ENGINEER AND UTILITY OWNER SUCH SERVICE CONNECTIONS MAY BE TEMPORARILY INTERRUPTED TO PERMIT THE CONTRACTOR TO REMOVE DESIGNATED LINES OR TO MAKE TEMPORARILY CHANGES IN THE LOCATIONS OF SERVICES. THE COST OF MAKING ANY CHANGES SHALL BE AT THE CONTRACTOR'S EXPENSE. ANY INTERRUPTIONS OF EXISTING UTILITIES SHALL BE COORDINATED A MINIMUM OF 72-HOURS IN ADVANCED WITH THE ENGINEER AND AIRPORT. INTERRUPTIONS OF THE AIRPORTS ELECTRIC SERVICE SHALL BE PERFORMED BETWEEN THE HOURS OF 10 PM - 6 AM.

17. THE CONTRACTOR SHALL AT HIS OWN EXPENSE, NOTIFY ALL UTILITY COMPANIES INVOLVED TO HAVE THEIR UTILITIES LOCATED AND MARKED IN THE FIELD. ALL UNDERGROUND UTILITIES SHALL THEN BE UNCOVERED TO VERIFY LOCATION AND ELEVATION BEFORE CONSTRUCTION BEGINS AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL COORDINATE WITH UTILITY OWNER IF UTILITY INSPECTOR MUST BE ON SITE WHEN LOCATING OR EXCAVATING NEAR UTILITIES. CONTRACTOR TO VERIFY UTILITY LOCATIONS AND DEPTH. IF LOCATIONS AND DEPTH ARE DIFFERENT FROM WHAT IS SHOWN ABOVE OR INTERFERE WITH INSTALLATION OF PROPOSED COMPONENTS, CONTRACTOR TO NOTIFY

ENGINEER IMMEDIATELY.

18. THE CONTRACTOR SHALL INSTALL SHEETING AND BRACING NECESSARY TO SUPPORT THE SIDES OF TRENCHES AND OTHER EXCAVATIONS WITH VERTICAL SIDES, AS REQUIRED BY CURRENT OSHA REGULATIONS. COST OF SHEETING AND BRACING

SHALL BE SUBSIDIARY TO CONSTRUCTION ACTIVITIES.

19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL HORIZONTAL AND VERTICAL CONSTRUCTION STAKING AS REQUIRED

FOR THE PROJECT DEVELOPMENT.

20. EACH WEEK THE CONTRACTOR SHALL SUBMIT HIS CONSTRUCTION WORK SCHEDULE TO THE ENGINEER, PROJECTING HIS

UPCOMING WORK FOR THE NEXT THREE WEEKS.

21. THE CONTRACTOR SHALL VIDEO TAPE THE ENTIRE WORK AREA AFTER THE PRE-CONSTRUCTION MEETING AND PRIOR TO MOBILIZATION OF PERSONNEL AND EQUIPMENT. THE CONTRACTOR SHALL PROVIDE ONE (1) COPY OF THE VIDEO TAPE(S) TO THE ENGINEER. IN AREAS WHERE CONSTRUCTION EQUIPMENT CROSSES EXISTING PAVEMENTS, THE CONTRACTOR SHALL TAKE PICTURES OR VIDEO OF THE PAVEMENT PRIOR TO COMMENCING OPERATIONS. THE CONTRACTOR SHALL PROVIDE THE ENGINEER WITH ONE COPY OF EACH OF THE PHOTOGRAPHS AND VIDEO TAPE(S) TAKEN. THIS DOCUMENTATION SHALL BE USED TO DETERMINE THE AMOUNT OF DAMAGE, IF ANY, CAUSED TO THE PAVEMENTS BY THE CONSTRUCTION EQUIPMENT CROSSINGS AND THE QUALITY OF CONSTRUCTION WHICH SHALL BE REQUIRED FOR THE

REPAIRS.

22. CONSTRUCTION WORKERS WILL NOT BE ALLOWED TO ESTABLISH OVERNIGHT RESIDENCE ON THE PREMISES. ALL CONSTRUCTION WORKERS SHALL LEAVE THE CONSTRUCTION SITE AT THE END OF THEIR WORK PERIOD.

23. THE CONTRACTOR'S PROJECT SUPERINTENDENT MUST BE ON SITE DURING ALL WORK ACTIVITIES BY EITHER THE

CONTRACTOR'S PERSONNEL OR BY ANY SUB-CONTRACTOR.

24. DELIVERIES: ALL DELIVERIES MUST BE COORDINATED BY THE CONTRACTOR, TO BE DELIVERED TO THE CONTRACTOR'S TRAILER OR JOBSITE. AIRPORT STAFF WILL NOT SIGN FOR ANY DELIVERIES, NO DELIVERIES MAY BE MADE TO THE AIRPORT TERMINAL OR ANY AIRPORT BUILDING. CONTRACTOR MUST GIVE EXPLICIT DELIVERY INSTRUCTIONS, AS THERE MAY BE MANY SEPARATE PROJECTS UNDER CONSTRUCTION ON THE AIRPORT AT ANY GIVEN TIME. CONTRACTOR SHALL ALSO INSTALL SUFFICIENT SIGNAGE ALONG HIGHWAY 6 TO INDICATE THE APPROPRIATE PATH THAT CONTRACTOR PERSONNEL, EQUIPMENT DELIVERIES, AND MATERIAL DELIVERIES SHALL TAKE. ADDITIONALLY, CONTRACTOR IS RESPONSIBLE FOR PLACING SIGNAGE AT THE TERMINAL ENTRANCE DRIVE INDICATE THAT "CONSTRUCTION TRAFFIC AND CONSTRUCTION

DELIVERIES ARE NOT ALLOWED BEYOND THIS POINT".

25. EMERGENCY CONTACT NUMBERS: CONTRACTOR WILL PROVIDE ENGINEER A LIST OF CONTACT NUMBERS, IN CASE OF

AFTER-HOURS EMERGENCIES AT THE SITE.

26. A PRECONSTRUCTION COORDINATION MEETING SHALL BE HELD WITH THE CITY, COUNTY, AIRPORT AND ENGINEER, ON THE

SITE PRIOR TO START OF CONSTRUCTION.

27. CONTRACTOR TO PROVIDE SUBMITTALS TO ENGINEER FOR REVIEW OF ALL EQUIPMENT AND MATERIALS THAT WILL BE

INCORPORATED INTO THE PROJECT.

ENVIRONMENTAL NOTES:

1. IN THE EVENT THAT UNANTICIPATED ARCHEOLOGICAL DEPOSITS ARE ENCOUNTERED DURING CONSTRUCTION, WORK IN THE

IMMEDIATE AREA WILL CEASE AND THE TxDOT PROJECT MANAGER WILL BE CONTRACTED TO COORDINATE WITH PROFESSIONAL ARCHEOLOGISTS TO INITIATE POST-REVIEW DISCOVERY PROCEDURES UNDER THE PROVISIONS OF 36 CRF 800.13.

2. STOCKPILES AND STAGING AREAS WILL NOT BE PLACED WITHIN ANY WATER OF THE UNITED STATES, INCLUDING WETLANDS.

3. HAZARDOUS WASTE: ALL SPILLS MUST BE REPORTED IMMEDIATELY TO THE ENGINEER.

4. CONTRACTOR SHALL INVESTIGATE THE PROJECT AREA FOR ANY STRUCTURES CONTAINING MIGRATORY BIRDS OR

INDICATIONS OF NESTING MIGRATORY BIRDS PRIOR TO CONSTRUCTION. MIGRATORY BIRDS MAY ARRIVE IN THE PROJECT AREA TO BREED DURING CONSTRUCTION OF THE PROPOSED PROJECT. THE CONTRACTOR SHALL TAKE MEASURES TO AVOID THE TAKE OF MIGRATORY BIRDS, THEIR OCCUPIED NESTS, EGGS, OR YOUNG, IN ACCORDANCE WITH THE MIGRATORY

BIRD TREATY ACT, THROUGH PHASING OF WORK OR PREVENTATIVE MEASURES.

ACCESS ROUTE NOTES:

1. DAMAGE TO EXISTING PAVEMENTS WHICH IS CAUSED BY THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED TO

ORIGINAL OR BETTER CONDITION AT NO EXPENSE TO THE OWNER.

2. THE PAVEMENT ON THE ACCESS ROUTES MAY NOT SUPPORT CONSTRUCTION TRAFFIC. THE CONTRACTOR SHALL LIMIT

LOADS AS NECESSARY TO PREVENT DAMAGE OR SHALL INCLUDE IN HIS BID ADEQUATE BUDGET TO REPAIR DAMAGE TO

PAVEMENT.

3. CONTRACTOR SHALL KEEP PAVEMENTS FREE OF DEBRIS AT ALL TIMES. FAILURE TO MAINTAIN PAVEMENTS FREE OF DEBRIS

SHALL RESULT IN A STOP WORK ORDER TO BE ISSUED.

EXISTING UTILITY & PIPELINE NOTES:

1. TYPE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE

CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATIONS AS TO TYPE AND LOCATION OF UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL PROTECT EXISTING UTILITIES DURING CONSTRUCTION AND SHALL REPAIR ALL

DAMAGES TO SAID UTILITIES AT NO EXPENSE TO THE OWNER.

2. CONTRACTOR SHALL VERIFY LOCATION OF UNDERGROUND UTILITY LINES AND SHALL NOTIFY THE FOLLOWING AGENCIES 48

HOURS PRIOR TO EXCAVATING NEAR EXISTING FACILITIES:

TEXAS ONE-CALL SYSTEMS

DIGTESS 1-800-344-8377

LONE STAR NOTIFICATION 1-800-669-8344

TEXAS ONE CALL 1-800-245-4545

ONE CALL SYSTEM OF TEXAS 1-800-545-6005

NATIONAL ONE-CALL 8-1-1

DEMOBILIZATION NOTES:

1. CONDITIONS OF THE PROJECT AREA UPON COMPLETION OF THE JOB SHALL BE AS GOOD AS OR BETTER THAN THE

CONDITIONS PRIOR TO STARTING WORK, IN ADDITION TO THE WORK ITEMS LISTED.

2. THE PROJECT AREA SHALL BE FREE OF ANY CONTRACTOR STOCKPILE MATERIALS UPON COMPLETION OF THE JOB UNLESS

OTHERWISE DIRECTED BY THE ENGINEER.

3. UPON COMPLETION OF THE PROJECT, ALL THE HAUL ROUTES SHALL BE PROPERLY CLEANED TO PREVENT OBSTRUCTION

AND/OR CAUSE INCONVENIENCE TO NORMAL REGULAR TRAFFIC. ALL TEMPORARY HAUL ROUTES SHALL BE REMOVED AND

BROUGHT BACK TO ORIGINAL CONDITION OR BETTER AT NO ADDITIONAL COST TO THE OWNER.

4. ANY PROPERTIES BELONGING TO THE AIRPORT SHALL BE RETURNED TO THE AIRPORT.

5. PROPER DRAINAGE (NO LOCALIZED PONDING) SHALL BE MAINTAINED, PRIOR TO, DURING AND AFTER DEMOBILIZATION.

6. DEMOBILIZATION SHALL BE COMPLETED TO THE SATISFACTION OF THE ENGINEER AND AIRPORT MANAGEMENT.

7. DEMOBILIZATION SHALL BE COMPLETED IN A MANNER THAT WILL MINIMIZE ANY INCONVENIENCE TO AIRPORT OPERATIONS.

8. ANY DAMAGE TO THE AIRPORT PROPERTIES DURING DEMOBILIZATION SHALL BE REPAIRED AND PAID FOR AT THE

CONTRACTOR'S OWN EXPENSE.

9. SAFETY REGULATIONS SHALL REMAIN IN EFFECT DURING DEMOBILIZATION.

SI

D

EW

AL

K

AutoCAD SHX Text X

H

C.

O.

W M

C.

O.

C.

O.

C.

O.

C.

O.

C.

O.

C.

O.

C.

O.

G

EN

ER

AT

O R

FO

U

N D

AT

IO

N D

ET

AI

LS

C03

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-1356

SHEET NO.

M

AR

K R

EV

IS

IO

N

D

AT

E

\\K

SA

.N

ET

\G

AT

EW

AY

\P R

O

JE

C

TS

\1

2\

C

AD

\3

SH

EE

TS

\0

C

IV

IL

\ 1

2-

C -L

O -0

2-

PR

O

J.

D

W G

G

EN

ER

AT

O

R F

O U

N D

AT

IO

N D

ET

/1

9/

1:

P M

LA

ST

S

AV

ED

B Y:

N M

IK

EL

L

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

N M

TE

XA

S G

U

LF

C O

AS

T

R

EG

IO

N

AL

A

IR

PO

R T

TE

R

M

IN

AL

B

U

IL

D

IN

G S

TA

N

D

BY

G

EN

ER

AT

O R

P R

O

JE

C T

BR

AZ

O R

IA

C

O U

N

TY

, T

EX

AS

T

EX

AS

G

UL

F

CO

AS

T

RE

GI

ON

AL

A

IR

PO

RT

T

ER

MI

NA

L B

UI

LD

IN

G

ST

AN

DB

Y

GE

NE

RA

TO

R

PR

OJ

EC

T

AN

GL

ET

ON

, T

EX

AS

(B

RA

ZO

RI

A

CO

UN

TY

D C

M

/0

3/

C ity W es t B ou le va rd

, T hi rd F lo or

H ou st on

, T X

T.

1-

4-w w w .k sa en g.

co m a Pa pe -D aw so n co m pa ny

20 20 40

GRAPHIC SCALE IN FEET

TERMINAL BUILDING

TERMINAL BUILDING

PARKING LOT

AIRPORT WAY

20.0'58.4'

15.0'

PROPOSED GENERATOR

(REFER TO ELECTRICAL)

EXISTING WATER LINE

NOTES:

1. THE SIZE OF THE FOUNDATION FOR THE GENERATOR IS DIMENSIONED IN A WAY SO THAT THE FOOTPRINT OF

THE FOUNDATION IS 1' LARGER IN LENGTH AND WIDTH THAN THE GENERATOR ITSELF. IF THE DIMENSION OF THE GENERATOR VARY FROM 18' - 4" X 4' - 5", NOTIFY ENGINEER SO NECESSARY ADJUSTMENTS CAN BE MADE.

2. CONTRACTOR SHALL OVER EXCAVATE MINIMUM OF 4'-0" BELOW EXISTING GRADE. PLACE SELECT FILL IN 6" LIFTS WITH COMPACTION EQUAL TO 95% STANDARD PROCTOR TO RESTORE GRADE BELOW GENERATOR

FOUNDATION.

3. SELECT FILL SHALL BE FREE OF ORGANIC OR OTHER DELETERIOUS MATERIALS, HOMOGENOUS MIXTURES, HAVING A MAX. PARTICLE SIZE OF 3", HAVE LESS THAN 35 AND A PI BETWEEN 7 AND 15, CONSISTING OF SILTY-CLAYEY SANDS (SM-SC), LOW PLASTICITY CLAYS (CL), OR CLAYEY SANDS (SC) OR CLAYEY SAND (SC) OR TxDOT ITEM 247 FLEXIBLE BASE, TYPE A, GRADE 1-2 COMPACTED TO 100% OF MAXIMUM DRY DENSITY AS DETERMINED BY TEX-113-E AT OPTIMUM MOISTURE. SELECT FILL SHALL BE COMPACTED TO 95% STANDARD

PROCTOR AT ±2% OPTIMUM MOISTURE.

4. IF SOFT SUBGRADE SOILS ARE ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL USE 3" X 5" CRUSHED CONCRETE TO STABILIZE THE SUBGRADE PRIOR TO PLACING SELECT FILL. 3" X 5" CRUSHED CONCRETE SHALL NOT BE PAID FOR DIRECTLY, BUT WILL BE CONSIDERED SUBSIDIARY TO THE VARIOUS BID

ITEMS.

5. CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 4,000 PSI, AND COMPLY WITH CLASS C

TX421 SPECIFICATION.

6. REINFORCING STEEL ASTM A 615, GRADE 60. ALL BARS SECURELY HELD IN ACCURATE POSITION BY SUITABLE

ACCESSORIES, TIE BARS, SUPPORT BARS, ETC.

7. MINIMUM CONCRETE COVER PROTECTION FOR REINFORCING BARS SHALL BE 2 INCHES: BOARD FORMED SIDES, 3 INCHES: EARTH FORMED SIDES, 3 INCHES: BOTTOM, 2 INCHES: TOP.

8. MOUNT GENERATOR TO FOUNDATION IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION.

CONTRACTOR SHALL PROVIDE ANCHORING AND MOUNTING DETAIL IN ACCORDANCE WITH GENERATOR

MANUFACTURER RECOMMENDATIONS FOR APPROVAL BY THE ENGINEER PRIOR TO CONSTRUCTION.

CONTRACTOR SHALL ENSURE GENERATOR FOUNDATION PROVIDED IS COMPATIBLE WITH THE CHOSEN MANUFACTURERS ANCHORING AND MOUNTING PLAN PRIOR TO CONSTRUCTION. IF THE MANUFACTURERS ANCHORING AND MOUNTING PLAN IS NOT COMPATIBLE, THE CONTRACTOR SHALL SUBMIT AN ALTERNATE FOUNDATION DESIGNED BY A TEXAS PROFESSIONAL ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION.

CONTRACTOR MAY SUBMIT ALTERNATE MANUFACTURER APPROVED FOUNDATION DESIGN FOR APPROVAL BY

THE ENGINEER.

GENERATOR FOUNDATION DETAIL

N.T.S.

19' - 4"

5' - 5"

1'-6"

2'-6"

8"

#3 STIRRUPS

@ 12" O.C.

3 - #6 BARS, TOP

AND BOTTOM

#4 BARS @

12" O.C.E.W.

#4 DOWELS @ 12" O.C.

(TYP. ALL SIDES) #3 STIRRUPS

@ 12" O.C.

SECTION A-A & B-B

PLAN VIEW

A

A

BB

1'-3"

1' -3

3' 3'

2" (TYP.)

4'-0" (MINIMUM)

1'-6"

3 - #6 BARS, TOP AND BOTTOM

6" COMPACTED

SELECT FILL

6" COMPACTED

SELECT FILL

6" COMPACTED

SELECT FILL

1-1/2" (TYP.) GENERATOR MAINTENANCE

CONCRETE @ -1.0% SLOPE,

WIDTH = 3'

GENERATOR MAINTENANCE

CONCRETE @ -1.0% SLOPE,

WIDTH = 3'

PROPOSED AUTOMATIC

TRANSFER SWITCH

REPLACEMENT

(REFER TO ELECTRICAL)

SI

D

EW

AL

K

EXISTING HANGAR

SECURITY FENCESIDEWALK

SANITARY SEWER LINE

OIL WATER SEPARATOR

STORM WATER

GRATE INLET

LEGEND

EXISTING FEATURES

EXIST. BUILDING / STRUCTURES

AIRPORT PROPERTY LINE

BENCHMARK - TEMPORARY

BENCHMARK - IRON RODIR

H

C.

O.

W M

C.

O.

C.

O.

C.

O.

C.

O.

C.

O.

C.

O.

C.

O.

G

EN

ER

AT

O R

M

AI

N

TE

N

AN

C E

C O

N C

R

ET

E D

ET

AI

LS

C04

20.0'58.4'

15.0'

PROPOSED GENERATOR

MAINTENANCE CONCRETE

EXISTING WATER LINE

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-1356

SHEET NO.

M

AR

K R

EV

IS

IO

N

D

AT

E

\\K

SA

.N

ET

\G

AT

EW

AY

\P R

O

JE

C

TS

\1

2\

C

AD

\3

SH

EE

TS

\0

C

IV

IL

\ 1

2-

C -L

O -0

2-

PR

O

J.

D

W G

G

EN

ER

AT

O

R M

AI

N

TE

N

AN

C

E

PA

D D

ET

/1

9/

1:

P M

LA

ST

S

AV

ED

B Y:

N M

IK

EL

L

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

N M

TE

XA

S G

U

LF

C O

AS

T

R

EG

IO

N

AL

A

IR

PO

R T

TE

R

M

IN

AL

B

U

IL

D

IN

G S

TA

N

D

BY

G

EN

ER

AT

O R

P R

O

JE

C T

BR

AZ

O R

IA

C

O U

N

TY

, T

EX

AS

T

EX

AS

G

UL

F

CO

AS

T

RE

GI

ON

AL

A

IR

PO

RT

T

ER

MI

NA

L B

UI

LD

IN

G

ST

AN

DB

Y

GE

NE

RA

TO

R

PR

OJ

EC

T

AN

GL

ET

ON

, T

EX

AS

(B

RA

ZO

RI

A

CO

UN

TY

D C

M

/0

3/

C ity W es t B ou le va rd

, T hi rd F lo or

H ou st on

, T X

T.

1-

4-w w w .k sa en g.

co m a Pa pe -D aw so n co m pa ny

20 20 40

GRAPHIC SCALE IN FEET

TERMINAL BUILDING

TERMINAL BUILDING

PARKING LOT

AIRPORT WAY

0.75" EXP. JOINT FILLER & JOINT

SEALER. SLOPE 0.25" PER FOOT

4.

5"

2"

FACE OF GENERATOR FOUNDATION

COMPACTED SUBGRADE

2" COMPACTED BANK SAND BASE

TOOLED EDGE

2" COMPACTED BANK SAND BASE

COMPACTED SUBGRADE

4.

5"

2"

4.

5"

2"

COMPACTED SUBGRADE

2" COMPACTED BANK SAND BASE

(NO SEPARATE PAY)

#3 BARS @ 18" E.W.

4.

5"

2"

COMPACTED SUBGRADE

2" COMPACTED BANK SAND BASE

(SUBSIDIARY TO SIDEWALK)

4,000 PSI CONCRETE

0.5" DEEP x 0.25" WIDE TOOLED JOINT

SPACED EQUALLY TO SIDEWALK WIDTH

EXCEPT WHERE SHOWN OTHERWISE #3 BARS @ 18" E.W.

(TYP. ALL SIDEWALKS)

GENERATOR MAINTENANCE

CONCRETE PAVING SECTION

N.T.S.

GENERATOR TO MAINTENANCE

CONCRETE

N.T.S.

GENERATOR MAINTENANCE

CONCRETE TOOLED EDGE

N.T.S.

GENEATOR MAINTENANCE

CONCRETE TOOLED JOINT

N.T.S.

3.0'

SI

D

EW

AL

K

EXISTING HANGAR

SECURITY FENCESIDEWALK

SANITARY SEWER LINE

OIL WATER SEPARATOR

STORM WATER

GRATE INLET

X X X X X X X X

XXXXX

X X

X X

X X

X X

X X

X

X

XX

X

XXXXXXXXXXXXXXXXX

X

XXX

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X X X X X X X X X

X X

X X

X X

X X

X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

XXXXXXX

OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE

O E

O E

O E

O E

OEOE

O E

O E

O E

S

TA

N D

BY

G

EN

ER

AT

O

R O

VE

R

AL

L

PL

AN

EG100

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-6864

SHEET NO.

M

AR

K R

EV

IS

IO

N

D

AT

E

Q :\S

H

AR

ED

\F

C I P

R O

J

AI

R -E

LE

C

\2

-T

X G

U

LF

C O

AS

T

R

EG

A

IR

PO

R

T G

EN

ER

AT

O

R \D

W G

\ T X

G U

LF

C

O

AS

T G

EN

ER

AT

O

R .D

W G

EG

| 1 0/

3/

3:

P M

LA

ST

S

AV

ED

B Y:

A C

O

TE

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

AL

C

TE

XA

S G

U

LF

C O

AS

T

R

EG

IO

N

AL

A

IR

PO

R T

ST

AN

D

BY

G

EN

ER

AT

O R

PR

O

JE

C

T

BR

AZ

O

R

IA

C O

U N

TY

, T

EX

AS

T

EX

AS

G

UL

F

CO

AS

T

RE

GI

ON

AL

A

IR

PO

RT

T

AX

IW

AY

P

AV

EM

EN

T

AN

D

EL

EC

TR

IC

AL

IM

PR

OV

EM

EN

TS

A

NG

LE

TO

N, T

EX

AS

(B

RA

ZO

RI

A

CO

UN

TY

AL

C

/0

3/

NEW STANDBY DIESEL

GENERATOR.

EG101

AIRPORT WAY

APRON

APRON

APRON

FUTURE

HANGAR

EXISTING

HANGAR

TERMINAL

BUILDING

PARKING

COUNTY ROAD 220B

TAXIWAY A

TA

XI

W A

Y E1

TA

XI

W A

Y F

TA

XI

W A

Y G

C O

U N

TY

R

O A

D

B

COUNTY ROAD 220B

EXISTING SERVICE ENTRANCE

DISCONNECT SWITCH AND ELECTRICAL

UTILITY C.T. CAN AND METER

RE:IMAGE 1 & 2/ THIS SHEET

2X3"C UG PATHWAY TO "ATS-1"1

TERMINAL BUILDING

PARKING LOT

EXISTING SERVICE ENTRANCE DISCONNECT

SWITCH AND ELECTRICAL METER

RE:IMAGE 3/ THIS SHEET

NEW AUTOMATIC TRANSFER SWITCH

"ATS-2" FOR GENERATOR.

REFER TO EG201 FOR ELECTRICAL

ONE-LINE DIAGRAM2X3"C UG PATHWAY

TO "ATS-2"

EXISTING HAGAR

IMAGE 1 IMAGE 2 IMAGE 3

REPLACE EXISTING "ATS-1"

TO PANEL "L" INSIDE OF

EXISTING HANGAR

2"C UG PATHWAY

(BLOCK HEATER)

2"C UG PATHWAY

(BATTERY CHARGER)

ELEC/ MECH ROOM 137

PROPOSED GENERATOR

ANNUNCIATOR PANEL

4(2) 2"C TO GENERATOR

ANNUNCIATOR PANEL

EXISTING PANEL "L"

RE: PANEL SCHEDULE ON

EG201 FOR MODIFICATIONS

EXISTING SIDEWALK

NEW DIESEL POWERED

STANDBY GENERATOR "GEN-1"

GENERATOR FOUNDATION

RE: SHEET C03 FOR DETAIL

J

EXISTING 120/ 208V PANEL "LC"

LC-26

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-6864

SHEET NO.

M

AR

K R

EV

IS

IO

N

D

AT

E

Q :\S

H

AR

ED

\F

C I P

R O

J

AI

R -E

LE

C

\2

-T

X G

U

LF

C O

AS

T

R

EG

A

IR

PO

R

T G

EN

ER

AT

O

R \D

W G

\ T X

G U

LF

C

O

AS

T G

EN

ER

AT

O

R .D

W G

EG

| 1 0/

3/

3:

P M

LA

ST

S

AV

ED

B Y:

A C

O

TE

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

AL

C

TE

XA

S G

U

LF

C O

AS

T

R

EG

IO

N

AL

A

IR

PO

R T

ST

AN

D

BY

G

EN

ER

AT

O R

PR

O

JE

C

T

BR

AZ

O

R

IA

C O

U N

TY

, T

EX

AS

T

EX

AS

G

UL

F

CO

AS

T

RE

GI

ON

AL

A

IR

PO

RT

T

AX

IW

AY

P

AV

EM

EN

T

AN

D

EL

EC

TR

IC

AL

IM

PR

OV

EM

EN

TS

A

NG

LE

TO

N, T

EX

AS

(B

RA

ZO

RI

A

CO

UN

TY

AL

C

/0

3/

EG101

S

TA

N D

BY

G

EN

ER

AT

O

R

LA

YO

U

T

PL

AN

GENERAL NOTES

1. ALL ITEMS SHOWN IN HEAVY LINEWEIGHT ARE

NEW OR MODIFIED, ALL ITEMS SHADED ARE

EXISTING TO REMAIN. REFER TO THIS SHEET

FOR ELECTRICAL SYMBOL LEGEND.

KEYED NOTES

1 REMOVE EXISTING AUTOMATIC TRANSFER

SWITCH (ATS). NEW ATS TO BE MOUNTED IN

THE SAME LOCATION ON EXISTING UNISTRUT

BRACING. REFER TO EG201 FOR ELECTRICAL

ONE-LINE DIAGRAM.

EQUIPMENT TO BE MOUNTED TO BUILDING VIA

UNISTRUT BRACING. CONTRACTOR TO MATCH

EXISTING EQUIPMENT MOUNTING AND CAULK

COLOR FOR CONSISTENCY.

CONTRACTOR TO OPEN CUT EXISTING

SIDEWALK CONCRETE AS NECESSARY TO

ROUTE CONDUIT TO ATS.

ROUTE (2) 2"C TO ELECTRICAL/ MECHANICAL

ROOM 137 FOR CONNECTION TO GENERATOR

ANNUNCIATOR PANEL. FIELD COORDINATE

EXACT ROUTE WITH EXISTING UTILITIES AND

STRUCTURES.

COORDINATE LOCATION OF EQUIPMENT WITH

OWNER PRIOR TO INSTALLATION.

TURN CONDUIT UP EXTERIOR WALL OF

HANGAR TO 12' AFF. PROVIDE NEMA 3R BOX ON

WALL WITH HINGED COVER (MIN 16"X16"X6"D).

PROVIDE (2) 2" SLEEVES THROUGH WALL TO

HANGAR INTERIOR. CONTINUE CONDUITS

INSIDE TO EXISTING PANEL "L" FOR

TERMINATION.

FIELD VERIFY EXACT LOCATION.

REFER TO EG201 FOR CONDUCTORS

QUANTITY AND SIZE.

EXISTING MANHOLE TO REMAIN

EXISTING PULLBOX TO REMAIN

SYMBOLS LEGEND

EXISTING ELECTRICAL EQUIPMENT

TO REMAIN

NEW ELECTRICAL EQUIPMENT

NEW CONDUIT

PROPOSED JUNCTION BOXJ

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-6864

SHEET NO.

M

AR

K R

EV

IS

IO

N

D

AT

E

Q :\S

H

AR

ED

\F

C I P

R O

J

AI

R -E

LE

C

\2

-T

X G

U

LF

C O

AS

T

R

EG

A

IR

PO

R

T G

EN

ER

AT

O

R \D

W G

\ T X

G U

LF

C

O

AS

T G

EN

ER

AT

O

R .D

W G

EG

| 1 0/

3/

3:

P M

LA

ST

S

AV

ED

B Y:

A C

O

TE

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

AL

C

TE

XA

S G

U

LF

C O

AS

T

R

EG

IO

N

AL

A

IR

PO

R T

ST

AN

D

BY

G

EN

ER

AT

O R

PR

O

JE

C

T

BR

AZ

O

R

IA

C O

U N

TY

, T

EX

AS

T

EX

AS

G

UL

F

CO

AS

T

RE

GI

ON

AL

A

IR

PO

RT

T

AX

IW

AY

P

AV

EM

EN

T

AN

D

EL

EC

TR

IC

AL

IM

PR

OV

EM

EN

TS

A

NG

LE

TO

N, T

EX

AS

(B

RA

ZO

RI

A

CO

UN

TY

AL

C

/0

3/

EG201

EL

EC

TR

IC

AL

O

N E-

LI

N

E D

IA

G

R

AM

PROPOSED ONE-LINE DIAGRAM

N.T.S.EG201

SURFACE GRADE

ELECTRICAL/ MECHANICAL

ROOM 137

PANEL 'DPA'

400A/3P/3R/(3)-400AF

EXISTING SERVICE

ENTRANCE

DISCONNECT SWITCH

M

METER

EXTERIOR WALL OF

TERMINAL BUILDING

RE: EG101 FOR LOCATION

AND EG202 FOR ELEVATIONS

(2 SETS) 3"C W/ (4) #4/0

THHN, #1/0G

POLE MOUNTED TRANSFORMER PROVIDING

277/480V, 3-PHASE, 4-WIRE 400A ELECTRICAL

SERVICE

PANEL

'HB'

XFMR 'TLA', K-13

480:208Y/120V

75KVA

300KW, 277/480V, 3-PHASE, DIESEL POWERED

STANDBY GENERATOR 'GEN-1' WITH A

WEATHER AND SOUND ENCLOSURE, 400A AND

200A DICONNECT BREAKERS, AND A MINIMUM 48

HOUR DIESEL SUB-BASE FUEL TANK. KOHLER

300REOZJ OR APPROVED EQUAL. REFER TO

262310 FOR ADDITIONAL REQUIREMENTS

400A, N3R RATED AUTOMATIC

TRANSFER SWITCH "ATS-1"

RE: 264130 FOR ADDITIONAL

REQUIREMENTS

C.T. CAN

SPD PANEL

'HA' RPHA

PANEL

'LA'

PANEL

'LB'

PANEL

'LC'

XFMR 'TLD'

480:208Y/120V

30KVA

PANEL

'LD'

SURFACE GRADE

INTERIOR OF HANGAR

PANEL 'L'

200A/3P/3R/200A, C/L FUSES

EXISTING SERVICE ENTRANCE

DISCONNECT SWITCH

M

METER

EXTERIOR WALL OF HANGAR

RE: EG101 FOR LOCATION

AND EG202 FOR ELEVATION

200A, N3R RATED AUTOMATIC

TRANSFER SWITCH "ATS-2"

RE: 264130 FOR ADDITIONAL

REQUIREMENTS

SURFACE GRADE

(2 SETS) 3"C W/ (4) #4/0 AWG, #1/0G

2.5"C W/ (4) #3/0 AWG, #6G

EXISTING PATHWAY W/ (4)

#3/0 AWG, #6G

2.5"C W/ (4)

#3/0 AWG, #6G

2/0G

#2G

(4) #3/0

GENERAL NOTES

1. ALL ITEMS SHOWN IN HEAVY LINEWEIGHT ARE

NEW OR MODIFIED, ALL ITEMS SHADED ARE

EXISTING TO REMAIN.

2. ALL CABLES SHALL BE COPPER TYPE THWN OR

SIMILAR, UNLESS OTHERWISE NOTED.

3. ALL EQUIPMENT SHALL BE OUTDOOR RATED,

MINIMUM OF NEMA 3R.

4. CONTRACTOR TO UPDATE ELECTRICAL

IDENTIFICATION PLATES ON EXISTING

EQUIPMENT AS NECESSARY.

N E

L

N E

L

(2 SETS) EXISTING PATHWAY

W/ (4) #4/0 AWG, #1/0G

(PULL BACK AND RE-USE

EXISTING CABLE IF POSSIBLE)

(2 SETS) 3"C W/ (4)

#4/0 AWG, #1/0G

EXTERIOR

INTERIOR

INTERIOR OF HAGAR

EXTERIOR

HANGAR

TERMINAL BUILDING

3P -4

A

3P -2

A

2"C W/ (2) #12 AWG, #12G

(BLOCK HEATER)

2"C W/ (2) #12 AWG, #12G

(BATTERY CHARGER)

KEYED NOTES

1 INSTALL NEW FUSES IN EXISTING DISCONNECT

SWITCH. NEW FUSE SIZE TO MATCH EXISTING

FUSE SIZE. IF NO EXISTING FUSE, SIZE FUSE

TO MATCH DISCONNECT SWITCH RATING.

FOUNDATION

SUB-BASE

FUEL TANK

GENERATOR WEATHER/

SOUND ENCLOSURE

GENERATOR CONTROL

PANEL

2/0G

CKT CKT BKR. KVA LOAD DESCRIPTION WIRE* C"BKR.KVALOAD DESCRIPTIONWIRE*C"

VOLTAGE: 120/208V 3 4 W AIC: REMARKS:*

SURFACE

NEMA 1

FLUSH

NEMA 3R

KVA CONNECTED LOAD

KVA DEMAND

AMPS DEMAND @ 208V

33.87

37.17

103.17

MAINS:

LUGS:

AMPS

SUB - FEED

200 MLO MCB

FEED - THRU

ALL CABLING IS 2 #12, 1 #12G UNLESS NOTED OTHERWISE.

PANEL: L

61.55

FANS1

INTER. LIGHTS 1.55

1.55

WATER HEATER

SPACE

DRYER

.36

.36

.18

SPACE

29 30

RECEPTACLES

1.92

0.36

0.24

0.50

RECEPTACLES

INTER. LIGHTS

INTER. LIGHTS

RECEPTACLES

RECEPTACLES

RECEPTACLES

EXIT SIGNS

CIRCULATION FAN

.36

2.25

2.25

.50

1.80

1.80

1.80

OUTSIDE LIGHTS

WASHER

WASHER

FANS

PARKING LOT LIGHTS

TELEPHONE BOARD

GEN. BLOCK HEATER

GEN. BATTERY CHARGER

0.50

2.80

2.50

2.50

0.84

1.25

0.50

2.40

1.25

22,000

GENERATOR "GEN-1"

THE EXISTING 200A SERVICE MEETS AND

EXCEEDS THE NEC REQUIREMENTS

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-6864

SHEET NO.

M

AR

K R

EV

IS

IO

N

D

AT

E

Q :\S

H

AR

ED

\F

C I P

R O

J

AI

R -E

LE

C

\2

-T

X G

U

LF

C O

AS

T

R

EG

A

IR

PO

R

T G

EN

ER

AT

O

R \D

W G

\ T X

G U

LF

C

O

AS

T G

EN

ER

AT

O

R .D

W G

EG

| 1 0/

3/

3:

P M

LA

ST

S

AV

ED

B Y:

A C

O

TE

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

AL

C

TE

XA

S G

U

LF

C O

AS

T

R

EG

IO

N

AL

A

IR

PO

R T

ST

AN

D

BY

G

EN

ER

AT

O R

PR

O

JE

C

T

BR

AZ

O

R

IA

C O

U N

TY

, T

EX

AS

T

EX

AS

G

UL

F

CO

AS

T

RE

GI

ON

AL

A

IR

PO

RT

T

AX

IW

AY

P

AV

EM

EN

T

AN

D

EL

EC

TR

IC

AL

IM

PR

OV

EM

EN

TS

A

NG

LE

TO

N, T

EX

AS

(B

RA

ZO

RI

A

CO

UN

TY

AL

C

/0

3/

EG202

EL

EC

TR

IC

AL

EL

EV

AT

IO

N

S

HANGAR WALL ELEVATION - PROPOSED

N.T.S.EG202

M

M

EXISTING HAGAR WALL

INCOMING UTILITY POWER

PROPOSED WALL MOUNT 200A

AUTOMATIC TRANSFER SWITCH

EXISTING SERVICE ENTRANCE

DISCONNECT SWITCH

EXISTING

METER BOX

CONDULET TO

PANEL 'L' LOCATED

INSIDE OF HANGAR

2.5"

2.5"

SURFACE GRADE

EXISTING TERMINAL BUILDING WALL

SURFACE GRADE

INCOMING UTILITY POWER

EXISTING AUTOMATIC

TRANSFER SWITCH EXISTING METER

EXISTING 400A

DISCONNECT

TO PANEL 'DPA'

M

EXISTING TERMINAL BUILDING WALL

SURFACE GRADE

INCOMING UTILITY POWER

EXISTING METER

EXISTING 400A

DISCONNECT

PROPOSED WALL MOUNT

AUTOMATIC TRANSFER SWITCH

TERMINAL BUILDING WALL ELEVATION - DEMO

N.T.S.EG202

TERMINAL BUILDING WALL ELEVATION - PROPOSED

N.T.S.EG202

TO GENERATOR 'GEN-1'

RE: EG101 FOR

CONTINUATION AND

EG201 FOR CONDUIT

AND CONDUCTORS

TO PANEL 'DPA'

IN ELECTRICAL/

MECHANICAL

ROOM 137

4"

4"

HANGAR WALL ELEVATION - DEMO

N.T.S.EG202

M

EXISTING HAGAR WALL

INCOMING UTILITY POWER

EXISTING SERVICE ENTRANCE

DISCONNECT SWITCH

EXISTING

METER BOX

DISCONNECT CONDULET FROM METER CAN AND

SEAL PENETRATION TO CAN. ROTATE CONDULET

90° FOR FUTURE USE OF EXISTING BUILDING

PENETRATION. REMOVE CONDUCTORS BACK TO

PANEL 'L' LOCATED INSIDE OF HANGAR.

SURFACE GRADE

ATS-1

ATS-2

TO GENERATOR 'GEN-1'

RE: EG101 FOR

CONTINUATION AND

EG201 FOR CONDUIT

AND CONDUCTORS

Sheets and Views
KSA COVER SHEET

Untitled

File details come from the government source that posted it. Updated .