6-26-22 Attachment C Plans.pdf
PDF 3 MB Posted
- Attached to
- Terminal Building Standby Generator Project
- Solicitation number
- 26-22
- Issued by
- Brazoria County, Amarillo City, Texas
About this file
This file contains the architectural and engineering plans for the Terminal Building Standby Generator Project at Texas Gulf Coast Regional Airport in Brazoria County, Angleton, Texas. The project is being undertaken by Brazoria County and involves the installation of a 300 kilowatt diesel-powered standby generator system to provide backup power to the airport terminal and Fixed Base Operator (FBO) support hangar. The plans include civil, electrical, and structural design details prepared by KSA Engineering, a Pape-Dawson company, with the civil work designed by Craig H. Phipps, P.E. and electrical systems designed by R. Cole Ferguson, P.E. The project scope encompasses the installation of a Kohler 300REOZJ or approved equivalent diesel generator with a weather and sound enclosure mounted on a reinforced concrete foundation, a 48-hour diesel sub-base fuel tank, generator maintenance concrete pads, and new automatic transfer switches (ATS-1 and ATS-2) to manage power distribution between utility service and generator output. The electrical infrastructure includes new three-inch conduit pathways, 400-amp and 200-amp disconnect breakers, and connections to existing electrical panels within the terminal building and hangar facilities.
The construction plans establish comprehensive requirements for contractor operations at the active airport facility, including a mandatory 72-hour advance notice to the airport and engineer before commencing construction activities, issuance of a Notice to Airmen (NOTAM), and strict adherence to airport security protocols. The contractor is responsible for obtaining all necessary permits from the City of Angleton and Brazoria County prior to construction, providing their own project office and temporary facilities, and bearing all costs associated with utility locating, dewatering, site restoration, and repair of any damage to existing airport infrastructure. Environmental compliance requirements include investigation for migratory birds and nesting activity, proper handling of hazardous waste, and adherence to wetlands protection regulations. The plans indicate construction must minimize disruption to airport operations, with all utility interruptions coordinated with a minimum 72-hour advance notice and electric service interruptions restricted to 10:00 p.m. to 6:00 a.m. hours. The generator foundation design requires over-excavation to a minimum of four feet below existing grade with compaction to 95 percent standard Proctor specifications, and the contractor must verify all underground utility locations before excavation begins. Upon project completion, all temporary work areas, haul routes, and stockpile locations must be restored to original or better condition at no additional cost to the owner.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
PROJECT
LOCATION
COUNTY JUDGE
L.M. "MATT" SEBESTA, JR
COUNTY COMMISIONERS
JAY BURRIDGE PRECINCT 1
RYAN CADE PRECINCT 2
STACY ADAMS PRECINCT 3
DAVID LINDER PRECINCT 4
COUNTY CLERK
JOYCE HUDMAN
DIRECTOR OF AVIATION
JEFF BILYEU, A.A.E.
VICINITY MAP
TEXAS GULF COAST REGIONAL AIRPORT
BRAZORIA COUNTY ~ ANGLETON, TEXAS
TERMINAL BUILDING
STANDBY GENERATOR PROJECT
T
EX
AS
G
UL
F
CO
AS
T
RE
GI
ON
AL
A
IR
PO
RT
T
ER
MI
NA
L B
UI
LD
IN
G
ST
AN
DB
Y
GE
NE
RA
TO
R
PR
OJ
EC
T
A
NG
LE
TO
N, T
EX
AS
(B
RA
ZO
RI
A
CO
UN
TY
\\ksa.net\gateway\Projects\104132\008 CAD\30 Sheets\02 Civil\104132-C-GI-0001-COVR.dwg : KSA COVER SHEET
OCTOBER 2025
ISSUED FOR BID
a Pape-Dawson company
Q
2107 CityWest Boulevard, Third Floor Houston, TX 77042
T. 281-494-3252 www.ksaeng.com
INDEX OF SHEETS
CIVIL
C01 COVERSHEET / INDEX OF SHEETS
C02 PROJECT LAYOUT
C03 GENERATOR FOUNDATION DETAILS
C04 GENERATOR MAINTENANCE CONCRETE DETAILS
ELECTRICAL
EG100 STANDBY GENERATOR OVERALL PLAN
EG101 STANDBY GENERATOR LAYOUT PLAN
EG201 ELECTRICAL ONE-LINE DIAGRAM
EG202 ELECTRICAL ELEVATIONS
a Pape-Dawson company
TBPE FIRM REGISTRATION No. F-1356
SUBMITTED BY:
CRAIG H. PHIPPS, P.E.
SENIOR VICE PRESIDENT CIVIL
ELECTRICAL
TBPE FIRM REGISTRATION No. F-6864
SUBMITTED BY:
R. COLE FERGUSON, P.E.
PROJECT ENGINEER
MH
M H
C.
O.
W M
C.
O.
C.
O.
C.
O.
C.
O.
C.
O.
C.
O.
C.
O.
PR
O
JE
C
T
LA
YO
U
T
C02
LEGEND
EXISTING FEATURES
EXIST. BUILDING / STRUCTURES
AIRPORT PROPERTY LINE
BENCHMARK - TEMPORARY
BENCHMARK - IRON RODIR
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
TBPE Firm Registration No. F-1356
SHEET NO.
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
2\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
2-
C -L
O -0
2-
PR
O
J.
D
W G
PR
O
JE
C T
LA
YO
U T
| 8 /1
9/
1:
P M
LA
ST
S
AV
ED
B Y:
N M
IK
EL
L
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
N M
TE
XA
S G
U
LF
C O
AS
T
R
EG
IO
N
AL
A
IR
PO
R T
TE
R
M
IN
AL
B
U
IL
D
IN
G S
TA
N
D
BY
G
EN
ER
AT
O R
P R
O
JE
C T
BR
AZ
O R
IA
C
O U
N
TY
, T
EX
AS
T
EX
AS
G
UL
F
CO
AS
T
RE
GI
ON
AL
A
IR
PO
RT
T
ER
MI
NA
L B
UI
LD
IN
G
ST
AN
DB
Y
GE
NE
RA
TO
R
PR
OJ
EC
T
AN
GL
ET
ON
, T
EX
AS
(B
RA
ZO
RI
A
CO
UN
TY
D C
M
/0
3/
C ity W es t B ou le va rd
, T hi rd F lo or
H ou st on
, T X
T.
1-
4-w w w .k sa en g.
co m a Pa pe -D aw so n co m pa ny
20 20 40
GRAPHIC SCALE IN FEET
TERMINAL BUILDING
EXISTING HANGAR
TERMINAL BUILDING
PARKING LOT
AIRPORT WAY
SECURITY FENCE
GENERATOR COORDINATES
NO. NORTHING EASTING
13604869.2080 3098977.5177
13604868.6001 3098958.1973
13604874.0174 3098958.0268
13604874.6253 3098977.3473
NOTE: THE COORDINATES ABOVE ARE
BASED ON A KOHLER INDUSTRIAL DIESEL
GENERATOR SET WHOSE L=18' - 4" AND
W = 4' - 5". PLEASE ADVISE ENGINEER IF
THERE ARE ANY CHANGES TO THE
DIMENSIONS STATED ABOVE SO THAT
UPDATED COORDINATES CAN BE
PROVIDED.
20.0'58.4'
15.0'
SIDEWALK
SANITARY SEWER LINE
OIL WATER SEPARATOR
STORM WATER
GRATE INLET
PROPOSED GENERATOR
EXISTING WATER LINE
GENERAL NOTES:
1. CONSTRUCTION EQUIPMENT AND VEHICLES SHALL NOT EXCEED 15 MPH WITHIN THE AIRPORT PROPERTY. ANY PERSONNEL
WHO EXCEED THE AFOREMENTIONED SPEED LIMIT WILL BE BANNED FROM THE AIRPORT INDEFINITELY.
2. THE CONTRACTOR MUST PROVIDE A MINIMUM OF 72 HOURS NOTICE TO THE AIRPORT AND ENGINEER, PRIOR TO BEGINNING
CONSTRUCTION ACTIVITIES. A NOTICE TO AIRMEN (NOTAM) SHALL BE ISSUED.
3. VEHICLE IDENTIFICATION AND PARKING: (A) CONTRACTOR VEHICLES AND EQUIPMENT SHALL BE IDENTIFIED BY FLAGS
AND/OR AMBER FLASHING LIGHTS. (B) EMPLOYEE PARKING SHALL ONLY BE IN THE CONTRACTOR'S STAGING AND STORAGE
AREA.
4. ALL EQUIPMENT AND MATERIALS SHALL BE STORED IN THE CONTRACTORS STAGING AND STORAGE AREA WHEN NOT IN USE.
EQUIPMENT AND MATERIALS SHALL NOT ENCROACH UPON ACTIVE OPERATIONAL AREAS. MINIMUM CLEARANCES SHALL BE MAINTAINED ON RUNWAYS IN ACCORDANCE WITH PART 77 OF THE FEDERAL AVIATION REGULATIONS.
5. ALL EXCAVATIONS, OPEN TRENCHES AND STOCKPILED MATERIAL AT THE CONSTRUCTION SITE SHALL BE PROMINENTLY MARKED WITH FLAGS AND LIGHT UNITS ACCEPTABLE TO THE ENGINEER DURING HOURS OF RESTRICTED VISIBILITY OR
DARKNESS.
6. AIRPORT SECURITY IS OF UTMOST IMPORTANCE. THE CONTRACTOR SHALL SUPPLY HIS OWN LOCK FOR ACCESS GATES, AND SHALL KEEP THE GATES LOCKED OR GUARDED AT ALL TIMES, EXCEPT FOR THE BRIEF PERIOD REQUIRED FOR PASSAGE
OF AUTHORIZED VEHICLES OR EQUIPMENT.
7. EACH CONSTRUCTION AREA SHALL BE SHAPED TO ALLOW DRAINAGE OF SURFACE WATER DURING EACH WORK OPERATION.
THE CONTRACTOR SHALL PUMP SURFACE WATER IMMEDIATELY FROM EACH CONSTRUCTION AREA AFTER EACH RAIN. THE
COST OF DEWATERING SHALL BE SUBSIDIARY TO CONSTRUCTION ACTIVITIES.
8. STOCKPILE LOCATION SHALL BE ADJUSTED IN THE FIELD AND COORDINATED WITH THE ENGINEER. STOCKPILE SHALL NOT CREATE ANY PONDING OF WATER OR ALTER DRAINAGE PATTERNS OF THE AIRPORT PROPERTY EXCEPT AS SHOWN IN
THESE PLANS.
9. ALL WASTE OR SPOIL MATERIAL SHALL BE DISPOSED OF OFF THE AIRPORT PROPERTY BY THE CONTRACTOR, UNLESS
OTHERWISE NOTED.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO AIRPORT FACILITIES INCLUDING BUT NOT LIMITED TO EXISTING PAVEMENTS, UNDERGROUND CABLES, LIGHTS, SIGNS, BUILDINGS, PIPELINES, ETC. ENCOUNTERED DURING CONSTRUCTIONS. ALL REPAIRS MUST BE MADE TO EQUAL OR BETTER QUALITY AND IN COMPLIANCE WITH CITY OF ANGLETON, BRAZORIA COUNTY, AIRPORT MANAGEMENT, AND THE ENGINEER. ALL REPAIR AND REPLACEMENT COSTS SHALL
BE AT THE EXPENSE OF THE CONTRACTOR.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND ACQUIRING AN ACCEPTABLE WATER SOURCE AS REQUIRED FOR CONSTRUCTION. CITY WATER IS AVAILABLE ON AIRPORT PROPERTY NEAR THE CONSTRUCTION SITE. CONTACT THE CITY OF ANGLETON FOR REQUIREMENTS FOR USING CITY WATER. THE CONTRACTOR SHOULD CHECK WITH THE CITY OF ANGLETON PRIOR TO PREPARING BID IN ORDER TO DETERMINE ANY COST FOR WATER USED. NO DIRECT PAY PROVIDED IN
BID PROPOSAL.
12. ALL TRAFFIC CONTROL DEVICES AND WARNING SIGNS SHALL BE IN ACCORDANCE WITH TEXAS MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES. NO DIRECT PAY.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING HIS OWN PROJECT OFFICE, TOILET FACILITIES AND OTHER NECESSARY BUILDINGS OR SHELTERS. THE AIRPORT WILL NOT PROVIDE FACILITIES TO THE CONTRACTOR DURING
CONSTRUCTION.
14. THE CONTRACTOR, ON BEHALF OF THE OWNER, WILL OBTAIN ALL PERMITS REQUIRED BY THE CITY OF ANGLETON AND/OR
BRAZORIA COUNTY, TEXAS PRIOR TO STARTING CONSTRUCTION.
15. THE CONTRACTOR SHALL ANTICIPATE ALL UNDERGROUND OBSTRUCTIONS SUCH AS, BUT NOT LIMITED TO, WATER MAINS, GAS LINES, STORM AND SANITARY SEWERS, TELEPHONE OR ELECTRIC LIGHT OR POWER DUCTS, CONCRETE, AND DEBRIS.
ANY SUCH LINES OR OBSTRUCTIONS INDICATED ON THE DRAWINGS SHOW ONLY THE APPROXIMATE LOCATIONS AND SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR. THE OWNER AND ENGINEER WILL ENDEAVOR TO FAMILIARIZE THE CONTRACTOR WITH ALL KNOWN UTILITIES AND OBSTRUCTIONS, BUT THIS SHALL NOT RELIEVE THE CONTRACTOR FROM FULL RESPONSIBILITY IN ANTICIPATING ALL UNDERGROUND OBSTRUCTIONS WHETHER OR NOT SHOWN ON THE DRAWINGS.
16. THE CONTRACTOR SHALL AT HIS OWN EXPENSE, MAINTAIN IN PROPER WORKING ORDER AND WITHOUT INTERRUPTION OF SERVICE ALL EXISTING UTILITIES AND SERVICES WHICH MAY BE ENCOUNTERED IN THE WORK. WITH THE CONSENT OF THE ENGINEER AND UTILITY OWNER SUCH SERVICE CONNECTIONS MAY BE TEMPORARILY INTERRUPTED TO PERMIT THE CONTRACTOR TO REMOVE DESIGNATED LINES OR TO MAKE TEMPORARILY CHANGES IN THE LOCATIONS OF SERVICES. THE COST OF MAKING ANY CHANGES SHALL BE AT THE CONTRACTOR'S EXPENSE. ANY INTERRUPTIONS OF EXISTING UTILITIES SHALL BE COORDINATED A MINIMUM OF 72-HOURS IN ADVANCED WITH THE ENGINEER AND AIRPORT. INTERRUPTIONS OF THE AIRPORTS ELECTRIC SERVICE SHALL BE PERFORMED BETWEEN THE HOURS OF 10 PM - 6 AM.
17. THE CONTRACTOR SHALL AT HIS OWN EXPENSE, NOTIFY ALL UTILITY COMPANIES INVOLVED TO HAVE THEIR UTILITIES LOCATED AND MARKED IN THE FIELD. ALL UNDERGROUND UTILITIES SHALL THEN BE UNCOVERED TO VERIFY LOCATION AND ELEVATION BEFORE CONSTRUCTION BEGINS AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL COORDINATE WITH UTILITY OWNER IF UTILITY INSPECTOR MUST BE ON SITE WHEN LOCATING OR EXCAVATING NEAR UTILITIES. CONTRACTOR TO VERIFY UTILITY LOCATIONS AND DEPTH. IF LOCATIONS AND DEPTH ARE DIFFERENT FROM WHAT IS SHOWN ABOVE OR INTERFERE WITH INSTALLATION OF PROPOSED COMPONENTS, CONTRACTOR TO NOTIFY
ENGINEER IMMEDIATELY.
18. THE CONTRACTOR SHALL INSTALL SHEETING AND BRACING NECESSARY TO SUPPORT THE SIDES OF TRENCHES AND OTHER EXCAVATIONS WITH VERTICAL SIDES, AS REQUIRED BY CURRENT OSHA REGULATIONS. COST OF SHEETING AND BRACING
SHALL BE SUBSIDIARY TO CONSTRUCTION ACTIVITIES.
19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL HORIZONTAL AND VERTICAL CONSTRUCTION STAKING AS REQUIRED
FOR THE PROJECT DEVELOPMENT.
20. EACH WEEK THE CONTRACTOR SHALL SUBMIT HIS CONSTRUCTION WORK SCHEDULE TO THE ENGINEER, PROJECTING HIS
UPCOMING WORK FOR THE NEXT THREE WEEKS.
21. THE CONTRACTOR SHALL VIDEO TAPE THE ENTIRE WORK AREA AFTER THE PRE-CONSTRUCTION MEETING AND PRIOR TO MOBILIZATION OF PERSONNEL AND EQUIPMENT. THE CONTRACTOR SHALL PROVIDE ONE (1) COPY OF THE VIDEO TAPE(S) TO THE ENGINEER. IN AREAS WHERE CONSTRUCTION EQUIPMENT CROSSES EXISTING PAVEMENTS, THE CONTRACTOR SHALL TAKE PICTURES OR VIDEO OF THE PAVEMENT PRIOR TO COMMENCING OPERATIONS. THE CONTRACTOR SHALL PROVIDE THE ENGINEER WITH ONE COPY OF EACH OF THE PHOTOGRAPHS AND VIDEO TAPE(S) TAKEN. THIS DOCUMENTATION SHALL BE USED TO DETERMINE THE AMOUNT OF DAMAGE, IF ANY, CAUSED TO THE PAVEMENTS BY THE CONSTRUCTION EQUIPMENT CROSSINGS AND THE QUALITY OF CONSTRUCTION WHICH SHALL BE REQUIRED FOR THE
REPAIRS.
22. CONSTRUCTION WORKERS WILL NOT BE ALLOWED TO ESTABLISH OVERNIGHT RESIDENCE ON THE PREMISES. ALL CONSTRUCTION WORKERS SHALL LEAVE THE CONSTRUCTION SITE AT THE END OF THEIR WORK PERIOD.
23. THE CONTRACTOR'S PROJECT SUPERINTENDENT MUST BE ON SITE DURING ALL WORK ACTIVITIES BY EITHER THE
CONTRACTOR'S PERSONNEL OR BY ANY SUB-CONTRACTOR.
24. DELIVERIES: ALL DELIVERIES MUST BE COORDINATED BY THE CONTRACTOR, TO BE DELIVERED TO THE CONTRACTOR'S TRAILER OR JOBSITE. AIRPORT STAFF WILL NOT SIGN FOR ANY DELIVERIES, NO DELIVERIES MAY BE MADE TO THE AIRPORT TERMINAL OR ANY AIRPORT BUILDING. CONTRACTOR MUST GIVE EXPLICIT DELIVERY INSTRUCTIONS, AS THERE MAY BE MANY SEPARATE PROJECTS UNDER CONSTRUCTION ON THE AIRPORT AT ANY GIVEN TIME. CONTRACTOR SHALL ALSO INSTALL SUFFICIENT SIGNAGE ALONG HIGHWAY 6 TO INDICATE THE APPROPRIATE PATH THAT CONTRACTOR PERSONNEL, EQUIPMENT DELIVERIES, AND MATERIAL DELIVERIES SHALL TAKE. ADDITIONALLY, CONTRACTOR IS RESPONSIBLE FOR PLACING SIGNAGE AT THE TERMINAL ENTRANCE DRIVE INDICATE THAT "CONSTRUCTION TRAFFIC AND CONSTRUCTION
DELIVERIES ARE NOT ALLOWED BEYOND THIS POINT".
25. EMERGENCY CONTACT NUMBERS: CONTRACTOR WILL PROVIDE ENGINEER A LIST OF CONTACT NUMBERS, IN CASE OF
AFTER-HOURS EMERGENCIES AT THE SITE.
26. A PRECONSTRUCTION COORDINATION MEETING SHALL BE HELD WITH THE CITY, COUNTY, AIRPORT AND ENGINEER, ON THE
SITE PRIOR TO START OF CONSTRUCTION.
27. CONTRACTOR TO PROVIDE SUBMITTALS TO ENGINEER FOR REVIEW OF ALL EQUIPMENT AND MATERIALS THAT WILL BE
INCORPORATED INTO THE PROJECT.
ENVIRONMENTAL NOTES:
1. IN THE EVENT THAT UNANTICIPATED ARCHEOLOGICAL DEPOSITS ARE ENCOUNTERED DURING CONSTRUCTION, WORK IN THE
IMMEDIATE AREA WILL CEASE AND THE TxDOT PROJECT MANAGER WILL BE CONTRACTED TO COORDINATE WITH PROFESSIONAL ARCHEOLOGISTS TO INITIATE POST-REVIEW DISCOVERY PROCEDURES UNDER THE PROVISIONS OF 36 CRF 800.13.
2. STOCKPILES AND STAGING AREAS WILL NOT BE PLACED WITHIN ANY WATER OF THE UNITED STATES, INCLUDING WETLANDS.
3. HAZARDOUS WASTE: ALL SPILLS MUST BE REPORTED IMMEDIATELY TO THE ENGINEER.
4. CONTRACTOR SHALL INVESTIGATE THE PROJECT AREA FOR ANY STRUCTURES CONTAINING MIGRATORY BIRDS OR
INDICATIONS OF NESTING MIGRATORY BIRDS PRIOR TO CONSTRUCTION. MIGRATORY BIRDS MAY ARRIVE IN THE PROJECT AREA TO BREED DURING CONSTRUCTION OF THE PROPOSED PROJECT. THE CONTRACTOR SHALL TAKE MEASURES TO AVOID THE TAKE OF MIGRATORY BIRDS, THEIR OCCUPIED NESTS, EGGS, OR YOUNG, IN ACCORDANCE WITH THE MIGRATORY
BIRD TREATY ACT, THROUGH PHASING OF WORK OR PREVENTATIVE MEASURES.
ACCESS ROUTE NOTES:
1. DAMAGE TO EXISTING PAVEMENTS WHICH IS CAUSED BY THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED TO
ORIGINAL OR BETTER CONDITION AT NO EXPENSE TO THE OWNER.
2. THE PAVEMENT ON THE ACCESS ROUTES MAY NOT SUPPORT CONSTRUCTION TRAFFIC. THE CONTRACTOR SHALL LIMIT
LOADS AS NECESSARY TO PREVENT DAMAGE OR SHALL INCLUDE IN HIS BID ADEQUATE BUDGET TO REPAIR DAMAGE TO
PAVEMENT.
3. CONTRACTOR SHALL KEEP PAVEMENTS FREE OF DEBRIS AT ALL TIMES. FAILURE TO MAINTAIN PAVEMENTS FREE OF DEBRIS
SHALL RESULT IN A STOP WORK ORDER TO BE ISSUED.
EXISTING UTILITY & PIPELINE NOTES:
1. TYPE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE
CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATIONS AS TO TYPE AND LOCATION OF UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL PROTECT EXISTING UTILITIES DURING CONSTRUCTION AND SHALL REPAIR ALL
DAMAGES TO SAID UTILITIES AT NO EXPENSE TO THE OWNER.
2. CONTRACTOR SHALL VERIFY LOCATION OF UNDERGROUND UTILITY LINES AND SHALL NOTIFY THE FOLLOWING AGENCIES 48
HOURS PRIOR TO EXCAVATING NEAR EXISTING FACILITIES:
TEXAS ONE-CALL SYSTEMS
DIGTESS 1-800-344-8377
LONE STAR NOTIFICATION 1-800-669-8344
TEXAS ONE CALL 1-800-245-4545
ONE CALL SYSTEM OF TEXAS 1-800-545-6005
NATIONAL ONE-CALL 8-1-1
DEMOBILIZATION NOTES:
1. CONDITIONS OF THE PROJECT AREA UPON COMPLETION OF THE JOB SHALL BE AS GOOD AS OR BETTER THAN THE
CONDITIONS PRIOR TO STARTING WORK, IN ADDITION TO THE WORK ITEMS LISTED.
2. THE PROJECT AREA SHALL BE FREE OF ANY CONTRACTOR STOCKPILE MATERIALS UPON COMPLETION OF THE JOB UNLESS
OTHERWISE DIRECTED BY THE ENGINEER.
3. UPON COMPLETION OF THE PROJECT, ALL THE HAUL ROUTES SHALL BE PROPERLY CLEANED TO PREVENT OBSTRUCTION
AND/OR CAUSE INCONVENIENCE TO NORMAL REGULAR TRAFFIC. ALL TEMPORARY HAUL ROUTES SHALL BE REMOVED AND
BROUGHT BACK TO ORIGINAL CONDITION OR BETTER AT NO ADDITIONAL COST TO THE OWNER.
4. ANY PROPERTIES BELONGING TO THE AIRPORT SHALL BE RETURNED TO THE AIRPORT.
5. PROPER DRAINAGE (NO LOCALIZED PONDING) SHALL BE MAINTAINED, PRIOR TO, DURING AND AFTER DEMOBILIZATION.
6. DEMOBILIZATION SHALL BE COMPLETED TO THE SATISFACTION OF THE ENGINEER AND AIRPORT MANAGEMENT.
7. DEMOBILIZATION SHALL BE COMPLETED IN A MANNER THAT WILL MINIMIZE ANY INCONVENIENCE TO AIRPORT OPERATIONS.
8. ANY DAMAGE TO THE AIRPORT PROPERTIES DURING DEMOBILIZATION SHALL BE REPAIRED AND PAID FOR AT THE
CONTRACTOR'S OWN EXPENSE.
9. SAFETY REGULATIONS SHALL REMAIN IN EFFECT DURING DEMOBILIZATION.
SI
D
EW
AL
K
AutoCAD SHX Text X
H
C.
O.
W M
C.
O.
C.
O.
C.
O.
C.
O.
C.
O.
C.
O.
C.
O.
G
EN
ER
AT
O R
FO
U
N D
AT
IO
N D
ET
AI
LS
C03
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
TBPE Firm Registration No. F-1356
SHEET NO.
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
2\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
2-
C -L
O -0
2-
PR
O
J.
D
W G
G
EN
ER
AT
O
R F
O U
N D
AT
IO
N D
ET
/1
9/
1:
P M
LA
ST
S
AV
ED
B Y:
N M
IK
EL
L
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
N M
TE
XA
S G
U
LF
C O
AS
T
R
EG
IO
N
AL
A
IR
PO
R T
TE
R
M
IN
AL
B
U
IL
D
IN
G S
TA
N
D
BY
G
EN
ER
AT
O R
P R
O
JE
C T
BR
AZ
O R
IA
C
O U
N
TY
, T
EX
AS
T
EX
AS
G
UL
F
CO
AS
T
RE
GI
ON
AL
A
IR
PO
RT
T
ER
MI
NA
L B
UI
LD
IN
G
ST
AN
DB
Y
GE
NE
RA
TO
R
PR
OJ
EC
T
AN
GL
ET
ON
, T
EX
AS
(B
RA
ZO
RI
A
CO
UN
TY
D C
M
/0
3/
C ity W es t B ou le va rd
, T hi rd F lo or
H ou st on
, T X
T.
1-
4-w w w .k sa en g.
co m a Pa pe -D aw so n co m pa ny
20 20 40
GRAPHIC SCALE IN FEET
TERMINAL BUILDING
TERMINAL BUILDING
PARKING LOT
AIRPORT WAY
20.0'58.4'
15.0'
PROPOSED GENERATOR
(REFER TO ELECTRICAL)
EXISTING WATER LINE
NOTES:
1. THE SIZE OF THE FOUNDATION FOR THE GENERATOR IS DIMENSIONED IN A WAY SO THAT THE FOOTPRINT OF
THE FOUNDATION IS 1' LARGER IN LENGTH AND WIDTH THAN THE GENERATOR ITSELF. IF THE DIMENSION OF THE GENERATOR VARY FROM 18' - 4" X 4' - 5", NOTIFY ENGINEER SO NECESSARY ADJUSTMENTS CAN BE MADE.
2. CONTRACTOR SHALL OVER EXCAVATE MINIMUM OF 4'-0" BELOW EXISTING GRADE. PLACE SELECT FILL IN 6" LIFTS WITH COMPACTION EQUAL TO 95% STANDARD PROCTOR TO RESTORE GRADE BELOW GENERATOR
FOUNDATION.
3. SELECT FILL SHALL BE FREE OF ORGANIC OR OTHER DELETERIOUS MATERIALS, HOMOGENOUS MIXTURES, HAVING A MAX. PARTICLE SIZE OF 3", HAVE LESS THAN 35 AND A PI BETWEEN 7 AND 15, CONSISTING OF SILTY-CLAYEY SANDS (SM-SC), LOW PLASTICITY CLAYS (CL), OR CLAYEY SANDS (SC) OR CLAYEY SAND (SC) OR TxDOT ITEM 247 FLEXIBLE BASE, TYPE A, GRADE 1-2 COMPACTED TO 100% OF MAXIMUM DRY DENSITY AS DETERMINED BY TEX-113-E AT OPTIMUM MOISTURE. SELECT FILL SHALL BE COMPACTED TO 95% STANDARD
PROCTOR AT ±2% OPTIMUM MOISTURE.
4. IF SOFT SUBGRADE SOILS ARE ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL USE 3" X 5" CRUSHED CONCRETE TO STABILIZE THE SUBGRADE PRIOR TO PLACING SELECT FILL. 3" X 5" CRUSHED CONCRETE SHALL NOT BE PAID FOR DIRECTLY, BUT WILL BE CONSIDERED SUBSIDIARY TO THE VARIOUS BID
ITEMS.
5. CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 4,000 PSI, AND COMPLY WITH CLASS C
TX421 SPECIFICATION.
6. REINFORCING STEEL ASTM A 615, GRADE 60. ALL BARS SECURELY HELD IN ACCURATE POSITION BY SUITABLE
ACCESSORIES, TIE BARS, SUPPORT BARS, ETC.
7. MINIMUM CONCRETE COVER PROTECTION FOR REINFORCING BARS SHALL BE 2 INCHES: BOARD FORMED SIDES, 3 INCHES: EARTH FORMED SIDES, 3 INCHES: BOTTOM, 2 INCHES: TOP.
8. MOUNT GENERATOR TO FOUNDATION IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION.
CONTRACTOR SHALL PROVIDE ANCHORING AND MOUNTING DETAIL IN ACCORDANCE WITH GENERATOR
MANUFACTURER RECOMMENDATIONS FOR APPROVAL BY THE ENGINEER PRIOR TO CONSTRUCTION.
CONTRACTOR SHALL ENSURE GENERATOR FOUNDATION PROVIDED IS COMPATIBLE WITH THE CHOSEN MANUFACTURERS ANCHORING AND MOUNTING PLAN PRIOR TO CONSTRUCTION. IF THE MANUFACTURERS ANCHORING AND MOUNTING PLAN IS NOT COMPATIBLE, THE CONTRACTOR SHALL SUBMIT AN ALTERNATE FOUNDATION DESIGNED BY A TEXAS PROFESSIONAL ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION.
CONTRACTOR MAY SUBMIT ALTERNATE MANUFACTURER APPROVED FOUNDATION DESIGN FOR APPROVAL BY
THE ENGINEER.
GENERATOR FOUNDATION DETAIL
N.T.S.
19' - 4"
5' - 5"
1'-6"
2'-6"
8"
#3 STIRRUPS
@ 12" O.C.
3 - #6 BARS, TOP
AND BOTTOM
#4 BARS @
12" O.C.E.W.
#4 DOWELS @ 12" O.C.
(TYP. ALL SIDES) #3 STIRRUPS
@ 12" O.C.
SECTION A-A & B-B
PLAN VIEW
A
A
BB
1'-3"
1' -3
3' 3'
2" (TYP.)
4'-0" (MINIMUM)
1'-6"
3 - #6 BARS, TOP AND BOTTOM
6" COMPACTED
SELECT FILL
6" COMPACTED
SELECT FILL
6" COMPACTED
SELECT FILL
1-1/2" (TYP.) GENERATOR MAINTENANCE
CONCRETE @ -1.0% SLOPE,
WIDTH = 3'
GENERATOR MAINTENANCE
CONCRETE @ -1.0% SLOPE,
WIDTH = 3'
PROPOSED AUTOMATIC
TRANSFER SWITCH
REPLACEMENT
(REFER TO ELECTRICAL)
SI
D
EW
AL
K
EXISTING HANGAR
SECURITY FENCESIDEWALK
SANITARY SEWER LINE
OIL WATER SEPARATOR
STORM WATER
GRATE INLET
LEGEND
EXISTING FEATURES
EXIST. BUILDING / STRUCTURES
AIRPORT PROPERTY LINE
BENCHMARK - TEMPORARY
BENCHMARK - IRON RODIR
H
C.
O.
W M
C.
O.
C.
O.
C.
O.
C.
O.
C.
O.
C.
O.
C.
O.
G
EN
ER
AT
O R
M
AI
N
TE
N
AN
C E
C O
N C
R
ET
E D
ET
AI
LS
C04
20.0'58.4'
15.0'
PROPOSED GENERATOR
MAINTENANCE CONCRETE
EXISTING WATER LINE
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
TBPE Firm Registration No. F-1356
SHEET NO.
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
2\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
2-
C -L
O -0
2-
PR
O
J.
D
W G
G
EN
ER
AT
O
R M
AI
N
TE
N
AN
C
E
PA
D D
ET
/1
9/
1:
P M
LA
ST
S
AV
ED
B Y:
N M
IK
EL
L
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
N M
TE
XA
S G
U
LF
C O
AS
T
R
EG
IO
N
AL
A
IR
PO
R T
TE
R
M
IN
AL
B
U
IL
D
IN
G S
TA
N
D
BY
G
EN
ER
AT
O R
P R
O
JE
C T
BR
AZ
O R
IA
C
O U
N
TY
, T
EX
AS
T
EX
AS
G
UL
F
CO
AS
T
RE
GI
ON
AL
A
IR
PO
RT
T
ER
MI
NA
L B
UI
LD
IN
G
ST
AN
DB
Y
GE
NE
RA
TO
R
PR
OJ
EC
T
AN
GL
ET
ON
, T
EX
AS
(B
RA
ZO
RI
A
CO
UN
TY
D C
M
/0
3/
C ity W es t B ou le va rd
, T hi rd F lo or
H ou st on
, T X
T.
1-
4-w w w .k sa en g.
co m a Pa pe -D aw so n co m pa ny
20 20 40
GRAPHIC SCALE IN FEET
TERMINAL BUILDING
TERMINAL BUILDING
PARKING LOT
AIRPORT WAY
0.75" EXP. JOINT FILLER & JOINT
SEALER. SLOPE 0.25" PER FOOT
4.
5"
2"
FACE OF GENERATOR FOUNDATION
COMPACTED SUBGRADE
2" COMPACTED BANK SAND BASE
TOOLED EDGE
2" COMPACTED BANK SAND BASE
COMPACTED SUBGRADE
4.
5"
2"
4.
5"
2"
COMPACTED SUBGRADE
2" COMPACTED BANK SAND BASE
(NO SEPARATE PAY)
#3 BARS @ 18" E.W.
4.
5"
2"
COMPACTED SUBGRADE
2" COMPACTED BANK SAND BASE
(SUBSIDIARY TO SIDEWALK)
4,000 PSI CONCRETE
0.5" DEEP x 0.25" WIDE TOOLED JOINT
SPACED EQUALLY TO SIDEWALK WIDTH
EXCEPT WHERE SHOWN OTHERWISE #3 BARS @ 18" E.W.
(TYP. ALL SIDEWALKS)
GENERATOR MAINTENANCE
CONCRETE PAVING SECTION
N.T.S.
GENERATOR TO MAINTENANCE
CONCRETE
N.T.S.
GENERATOR MAINTENANCE
CONCRETE TOOLED EDGE
N.T.S.
GENEATOR MAINTENANCE
CONCRETE TOOLED JOINT
N.T.S.
3.0'
SI
D
EW
AL
K
EXISTING HANGAR
SECURITY FENCESIDEWALK
SANITARY SEWER LINE
OIL WATER SEPARATOR
STORM WATER
GRATE INLET
X X X X X X X X
XXXXX
X X
X X
X X
X X
X X
X
X
XX
X
XXXXXXXXXXXXXXXXX
X
XXX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X X X X X X X X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
XXXXXXX
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
O E
O E
O E
O E
OEOE
O E
O E
O E
S
TA
N D
BY
G
EN
ER
AT
O
R O
VE
R
AL
L
PL
AN
EG100
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
TBPE Firm Registration No. F-6864
SHEET NO.
M
AR
K R
EV
IS
IO
N
D
AT
E
Q :\S
H
AR
ED
\F
C I P
R O
J
AI
R -E
LE
C
\2
-T
X G
U
LF
C O
AS
T
R
EG
A
IR
PO
R
T G
EN
ER
AT
O
R \D
W G
\ T X
G U
LF
C
O
AS
T G
EN
ER
AT
O
R .D
W G
EG
| 1 0/
3/
3:
P M
LA
ST
S
AV
ED
B Y:
A C
O
TE
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
AL
C
TE
XA
S G
U
LF
C O
AS
T
R
EG
IO
N
AL
A
IR
PO
R T
ST
AN
D
BY
G
EN
ER
AT
O R
PR
O
JE
C
T
BR
AZ
O
R
IA
C O
U N
TY
, T
EX
AS
T
EX
AS
G
UL
F
CO
AS
T
RE
GI
ON
AL
A
IR
PO
RT
T
AX
IW
AY
P
AV
EM
EN
T
AN
D
EL
EC
TR
IC
AL
IM
PR
OV
EM
EN
TS
A
NG
LE
TO
N, T
EX
AS
(B
RA
ZO
RI
A
CO
UN
TY
AL
C
/0
3/
NEW STANDBY DIESEL
GENERATOR.
EG101
AIRPORT WAY
APRON
APRON
APRON
FUTURE
HANGAR
EXISTING
HANGAR
TERMINAL
BUILDING
PARKING
COUNTY ROAD 220B
TAXIWAY A
TA
XI
W A
Y E1
TA
XI
W A
Y F
TA
XI
W A
Y G
C O
U N
TY
R
O A
D
B
COUNTY ROAD 220B
EXISTING SERVICE ENTRANCE
DISCONNECT SWITCH AND ELECTRICAL
UTILITY C.T. CAN AND METER
RE:IMAGE 1 & 2/ THIS SHEET
2X3"C UG PATHWAY TO "ATS-1"1
TERMINAL BUILDING
PARKING LOT
EXISTING SERVICE ENTRANCE DISCONNECT
SWITCH AND ELECTRICAL METER
RE:IMAGE 3/ THIS SHEET
NEW AUTOMATIC TRANSFER SWITCH
"ATS-2" FOR GENERATOR.
REFER TO EG201 FOR ELECTRICAL
ONE-LINE DIAGRAM2X3"C UG PATHWAY
TO "ATS-2"
EXISTING HAGAR
IMAGE 1 IMAGE 2 IMAGE 3
REPLACE EXISTING "ATS-1"
TO PANEL "L" INSIDE OF
EXISTING HANGAR
2"C UG PATHWAY
(BLOCK HEATER)
2"C UG PATHWAY
(BATTERY CHARGER)
ELEC/ MECH ROOM 137
PROPOSED GENERATOR
ANNUNCIATOR PANEL
4(2) 2"C TO GENERATOR
ANNUNCIATOR PANEL
EXISTING PANEL "L"
RE: PANEL SCHEDULE ON
EG201 FOR MODIFICATIONS
EXISTING SIDEWALK
NEW DIESEL POWERED
STANDBY GENERATOR "GEN-1"
GENERATOR FOUNDATION
RE: SHEET C03 FOR DETAIL
J
EXISTING 120/ 208V PANEL "LC"
LC-26
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
TBPE Firm Registration No. F-6864
SHEET NO.
M
AR
K R
EV
IS
IO
N
D
AT
E
Q :\S
H
AR
ED
\F
C I P
R O
J
AI
R -E
LE
C
\2
-T
X G
U
LF
C O
AS
T
R
EG
A
IR
PO
R
T G
EN
ER
AT
O
R \D
W G
\ T X
G U
LF
C
O
AS
T G
EN
ER
AT
O
R .D
W G
EG
| 1 0/
3/
3:
P M
LA
ST
S
AV
ED
B Y:
A C
O
TE
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
AL
C
TE
XA
S G
U
LF
C O
AS
T
R
EG
IO
N
AL
A
IR
PO
R T
ST
AN
D
BY
G
EN
ER
AT
O R
PR
O
JE
C
T
BR
AZ
O
R
IA
C O
U N
TY
, T
EX
AS
T
EX
AS
G
UL
F
CO
AS
T
RE
GI
ON
AL
A
IR
PO
RT
T
AX
IW
AY
P
AV
EM
EN
T
AN
D
EL
EC
TR
IC
AL
IM
PR
OV
EM
EN
TS
A
NG
LE
TO
N, T
EX
AS
(B
RA
ZO
RI
A
CO
UN
TY
AL
C
/0
3/
EG101
S
TA
N D
BY
G
EN
ER
AT
O
R
LA
YO
U
T
PL
AN
GENERAL NOTES
1. ALL ITEMS SHOWN IN HEAVY LINEWEIGHT ARE
NEW OR MODIFIED, ALL ITEMS SHADED ARE
EXISTING TO REMAIN. REFER TO THIS SHEET
FOR ELECTRICAL SYMBOL LEGEND.
KEYED NOTES
1 REMOVE EXISTING AUTOMATIC TRANSFER
SWITCH (ATS). NEW ATS TO BE MOUNTED IN
THE SAME LOCATION ON EXISTING UNISTRUT
BRACING. REFER TO EG201 FOR ELECTRICAL
ONE-LINE DIAGRAM.
EQUIPMENT TO BE MOUNTED TO BUILDING VIA
UNISTRUT BRACING. CONTRACTOR TO MATCH
EXISTING EQUIPMENT MOUNTING AND CAULK
COLOR FOR CONSISTENCY.
CONTRACTOR TO OPEN CUT EXISTING
SIDEWALK CONCRETE AS NECESSARY TO
ROUTE CONDUIT TO ATS.
ROUTE (2) 2"C TO ELECTRICAL/ MECHANICAL
ROOM 137 FOR CONNECTION TO GENERATOR
ANNUNCIATOR PANEL. FIELD COORDINATE
EXACT ROUTE WITH EXISTING UTILITIES AND
STRUCTURES.
COORDINATE LOCATION OF EQUIPMENT WITH
OWNER PRIOR TO INSTALLATION.
TURN CONDUIT UP EXTERIOR WALL OF
HANGAR TO 12' AFF. PROVIDE NEMA 3R BOX ON
WALL WITH HINGED COVER (MIN 16"X16"X6"D).
PROVIDE (2) 2" SLEEVES THROUGH WALL TO
HANGAR INTERIOR. CONTINUE CONDUITS
INSIDE TO EXISTING PANEL "L" FOR
TERMINATION.
FIELD VERIFY EXACT LOCATION.
REFER TO EG201 FOR CONDUCTORS
QUANTITY AND SIZE.
EXISTING MANHOLE TO REMAIN
EXISTING PULLBOX TO REMAIN
SYMBOLS LEGEND
EXISTING ELECTRICAL EQUIPMENT
TO REMAIN
NEW ELECTRICAL EQUIPMENT
NEW CONDUIT
PROPOSED JUNCTION BOXJ
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
TBPE Firm Registration No. F-6864
SHEET NO.
M
AR
K R
EV
IS
IO
N
D
AT
E
Q :\S
H
AR
ED
\F
C I P
R O
J
AI
R -E
LE
C
\2
-T
X G
U
LF
C O
AS
T
R
EG
A
IR
PO
R
T G
EN
ER
AT
O
R \D
W G
\ T X
G U
LF
C
O
AS
T G
EN
ER
AT
O
R .D
W G
EG
| 1 0/
3/
3:
P M
LA
ST
S
AV
ED
B Y:
A C
O
TE
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
AL
C
TE
XA
S G
U
LF
C O
AS
T
R
EG
IO
N
AL
A
IR
PO
R T
ST
AN
D
BY
G
EN
ER
AT
O R
PR
O
JE
C
T
BR
AZ
O
R
IA
C O
U N
TY
, T
EX
AS
T
EX
AS
G
UL
F
CO
AS
T
RE
GI
ON
AL
A
IR
PO
RT
T
AX
IW
AY
P
AV
EM
EN
T
AN
D
EL
EC
TR
IC
AL
IM
PR
OV
EM
EN
TS
A
NG
LE
TO
N, T
EX
AS
(B
RA
ZO
RI
A
CO
UN
TY
AL
C
/0
3/
EG201
EL
EC
TR
IC
AL
O
N E-
LI
N
E D
IA
G
R
AM
PROPOSED ONE-LINE DIAGRAM
N.T.S.EG201
SURFACE GRADE
ELECTRICAL/ MECHANICAL
ROOM 137
PANEL 'DPA'
400A/3P/3R/(3)-400AF
EXISTING SERVICE
ENTRANCE
DISCONNECT SWITCH
M
METER
EXTERIOR WALL OF
TERMINAL BUILDING
RE: EG101 FOR LOCATION
AND EG202 FOR ELEVATIONS
(2 SETS) 3"C W/ (4) #4/0
THHN, #1/0G
POLE MOUNTED TRANSFORMER PROVIDING
277/480V, 3-PHASE, 4-WIRE 400A ELECTRICAL
SERVICE
PANEL
'HB'
XFMR 'TLA', K-13
480:208Y/120V
75KVA
300KW, 277/480V, 3-PHASE, DIESEL POWERED
STANDBY GENERATOR 'GEN-1' WITH A
WEATHER AND SOUND ENCLOSURE, 400A AND
200A DICONNECT BREAKERS, AND A MINIMUM 48
HOUR DIESEL SUB-BASE FUEL TANK. KOHLER
300REOZJ OR APPROVED EQUAL. REFER TO
262310 FOR ADDITIONAL REQUIREMENTS
400A, N3R RATED AUTOMATIC
TRANSFER SWITCH "ATS-1"
RE: 264130 FOR ADDITIONAL
REQUIREMENTS
C.T. CAN
SPD PANEL
'HA' RPHA
PANEL
'LA'
PANEL
'LB'
PANEL
'LC'
XFMR 'TLD'
480:208Y/120V
30KVA
PANEL
'LD'
SURFACE GRADE
INTERIOR OF HANGAR
PANEL 'L'
200A/3P/3R/200A, C/L FUSES
EXISTING SERVICE ENTRANCE
DISCONNECT SWITCH
M
METER
EXTERIOR WALL OF HANGAR
RE: EG101 FOR LOCATION
AND EG202 FOR ELEVATION
200A, N3R RATED AUTOMATIC
TRANSFER SWITCH "ATS-2"
RE: 264130 FOR ADDITIONAL
REQUIREMENTS
SURFACE GRADE
(2 SETS) 3"C W/ (4) #4/0 AWG, #1/0G
2.5"C W/ (4) #3/0 AWG, #6G
EXISTING PATHWAY W/ (4)
#3/0 AWG, #6G
2.5"C W/ (4)
#3/0 AWG, #6G
2/0G
#2G
(4) #3/0
GENERAL NOTES
1. ALL ITEMS SHOWN IN HEAVY LINEWEIGHT ARE
NEW OR MODIFIED, ALL ITEMS SHADED ARE
EXISTING TO REMAIN.
2. ALL CABLES SHALL BE COPPER TYPE THWN OR
SIMILAR, UNLESS OTHERWISE NOTED.
3. ALL EQUIPMENT SHALL BE OUTDOOR RATED,
MINIMUM OF NEMA 3R.
4. CONTRACTOR TO UPDATE ELECTRICAL
IDENTIFICATION PLATES ON EXISTING
EQUIPMENT AS NECESSARY.
N E
L
N E
L
(2 SETS) EXISTING PATHWAY
W/ (4) #4/0 AWG, #1/0G
(PULL BACK AND RE-USE
EXISTING CABLE IF POSSIBLE)
(2 SETS) 3"C W/ (4)
#4/0 AWG, #1/0G
EXTERIOR
INTERIOR
INTERIOR OF HAGAR
EXTERIOR
HANGAR
TERMINAL BUILDING
3P -4
A
3P -2
A
2"C W/ (2) #12 AWG, #12G
(BLOCK HEATER)
2"C W/ (2) #12 AWG, #12G
(BATTERY CHARGER)
KEYED NOTES
1 INSTALL NEW FUSES IN EXISTING DISCONNECT
SWITCH. NEW FUSE SIZE TO MATCH EXISTING
FUSE SIZE. IF NO EXISTING FUSE, SIZE FUSE
TO MATCH DISCONNECT SWITCH RATING.
FOUNDATION
SUB-BASE
FUEL TANK
GENERATOR WEATHER/
SOUND ENCLOSURE
GENERATOR CONTROL
PANEL
2/0G
CKT CKT BKR. KVA LOAD DESCRIPTION WIRE* C"BKR.KVALOAD DESCRIPTIONWIRE*C"
VOLTAGE: 120/208V 3 4 W AIC: REMARKS:*
SURFACE
NEMA 1
FLUSH
NEMA 3R
KVA CONNECTED LOAD
KVA DEMAND
AMPS DEMAND @ 208V
33.87
37.17
103.17
MAINS:
LUGS:
AMPS
SUB - FEED
200 MLO MCB
FEED - THRU
ALL CABLING IS 2 #12, 1 #12G UNLESS NOTED OTHERWISE.
PANEL: L
61.55
FANS1
INTER. LIGHTS 1.55
1.55
WATER HEATER
SPACE
DRYER
.36
.36
.18
SPACE
29 30
RECEPTACLES
1.92
0.36
0.24
0.50
RECEPTACLES
INTER. LIGHTS
INTER. LIGHTS
RECEPTACLES
RECEPTACLES
RECEPTACLES
EXIT SIGNS
CIRCULATION FAN
.36
2.25
2.25
.50
1.80
1.80
1.80
OUTSIDE LIGHTS
WASHER
WASHER
FANS
PARKING LOT LIGHTS
TELEPHONE BOARD
GEN. BLOCK HEATER
GEN. BATTERY CHARGER
0.50
2.80
2.50
2.50
0.84
1.25
0.50
2.40
1.25
22,000
GENERATOR "GEN-1"
THE EXISTING 200A SERVICE MEETS AND
EXCEEDS THE NEC REQUIREMENTS
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
TBPE Firm Registration No. F-6864
SHEET NO.
M
AR
K R
EV
IS
IO
N
D
AT
E
Q :\S
H
AR
ED
\F
C I P
R O
J
AI
R -E
LE
C
\2
-T
X G
U
LF
C O
AS
T
R
EG
A
IR
PO
R
T G
EN
ER
AT
O
R \D
W G
\ T X
G U
LF
C
O
AS
T G
EN
ER
AT
O
R .D
W G
EG
| 1 0/
3/
3:
P M
LA
ST
S
AV
ED
B Y:
A C
O
TE
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
AL
C
TE
XA
S G
U
LF
C O
AS
T
R
EG
IO
N
AL
A
IR
PO
R T
ST
AN
D
BY
G
EN
ER
AT
O R
PR
O
JE
C
T
BR
AZ
O
R
IA
C O
U N
TY
, T
EX
AS
T
EX
AS
G
UL
F
CO
AS
T
RE
GI
ON
AL
A
IR
PO
RT
T
AX
IW
AY
P
AV
EM
EN
T
AN
D
EL
EC
TR
IC
AL
IM
PR
OV
EM
EN
TS
A
NG
LE
TO
N, T
EX
AS
(B
RA
ZO
RI
A
CO
UN
TY
AL
C
/0
3/
EG202
EL
EC
TR
IC
AL
EL
EV
AT
IO
N
S
HANGAR WALL ELEVATION - PROPOSED
N.T.S.EG202
M
M
EXISTING HAGAR WALL
INCOMING UTILITY POWER
PROPOSED WALL MOUNT 200A
AUTOMATIC TRANSFER SWITCH
EXISTING SERVICE ENTRANCE
DISCONNECT SWITCH
EXISTING
METER BOX
CONDULET TO
PANEL 'L' LOCATED
INSIDE OF HANGAR
2.5"
2.5"
SURFACE GRADE
EXISTING TERMINAL BUILDING WALL
SURFACE GRADE
INCOMING UTILITY POWER
EXISTING AUTOMATIC
TRANSFER SWITCH EXISTING METER
EXISTING 400A
DISCONNECT
TO PANEL 'DPA'
M
EXISTING TERMINAL BUILDING WALL
SURFACE GRADE
INCOMING UTILITY POWER
EXISTING METER
EXISTING 400A
DISCONNECT
PROPOSED WALL MOUNT
AUTOMATIC TRANSFER SWITCH
TERMINAL BUILDING WALL ELEVATION - DEMO
N.T.S.EG202
TERMINAL BUILDING WALL ELEVATION - PROPOSED
N.T.S.EG202
TO GENERATOR 'GEN-1'
RE: EG101 FOR
CONTINUATION AND
EG201 FOR CONDUIT
AND CONDUCTORS
TO PANEL 'DPA'
IN ELECTRICAL/
MECHANICAL
ROOM 137
4"
4"
HANGAR WALL ELEVATION - DEMO
N.T.S.EG202
M
EXISTING HAGAR WALL
INCOMING UTILITY POWER
EXISTING SERVICE ENTRANCE
DISCONNECT SWITCH
EXISTING
METER BOX
DISCONNECT CONDULET FROM METER CAN AND
SEAL PENETRATION TO CAN. ROTATE CONDULET
90° FOR FUTURE USE OF EXISTING BUILDING
PENETRATION. REMOVE CONDUCTORS BACK TO
PANEL 'L' LOCATED INSIDE OF HANGAR.
SURFACE GRADE
ATS-1
ATS-2
TO GENERATOR 'GEN-1'
RE: EG101 FOR
CONTINUATION AND
EG201 FOR CONDUIT
AND CONDUCTORS
| Sheets and Views |
| KSA COVER SHEET |
Untitled
File details come from the government source that posted it. Updated .