6-01-PondSprings-BidForm.xlsx
XLSX spreadsheet 692 KB Posted
- Solicitation number
- 26IFB26
- Issued by
- Williamson County, Texas
About this file
This is a bid form for the Pond Springs Road Area Drainage Improvements project in Williamson County, Texas. The project encompasses construction of a new storm sewer and water line, along with associated pavement finishing and striping work. The bid form itemizes 76 line items across multiple work categories, including mobilization, traffic handling, erosion control, pipe installation (ranging from 2-inch copper to 18-inch RCP), concrete structures (junction boxes, manholes, curb inlets), pavement removal and resurfacing, concrete curb and sidewalk work, and extensive pavement markings and striping. Quantities vary significantly across items, ranging from single units for specialized items such as junction boxes and gate valves to large-scale linear footage requirements, such as 11,052 linear feet for work zone pavement mark removal and 5,115 linear feet for reflectorized thermoplastic pavement markings in yellow. The form includes five force account line items for estimated bonuses or penalties and contingency work, with one item (999-WC01 Soil Retention Blankets) pre-calculated at $25,000.00.
The bid form requires contractors to provide unit costs for each line item, with the total bid amount currently showing $25,000.00, representing only the pre-calculated force account item. All costs for compliance with the Request for Bids, specifications, and contract provisions must be included in the unit prices provided, with no separate compensation offered unless expressly stated. The form designates specific roles for project personnel, including Maria Castanon and James Chamberlin as engineers responsible for inserting bid quantities and specifications, and Christen Eschberger as the contractor responsible for inserting unit costs and the total bid amount. The bid form structure allows for flexible quantity adjustments by engineering personnel prior to final submission, indicating this may be a preliminary or template version pending finalization of actual project quantities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| PROJECT: | POND SPRINGS DRAINAGE AREA IMPROVEMENTS | ||
| Maria Castanon: Engineer to Insert Project Name | BIDDER: |
| Christen Eschberger: Contractor to Insert Bidder Name | Full compensation for compliance with each and every provision of the Request for Bids, the Bid, the Specifications, and the Contract will be considered as included in the unit prices for the work set forth below, and no separate payment will be made for compliance with each and every provision of the Request for Bids, the Bid, the Specifications, and the Contract, unless separate payment is expressly provided for therein. | ||||||
| BID | TECH | DESCRIPTION | BID | UNIT | UNIT COST | AMOUNT BID | |
| ITEM | SPEC1 | QUANTITY | MEASURE | ||||
| 1 | 0467-7099 | SET (TY I) (S= 5 FT) (HW= 4 FT) (3:1) (C) | 2 |
James Chamberlin: Engineer to insert Bid Quantity
| EA | $ - 0 | ||
| 2 | 0496-7004 | REMOV STR (SET) | 2 |
James Chamberlin: Engineer to insert Bid Quantity
| James Chamberlin: Contractor to Insert Unit Cost | EA | $ - 0 | ||
| 3 | 0496-7007 | REMOV STR (PIPE) | 122 |
James Chamberlin: Engineer to insert Bid Quantity
| James Chamberlin: Contractor to Insert Unit Cost | LF | $ - 0 | ||
| 4 | 0500-7001 | MOBILIZATION | 1 |
James Chamberlin: Engineer to insert Bid Quantity James Chamberlin: Contractor to Insert Unit Cost
| LS | $ - 0 | ||
| 5 | 0502-7001 | BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 |
James Chamberlin: Engineer to insert Bid Quantity
| James Chamberlin: Contractor to Insert Unit Cost | MO | $ - 0 | ||
| 6 | 0503-7002 | PORTABLE CHANGEABLE MESSAGE SIGN | 2 |
James Chamberlin: Engineer to insert Bid Quantity
James Chamberlin: Contractor to Insert Unit Cost EA James Chamberlin: Contractor to Insert Unit Cost
| $ - 0 | |||||
| 7 | 0506 7023 | CONSTRUCTION EXITS (INSTALL) (TY 4) | 187 | SY | $ - 0 |
| 8 | 0512-7009 | PORT CTB (FUR & INST)(LOW PROF)(TY 1) | 2032 |
James Chamberlin: Engineer to insert Bid Quantity
| LF | $ - 0 | ||
| 9 | 0512-7010 | PORT CTB (FUR & INST)(LOW PROF)(TY 2) | 160 |
James Chamberlin: Engineer to insert Bid Quantity
| James Chamberlin: Contractor to Insert Unit Cost | LF | $ - 0 | ||
| 10 | 0512-7033 | PORT CTB (MOVE)(LOW PROF)(TY 1) | 621 |
James Chamberlin: Engineer to insert Bid Quantity
| James Chamberlin: Contractor to Insert Unit Cost | LF | $ - 0 | ||
| 11 | 0512-7034 | PORT CTB (MOVE)(LOW PROF)(TY 2) | 220 |
James Chamberlin: Engineer to insert Bid Quantity
James Chamberlin: Contractor to Insert Unit Cost
| LF | $ - 0 | ||
| 12 | 0512-7057 | PORT CTB (REMOVE)(LOW PROF)(TY 1) | 2032 |
James Chamberlin: Engineer to insert Bid Quantity
| James Chamberlin: Contractor to Insert Unit Cost | LF | $ - 0 | ||
| 13 | 0512-7058 | PORT CTB (REMOVE)(LOW PROF)(TY 2) | 160 |
James Chamberlin: Engineer to insert Bid Quantity James Chamberlin: Contractor to Insert Unit Cost
| LF | $ - 0 | ||
| 14 | 0662-7064 | WK ZN PAV MRK REMOV (W)4"(SLD) | 11052 |
James Chamberlin: Engineer to insert Bid Quantity
James Chamberlin: Contractor to Insert Unit Cost
| LF | $ - 0 | ||
| 15 | 0662-7070 | WK ZN PAV MRK REMOV (W)8"(DOT) | 860 |
James Chamberlin: Engineer to insert Bid Quantity James Chamberlin: Contractor to Insert Unit Cost LF James Chamberlin: Contractor to Insert Unit Cost
| $ - 0 | ||||||
| 16 | 0662-7072 | WK ZN PAV MRK REMOV (W)8"(SLD) | 115 | LF | $ - 0 | |
| 17 | 0662-7095 | WK ZN PAV MRK REMOV (Y)4"(BRK) | 2949 | |||
| James Chamberlin: Engineer to insert Bid Quantity | LF | $ - 0 | ||||
| 18 | 0662-7097 | WK ZN PAV MRK REMOV (Y)4"(SLD) | 8807 |
James Chamberlin: Engineer to insert Bid Quantity
| James Chamberlin: Contractor to Insert Unit Cost | LF | $ - 0 | ||
| 19 | COA 101S-B | Preparing Right-of-Way | 17 |
Maria Castanon: Engineer to Insert Bid Quantity
James Chamberlin: Contractor to Insert Unit Cost
| STA | $ - 0 | PREPARING ROW | ||
| 20 | COA 104S-A | Remove P.C. Concrete Curb | 11 |
James Chamberlin: Engineer to insert Bid Quantity
| Christen Eschberger: Contractor to Insert Unit Cost | LF | $ - 0 | ||
| 21 | COA 104S-B | Remove P.C. Concrete Curb | 248 |
Maria Castanon: Engineer to Insert Bid Quantity
| Christen Eschberger: Contractor to Insert Unit Cost | SF | $ - 0 | PREPARING ROW | ||
| 22 | COA 104S-C | Remove P.C. Concrete Sidewalks and Driveways | 74 |
Maria Castanon: Engineer to Insert Bid Quantity
| Christen Eschberger: Contractor to Insert Unit Cost | SY | $ - 0 | PREPARING ROW | ||
| 23 | COA 312S-A | Seal Coat, (AC-15P, HFRS-2P OR CRS-2P) | 2311 |
Maria Castanon: Engineer to Insert Bid Quantity
| Christen Eschberger: Contractor to Insert Unit Cost | GAL | $ - 0 | PREPARING ROW | ||
| 24 | COA 312S-B | Seal Coat, (TY-D GR-5) | 50 |
James Chamberlin: Engineer to insert Bid Quantity
| Christen Eschberger: Contractor to Insert Unit Cost | CY | $ - 0 | ||
| 25 | COA 315S-A | Surface Milling | 7217 |
James Chamberlin: Engineer to insert Bid Quantity
| James Chamberlin: Contractor to Insert Unit Cost | SY | $ - 0 | ||
| 26 | COA 340S-A | Hot Mix Asphaltic Concrete Pavement, TY-D PG70-22 | 830 |
James Chamberlin: Engineer to insert Bid Quantity James Chamberlin: Contractor to Insert Unit Cost
| TON | ||||||
| James Chamberlin: Contractor to Insert Unit Cost | $ - 0 | |||||
| 27 | COA 401S-B | Common Structural Excavation | 1592 | CY | $ - 0 | |
| 28 | COA 402-A | Controlled Low Strength Material | 421 | CY | $ - 0 | |
| 29 | COA 430S-A | P.C. Concrete Curb and Gutter (Excavation) | 337 | |||
| James Chamberlin: Engineer to insert Bid Quantity | LF | $ - 0 | ||||
| 30 | COA 432SR-4 | Reconstruct Concrete sidewalks to 4 inch thickness, including removal of exisitng sidewalk | 69 |
James Chamberlin: Engineer to insert Bid Quantity
James Chamberlin: Contractor to Insert Unit Cost
| SF | $ - 0 | ||
| 31 | COA 433S-C | Type II P.C. Concrete Driveway | 1781 |
James Chamberlin: Engineer to insert Bid Quantity
James Chamberlin: Contractor to Insert Unit Cost
| SF | ||||||
| James Chamberlin: Contractor to Insert Unit Cost | $ - 0 | |||||
| 32 | COA 506-J8x8 | Junction Box, 8 Ft. x 8 Ft. | 5 | EA | $ - 0 | |
| 33 | COA 506-J16x8 | Junction Box, 16 Ft. x 8 Ft. | 1 | EA | $ - 0 | |
| 34 | COA 506-M4 | Standard Pre-cast Manhole w/Pre-cast Base, 4' Dia. | 3 | EA | $ - 0 | |
| 35 | COA 508S-I10S | Curb Inlet, Standard, 10ft | 3 | EA | $ - 0 | |
| 36 | COA 509S-1 | Trench Excavation Safety Protective Systems (all depths) | 1406 | LF | $ - 0 | |
| 37 | COA 510-ASD-18-CLV | Pipe, 18" dia., RCP-CL V (all depths) | 294 | LF | $ - 0 | |
| 38 | COA 510-AW-2"-W | Pipe, 2" Dia.Copper Type K, Complete in Place, Including Excavation and Backfill | 53 | LF | $ - 0 | |
| 39 | COA 510-AWRJ-8"-W | Pipe, 8" Dia. DI CL-350 (Restrained), all depths, Complete in Place, Including Excavation and Backfill | 96 | LF | $ - 0 | |
| 40 | COA 510-AWRJ-12"-W | Pipe, 12" Dia. DI CL-350 (Restrained), all depths, Complete in Place, Including Excavation and Backfill | 20 | LF | $ - 0 | |
| 41 | COA 510-JW-12"X8" | Wet Connections, 12"x8" | 1 | |||
| James Chamberlin: Engineer to insert Bid Quantity | EA | $ - 0 | ||||
| 42 | COA 510-KW | Ductile Iron Fittings (C-110 Weight Schedule) | 0.12 |
James Chamberlin: Engineer to insert Bid Quantity James Chamberlin: Contractor to Insert Unit Cost
| TON | $ - 0 | ||
| 43 | COA 511-A-8" | Valves, Gate 8" Dia. | 1 |
James Chamberlin: Engineer to insert Bid Quantity James Chamberlin: Contractor to Insert Unit Cost EA James Chamberlin: Contractor to Insert Unit Cost
| $ - 0 | |||||
| 44 | COA 559S-5x2 | Precast Concrete Box Culverts, 5 FT x 2FT | 42 | LF | $ - 0 |
| 45 | COA 559S-5x3 | Precast Concrete Box Culverts, 5 FT x 3FT | 558 | LF | $ - 0 |
| 46 | COA 559S-5x4 | Precast Concrete Box Culverts, 5 FT x 4FT | 591 | LF | $ - 0 |
| 47 | COA-602S-A | Bermuda Block Sodding | 739 | SY | $ - 0 |
| 48 | COA-639S | Rock Berm | 100 | LF | $ - 0 |
| 49 | COA-642S | Silt Fence for Erosion Control | 894 | LF | $ - 0 |
| 50 | COA-648S | Mulch Sock | 1298 | LF | $ - 0 |
| 51 | COA 705 | Remove and Relocate Existing Metal Beam Guard Railing | 67 |
James Chamberlin: Engineer to insert Bid Quantity
| LF | ||||||
| James Chamberlin: Contractor to Insert Unit Cost | $ - 0 | |||||
| 52 | COA 829A-4W | Type I Bicycle Lane Markings 4 inches in width, W in color | 4313 | LF | $ - 0 | |
| 53 | COA 829S-B | Type I Bicycle Lane Preferential (directional arrow) Symbol, w in color | 21 | EA | $ - 0 | |
| 54 | COA 829S-C | Type I Bicycle Lane (Biker Rider) Symbol, W in color | 12 | EA | $ - 0 | |
| 55 | COA 829S-E-4W | Type II Bicycle Lane Markings 4 inch in width, W in color | 4313 | LF | $ - 0 | |
| 56 | COA 829S-F | Type II Bicycle Lane Preferential (directional arrow) Symbol, W in color | 21 | EA | $ - 0 | |
| 57 | COA 829S-G | Type II Bicycle Lane (Biker Rider) Symbol, W in color | 12 | EA | $ - 0 | |
| 58 | COA 863S-3 | Reflectorized Pavement Markers (Type II-A-A) | 106 | EA | $ - 0 | |
| 59 | COA 863S-5 | Reflectorized Pavement Markers (Type II-C-R) | 7 | EA | $ - 0 | |
| 60 | COA 871S-A-4W | Reflectorized Type I Thermoplastic Pavement Markings, 4 inches in width, 90 mils in thickness, W in color | 531 | LF | $ - 0 | |
| 61 | COA 871S-A-4Y | Reflectorized Type I Thermoplastic Pavement Markings, 4 inches in width, 90 mils in thickness, Y in color | 5115 | LF | $ - 0 | |
| 62 | COA 871S-A-8W | Reflectorized Type I Thermoplastic Pavement Markings, 8 inches in width, 90 mils in thickness, W in color | 138 | LF | $ - 0 | |
| 63 | COA 871S-A-24W | Reflectorized Type I Thermoplastic Pavement Markings, 24 inches in width, 90 mils in thickness, W in color | 70 | LF | $ - 0 | |
| 64 | COA 871S-D | Reflectorized Type I Thermoplastic Pavement Chevrons, 90 mils in thickness, w in color | 142 | EA | $ - 0 | |
| 65 | COA 871S-E-4W | Reflectorized Type II Paint Pavement Markings 4 inches in width, W in color | 531 | LF | $ - 0 | |
| 66 | COA 871S-E-4Y | Reflectorized Type II Paint Pavement Markings 4 inches in width, Y in color | 5115 | |||
| James Chamberlin: Engineer to insert Bid Quantity | LF | $ - 0 | ||||
| 67 | COA 871S-E-8W | Reflectorized Type II Paint Pavement Markings 8 inches in width, W in color | 138 |
James Chamberlin: Engineer to insert Bid Quantity James Chamberlin: Contractor to Insert Unit Cost
| LF | $ - 0 | ||
| 68 | COA 871S-E-24W | Reflectorized Type II Paint Pavement Markings 24 inches in width, W in color | 70 |
James Chamberlin: Engineer to insert Bid Quantity
| James Chamberlin: Contractor to Insert Unit Cost | LF | $ - 0 | ||
| 69 | COA 871S-H | Reflectorized Type II Paint Pavement Chevrons, W in color | 142 |
Maria Castanon: Engineer to Insert Bid Quantity
James Chamberlin: Contractor to Insert Unit Cost
| EA | ||||||
| Christen Eschberger: Contractor to Insert Unit Cost | $ - 0 | PREPARING ROW | ||||
| 70 | COA 872S-A | Prefabricated Pavement Markings (Word), W in color | 1 | EA | $ - 0 | |
| 71 | COA 872S-B | Trench Excavation Safety Protection System (All Depths) | 1 | EA | $ - 0 | |
| 72 | COA 874S-A6 | ELIM EXT PAV MRK & MRKS (6") | 11000 | LF | $ - 0 | |
| 73 | COA SP510-BW-2"x2" Dia | Water Service Reconnection, including 2” Corporation Stop, Tap to Main, as well as removal of the existing components | 1 |
Maria Castanon: Engineer to Insert Bid Quantity
| EA | ||||||
| Christen Eschberger: Contractor to Insert Unit Cost | $ - 0 | PREPARING ROW | ||||
| 74 | COA SP510-JW-AC-8''x8" | AC Pipe Connections, 8" Dia. x 8" Dia. | 1 | EA | $ - 0 | |
| 75 | COA SP510-JW-CI-12''x12" | CI Pipe Connections, 12" Dia. x 12" Dia. | 1 | EA | $ - 0 | |
| 76 | SP-A400-W8" Dia | Removing Pipe, 8" Diameter, AC Pipe - For Removal at Storm Crossings, Required Restrained Joints, to Existing Couplings, and Other Areas Specified on Plans; Pipe Removal shall include the cost of trench and pavement repairs, Complete and in place; Removal of valves considered subsidiary to cost of pipe removal | 92 | LF | $ - 0 |
| NON-BID ITEMS TO BE INCLUDED IN BID AND CONTRACT AMOUNT. DO NOT MAKE CHANGES TO THIS SECTION. | ||||||||||
| 585-WC01 | FORCE ACCOUNT - ESTIMATED RIDE QUALITY BONUS/PENALTY | DOL | $ 1.00 | $ - 0 | ||||||
| 76 | 999-WC01 | FORCE ACCOUNT | 25000 | DOL | $ 1.00 | $ 25,000.00 | SOIL RETENTION BLANKETS (CL 1) (TY C) | |||
| 999-WC02 | FORCE ACCOUNT - RAILROAD FLAGGERS | DOL | $ 1.00 | $ - 0 | ||||||
| 3076-WC01 | FORCE ACCOUNT - ESTIMATED PLACEMENT AND PRODUCTION BONUS/PENALTY (TY B) | DOL | $ 1.00 | $ - 0 | ||||||
| 3076-WC02 | FORCE ACCOUNT - ESTIMATED PLACEMENT AND PRODUCTION BONUS/PENALTY(TY D SURFACE) | DOL | $ 1.00 | $ - 0 | SOIL RETENTION BLANKETS (CL 1) (TY C) | |||||
| TOTAL AMOUNT OF BID | ||||||||||
| Dollars and | ||||||||||
| Christen Eschberger: Contractor to Insert Total Amount of Bid in Words | Cents | $ 25,000.00 |
NOTE: THE COURT MAY EITHER REJECT ALL BIDS OR AWARD A CONTRACT TO THE LOWEST AND BEST BID.
| Note To User: If Alternate Bid is utilized, include instructions for how to complete the Alternate Bid section. |
| For example, identify those Items in the Base Bid which are being replaced by the Alternate Items, as applicable. |
&"Arial,Bold"BID FORM
WILLIAMSON COUNTY, TEXAS
&9 &X1&XRefer to the Technical Specifications section for a description of the specific reference number. &8Page &P of &N
Sheet1
| COA 101S-B |
| COA 104S-A |
| COA 104S-B |
| COA 104S-C |
| COA 312S-A |
| COA 312S-B |
| COA 315S-A |
| COA 340S-A |
| COA 430S-A |
| COA 432SR-4 |
| COA 433S-C |
| COA 705 |
| 0502-7001 |
| 0503-7002 |
| 0512-7009 |
| 0512-7010 |
| 0512-7033 |
| 0512-7034 |
| 0512-7057 |
| 0512-7058 |
| 0662-7064 |
| 0662-7070 |
| 0662-7072 |
| 0662-7095 |
| 0662-7097 |
| COA 874S-A6 |
| 0467-7099 |
| 0496-6004 |
| 0496-6007 |
| COA 401S-B |
| COA 402-A |
| COA 506-J8x8 |
| COA 506-J16x8 |
| COA 506-M4 |
| COA 508S-I10S |
| COA 509S-1 |
| COA 510-ASD-18-CLV |
| COA 559S-5x2 |
| COA 559S-5x3 |
| COA 559S-5x4 |
| 0506 7023 |
| COA-602S-A |
| COA-639S |
| COA-642S |
| COA-648S |
| COA 829A-4W |
| COA 829S-B |
| COA 829S-C |
| COA 829S-E-4W |
| COA 829S-F |
| COA 829S-G |
| COA 863S-3 |
| COA 863S-5 |
| COA 871S-A-4W |
| COA 871S-A-4Y |
| COA 871S-A-8W |
| COA 871S-A-24W |
| COA 871S-D |
| COA 871S-E-4W |
| COA 871S-E-4Y |
| COA 871S-E-8W |
| COA 871S-E-24W |
| COA 871S-H |
| COA 872S-A |
| COA 872S-B |
| COA 509-A |
| COA 510-AW-2"-W |
| COA 510-AWRJ-8"-W |
| COA 510-AWRJ-12"-W |
| COA 510-JW-12"X8" |
| COA 510-KW |
| COA SP510-BW-2"x2" Dia |
| COA SP510-JW-AC-8''x8" |
| COA SP510-JW-CI-12''x12" |
| COA 511-A-8" |
| SP-A400-W8" Dia |
| 0500 7001 |