UNIT

USCCG DEPENDABLE (WMEC 626)

TITLE
Port Anchor Wildcat, Open and Inspect
DATE REQUIRED/POP
POP 03/29/22-04/28/22

Address, 1100 ABBOTT ROAD, STE 200 Virginia Beach, VA 23459 POC: LT Steve Horvath (757) 462-7770

PRIORITY

(100 Urgent/200 Necessary

300 Desirable/400 Routine

500 Backlog)

INSPECTION? (Y/N)
Y
HAZMAT? (Y/N)
Y

Description: Add the below information to this block. No apparent character restrictions. Copy/paste the below into MAM.

LOCATION
Focsle
CONDITIONS EXISTING, Work Requested
It was discovered that the port anchor windlass would not release the anchor or disengage the gypsy head. The port anchor would fall if the anchor was assisted manually by walking it out of the pocket. In the past, it had to be walked out completely, then returned to the pocket, before it could be released to let fall. S/F cleaned and re-greased the equipment until fresh grease was produced from fittings per product line guidance and IAW depot level MPC. Immediately after that maintenance, the gypsy head moved freely in both directions. Additional note: S/F had trouble disengaging the handle within upper Bosn stores indicating binding issues.

During line to power training it was discovered that the port gypsy head wouldn’t disengage from the wildcat portion of the anchor windlass again. S/F was able to disengage the head from the wildcat by exercising the handle within upper Bosn stores for approximately a half an hour.

Requesting contractor come on board and observe Ship’s Force operate the port anchor windlass and wildcat operation. Following the operation, we request that the windlass be troubleshot/open/inspect to determine the failure and submit a CFR for windlass/wildcat repair.

WORK TO BE ACCOMPLISHED

Open, Inspect, and Repair

Anchor Windlass Assembly

N/A

Accomplish prior to repairs. Submit (CIR). See paragraph 3.1.1 in Std Spec 5000.

GFE (Government Furnished Equipment)
N/A
INTERFERENCES
The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
REFERENCE PLANS/NAME PLATE DATA
627 WMEC 581-001, Rev B, Anchor Handling

627 WMEC 581-003, Rev -, Capstan Windlass Assembly 627 WMEC 581-005, Rev A, Anchor Windlass (TP) 3240A, Apr 2018, Manufacturer's Instruction Book -SWBS 581, Section D, Anchor Windlass, Model C18L137E

(SFLC Std Spec 0000), 2018, General Requirements (SFLC Std Spec 3020), 2018, Overhaul AC Electrical Motors In-Shop (SFLC Std Spec 5000), 2018, Auxiliary Machine Systems

(SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures

SAFETY
Handling of petroleum products.

Heavy Lifting/use of crane.

UNIT ASSISTANCE TO BE PROVIDED
SF will be available to operate and assist as needed.
COST ESTIMATE/AFC (FUNDS// EX: 45, 30// Hint: check CMP)
AFC 45

TEST/DOCUMENTATION

(EX: UT Shots…) CIR after op test and inspection

EO REMARKS/CMP ID #

ATTACHMENTS

(Pictures, spreadsheets, etc) N/A

Refer to SFLC CSMP Help Guide to complete each block

CAN ASSOCIATE “CONFIGURATION ITEMS” IN THE PROGRAM (PARTS INFO)

PR NR 52000PR220016340