5-PW-7611 Unit Price Schedule Final.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
PW-7611 City-Wide Targeted Sidewalk Improvements
Solicitation number
545661
Issued by
Wayne County, Detroit City, Michigan

About this file

This is a Unit Price Schedule for PW-7611 City-Wide Targeted Sidewalk Improvements, prepared by the City of Detroit Office of Contracting and Procurement on behalf of the Department of Public Works. The project encompasses city-wide targeted sidewalk improvements including removal and replacement of sidewalks, curbs, gutters, driveways, and related infrastructure. The scope of work includes 37 line items covering mobilization, clearing and grubbing, stump removal, concrete and asphalt work, curb ramps, detectable warning surfaces, seeding and sodding, and utility adjustments. Work quantities are substantial, with major items including 137,736 square yards of sidewalk removal, over 1.2 million square feet of concrete sidewalk installation (including sections with tree root accommodation), 1,950 linear feet of curb ramp opening, and associated site restoration. The contract allows 210 calendar days for completion and requires contractors to provide capacity information including average sidewalk installation rates, personnel classifications, and equipment assignments.

All unit prices in the schedule are currently listed at $0.00, indicating this is a blank form awaiting bid submissions. Contractors must quote all unit prices in US dollars with two decimal points, accurately reflecting labor, equipment costs, and materials necessary to perform each task. The instructions note that bids may be rejected if considered unbalanced, and emphasize that while quantities represent the City's best estimate, actual work may deviate based on changing site conditions. Contractors are required to demonstrate that each unit price accurately reflects the actual costs of services for the described work items.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PW-7611 CITY-WIDE TARGETED SIDEWALK IMPROVEMENTS
UNIT PRICE SCHEDULE
ITEM NO.DESCRIPTION OF ITEMITEM CODEQTY.PAY UNITUNIT PRICEITEM TOTAL
1Mobilization, Max. 5%11000011LSUM$ 0
2_Clearing and Grubbing, Modified20170114,550Syd$ 0
3Stump, Rem, 19 inch to 36 inch20200066Ea$ 0
4Stump, Rem, 37 inch or larger20200077Ea$ 0
5Stump, Rem, 6 inch to 18 inch20200086Ea$ 0
6_Sidewalk, Rem, Modified2047011137,736Syd$ 0
7_Curb and Gutter, Rem, Modified20470013,900Ft$ 0
8_Curb, Rem, Modified20470017,800Ft$ 0
9_Integral Curb and Sidewalk, 2 Feet, Rem, Modified2047001975Ft$ 0
10_Driveway, Rem, Modified20470112,795Syd$ 0
11_ Excavation, Earth, Modified205702133Cyd$ 0
12Aggregate Base, 4 inch3020010390Syd$ 0
13_Dr Structure Cover, Adj, Case 2, Modified403705020Ea$ 0
14_ HMA Approach, Driveway, Modified501703165Ton$ 0
15_Driveway, Nonreinf Conc, 6 inch, Modified8017011988Syd$ 0
16_Driveway, Nonreinf Conc, 8 inch, Modified8017011130Syd$ 0
17_Curb and Gutter, Conc, Det C5, Modified80270011,950Ft$ 0
18_Curb, Conc, Detail CD, Modified80270013,900Ft$ 0
19_Integral Curb and Sidewalk, 2 Feet, Modified8027001650Ft$ 0
20Curb Ramp Opening, Conc80300301,950Ft$ 0
21_Detectable Warning Surface Tile, Modified8037001390Ft$ 0
22_Grinding Sidewalk, Modified80370013,900Ft$ 0
23_Curb Ramp, Conc, 6 inch, Modified803701014,248Sft$ 0
24_Sidewalk, Conc with Tree Roots, 4 inch, Modified8037010341,560Sft$ 0
25_Sidewalk, Conc with Tree Roots, 6 inch, Modified803701022,360Sft$ 0
26_Sidewalk, Conc, 4 inch, Modified8037010716,328Sft$ 0
27_Sidewalk, Conc, 6 inch, Modified8037010145,108Sft$ 0
28Minor Traf Devices81201701LSUM$ 0
29Traf Regulator Control81203701LSUM$ 0
30_Seeding, Mixture THM, Modified81670111,560Syd$ 0
31_Topsoil Surface, Furn, LM, Modified8167021172Cyd$ 0
32_Water, Sodding/Seeding, Modified81670521Unit$ 0
33_Monument Box, Adjust, Modified82170501Ea$ 0
34_Monument Box, Modified82170501Ea$ 0
35_Monument Preservation, Vertical, Modified82170501Ea$ 0
36_Water Shutoff, Adj, Case II, Modified823705048Ea$ 0
37_Door Hanger Notifications, Modified85070511LSUM$ 0
TOTAL BASE BID PRICE, ITEMS 1-37$ 0
CONTRACTOR:

CAPACITY INFORMATION

CONTRACTOR:
ITEM NO.DESCRIPTION OF ITEMQTYUNIT
1Average sidewalk installation rate including removal, replacement and restoration.SFT/WEEK
2Personnel by Work Classification Assigned to this Project (Attach separate list, if needed):COUNT

3 Equipment by Classification Assigned to this Project (Attach separate list, if needed): COUNT

Time Allowed for Completion: 210 Calendar Days
Quote all unit prices in US Dollars with two (2) decimal points only (example: $0.00)

Note: Unbalanced bids may be rejected. Each Unit Price quoted must accurately reflect the labor, equipment costs and materials necessary to perform the described tasks. The quantity depicted on the bid form is our best estimate of the anticipated work, but changing site conditions or other factors may contribute to deviations from the planned quantities. It is incumbent that the Bidder accurately reflect the actual costs of services for each unit price listed on this form.