Construction_Statement_of_Work_Incl_Options.pdf

PDF 14 KB Posted

Attached to
Vault 3 & 4 Electrical Upgrades Project Federal contract opportunity
Solicitation number
47PM0218N0001
Issued by
General Services Administration Public Buildings Service National Capital Region

About this file

SOW with Options

View the file

Other files for this federal contract opportunity

Other files attached to Vault 3 & 4 Electrical Upgrades Project, newest first.
File Type Posted
Amendment_No_1_SF30_RFI_Responses.pdf PDF
Site_Visit_Sign_in_Sheet.pdf PDF
Amendment_No_1_SF30_-_VAULT_3_&_4.pdf PDF
Attachment_3_CD_Pickup_Instructions_VAULT_3_&_4.pdf PDF
Registration_Form_for_Site_Visit.docx DOCX document
SF25-16_Performance_Bond.pdf PDF
SF_1442_Form_-_47PM0218N0001.pdf PDF
Vault_3_&_4__Agreement.pdf PDF
Firms_Past_Performance_Form.pdf PDF
Solicitation.pdf PDF
Vault_3_&_4__Offeror_Representations_and_Certifications.pdf PDF
SOW_-_VAULT_3_&_4.pdf PDF
Davis_Bacon_Wage_Determination.pdf PDF
SF25A-16_Payment_Bond.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

October 4, 2017

Vault 3 & 4 Upgrade Statement of Work

Refer to the Vault 3&4 Electrical Upgrade 100% Construction Documents Dated April 4, 2017.

This a construction project that consists of replacing the Vaults 3 & 4 electrical distribution equipment, located in the Harry S. Truman Building. Perspective bidders shall provide quotes for the base project and three options.

The project will entail numerous outages, which all need to be coordinated in advance with the appropriate State Department point of contact. The Contractor shall adhere to the phasing plan described in the construction documents.

The work should be in accordance with the plans and specifications provided by WRL and the security plans and specifications provided by Diplomatic Security.

Base Project:

• Replace all of the electrical distribution equipment from secondary side of the network transformers. This includes all of the network protectors, switch gear, bus duct, distribution panels with associated conductors, low voltage transformers, lighting, fire alarm and fire protection. The base bid shall include everything except: both options discussed in Paragraph 3.1 "SCHEDULE OF OPTIONS" in specification section 012300

- 2.

• Security plans and specifications provided by Diplomatic Security.

Option 1:

Replace network transformers and feeders already shown in the plans and specifications.

• Replace the network transformers in Vaults 3 & 4.

• Replace medium voltage feeders between Vaults 3 & 4 (Refer to Sheet EP 0B1)

• Replace medium voltage feeders between Vault 3 and Manhole 3 and 3A (Refer to Sheet

EP 0B1)

Option 2:

Medium voltage feeder replacement between the Main Vault and Vault 5. This is referred to as Option No 1 in Paragraph 3.1 in Specification Section 012300-2.