Contractor RFIs Amendment 0003.pdf

PDF 26 KB Posted

Attached to
Hatfield Courthouse Judge's Elevator Upgrades Federal contract opportunity
Solicitation number
47PL0121R0011
Issued by
General Services Administration Public Buildings Service Region 10

About this file

This document contains responses to contractor questions regarding a solicitation for design-build construction services to modernize judge's elevators at the Hatfield United States Courthouse in Portland, Oregon. The General Services Administration Public Buildings Service Region 10 is seeking proposals to replace elevator equipment including the controller, door equipment, signal fixtures, and perform electrical and communication wiring upgrades. A site visit was held on 24 February 2021 and proposals are due by 19 March 2021. The basis for award is lowest price technically acceptable. The project has an estimated value between $500,000 to $1,000,000. Emergency response time for elevator issues must be within one hour as part of the warranty requirements. Additional site visits are not permitted due to security concerns at the courthouse.

View the file

Other files for this federal contract opportunity

Other files attached to Hatfield Courthouse Judge's Elevator Upgrades, newest first.
File Type Posted
Elevator Plate and Switch.jpg JPG image
Amendment 0003.pdf PDF
19 and 20 Details.jpg JPG image
8 and 9 Details.jpg JPG image
7 and 8 Details.jpg JPG image
Motor tag.jpg JPG image
Amend 0002 - Extension to Proposal Due date.pdf PDF
Amend 0001 - SOW v.1.pdf PDF
Amend 0001 -GSA HATFIELD USCH ELEV PDS -Redacted.pdf PDF
Amend 0001 - C301-SAT - Reps and Certs v.1.pdf PDF
SF30 Amendment 0001.pdf PDF
Amend 0001 - Contractor RFIs Amendment 0001.pdf PDF
Agreement.pdf PDF
Section 14220 ELECTRIC TRACTION ELEVATOR MODERNIZATION Final 080520.pdf PDF
Sample OF 306.pdf PDF
Past Performance Questionnaire.docx DOCX document
Sample CIW Form.docx DOCX document
Wage Determination.pdf PDF
SF1442 47PL0121R0011.pdf PDF
GC Reps and Certs.pdf PDF
C301-SAT - Reps and Certs.pdf PDF
SOW.pdf PDF
Solicitation.pdf PDF
Sample ROCAL.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

March 22, 2021

RFP 47PL0121R0011- Hatfield FB Judge’s Elevator

Modernization

Pre-Proposal Questions & Answers Amendment 0003

1.) RFI: Are there existing support beams in the machine room? If so, please provide the size and attachment type to supports.

Response: See details 20, 8 and 9 in attached photographs.

Reference: 14220 2.4 G

2.) RFI: Please provide the distance of the length of conduit between the electrical panel and the disconnects. No information was provided as part of the project and Amendment 1 seems to indicate replacement of the 3 phase power feeders is required.

Response: Approximately 35' of 1.5" conduit.Final size of condit and feeder to be determined by NEC regulations as interpreted by a licensed electrician. This project removes DC motors and replaces with AC Motors. Electrician to determine if the breakers, feaders and conduit need to be replaced due to this change.

Reference: Amendment 1, SOW V.1 Response 13

3.) RFI: What is the existing main feeder size and conduit size between the electrical panel and main elevator disconnect?

Response: 1.5" Inch conduit. Feeder is approprite for existing DC Motors. See

Motor Tag photo. May not be for new AC Motors. TBD by liscenced Electrician in accordance with NEC.

Reference: Amendment 1, SOW V.1 Response 13

4.) RFI: No Emergency Call response time is provided in the documents provided that we have found. Is there a requirement for emergency response time as a part of this RFP?

March 22, 2021

Response: All government contracts require a one year warranty period for work performed. If a component fails or fails to work as specified during that one year period, the contractor will be required to address the problem as soon as possible. Someone stuck in an elevator is an emergency that must be responded to within no more than an hour. The specifications called out specific elevator contractors approved for this project. Part of their inclusion was the ability to provide these services.

Reference: Specifications 14220

5.) RFI: Will replacement of any switches in the MDP/ Switchgear be necessary for the elevator upgrades?

Response: Motors are changing from DC to AC. Electrical feeders and switches to be evaluated by licensed electrician for appropriateness of use with new motors.

Reference: Motor tag.jpg and SOW V.1 Response 13

6.) RFI: Can an additional Site Visit be held?

Response: Currently access to this building is not being authorized due to unrest surrounding it, therefore, a second site visit is not an option prior to the due date of proposals.

Reference: Photographs provided to assist with proposal preparation in lieu of second site visit.