Q&A - 2nd Set
View the file
Other files
| File | Type | Posted |
|---|---|---|
| summary_of_changes_A11_.docx | DOCX document | |
| Solicitation_Amendment_47PH0217R0016_0011.pdf | ||
| Figure_B-3_Pricing_of_Services_(3).xlsx | XLSX spreadsheet | |
| Solicitation_Amendment_47PH0217R0016_0010_(4).pdf | ||
| Solicitation_Amendment_47PH0217R0016_0010_(1).pdf | ||
| summary_of_changes_A10_(1).docx | DOCX document | |
| Amendment_9.zip | ZIP file | |
| New_Mexico_Solicitation_Amendment_8.zip | ZIP file | |
| New_Mexico_-_Amendment_7.zip | ZIP file | |
| Solicitation Amendment 47PH0217R0016_0006.pdf | ||
| Fig_L-2_MANGEMENT_PLAN_BASELINE_(1).xlsx | XLSX spreadsheet | |
| Summary_of_changes_(1).docx | DOCX document | |
| Solicitation_Amendment_47PH0217R0016_0005.pdf | ||
| Solicitation_Amendment_47PH0217R0016_0004.pdf | ||
| Summary_of_Changes_-_Amendment_4.pdf | ||
| Amendment_3_Albuquerque_NM.zip | ZIP file | |
| Solicitation_Amendment_47PH0217R0016_0002_Signed.pdf | ||
| A_1_SOW.pdf | ||
| A1.pdf | ||
| Amendment_1.pdf | ||
| Synopsis_amendment_1.pdf | ||
| Synopsis.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
47PH0217R0016, AMENDMENT 03
RESPONSES TO REQUEST FOR INFORMATION
| Questions Number | Question |
| 1 | Performing required services for multiple buildings each with approximately 200,000 square feet or greater. Consideration will be given for demonstrated experience with diverse geographic locations. I see that the Chavez building is the only location greater than 200K SF. Will you accept a project that is similar to scope and magnitude of this requirement with one (1) building greater than 200K SF as long as the entire project consists of multiple buildings with multi stories? |
| Answer | Intent will be 1 building over 200,000, amendment forthcoming. |
| 2 | Can the experience and past performance come strictly from the Sub-Contractor within the Teaming agreement? Just to clarify, we’re trying to determine if the requirement for joint ventures (L.5.3.1.1 - a minimum of 1 of the maximum 5 Past Performance projects must be submitted from each member of the joint venture) applies to teaming arrangements as well or can subcontractor past performance solely be used for a teaming (prime/sub) arrangement. I just wanted to make sure that was clear. |
| Answer | No, the experience and past performance must come from members of the teaming arrangement. Sub-contractors are not formal members of teaming arrangements - we will be posting a formal response at the end of the questioning period. -Answer provided to asker on 15 Nov 17 |
| 3 | Pg 203, para L.5.3.1.1. versus pg 202, para L.5.2.2. Para L.5.2.2 says that projects submitted as demonstrated experience can be any party to the Joint Venture or Partnerships and other teaming arrangements. Para L.5.3.1.1 also specifies that projects for past performance may be submitted from any member of the Joint Venture or Partnerships and other teaming arrangements. The next sentence appears to contradict both L.5.2.2 and L.5.3.1.1 by stating that one of the qualifying projects must be submitted from each member of the Joint Venture or partnerships and other teaming arrangements. This appears to be contradictory. Please clarify. |
| Answer | There is no contridiction. Each member should submit at least 1 project but the remaining projects, up to the maximum of 5, may be from any member of the team. |
| 4 | Pg 201, para L.5.2.1. The last sentence describes similarity as cumulatively demonstrating the offeror can meet the several bulleted characteristics that follow. May the multiple buildings with 200,000 square feet bullet be demonstrated by several projects with buildings less than 200,000 square feet, but that cumulatively exceed 200,000 square feet? |
| Answer | See response to Question 1. |
| 5 | Pg 201, para L.5.2.1. Is the requirement for multiple buildings of approximately 200,000 square feet or greater cumulative or must each building be greater than 200,000 square feet? |
| Answer | See response to Question 1. |
| 6 | L.5.2.1 states under Experience factors “To be considered similar the projects provided must cumulatively demonstrate: |
• Performing required services for multiple buildings each with approximately 200,000 square feet or greater. Consideration will be given for demonstrated experience with diverse geographic locations.
a. Please clarify if the 200,000 SF requirement is applied to each building of a given reference. We have a reference in which there are 3 buildings, 2 of which exceed 200,000 SF but the third is less than 100,000 SF, would this reference qualify?
b. Will GSA consider changing the square footage requirement? Only one of the buildings in this RFP is over 200,000 SF.
| Answer | See response to Question 1. |
| 7 | Paragraph L.5.2.1 states “To be considered similar the projects provided must cumulatively demonstrate:” followed by a list of bullet points. Does a contract used as an example of experience have to have all the bullet points or only most of them? Please clarify. |
| Answer | The projects must cumulatively demonstrate the experience listed in L.5.2.1. Not all projects must demonstrate each bullet point. However, the more factors a project demonstrates, the more it will be considered similar in scope. |
| 8 | Paragraph L.5.2.1 with the first bullet states, “To be considered similar the projects provided must cumulatively demonstrate: Performing required services for multiple buildings each with approximately 200,000 square feet or greater.” Will a contract with two adjacent buildings each over 200,000 SF will meet the “multiple buildings” criteria? Please clarify |
| Answer | See response to Question 1. |
| 9 | Regarding the above referenced solicitation, L.5.3.1.1 For offers from Joint Venture, Partnerships, and other teaming arrangement, projects may be submitted from any firm listed in offerors submittal for L.4.2.6 Joint Ventures, Partnerships and other teaming arrangements. A minimum of 1 of the maximum 5 Past Performance projects must be submitted from each member of the joint venture. |
My interpretation of the underlined sentence is that the requirement for a minimum of 1 of the maximum 5 past performance projects only applies to joint ventures, not partnerships or teaming arrangements, since it only states joint ventures and therefore partnerships and other teaming arrangements are not required to do this. I am basing this assumption on the first sentence stating that the projects may be submitted from any firm listed in the offerors submittal, and then goes further addressing Joint Ventures, Partnerships and other teaming arrangements
Can you let me know if my assumption is correct?
| Answer | Your assumption is incorrect. The intent is for each member of the Joint Venture, Partnership, and other teaming arrangements to submit a Past Performance. This section will be amended. |
| 10 | Reference paragraph CC.2, Objectives and Scope for the custodial services portion of the contract. And, Reference the Exhibit 1, |
Building Information Sheets. In paragraph CC.2 you list all of the facilities of the contract and indicate that full maintenance services are required in all of the listed facilities. However in Exhibit 1, there is no Building Information Sheet for the Pete Domenici Courthouse. Without the Building Information Sheet for the Domenici USCH bidders have no idea of the size or square foot breakout to develop staffing and cost for this facility. Please provide the BIS for the Domenici USCH.
| Answer | The Pete Domenici Courthouse does not include custodial. The solicitation will be amended. |
| 11 | May I ask what the current contract is valued at? |
| Answer | The current contract value is $14,991,893 but the specification has been significantly revised since the current contract was awarded. |
| 12 | Is there a size restriction for the subcontractor performing services for this project? |
| Answer | No |
| 13 | QUESTION: CC.5.4.1 Grounds Maintenance Services |
General: Grounds maintenance in the standard services shall benefit the environment and generate cost savings to the Federal Government. The Contractor shall maintain all plants, trees, shrubs, ground covers, and lawns in a manner that prolongs life and sustains a healthy appearance.
| Answer | Yes, this statement is correct. |
| 14 | CC.5.4.9 Flowerbeds and Planted Areas |
Please provide the number of seasonal plants that the contractor will be required to provide annually for each location that seasonal plants will be required.
| Answer | Zero, these are not plants that have to be provided annually. |
| 15 | CC.5.4.10 Plant Replacements |
The Contractor shall be responsible for all costs associated with the replacement of all planted materials that have been damaged as a direct result of the Contractor’s lack of oversight, neglect, or lack of proper care and maintenance.
Please provide the number of plants that the contractor will be required to maintain annually for each location and the length of transition warranty of the plants.
| Answer | The successful offeror will be able to inventory current plants and identify neglected plants on the Initial Deficienty List. |
| 16 | 2. QUESTION: CC.5.3 Snow and Ice Removal |
The Contractor shall perform snow and ice removal standard services for the snow and ice removal program.
This section is incomplete as to specifying the total snow operations requirement. While it is clear in relation to clearing of snow from doorways, entrances, stairs, landings etc., as being part of the standard services price, it excludes the costs for loaders, bobcats, plows etc., and does not address the clearing, loading and hauling of snow from the parking areas.
Please provide a copy of the Snow and Ice Program.
Can maps or drawings of the snow removal areas be provided that clearly show those areas that are considered to be part of the standard service and those that would be performed as ordered services?
| Answer | All sidewalks serving the Federal Property; all parking lots, intakes and discharges |
| 17 | In the motor pool areas and warehouse areas, will staging of snow be permitted as there appears to be adequate space in lieu of the more costly loading and hauling away of snow? |
Please provide guidance as to how these areas; vehicular courts, driveways, plaza areas, roadways, parking areas should be performed with the use of heavy equipment (ride-on equipment such as front end loaders, backhoes, bobcats, snow plows, etc.)
Who responsible for the cost of snow and ice removal by the means of heavy equipment?
Where is the snow be staged by the contractor, so the heavy equipment can have access to it?
Please define in a more definitive scope with respect to the various locations/areas of the snow removal requirements.
Answer The contractor is responsible for the cost of heavy equipment.
18 QUESTION: CC.5.2.2 Window Washing (Exterior Surfaces of Windows)
Please provide the workload information for the exterior window. Any many, Square Feet , number of high rise window cleaning platforms and other information about the cleaning requirements.
| Answer | All windows are listed in the Building Information Sheet |
| 19 | QUESTION: Will GSA be providing additional building information for Custodial & Grounds Services such as net cleanable area, square feet of bare and carpeted floor, square feet of lawn & shrubbery, etc. so that we can prepare accurate pricing for this Solicitation? |
| Answer | That information is provided in Section J, Attachment C1 |
| 20 | QUESTION: The specifications seem to indicate that hauling of solid waste is the responsibility of the contractor. However, during the site visit we were told that the GSA pays for trash disposal. Could the government please clarify who pays for trash disposal at all sites? |
| Answer | GSA is paying for trash disposal at all sites. |
| 21 | QUESTION: CM.5. Startup Phase/Transition Phase |
There is a cost associated with putting personnel on site to complete the requirements of the transition phase. How are the associated costs to be captured and reimbursed by GSA? Should the bidder include it in the Base Year Monthly Operations and Maintenance Costs?
| Answer | The Startup Phase/Transition Phase is not separately priced. |
| 22 | QUESTION: In reference to emergency generator (Pete Domenici Courthouse) Will GSA require load bank testing during the annual maintenance? |
| Answer | Yes |
| 23 | QUESTION: Please provide the list of attendees at the site visits and Pre-proposal conference. |
| Answer | A list is provided via amendment |
| 24 | QUESTION: Could the government please provide an average total number of annual service calls? Could we please be provided with a digital copy of the service call log which was in the bidder's library? |
| Answer | The information is in the Bidder's Library in Section J |
| 25 | QUESTION: Will the contractor be required to have a dedicated, full time Quality Control person or can this function be performed by lead mechanics and the project manager? |
| Answer | No dedicated quality control person required, can be performed by project manager. |
| 26 | QUESTION: When was the last time the preventive maintenance (PM) tasks that have frequency longer than annually performed? |
| Answer | 2017 |
| 27 | QUESTION: Do we have to accomplish all multi-year frequency PM tasks in the first year of the contract? |
| Answer | All Pms will be completed the first year of the contract. |
| 28 | QUESTION: Can we have a list of new equipment subject to warranty work, as it will affect the price? |
| Answer | NM0050Z = (1) 150 Ton Mag Lev Smardt Chiller. NM0038ZZ = (2) 100 Ton Smart Chillers (2) air cooled conednsing units. (2)VFD Drives for chilled water,(2) chilled water pumps and motors 7.5hp |
| 29 | QUESTION: Does GSA currently maintain files on Safety Data Sheets and are these files current and up-to-date? |
| Answer | Yes |
| 30 | QUESTION: Will GSA have files of Equipment Warranty, which are current and up to date? |
| Answer | Yes |
| 31 | QUESTION: Can we have the name list and position list for all incumbent employees? |
| Answer | A list will be provided to the successful offeror. |
| 32 | QUESTION: How many days does it take for GSA to clear new employees? |
| Answer | The average is 4-6 weeks. |
| 33 | QUESTION: Does the government provide parking spaces for contractor's employees who are working at the facilities regularly? If yes, how many spaces? If no, can we purchase the spaces and if yes, how much does it cost for long term use? |
| Answer | The government does not provide parking for contractor employees. |
| 34 | QUESTION: Will this contract be subject to the New Mexico Gross Receipts Tax? |
| Answer | No, per FAR 29.401-4(b) the New Mexico Gross Receipts Tax applied to cost-reimbursement contract. |
Sales of services to a governmental agency are not deductible from NM gross receipts tax per 3.2.212.9
| 35 | What is the current monthly value of the contract? |
| Answer | See response to question 11 |
| 36 | Please confirm that there are no roof anchorage points requiring annual inspection, but if so, how many are there? |
What type are they (e.g. Davit)?
If applicable, when were they (Roof Anchorage Points) last inspected and certified?
| Answer | Roof anchorage points are present, Certified 2017, NM0030ZZ, Chavez FB, 68 anchor points. |
| 37 | Fire Alarm System Central Station Monitoring- a) Does GSA provide the telephone lines for this service?, b) If not and it is a contractor responsibility, how many telephone lines are required? |
| Answer | Telephone lines are provided for Fire Alarm System monitoring. |
| 38 | With regards corrosion monitoring, please identify which systems do not currently have coupon racks or equivalent electronic monitoring systems installed? |
| Answer | All sites have coupon racks. |
| 39 | Is there parking available for employees? If so, please provide which buildings. |
| Answer | See response to Question 33. |
| 40 | Are there Advanced Meters currently operating in the building, and if so how many? |
| Answer | Yes, one each ( water,gas,electric ). |
| 41 | Please provide the name of the Vendor providing service and maintenance for Gates, Sally Port and Arms. |
| Answer | That information is proprietary to the incumbent contract. |
| 42 | Per H.15.1.3 Controls/HVAC Training- does the contract require that one person receive the training for the entire contract, or one person per building receives the training? |
| Answer | One person per contract. |
| 43 | Are there any Above Ground or Underground Fuel Storage Tanks? If so, please provide location and size for each. |
| Answer | NM0030ZZ has above ground fuel storage for gen set 300 gallon. NM0050ZZ has fuel storage for gen set 150 Gallon . |
| 44 | Please provide the name of the subcontractor who provides maintenance for the small solar panel on the Domenici building. |
| Answer | That information is proprietary to the incumbent contractor. |
| 45 | Can you provide a current seniority list for personnel? |
| Answer | That information will be provided to the successful offeror. |
| 46 | Please provide a list of current subcontractors being used. |
| Answer | That information is proprietary to the incumbent contractor. |
| 47 | Is the staffing listed on "Figure L-1 the minimun requirements for this solicitation? |
| Answer | Refer to L.5.1.2, Figure L-1 is the government's baseline manpower projection. |
| 48 | Is there any on site staffing requirements for the buildings? (O&M, Grounds, Custodial)? |
| Answer | See Section H of the solicitation |
| 49 | Has the scope of the new contract changed significantly over the existing one? |
| Answer | Yes, this scope is a major revision from the previous contract. |
| 50 | Are there any incumbent employees currently performing? If yes, how many? |
| Answer | Yes, that information is proprietary to the incumbent contractor. |
| 51 | What is the make, model, serial number and size of the generators? What is the tube count? |
| Answer | Refer to the equipment inventory provided in the solicitation. |
| 52 | Reference Exhibits BL5 – Work Orders. What performance period, or performance dates do these work orders represent? |
| Answer | Examples of are for 3-4 months |
| 53 | Reference Exhibits BL5 – Work Orders. Please provide the labor hours, labor cost and total cost for the work orders in these exhibits . |
| Answer | Work Orders are not separately priced and are included in normal duties. |
| 54 | Trash Hauling, pages 34-35. Is this Contractor responsible for this effort? |
| Answer | The contractor is only responsible to haul trash to the nearest dumpster. |
| 55 | Solicitation Paragraph CC.7, Custodial Service Calls. Please confirm as to whether the 15 hours per month limitation refers to each building where custodial is being performed, or 15 hours per month for all buildings combine.. |
| Answer | The 15 hour is per month which includes all buildings. |
| 56 | Reference Solicitation pg 2, Period of Performance and CLIN 4001. Page 2 of Solicitation indicates that the period of performance ends April 30, 2022, while CLIN 4001 indicate April 30, 2023. Please confirm the intended performance end date. |
| Answer | The last option year will end April 30, 2023. |
| 57 | Reference Solicitation L.5.1.2, Management Plan Worksheet and Narrative and Figure L-1, Management Plan Worksheet. The Solicitation’s instructions stipulates that “If the offeror elects to deviate from the government’s |
manpower projection, the offer must submit a Worksheet Narrative explaining how their proposed manpower approach will meet the requirement of the solicitation”. Figure L-1 Management Staffing Plan shows a sample staffing of 15.5 FTE’s. Please confirm that the sample manpower plan is for all federal buildings, courthouses and other GSA buildings described in this Solicitation.
| Answer | Confirmed |
| 58 | Reference solicitation L.5.3.2, Past performance. If the projects being submitted have been evaluated in CPARS, the offeror will complete the CONTRACT IDENTIFICATION section of the questionnaire and submit with their proposal, no further action is required. Please verify that the form is not required to be submitted to our customer for evaluation if the contract has been rated in CPARS? |
| Answer | Confirmed, if the project was rated in CPARS, the form is not required to be submitted by your customer for evaluation. |
| 59 | Should the contractor price janitorial on the assumption that the Government will take the reduction for areas that remain unoccupied for long term? |
| Answer | Price should be based on the information provided in the Exhibit C1 for each facility. If there is temporary vacant space, deductions will be taken in accordance with Section G.7.3. |
| 60 | Question: Page 198 of the RFP mentions that you want completed versions of spreadsheets provided in Section J included on the CD-R with the Technical Proposal and the same spreadsheets on the CD-R of the Price Proposal. Is it correct that you want the spreadsheets, including ‘Figure B-3 Pricing of Services’, included on both CDs? |
| Answer | Include the Figure B-3 in Part Two, not Part One - Technical Proposal. |
| 61 | Some of the spreadsheets in Section J seem to be required after the contract is awarded. Can you verify which of these spreadsheets you want included with the proposal and not after contract award? Are there others? |
Figure B-1 Contractor Staffing Declaration Figure B-2 DOL_CBA Combination Wage Adjustment Figure B-3 Pricing of Services Figure L-1: Management Plan Worksheet Figure L-2 Management Plan Baseline
| Answer | Figures B-2 and Figure L-2 are for information purposes and do not need to be included with the proposal. |
| 62 | Are you aware of the quantities of expendable materials? |
| Answer | This is not data the government maintains. |
| 63 | L.5.1.1 Management Plan Narrative: There is a 10 page limitation for the Management Plan Narrative. Does this include the Quality Control Plan as well? If so, we feel it would be a stretch to fit the management narrative and QC plan within 10 pages. Is it possible to increase this section to 15 pages? |
| Answer | The requirement is for a narrative discription of the Quality Control Plan, not the plan itself. The 10 page limitation is firm. |
| 64 | Will the government provide a list of subcontractors currently performing services such as equipment PM’s? |
| Answer | No, current subcontractors are proprietary to the incumbent contractor. |
| 65 | No lightening protection systems were observed during the site visit. Are there lightening protection systems for which the contractor must provide certifications? |
| Answer | NM0030,NM0050 and NM0038, All have lightening protection |
| 66 | No kitchens were observed during the site visit. How many kitchen hood fire extinguishing systems require service from the contractor? |
| Answer | None. |
| 67 | How many kitchen grease traps will require service? |
| Answer | None |
| 68 | Tags on electrical panels indicate the last IR scan was done in 2014. Is this accurate? When was the last IR scan performed? |
| Answer | December 2017 |
| 69 | When was the last eddy current performed on chillers at each location? |
| Answer | 2017 |
| 70 | Please provide clarity of the solicitation in regard to waste disposal. Does the contractor bear the cost of waste/recycling hauling and disposal? |
| Answer | The contractor is responsible for all recycling. |
| 71 | Please provide clarity of the solicitation in regard to restroom soap and paper products. Does the government provide soap and paper? |
Answer CC.2.0 The Contractor Shall Furnish all personnel, labor, equipment, materials, tools, supplies, supervision, management, training/certifications, and services.
72 In regard to the $1000 threshold for the purchase of generator fuel, does this $1000 apply to each site or is it for the entire contract?
| Answer | Entire Contract, per year. |
| 73 | Is parking space available for employees at each location? |
| Answer | No |
| 74 | What equipment is currently under warranty? |
| Answer | See question # 28 |
| 75 | Reference SOW Section CM 40.2, Non-reimbursable Repairs. Please provide the annual service call counts for each facility. |
| Answer | This data is not maintained by the government. |
| 76 | Reference SOW Section CM 40.3, Reimbursable Repairs - Can the GSA provide the annual number of repairs that exceed the $2500 threshold for each facility? |
| Answer | This data is not maintained by the government. |
| 77 | SOW Section CM.8.1, Minimum staffing provides two key personnel positions – a Full Time Onsite Project Manager and a Full Time Onsite Supervisor. |
a. Please confirm that the requirement for an Onsite Project Manager is limited to one (1) per contract.
b. Is it the government’s intent for the contractor to provide a dedicated onsite supervisor at each facility? Will the government allow an onsite supervisor to oversee multiple locations provided they are close in proximity?
| Answer | The onsite Project Manager is per contract and onsite supervisor is for each facility. |
| 78 | SOW Section CM.40.4, Miscellaneous Work requires the contractor to “provide 20 hours and up to $50.00 for parts and supplies per calendar month… when requested by the CO or designee.” Is the requirement for 20 hours of miscellaneous work applicable for the contract as a whole or per building? Please clarify. |
| Answer | 20 hours applies to the contract as a whole. |
| 79 | The second paragraph of SOW Section CM2.15, Consumable Parts states, “The contractor shall provide fuel up to $1000 per contract year.” Please clarify whether this requirement is for the first $1000 of fuel for the entire contract or per generator. |
| Answer | The $1,000 refers to the entire contract. |
| 80 | Reference RFP Sections L.5.2.1, which states “The offeror must submit a minimum of 2 projects within the last 5 years that detail experience that is similar to scope and magnitude of this requirement.” Similarly, RFP Section L.5.2.2 states “The offeror must submit a minimum of 2 projects but may elect to provide up to 5 projects to demonstrate experience.” Please confirm that the government’s intent is for offerors to submit one group of project narratives, each limited to 2 pages, that demonstrate the cumulative experience items listed in Section L.5.2.1 and provide the information outlined in Section L.5.2.2. |
| Answer | See response to question 1 |
| 81 | Per RFP Section L.5.3.1, “As a minimum, Past Performance information must be submitted on the 2 projects that were submitted for evaluation under L.5.2 Experience.” RFP Section L.5.2.1 requires offerors to submit a minimum of 2 projects while SectionL.5.2.2 requires a minimum of 2 and up to 5 projects. |
a. Does Section L.5.3.1 refer to the projects submitted in response to L.5.2.1 or to L.5.2.2? Or is it the government’s intent that offerors submit the same projects for Sections L.5.2.1, L.5.2.2, and L.5.3.1?
| Answer | In accordance with L.5.3.1, two of the projects submitted for Past Performance must be the same as the 2 projects submitted for Experience under L.5.2 |
| 82 | Solicitation Section Nos. L.4.2.2.5 and L.4.2.3 state that proposals are required to be submitted electronically with Parts One and Two being submitted on separate CD-R compact disks. Since electronic submission is required, would the government be open to offerors submitting proposals via email provided that proposals are received in their entirety prior to the submission deadline? |
| Answer | No, e-mail submissions are not authorized. |
| 83 | Will this contract be subject to the New Mexico Gross Receipts Tax (GRT)? |
| Answer | Yes (*NOTE: This is a change from previous answer) |
| 84 | L.5.1.2 Management Plan Worksheet and Narrative (if needed) |
Figure L-1 indicates the government’s baseline manpower projection. The projection is not intended to mandate the labor mixed utilized fulfill this requirement. The offeror may elect to propose any alternative that will fulfill the requirement of this solicitation. If the offeror elects to deviate from the government’s manpower projection, the offer must submit a Worksheet Narrative explaining how their proposed manpower approach will meet the requirement of the solicitation. There is a 2 page limitation on the Worksheet Narrative."
Please confirm that the manpower projection at the top of Figure L-1 (shaded in gray) represents an example illustrating how offerors are required to complete Figure L-1 Management Plan Worksheet and is not the government's actual baseline manpower projection, as indicated in the response to Question No. 47.
| Answer | L.5.1.2 is changed via amendment to reference Figure L-2 Management Plan Baseline and the Figure L-2 spreadsheet in Section J is replaced |
| NEW QUESTIONS | |
| 85 | Paragraph CC.2.1 Cleaning Hours states that the performance of the cleaning at building(s) shall take place between the hours of 6 a.m. and 9 p.m., Monday through Friday, excluding federal holidays. |
It further states that the hours shall not be changed unless authorized by the CO or their designee.
In contrast, "Fig_L-2_MANGEMENT_PLAN_BASELINE_.xlsx" shows some locations require cleaning up to 10 p.m. or 11 p.m. and also advises that "THE GOVERNMENT ESTIMATE SHOULD BE USED TO COMPLETE THIS FORM."
In addition, paragraph L.5.1.2.1, Additional Information regarding Management Plan Worksheet, states that the staffing/labor mix proposed in the Management Plan Worksheet must be adhered to for the Base year period of performance and the offeror may request an annual review of the labor mix 60 days prior to issuance of the first Option Period.
Please confirm the actual hours of operations for this requirement.
Answer Derek Gadberry is the CO (Contracting Officer) and has the authority to change the hours of operation if it better fits mission requirements. Unless he dictates otherwise, the hours of operation will be 6am to 9pm. The contractor will be alerted well in advance before this change takes place.
Due to some geographical disparities, some locations may have differing hours, for example, Santa Fe properties may (and currently do) operate later than the ABQ properties....regardless, this is a performance-based instrument, and however the KTR arrives at the finish line is up to them.
| 86 | According to Section L, Part One - Technical Proposal, it states that it contain1 Electronic CD-R. In Section L.5.3.2, Past Performance Questionnaire, it states that “Upon completion, the Past Performance Questionnaire should be return to the offeror for submission with their technical proposal. Since this is an electronic submission, are you requesting the original copies of these questionnaires be submitted or are .pdf copies on disk acceptable? |
| Answer | Yes, submit .pdf copies on the CD-R. |