Solicitation Amendment 47PF0022R0025_0001.pdf

PDF 738 KB Posted

Attached to
EMD Garage Dock Structural Slab Upgrades Federal contract opportunity
Solicitation number
47PF0022R0025
Issued by
General Services Administration Public Buildings Service Region 5

About this file

This document is an amendment to a solicitation for the EMD Garage Dock Structural Slab Upgrades project at the Everett M. Dirksen U.S. Courthouse in Chicago, Illinois. The amendment replaces drawing sheet D-1-01 with a revised version dated February 17, 2022. The scope of work involves repairing the structural slab and concrete beam cover in the loading dock area, replacing deteriorated concrete and asphalt, installing a new accessible steel ramp and stairs from the dock level to parking, and adding bollards and gates for protection and accessibility. The General Services Administration Public Buildings Service Region 5 is the contracting agency. The solicitation number is 47PF0022R0025.

View the file

Other files for this federal contract opportunity

Other files attached to EMD Garage Dock Structural Slab Upgrades, newest first.
File Type Posted
PREPROPOSAL_SITE VISIT RSVP 47PF0022R0025 EMD GARAGE DOCK STRUCTURAL REPAIRS.pdf PDF
Solicitation Amendment 47PF0022R0025_0002.pdf PDF
EMD Garage Dock Structural Repairs Preproposal agenda.pdf PDF
SF24-16d (1).pdf PDF
47PF0022R0025 RFP EMD DOCK GARAGE STRUCTURAL REPAIRS.pdf PDF
GSA527-15e (5).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

3'-8"

1'-

0"UP UP

LOADING PLATFORM

EL. ± 0'-0"

1ST LEVEL PARKING

EL. - 3'-8"±

STAIR 01

REMOVE AND SALVAGE EXISTING

STAIR AND RE-INSTALL AFTER REPAIR

WORK AND NEW ASPHALT PAVING IS

INSTALLED

STAIR 03

8'- 6"

5'- 4"

EXISTING DOCK

LEVELERS, REMOVE

SALVAGE AND REINSTALL

FD DISPATCHER

ROOM

FREIGHT

ELEVATOR

MOTOR

POOL

DRIVERS

ELECT

ROOM

FD

FD FD

11'-8" (VIF) 20'-6" (VIF) 13'-6" (VIF)

'-6

VI

F)

7'- 6"

5'- 0"

REMOVE AND SALVAGE EXISTING

RAMP AND RE-INSTALL AFTER

REPAIR WORK AND NEW

ASPHALT PAVING IS INSTALLED

DUMPSTER

SEE NOTE 1

6'-8" 6'-4" 6'-8"

4'-3"

1'- 0"

2'-10"

3'- 8"

FD

SECURITY

KIOSK

EXIST

STAIR 02

REMOVE STEEL

STAIR AND RAILS

COMPACTOR

SEE NOTE 1

DUMPSTER

SEE NOTE 1

REMOVE AND SALVAGE

EXISTING STEEL PROTECTION

PLATE.

THIS PORTION EXISTING ASPHALT

REMOVED BY OTHERS PRIOR TO

THIS PROJECT

CONTRACT LIMIT LINE

REMOVE AND

SALVAGE EXISTING

BUMPER AND

STEEL SUPPORT

UP DN

EXISTING ASPHALT TO BE

REMOVED IN THIS AREA

EXISTING ASPHALT TO BE

REMOVED IN THIS AREA

'-4

VI

F) 9'-

2" (V

IF

'-8

VI

F)

4'-1"1'-4"11"1'-1"3'-7 3/4"

5 1 /2"

EXISTING CONDUITS

(2) TO REMAIN

EXISTING PIPE

PENETRATION TO REMAIN

EXISTING ANGLE AT

COMPACTOR TO REMAIN

REMOVE & PROPERLY

DISPOSE OF DUMPSTER

PROTECTION PLATE.

EXISTING PHONES

TO REMAIN

LINE OF

EXISTING SAFE

EXISTING LOCK

BOX TO REMAIN

EXISTING SHELF

UNIT TO REMAIN

EXISTING ELEC

PANEL TO REMAIN

REMOVE DOCK BUMPER AND

ANGLES AT THIS LOCATION

EXISTING 72"w x 16"h

GRILLE AT FLOOR

EXISTING 30"w x 28"h

GRILLE AT FLOOR

EXISTING WINDOW TO REMAIN. CUT

DOOR FRAME AT TOP & BOTTOM OF

WINDOW FRAME. REMOVE DOOR

PORTION OF FRAME ONLY

REMOVE ABANDONED

DOORS & FRAMES TO

DISPATCH & MOTOR

POOL DRIVERS ROOMS

AS NOTED

A-4-01

NOT IN CONTRACT

NOT IN CONTRACT

NOT IN CONTRACT

NO

T

IN

C

ON

TR

AC

T

NOT IN CONTRACT

9 10 11 12

28'-0"

8/9

28'-0"28'-0" 28'-0"

9'-3"

6'-8 1/2"

G

F

E

D

6'- 5"

E/F

'-3

9'-

4"

'-0

A. ALL NEW CONDITIONS SHALL BE COORDINATED

WITH ARCHITECTURAL AND MEP DRAWINGS FOR

DIMENSIONS, LOCATIONS AND ELEVATIONS.

B. ALL EXISTING CONDITIONS SHALL BE FIELD VERIFIED

BY CONTRACTOR AND ALL DISCREPANCIES SHALL

BE REPORTED TO GSA AND THE AOR/EOR PRIOR TO

FABRICATION, ERECTION AND CONSTRUCTION.

LEGEND:

WALL EXISTING

"SLAB" OPENING EXISTING

AREA - NOT IN CONTRACT

EXISTING ASPHALT REMOVED PRIOR TO THIS PROJECT

EXISTING ASPHALT TO BE DEMOLISHED AS PART OF

THIS PROJECT

SCALE:1

ARCHITECTURAL DEMOLITION PLAN AT LOADING DOCK

1/4" = 1'-0"

NOTES:

1. TEMPORARILY RELOCATE DUMPSTERS AND COMPACTOR

DURING WORK. COORDINATE WITH GSA STAFF.

AutoCAD SHX Text

GREAT LAKES REGION 5

AutoCAD SHX Text

PROPERTY OF THE

AutoCAD SHX Text

UNITED STATES GOVERNMENT

AutoCAD SHX Text

FOR OFFICIAL USE ONLY

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DISCIPLINE

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PCN NO.

AutoCAD SHX Text

GSA PM

AutoCAD SHX Text

PROJ. DESC.

AutoCAD SHX Text

BLDG NO.

AutoCAD SHX Text

CITY/ST./ZIP

AutoCAD SHX Text

STREET

AutoCAD SHX Text

BLDG NAME

AutoCAD SHX Text

MARK

AutoCAD SHX Text

FLOOR NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

TITLE

AutoCAD SHX Text

GENERAL SERVICES ADMINISTRATION

AutoCAD SHX Text

SHEET DESIGNATOR

AutoCAD SHX Text SENSITIVE BUT UNCLASSIFIED (SBU) - PROPERTY OF THE UNITED STATES GOVERNMENT. COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS, OR SPECIFICATIONS TO UNAUTHORIZED PERSONS IS PROHIBITED. Do not remove this notice. Properly destroy documents when no longer needed.

AutoCAD SHX Text

SHEET SIZE

AutoCAD SHX Text

SUB A/E

AutoCAD SHX Text

PRIME A/E

AutoCAD SHX Text

CONS. CONTR.

AutoCAD SHX Text

A/E CON. NO.

AutoCAD SHX Text

CONTRACTORS

AutoCAD SHX Text

CONSTR. CON.

AutoCAD SHX Text

A/E TASK NO.

AutoCAD SHX Text

CONS. WORK

AutoCAD SHX Text

CONTRACTOR INFO

AutoCAD SHX Text

230 S. DEARBORN CHICAGO, IL

AutoCAD SHX Text 30 X 42

AutoCAD SHX Text D101

AutoCAD SHX Text 60604

AutoCAD SHX Text

IL

AutoCAD SHX Text

CHICAGO

AutoCAD SHX Text

219 S. DEARBORN

AutoCAD SHX Text

EVERETT M. DIRKSEN COURTHOUSE

AutoCAD SHX Text

RIL11808

AutoCAD SHX Text

A. DILBECK

AutoCAD SHX Text

GARAGE DOCK STRUCTURAL SLAB REPAIRS

AutoCAD SHX Text

0XX

AutoCAD SHX Text A

AutoCAD SHX Text

PP

AutoCAD SHX Text 02/17/2022

AutoCAD SHX Text

ARCH DEMO PLAN AT LOADING DOCK

AutoCAD SHX Text

50% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

75% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

RUBINOS & MESIA ENGINEERS, INC. (RME)

AutoCAD SHX Text

GRUMMAN/BUTKUS ASSOCIATES

AutoCAD SHX Text

IL0205ZZ

AutoCAD SHX Text D-1-01

AutoCAD SHX Text 07/07/21

AutoCAD SHX Text 09/29/21

AutoCAD SHX Text 01/18/22

AutoCAD SHX Text

ISSUE FOR BID

AutoCAD SHX Text 02/01/22

AutoCAD SHX Text

AutoCAD SHX Text

AMENDMENT 1

AutoCAD SHX Text 02/17/22

AutoCAD SHX Text Horizontal Scale: 1/4" = 1'-0"

AutoCAD SHX Text 5'

AutoCAD SHX Text

AutoCAD SHX Text 1'

AutoCAD SHX Text 20'

AutoCAD SHX Text 15'

AutoCAD SHX Text 10'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Revised 2.17.22 D101.pdf
Sheets and Views
Layout
topmostSubform[0]:
Page2[0]:
TextField1[5]:
TextField1[2]:
TextField1[1]:
TextField1[4]:
TextField1[3]:
TextField1[0]:
Page1[0]:
Code[0]: 5P1QCA
Copies[0]:
CheckBox9[0]: 1
Code[2]: 5P1QCA
NameandTitleOfficer[0]: Jennifer Dunne, Contracting Officer
Is[0]: Off
CheckBox10[0]: Off
NameandAddress[0]:
DateSigned[1]:
Pages[0]: 2
AmendmentNo[0]: 0001
Dated10B[0]:
ModificationNo[0]:
AdministeredBy[0]: R5 AMD Chicagoland Construction Contracting Team

230 S. Dearborn St.

Room 3500 Chicago, IL 60604 USA

FacilityCode[0]:
CheckBox13B[0]: Off
CheckBox13D[0]: Off
ReqNumber[0]: EQ5P1CC-22-0012
Dated9B[0]: 2/9/2022
C13[0]:
Description[0]: EMD Garage Dock Structural Repairs, Dirksen U.S. Courthouse, 219 S. Dearborn Street, Chicago, Illinois 60604

Amendment 0001 is being issued to replace drawing Sheet D-1-01 with the attached D-1-01 dated 2/17/2022.

NotExtended[0]: 1
Code[1]:
AmendmentNo[1]: 47PF0022R0025
ContractIDCode[0]:
DateSigned[0]:
CheckBox11[0]: 1
Page[0]: 1
AccountingData[0]:
CopiesReturned[0]:
CheckBox13A[0]: Off
IsNot[0]: Off
EffectiveDate[0]: 2/17/2022
A13[0]:
ProjectNo[0]: ePM# 66531
CheckBox13C[0]: Off
Extended[0]: Off
D13[0]:
IssuedBy[0]: R5 AMD Chicagoland Construction Contracting Team

230 S. Dearborn St.

Room 3500 Chicago, IL 60604 USA NameandTitleSigner[0]:

File details come from the government source that posted it. Updated .