EMD Garage Dock Structural Repairs Preproposal agenda.pdf

PDF 141 KB Posted

Attached to
EMD Garage Dock Structural Slab Upgrades Federal contract opportunity
Solicitation number
47PF0022R0025
Issued by
General Services Administration Public Buildings Service Region 5

About this file

This pre-proposal document outlines requirements for a federal construction project to repair structural slabs and install accessibility upgrades in the loading dock area of the Everett M. Dirksen U.S. Courthouse in Chicago, Illinois. Offerors must submit proposals by March 9, 2022 following the instructions provided, including a price proposal, past performance questionnaires, and technical qualifications demonstrating experience on similar projects. The General Services Administration will evaluate proposals based on past experience and performance. Work must be completed after hours and on weekends to avoid disrupting courthouse operations, and all contractor personnel will require security clearances. A mandatory pre-bid site walk is scheduled for February 24, 2022 to review the scope of work, which includes removing and replacing deteriorated concrete slabs, installing a new accessible ramp and stair, and applying waterproofing.

View the file

Other files for this federal contract opportunity

Other files attached to EMD Garage Dock Structural Slab Upgrades, newest first.
File Type Posted
PREPROPOSAL_SITE VISIT RSVP 47PF0022R0025 EMD GARAGE DOCK STRUCTURAL REPAIRS.pdf PDF
Solicitation Amendment 47PF0022R0025_0002.pdf PDF
Solicitation Amendment 47PF0022R0025_0001.pdf PDF
GSA527-15e (5).pdf PDF
SF24-16d (1).pdf PDF
47PF0022R0025 RFP EMD DOCK GARAGE STRUCTURAL REPAIRS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Agenda

47PF0022R0025

EMD GARAGE DOCK STRUCTURAL REPAIRS

DIRKSEN US COURTHOUSE

219 S. DEARBORN ST, CHICAGO, IL 60604

FEBRUARY 16, 2022 AT 11:00 AM CST

Government Team:

Contracting Officer: Jennifer Dunne, jennifer.dunne@gsa.gov Contracting Officer’s Representative: April Dilbeck, april.dilbeck@gsa.gov Supervisory Property Manager: Petar Rogic, petar.rogic@gsa.gov Property Manager: Marco Lopez, marco.lopez@gsa.gov Architect/Engineer:

Sergio Cano, Project Manager, SCano@grummanbutkus.com, Grumman/Butkus Associates Nihar Shah, Engineer, NShah@RME-i.com - RME (Engineer, Rubinos & Mesia Engineers, Inc) John Corboy, Engineer, JCorboy@rme-i.com - RME (Engineer, Rubinos & Mesia Engineers, Inc)

QUESTIONS:

All questions shall be submitted in writing to Jennifer Dunne, jennifer.dunne@gsa.gov, by no later than 4:00 P.M. CST, February 23, 2022.

SAM

All contractors must be active in the System for Award Management (SAM), www.sam.gov, prior to submission of offers to be considered for award. BE ADVISED: If you are registering a new entity in SAM.gov or updating your entity, you must provide and mail an original, signed notarized letter available here:

(https://www.fsd.gov/gsafsd_sp?id=kb_article_view&sysparm_article=KB0016652) stating that you are the authorized Entity Administrator.

Read the FAQs available here:

(https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=899cc97a1bab7c105465eaccac 4bcbae) for more information on these requirements and / or contact the Federal Service Desk at www.fsd.gov for additional questions or assistance.

CONTRACTUAL ITEMS

Offerors are cautioned to carefully read the entire Solicitation and the Agreement to be included in the Contract contemplated by the Solicitation in order to be fully aware of all requirements and clauses in the contemplated Contract. Verify that all blanks requiring information to be supplied in an Offer have been properly filled out, that all pricing and other numerical data is accurately calculated, and that all copies of the Offer contain the same information.

No oral statement made by a Government representative during the pre proposal conference, nor any written record of such oral statements as may be made and subsequently furnished to the offeror, will be deemed to have the effect of adding to, modifying, or otherwise varying from mailto:marco.lopez@gsa.gov mailto:SCano@grummanbutkus.com mailto:JCorboy@rme-i.com mailto:jennifer.dunne@gsa.gov https://www.fsd.gov/gsafsd_sp?id=kb_article_view&sysparm_article=KB0016652 https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=899cc97a1bab7c105465eaccac4bcbae https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=899cc97a1bab7c105465eaccac4bcbae

EMD GARAGE DOCK STRUCTURAL REPAIRS

DIRKSEN US COURTHOUSE

219 S. DEARBORN ST, CHICAGO, IL 60604

FEBRUARY 16, 2022 AT 11:00 AM CST

the written provisions of the Solicitation (including, but not limited to specifications, drawings and written amendments to the solicitation). In the event the discussion or questions raised during the pre proposal conference indicate a need to modify the Solicitation, an amendment to the Solicitation will be issued in writing; any such amendment to the Solicitation must be acknowledged in the same manner and under the same conditions as all other written amendments to the Solicitation.

I.G Receipt of Offers

(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received electronically at the following office no later than 4:00 pm Central Standard Time on the following date and at the following email addresses:

Date: March 9, 2022 Addresses: jennifer.dunne@gsa.gov Use subject line: PROPOSAL RFP 47PF0022R0025 EMD GARAGE DOCK

(2) Offers sent shall be deemed timely if received by the email addresses of the GSA POCs listed above on or before the date and time established for receipt of offers, as recorded by the Government computer system’s documentation of the exact official time of receipt, not by the time it was sent by the Offeror. It is the Offeror’s responsibility to ensure proposals are complete and submitted early enough to be received by the Government before the deadline, and to confirm receipt before the deadline. Offerors are strongly encouraged to use a “read receipt” function to confirm receipt.

II.A. Proposal Contents Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:

1. Price Proposal SF–1442

2. Price Breakdown Sheet

3. Technical Proposal

a. Attachment A- Past Performance & Experience

b. Attachment B- Past Performance & Past Experience Reference Attachment B (submitted by references directly to Contracting Officer)

4. GSA-527 Financial Information

5. SF24 Bid Guarantee

II.B. Proposal Format

EMD GARAGE DOCK STRUCTURAL REPAIRS

DIRKSEN US COURTHOUSE

219 S. DEARBORN ST, CHICAGO, IL 60604

FEBRUARY 16, 2022 AT 11:00 AM CST

Offerors are to submit an email with the subject line: “PROPOSAL RFP 47PF0022R0025 EMD

GARAGE DOCK”

Proposals will only be accepted in electronic format, via email.

Offerors that need to submit multiple emails due to file size limitations shall name their electronic submissions as follows: “ PROPOSAL RFP 47PF0022R0025 EMD GARAGE DOCK Email 1 of X”, etc

Offerors shall note that in the case of multiple submissions, all emails shall be received by the Contracting Officer prior to the closing date and time of this solicitation in order for the submission to be considered timely.

II.C. Technical Proposal

Technical proposals will be evaluated on the two (2) factors listed below; all factors are weighted equally. Make sure you thoroughly complete Attachment A and B.

TECHNICAL EVALUATION CRITERIA

1. Past Experience for Similar Projects

2. Past Performance on Similar Projects

Scope Overview The overall project scope consists of removing existing concrete slab and asphalt topping in dock area and concrete beam cover. A new concrete slab in dock with some concrete repair on the slab. Apply waterproofing to the membrane and replace asphalt topping. Installation of a new ABBAS accessible steel ramp from loading dock level to parking level and provide bollards to protect ramp. Remove the existing stair and replace it with a new stair next to the ramp.

Provide guard rails along the dock edge at an accessible path and provide swinging gate.

Building Access and Hours of Performance

1. All work is to be performed After hours - 6:00 PM – 5:30 AM and on Weekends. All work scheduled shall be coordinated at time of construction unless otherwise specified by the Contracting Officer (CO) or the Contracting Officer Representative (COR). Special requirements from the Property Management Office and/or the agency must be taken into consideration during all phases of construction.

2. Provide not less than 48 hours notice of activities that will affect operations of occupied spaces and building.

3. Maintain access to existing walkways, exits, and other facilities used by occupants during working hours and after hours to assure that Life Safety Code and OSHA requirements are met.

EMD GARAGE DOCK STRUCTURAL REPAIRS

DIRKSEN US COURTHOUSE

219 S. DEARBORN ST, CHICAGO, IL 60604

FEBRUARY 16, 2022 AT 11:00 AM CST

4. The Contractor shall provide not less than 48 hour notice when requesting building access and/or dock access. Building and Dock access requests shall be submitted to the Project Manager. The following information must be contained on the request form.

Building Access Requests Shall Include:

- Names of all persons.

- Dates and times for access.

- Dock access requests shall include; Names of drivers and passenger(s); Make and type of vehicle; license plate of vehicle; delivery date; Time entering/leaving-loading and unloading permitted only.

Deliveries:

The Contractor shall submit a dock access request per above instructions and include the name of the badged person(s) accepting the delivery. The Contractor shall be responsible for accepting the delivery and ensuring it is delivered to the project area accordingly. Storage at the dock level, public hallways, storage closet, electrical closets, data closets, etc. are not permitted. Dock access is for delivery/drop off/pick-up only. No parking will be permitted

5. If required, the Contractor shall complete and submit permit request forms to the Project Manager. Forms may be obtained from the Project Manager or Property Management Office. Forms may include but are not limited to; electrical shutdown, fire protection, sprinkler, burn permit, lighting shutdown, electrical/data/utility closet access, etc. These forms will need to be submitted 48 hours prior for review and approval.

Security Clearance Requirement:

Contractors and their staff will be required to comply with security regulations imposed by the occupying agency including any necessary clearances required for access to classified areas. Access to the project site will be limited to specific times established by the Government. After award of the Contract, the Project Manager/Contracting Officer’s Representative (COR) shall provide the Contractor with a "Requesting Official’s (RO) Approval" list template. The Contractor shall have no more than 14 calendar days to submit to the Project Manager/COR a completed RO Approval list including the full names of all employees – prime and/or subcontractors – that will be required for the entirety of the project and will need access to the facility.

NO ESCORTING SHALL BE PERMITTED DURING THE PERFORMANCE OF THIS

WORK. ALL PERSONS ENTERING THE FACILITY AS RELATED TO THE

PERFORMANCE OF THE INTENDED SCOPE MUST BE BADGED. TIMELY

PROCESSING OF CLEARANCE APPLICATIONS SHALL BE THE RESPONSIBILITY

OF THE GC AND THEIR RESPECTIVE SUB-CONTRACTORS. FAILURE TO PROVIDE

TIMELY FOLLOW-UP AND RESPONSE TO NOTIFICATIONS REGARDING THE

CLEARANCE PROCESS OF ANY APPLICANT SUBMITTED FOR THIS PROJECT

EMD GARAGE DOCK STRUCTURAL REPAIRS

DIRKSEN US COURTHOUSE

219 S. DEARBORN ST, CHICAGO, IL 60604

FEBRUARY 16, 2022 AT 11:00 AM CST

WILL NOT BE GROUNDS TO EXTEND THE CONTRACT SUBSTANTIAL

COMPLETION AND MAY RESULT IN THE ASSESSMENT OF LIQUIDATED

DAMAGES.

Site Walkthrough: Thursday February 24th @ 10:00 AM CST All contractors will meet the Project Manager/COR onsite in the main lobby of the Dirksen Courthouse. Each individual will be required to go through security, allowing time for the security scanning prior to entering the building so that we can start our site walk through at 10AM. If you have any questions, or are running late, you may contact the Project Manager, April Dilbeck (312.983.1834).