This pre-solicitation notice seeks proposals for a design-build contract to renovate office space for the Department of Housing and Urban Development located in the Brickell Plaza Federal Building in Miami, Florida. The project includes selective demolition and new construction such as architectural, electrical, mechanical, fire protection, and communications improvements. The estimated value is between $500,000 to $1,000,000. The solicitation will be issued on March 11, 2021 with site visits scheduled thereafter. Proposals are due 180 days after notice to proceed. The acquisition is reserved for Service-Disabled Veteran-Owned Small Businesses. Interested parties must register in the System for Award Management and monitor the site for solicitation updates.

View the file

Other files

File Type Posted
T02 Drawings 09 11 2020.pdf PDF
T02 Specifications 09 11 2020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HUD OFFICE RENOVATION

BRICKELL PLAZA FEDERAL BUILDING

909 SE 1st Ave., MIAMI, FL 33131

100% DESIGN NARRATIVE

Contract No.: GS-07-P-16-UC-D-7010

Task Order: 47PE0720F0023

CEMS No.: 16-151AG

11 SEPTEMBER 2020

Prepared by CEMS Engineering, Inc.

at the direction of GSA

THIS PAGE INTENTIONALLY LEFT BLANK

T A B L E O F C O N T E N T S

HUD Office Renovation, Brickell Plaza Federal Building P A G E i

TABLE OF CONTENTS

SECTION 1: PROJECT INTRODUCTION

OVERVIEW

SECTION 2: DISCIPLINE NARRATIVES

ARCHITECTURAL

INTERIOR DESIGN

MECHANICAL

ELECTRICAL

COMMUNICATIONS

FIRE PROTECTION

A P P E N D I X A : L I G H T I N G C A L C U L A T I O N S ......................................................................... A

T A B L E O F C O N T E N T S

HUD Office Renovation, Brickell Plaza Federal Building P A G E ii

P R O J E C T I N T R O D U C T I O N

HUD Office Renovation, Brickell Plaza Federal Building P A G E 1

S EC T I ON 1 :

PROJECT INTRODUCTION

HUD Office Renovation, Brickell Plaza Federal Building P A G E 2

HUD Office Renovation, Brickell Plaza Federal Building P A G E 3

OVERVIEW

1.1.1 PROJECT BACKGROUND

The General Services Administration (GSA) needs Construction Documents including full specifications necessary to have HUD Audit/Investigative staff and associates co-located and the office space brought up to modern office standards with improved lighting, paint, flooring, ventilation, heating/cooling and new office furnishings.

1.1.2 PROJECT DESCRIPTION

CEMS Engineering will provide electrical, mechanical, fire protection and architectural design services for the Brickell Plaza Federal Building located in Miami, FL. This government office building is managed by the General Services Administration (GSA) Public Building Service (PBS). The U.S. Department of Housing and Urban Development (HUD) located inside the Brickell Plaza currently occupy office space on the 4th floor. The goal is to have HUD Audit/Investigative staff and associates co-located and the office space brought up to modern office standards with improved lighting, paint, flooring, ventilation, heating/cooling and new office furnishings. The office space will be designed to incorporate the conference, evidence, and firearms rooms currently located on the opposite side of 4th floor nearest Coast

Guard Offices.

1.1.3 PROJECT LOCATION

The 9-story, 204,108 sf Brickell Plaza Federal Building is situated in downtown Miami, FL located at 909 SE

1st Ave. It is composed of fireproof steel and was constructed in 1971.

HUD Office Renovation, Brickell Plaza Federal Building P A G E 4

D I S C I P L I N E N A R R A T I V E S

HUD Office Renovation, Brickell Plaza Federal Building P A G E 5

S EC T I ON 2 :

DISCIPLINE NARRATIVES

HUD Office Renovation, Brickell Plaza Federal Building P A G E 6

HUD Office Renovation, Brickell Plaza Federal Building P A G E 7

ARCHITECTURAL

2.1.1 DESIGN REQUIREMENTS

PBS-P100 Facility Standards for the Public Buildings Services (2018)

NFPA 70 National Electrical Code, current version

NFPA 70E National Electrical Safety Code, current version

Florida Building Code 2017 Edition or current version

International Building Code 2018 Edition or current version

2.1.2 EXISTING CONDITIONS

The Brickell Plaza Federal Building located at 909 SE 1st Ave in Miami, FL and was constructed in 1971.

The building is located near the coastline of Miami. The building consists of 9 floors above ground with a mechanical penthouse floors for a total or 10 levels. The building is composed of a concrete frame with decorative concrete panels and vertical slotted glass windows. On the fourth floor will be the new location of the expanded location of the US Housing & Urban Development offices. This project will consist of taking a current occupied portion of this fourth floor and upfitting the areas for the HUD offices.

2.1.3 DEMOLITION

Demolition of most of the walls within the area to be upfitted will need to take place. There are a few walls that will need finishes removed to install security grating, sound attenuating batt insulation and so forth. All of the ceilings and floor finishes will be removed within the remodeled area. Three existing doors from the main circulation corridor into the suite will be demolished. No demolition of any exterior walls or windows is anticipated.

2.1.4 NEW WORK

The tenant upfit will consist of reworking the existing entrance into the suite from the main circulation corridor into the new HUD/OIG space. A second entry from the main circulation corridor will be created into an existing room that is being converted to the new Interview Room. Two additional existing rooms will also be remodeled to meet proposed functions within each room. Additional new rooms being created in the office suite are ASAC and ARIGA offices, two open cubicle work areas (one for HUD and one for OIG), Breakroom, Conference Room, LAN Room, Shared Files Room, Firearms Room, and a shared entry vestibule. The office suite will be divided into two separate work areas, one for HUD and the other for OIG, but will share a common breakroom. Access to each portion of the suite is provided from a common vestibule located at the main entry from the building corridor. The two private offices, Conference Room, and Interview Room will be acoustically rated. The existing walls that are common between the suite and the corridor will be reworked to also be acoustically rated. Security grating consisting of heavy gauge expanded metal mesh will be provided on the suite side of the corridor walls, at the interior walls bounding the Interview Room, Grand Jury Room, and Evidence Room, both offices, the

LAN room, and the Firearms Room. Acoustically rated walls and walls with the expanded metal mesh will be extend from floor to underside of floor slab above. Since the building has an open HVAC plenum, sound attenuating security transfer ducts will be provided at sound rated walls.

HUD Office Renovation, Brickell Plaza Federal Building P A G E 8

2.1.5 ARCHITECTURAL FINISHES

Architectural finishes throughout the suite will be neutral in color and of materials that will deliver long lasting low maintenance and quality. For more information regarding interior finishes see the Interior

Design section.

2.1.5.1 FLOOR FINISHES

The floor finishes will consist of carpet tiles in all areas except for the Breakroom and the LAN room. The

Breakroom will have porcelain tile and the LAN Room will have static dissipative VCT. No new floor finish work is anticipated in the corridor except to tie the new suite finish flooring into the existing corridor floor finish.

2.1.5.2 WALL FINISHES

Interior partitions throughout the tenant space will be metal stud framing with painted 5/8” gypsum wallboard on each side. Rubber base will be provided in all rooms except the Breakroom where there will be porcelain tile base. New rubber base in the corridor will need to be installed in location of infills of demolished doors to match the existing rubber base. Ceramic wall tile will be provided above the countertop to below the wall cabinets in the breakroom for the backsplash.

2.1.5.3 DOORS

Doors into and within the suite will be 1 ¾ inch-thick solid wood core (wood stave) in hollow metal frames. All doors within the suite will have a minimum STC rating of 38 while the doors leading into the

Interview room will have an STC rating of 45. Doors into the offices and the conference room will have vision windows.

2.1.5.4 EXTERIOR WINDOWS

All existing exterior windows will remain; however, the existing window treatment will be replaced.

2.1.5.5 CEILING FINISHES

A new acoustical tile suspended ceiling system will be provided throughout all areas of the remodeled suite which will match the system and materials currently being used within the HUD office suite on the fifth floor.

2.1.5.6 SPECIALTY FINISHES

New directional signage and room signage will be provided.

2.1.5.7 CASEWORK

Plastic laminate clad cabinets with a solid surface quartz countertop will be utilized in the Breakroom.

HUD Office Renovation, Brickell Plaza Federal Building P A G E 9

INTERIOR DESIGN

2.2.1 DESIGN REQUIREMENTS

1 PBS-P100 Facility Standards for the Public Buildings Services (2018)

2 International Building Code 2018 Edition or current version

2.2.2 EXISTING CONDITIONS

Existing flooring is worn and outdated carpet tiles. Ceilings are all acoustical tile in a suspended metal grid which consists of areas where ceiling tiles are mismatched, and the grid has been reworked. At some locations the ceilings pass over interior stud walls while at other locations the walls are the termination point for the ceilings. All areas have vinyl base except the Breakroom which will be porcelain wall base.

All walls are drywall and are painted.

2.2.3 DEMOLITION

All finish flooring, suspended acoustical ceilings, and vinyl base will be removed.

2.2.4 NEW WORK

Interior finish materials will be selected that are similar in color, appearance, and quality as those installed in the existing HUD office suite on the 5th floor. Products will be neutral in color and of materials that will be of high quality that provide low maintenance over time. Materials selected will be low VOC and environmentally friendly.

2.2.4.1 FLOOR FINISHES

The floor finishes will consist of 24”x24” carpet tiles in all areas except for the Breakroom and the LAN room. The carpet tiles inside the suite will be similar to those used in the HUD office suite on the 5th floor.

Areas of carpet tiles in the corridor that need to be reworked will match those used in the corridor. The

Breakroom will have 12”x24” porcelain floor tile with a color complementing standard cement-based grout in a standard lay. The LAN Room will have 12”x12” static dissipative VCT and be in a standard lay.

Rubber base will be provided throughout all rooms except for the Breakroom which will receive porcelain tile base.

2.2.4.2 WALL FINISHES

Interior partitions throughout the tenant space will be metal stud framing with painted 5/8” gypsum wallboard on each side and will be painted drywall. Existing wall to remain will also repainted. Ceramic wall tile backsplash with a complimenting grout will be provided above the countertop to below the wall cabinets in the breakroom.

2.2.4.3 DOORS

Doors from the corridor into the suite will be wood of species matching the existing doors in the corridor.

Doors within the suite will be birch with stain matching the color of the doors in the current HUD suite on the 5th floor. All new wood doors will be factory prefinished.

HUD Office Renovation, Brickell Plaza Federal Building P A G E 10

2.2.4.4 WINDOWS

New window treatment matching that installed in the current HUD offices found on the 5th floor will be provided.

2.2.4.5 CEILING FINISHES

A new acoustical tile suspended ceiling system will be provided throughout all areas of the remodeled suite which will match the system and materials currently being used within the HUD office suite on the fifth floor.

2.2.4.6 SPECIALTY FINISHES

New signage at the main new entrance and at the entry into the Interview Room will be provided as well as signage throughout the office suite. Signage used in the corridor will comply with building standards and signage provided within the suite will match that used in the current HUD suite located on the 5th floor. Solid surface top will be provided on the Breakroom base cabinets.

2.2.4.7 CASEWORK

Plastic laminate clad cabinets in the Breakroom. Standard commercial grade hardware will be provided.

2.2.5 FURNITURE FIXTURES AND EQUIPMENT (FF&E)

FF&E to be provided by the HUD/OIG and is not a part of this project. Typical FF&E items will be shown on the drawings and services typical to FF&E items will be coordinated and shown on the drawings.

HUD Office Renovation, Brickell Plaza Federal Building P A G E 11

MECHANICAL

2.3.1 OVERVIEW

2.3.1.1 HVAC

A portion of the fourth floor Brickell Plaza Federal Building will be the new location of the expanded location of the US Housing & Urban Development (HUD) offices, which requires environmental conditioning to foster a healthy and operable office space. The new office space will consist of open offices, evidence room, grand jury room, interview room, firearms room, shared files room, LAN room, ASAC room, ARIGA room, entry area, a break room and a conference room. The existing air handler located in the mechanical room will be utilized to provide the conditioned air to the spaces. New supply air terminal units will be provided for zone control. New insulated supply ducts will be required. Return air will be transferred back to the mechanical room. Where fire wall penetrations are required a fire damper will be provided. Local controls will include thermostats and local DDC controls for terminal units and a new DDC control panel for the existing air handling unit.

2.3.2 DESIGN CRITERIA

2.3.2.1 APPLICABLE CODES AND STANDARDS

Client Standards:

PBS-P100 2018 Facilities Standards for the Public Buildings Service

ASHRAE Standard 55-2017, Thermal Environmental Conditions for Human Occupancy

ASHRAE Standard 62.1-2016, Ventilation for Acceptable Indoor Air Quality

ASHRAE Standard 90.1-2016, Energy Standard for Buildings Except Low-Rise Residential Buildings

ASHRAE Standard 100-2015, Energy Conservation in Existing Buildings

NFPA/NEC 70-2017, National Electric Code

NFPA 90A-2017, Standard for the Installation of Air Conditioning and Ventilating Systems, 2015 Edition

SMACNA Fire, Smoke and Radiation Damper Installation Guide for HVAC

SMACNA HVAC Duct Construction Standards – Metal and Flexible

SMACNA HVAC Sound and Vibration Manual

SMACNA HVAC Systems Application

SMACNA HVAC Systems Testing, Adjusting & Balancing

SMACNA IAQ Guidelines for Occupied Buildings Under Construction

SMACNA Round Industrial Duct Construction Standards

SMACNA Seismic Restraint Manual Guidelines for Mechanical Systems

Building Codes:

International Building Code, 2018 Florida Edition

International Existing Building Code, 2018 Florida Edition

International Mechanical Code, 2018 Florida Edition

International Energy Conservation Code, 2018 Florida Edition

HUD Office Renovation, Brickell Plaza Federal Building P A G E 12

2.3.2.2 DESIGN REQUIREMENTS

2.3.2.2.1 CLIMATE CONDITIONS

Location: (Miami Executive, FL, ASHRAE Fund. 2017)

Latitude: 25° 65’ N

Longitude: 80° 43’ W

Elevation: 10 ft.

Temperature/Humidity:

Heating: 99.6% DB 45.6 °F

Cooling: 1% DB 91.4 °F

1% MCWB 77.7 °F

Dehumidification:

1% DP 77.5 °F

1% HR 143.1 grains/lb.

1% MCDB 83.0 °F

Extreme Annual Wind speed:

1% 20.7 mph

Degree Days:

Heating (base 65 deg. F) 164

Cooling (base 65 deg. F) 4147

2.3.2.2.2 SEISMIC CONDITIONS

Category A Ss=0.041 g, S1=0.020 g

2.3.2.2.3 DESIGN REQUIREMENTS (INTERIOR)

2.3.2.2.3.1 SPACE REQUIREMENTS

Space Type: All

Temperature/Humidity:

Heating: 68°F

Cooling: 78°F w/ 50% RH

Minimum Outdoor Air Flow: 5 CFM/person + 0.06 CFM/FT2

Recirculation Allowed: Yes

Noise Criteria: 35 NC

Pressurization: NR

Local Control: Thermostat

Flow Control: Variable

2.3.2.2.3.2 SYSTEM REQUIREMENTS

Note: 55°F will be used for the cooling and heating leaving air temperature from the air handler. The current percentage of outdoor air (ventilation air) from the ERV is assumed to be 9% of the total supply air based on 2014 record documents.

HUD Office Renovation, Brickell Plaza Federal Building P A G E 13

2.3.3 EXISTING CONDITIONS

2.3.3.1 HVAC

The existing space within the area of work currently utilize a multi-zone, constant volume air handling unit

(AHU) located in the fourth floor mechanical room that serves approximately half of the fourth floor. The

AHU is equipped with DX cooling, hot water heating, and water-cooled condensers. Condensers are cooled by an open condensing water cooling system with a cooling tower located on the roof. Zone modulating balancing dampers are used to control airflow thru each of the (4) supply duct mains leaving the mechanical room. Air is returned back to the air handling unit via existing return air plenum. An

Energy Recovery Ventilator (ERV) is also located on the roof, providing outdoor air to the building.

Outdoor air from the ERV is ducted directly into the fourth floor mechanical room. Utility and HVAC systems are operated by DDC controls tied back to a PC located in the first-floor mechanical room.

Note: Current conditions of the mechanical room and return plenum are not P-100 complicit.

The AHU draws intake air directly from the equipment room in which they are located. Outdoor air is ducted to the mechanical room from the rooftop ERV. Return air is returned via ceiling plenum and transfer ducts into the mechanical room as well. This use of the equipment room as a plenum, or mixing box is expressly forbidden by the P-100. Additionally, this violates the requirements of ASHRAE 62.1, which does not allow Class 2 air (as found in mechanical spaces) to be recirculated to Class 1 spaces (such as office spaces). Lastly, the existing plenum return air system exceeds the P-100 required maximum horizontal distance (50 feet) from the farthest point in the plenum to a return air duct.

Note: Existing mechanical conditions, i.e. presence and location of ductwork, piping, equipment and materials, indicated are based on information obtained from 1989 and 2014 drawings and field survey.

2.3.4 DEMOLITION

2.3.4.1 HVAC

Ductwork, air devices, flex duct, and associated hangers and supports that supply the existing space will be demolished.

2.3.5 NEW WORK

2.3.5.1 HVAC

A new HVAC system will be designed to the PBS P-100 Tier 1 High performance characteristics. The distribution will utilize the existing multi-zone constant volume AHU serving the Plan-East half of the fourth floor. The new portion of the distribution system serving this renovation area will consist of VAV boxes with electric reheat and lay-in diffusers. VAV’s will be provided with local DDC controls including individual thermostats. The existing AHU will also be provided with a local DDC controller with BAS integration capability. Return air will be transferred back to the fourth floor mechanical room.

Note: It is understood that within the Firearms Room, if personnel clean weapons stored in this space will provide portable devices to ensure safe removal of solvent fumes and filtering for recirculation to the affected airspace.

HUD Office Renovation, Brickell Plaza Federal Building P A G E 14

ELECTRICAL

2.4.1 DESIGN REQUIREMENTS

GSA P100 Facility Standards for the Public Buildings Services (2018)

NFPA 70 National Electrical Code

NFPA 70E National Electrical Safety Code

International Building Code 2018 Edition

Florida Building Code 2017 Edition

2.4.2 DEMOLITION

Demolition work will be required in the two independent tenant spaces (HUD and OIG). All existing outlets, lighting fixtures, lighting control devices, conduits, and wiring will be demolished. The existing panelboards located in the fourth floor electrical room will remain to feed new circuits to the space.

2.4.3 NEW WORK

2.4.3.1 POWER

New power will be provided to the various workstations throughout the open offices utilizing ceiling power poles throughout. Individual offices will be provided with receptacles on three walls and a quadruplex to support a workstation on the fourth wall. The break room will be provided with counter top

GFI receptacles. The conference room will be provided with a dual compartment power, telecom box to serve the table. LAN 412 will be provided with one quadruplex outlet per wall and a dedicated 120V duplex outlet. General power provisions will be provided throughout the rest of the area to support general office needs. Devices installed on existing walls to remain will utilize non-metallic surface raceway.

HVAC equipment will be provided with appropriate disconnects and circuits as the need arises at

480Y/277V, utilizing an existing panel 1H-B on the fourth floor.

Power will be provided through a new, recess mounted 208Y/120V, 100A Panel 1L-D installed in the wall space where the door to HUD will be removed. A 3-pole, 100A circuit breaker will be installed in existing spaces in Panel 1L-C to serve Panel 1L-D. All panels involved in the renovation shall be labeled according to NFPA 110.16 standards.

2.4.3.2 LIGHTING

All new fixtures will be recessed LED 2’x4’ troffers. Architectural direct/indirect fixtures will be used in office, open office, grand jury, and conference room settings. Storage areas and support areas will utilize acrylic lens troffers. Lighting levels will be designed to IES standards throughout. Exit lighting will be provided as necessary. Emergency lighting will be provided through integral fixture batteries with 90 minutes run time.

Various local lighting controllers will serve the area, including single pole, three way, and dimming switches. Ceiling mounted dual-technology occupancy sensors will be provided in open offices, single

HUD Office Renovation, Brickell Plaza Federal Building P A G E 15 offices, the break room, and the entrance. Wall mounted switches with integral occupancy sensors will be used in the LAN room, and storage areas. Dimmers will be provided in the conference room and the single occupancy offices.

Power for the new lighting fixtures will be derived from an existing 480Y/277V power panel 1H-B in the fourth floor electrical room.

HUD Office Renovation, Brickell Plaza Federal Building P A G E 16

COMMUNICATIONS

2.5.1 DESIGN REQUIREMENTS

GSA P100 Facility Standards for the Public Buildings Services (2018)

NFPA 70 National Electrical Code

NFPA 70E National Electrical Safety Code

International Building Code 2018 Edition

Florida Building Code 2017 Edition

NSTISSAM TEMPEST/2-95A National Security Telecommunications and Information Systems

Security, Amendment to Advisory Memorandum TEMPEST 2-95

Red/Black Installation Guidance

2.5.2 DEMOLITION

Demolition work will be required in the existing dual-tenant space. Existing devices, pathways, and cabling will be demolished back to source. Telecommunications equipment in the existing LAN room will be preserved during demolition to be reused for new construction.

2.5.3 NEW WORK

2.5.3.1 VOICE/DATA

The new workstations throughout the open offices will utilize dual channel power poles, providing two

Cat5e cables to each workstation. Each individual office will be provided with a two port data outlet adjacent to the quadruplex power outlet to support the workstation. 6”W by 2”D basket type cable tray mounted 3” above the finished ceiling will provide the pathway for the cabling throughout the upfit space. The Cat5e cables will terminate to an existing patch panel to be relocated from the existing LAN room to LAN 412. All backbone cabling will be re-routed after demolition to continue service. Devices installed on existing walls to remain will utilize non-metallic surface raceway.

2.5.3.2 SECURITY

The HUD/OIG tenant space requires various security devices throughout. Cabling and devices are not part of the contract, therefore, conduit, pull-string, and back-boxes will be provided. Camera back-boxes will be provided at the HUD/OIG entrance and within the interview room. The interview camera back-box will tie to a monitor location directly outside the room, and the lobby camera back-box will be tied to one monitor location in the HUD space and one monitor location in the OIG space. Card reader back-boxes will be provided in the corridor at entrances to the interview room and the main lobby, at the entrances from the lobby to the HUD space and OIG space, and at the LAN room. Aiphone system back-boxes will also be provided in the lobby at each entrance to screen guests to the spaces. A panic switch back-box will be installed under the table in the interview room. The firearms room, grand jury room, and evidence room will all be provided with keypad back-boxes, motion sensor back-boxes, and alarm back-boxes.

HUD Office Renovation, Brickell Plaza Federal Building P A G E 17

FIRE PROTECTION

2.6.1 DESIGN STANDARDS

NFPA 101 Life Safety Code, 2018

NFPA 13 Standard for the Installation of Sprinkler Systems, 2019

NFPA 72 National Fire Alarm and Signaling Code, 2019

GSA P100 Facility Standards for the Public Buildings Services (2018)

International Building Code (Unaltered) 2018 Edition

International Fire Code 2018 Edition

Florida Accessibility Code 2017 Edition

2.6.2 LIFE SAFETY ANALYSIS

A building code and life safety analysis has been performed and evaluated by the design team fire protection engineer. Refer to the Building Code/Life Safety Analysis sheet in the drawing set.

2.6.3 FIRE ALARM

There is an existing addressable fire alarm system and a separate emergency voice communication system that serves the entire building. The existing fire alarm system is a Notifier AM-2020 with a voice activation module for interface with the emergency communications system. The main control panel is located inside of the first-floor fire control room. The existing fire alarm system on the fourth floor consists of manual pull stations, smoke detectors, horn/strobes, and strobes as well as fire sprinkler flow and tamper switches. The existing notification appliance circuit (NAC), is powered by an existing Gamewell FCI GFPS-9

Distributed Power Module NAC Expander located in a corridor electrical room east of the renovation area.

Inside of the renovation area, the existing fire alarm system consists of strobes which shall be demolished.

New wall-mounted horn/strobes and strobes, as well as a manual pull station will be added throughout the renovated areas in accordance with NFPA 72. Existing strobes, horn/strobes, smoke detectors, heat detectors, duct smoke detectors, manual pull stations and emergency communication system speakers outside of the renovated area as well as the existing fire sprinkler flow and tamper switches will remain.

A new manual pull station will be installed and connected to the fire alarm system by extending the existing signaling line circuit (SLC) from the nearest existing initiating device. Similarly, the existing

NAC will be demolished back to the nearest notification appliance to remain and new NAC wiring will be connected to an existing spare circuit inside the existing Distributed Power Module NAC Expander to power the new notification appliances.

In areas of the fourth floor outside of the renovated area, the existing fire alarm system is to remain operational at all times.

2.6.4 FIRE SUPPRESSION

The fourth floor is protected by a wet-pipe sprinkler system and is equipped with a Class I standpipe system. The sprinkler and standpipe systems are supplied by an electric fire booster pump located on the first floor. The fire booster pump has a rating of 750 gpm @ 90 psi. Based on the fire pump test report provided by the government, the fire pump performance is as follows:

HUD Office Renovation, Brickell Plaza Federal Building P A G E 18

2.6.4.1 FIRE PUMP TEST POINTS

First Floor Fire Pump

Churn – Discharge pressure: 105 psi

756 gpm – Discharge pressure: 96 psi

1128 gpm – Discharge pressure: 80 psi

Sprinkler protection for the fourth floor is supplied from a sprinkler feed main above the corridor ceiling that is connected to a sprinkler riser located in the north stairwell. All sprinkler heads and branch lines in the renovation area will be demolished back to the existing corridor sprinkler main and capped in order to keep the sprinkler system on the remainder of the floor in service. The existing floor control valve assembly and riser in the north stairwell will remain. New branch lines will be connected to the existing corridor sprinkler main and all new sprinklers and associated piping will be installed throughout the renovated space in accordance with NFPA 13 for light hazard and ordinary hazard group 1.

HUD Office Renovation, Brickell Plaza Federal Building A P P E N D I X A

A PP EN D I X A :

LIGHTING CALCULATIONS

D a te

C o m m e n ts

Revisions

D a te

:3 /3

/2

H U

D /O

IG

D ra w n B y

M

A C

H O

R D

C h e c k e d B y

S

P E

R K

IN

S

S c a le

N

O T

T O

S C

A L E

Luminaire Schedule

Calculation Summary Label Avg Max Min Avg/Min Max/Min

Project: Project_1 Symbol Qty LLF Tag Lum. Watts

400_ENTRY 30.95 35.2 24.6

Lum. Lumens

1.26 1.43

401_OPEN OFFICE 43.55 61.4 16.5

14 0.900 A 24.9 3469

2.64 3.72

402_OPEN OFFICE 37.90 55.5 5.7 6.65 9.74

403_SHARED FILES ROOM

1 0.900 B 48 6231 21 0.900 C 34.2 4035 2 0.900 D 48 5523

23.01 28.8 14.1 1.63 2.04

404_FIREARMS ROOM 24.75 31.1 10.0 2.48 3.11

405_INTERVIEW ROOM 30.33 54.2 11.5 2.64 4.71

406_GRAND JURY ROOM 29.90 53.7 12.6 2.37 4.26

407_EVIDENCE ROOM 24.39 35.5 13.9 1.75 2.55

408_ASAC 50.15 75.9 17.4 2.88 4.36

409_BREAKROOM 22.93 29.0 16.7 1.37 1.74

410_ARIGA 41.11 58.4 24.5 1.68 2.38

411_CONFERENCE ROOM 35.05 62.5 13.6 2.58 4.60

412_LAN 48.39 80.4 25.1 1.93 3.20

View_1:Plan Rotated 0 Tilted 0 Not to Scale

A

A

A

A

C

C

C

C

C

C

C

C

D

D

CC C

C CC

CC

A AA A

A

A

A

A

A

A

C C

C C C

B

14.6 20.2 26.0 28.6 26.0 20.2 14.5

17.0 23.7 30.7 33.8 30.7 23.7 17.0

18.1 25.0 32.3 35.5 32.3 25.0 18.1

18.0 24.9 32.1 35.3 32.1 24.9 17.9

16.6 23.2 29.9 33.0 29.9 23.1 16.6

19.5 24.9 27.2 24.8 19.3 13.9

67.9 72.4 54.3 33.2

72.1 72.5 53.7 33.6

31.7 44.6 66.1 67.4 58.2 42.6 28.5

41.3 65.0 75.9 64.7 46.1 31.7 22.2

41.0 61.8 70.3 56.5 37.2 24.5 17.4

12.6 20.4 31.5 37.4 31.5 20.4 12.6

15.4 26.0 42.5 51.4 42.5 26.0 15.4

16.6 27.5 43.3 52.0 43.3 27.5 16.6

16.7 27.5 42.6 50.7 42.6 27.5 16.7

16.1 27.2 44.5 53.7 44.5 27.2 16.1

13.6 22.9 36.4 44.0 36.4 22.9 13.6

12.0 20.3 31.5 37.5 31.6 20.6 12.6

11.5 26.4 42.8 51.7 42.8 26.2 15.6

28.0 43.6 52.3 43.6 27.7 16.8

16.6 27.6 42.9 50.9 42.9 27.7 16.9

16.1 27.4 44.8 54.2 44.9 27.5 16.3

13.7 23.1 36.8 44.5 36.8 23.1 13.7

16.7 19.4

25.2 32.8 36.1 31.9 28.7 31.3 36.9 37.6 30.8 24.5 23.4 28.2 34.8 35.6 28.3

33.8 46.8 50.2 41.5 35.3 39.9 50.2 51.5 39.9 29.8 28.3 36.2 47.6 49.2 37.5

35.7 48.7 52.1 43.5 37.4 42.0 52.2 53.4 42.3 32.3 31.0 38.7 49.4 50.2 38.4

33.0 42.1 45.1 39.9 36.2 39.5 45.9 46.8 39.5 33.1 32.8 38.4 43.3 41.2 32.2

33.1 42.8 45.7 40.2 36.4 39.7 46.9 48.0 40.9 35.4 37.1 43.4 44.8 37.2 27.4

35.6 48.9 52.5 43.4 37.4 42.1 53.6 55.5 45.2 38.0 41.8 51.8 52.5 38.6 22.5

32.4 44.7 48.3 40.0 34.4 39.0 50.2 52.2 42.9 36.5 40.3 49.9 51.1

23.1 29.9 32.8 29.7 27.0 29.7 34.9 38.2 34.0 31.1 33.1 37.6 37.7

14.0 16.6 28.3 27.9 27.3 27.9 29.0 27.8

7.9 8.3 27.8 29.7 29.6 29.8 30.3 28.7

5.7 5.7 38.4 41.5 38.6 38.2 41.0 40.1

50.9 54.5 47.9 46.7 53.2 53.2

49.8 53.0 46.7 45.7 51.9 51.7

38.1 36.0 35.6 38.2 37.1

24.4 27.1 25.7 23.6 23.9 25.8 25.3 20.9

28.3 31.1 29.2 26.4 27.0 29.5 29.1 14.0

26.9 29.7 27.8 25.2 25.9 28.2 27.6 10.0

20.7 21.5 22.9 22.1 18.0

18.8 23.6 25.0 23.4 21.9 23.0 24.8 23.9 19.5 14.1

21.9 27.3 28.8 26.8 24.8 26.1 28.6 27.6 22.4 16.0

20.9 26.1 27.6 25.7 23.9 25.0 27.2 26.3 21.3 15.2

17.0 21.0 22.4 21.2 20.0 20.7 21.5

25.0 27.6 24.6

30.3 33.3 29.9

31.8 34.9 31.5

31.3 34.2 31.0

31.8 34.9 31.5

31.9 35.2 31.6

28.3 31.3 28.1

16.9 22.3 25.2 23.6 18.7

19.6 25.6 29.0 27.2 21.6

19.4 24.8 27.7 26.2 21.3

18.5 22.8 25.1 23.9 19.9

18.5 22.9 25.2 24.0 20.0

19.5 25.0 27.9 26.3 21.4

19.5 25.4 28.8 27.1 21.5

16.7 21.9 24.7 23.2 18.4

39.3 44.0 38.6 32.8 34.0 40.5 43.1 35.3

50.1 56.2 47.7 39.1 41.0 51.3 55.4 44.2

48.8 54.6 47.7 40.4 41.9 50.6 53.8 43.8

43.1 48.2 44.5 39.5 40.4 45.8 47.7 42.2

47.8 53.2 47.5 41.3 42.5 49.5 52.5 45.5 37.2 34.5 38.4 40.2 32.3 22.2

54.4 61.4 52.5 43.8 45.6 55.9 60.8 51.0 41.0 41.4 49.2 52.5 40.8 25.5

50.9 57.4 50.4 42.7 44.0 52.8 56.8 49.0 40.7 41.3 48.9 51.6 41.1 22.4

44.1 49.4 45.4 40.1 40.9 46.4 48.7 44.1 38.5 39.0 44.2 45.7 39.4

46.6 52.4 46.6 40.2 41.4 48.5 51.9 45.7 38.9 39.9 46.7 49.8 42.0

51.2 58.1 49.3 40.4 42.2 52.6 57.8 48.5 39.5 41.0 50.9 56.0 45.6

44.1 49.9 43.2 35.7 36.9 45.5 49.6 42.5 35.0 36.3 44.3 48.3 39.7

29.4 33.3 26.5 16.5 27.8 32.0 33.8 30.8 27.3 27.8 31.3 32.4 27.5

28.2 45.3 61.7 59.5 41.2 25.1

33.4 56.6 80.4 76.9 51.1 29.5

29.6 49.0 67.7 65.2 44.3 26.4

25.7 30.2 31.7 31.6 29.5 24.5

39.1 47.0 47.8 47.8 45.9 36.8

47.8 58.3 58.2 58.4 57.0 44.4

41.7 50.2 50.8 51.3 49.2 38.8

28.2 33.2 34.3 26.7 26.1

13.9 16.8 19.0 20.3 20.9 21.0 20.5 19.3 17.2 14.2

21.1 26.8 30.5 32.3 33.3 33.4 32.5 30.9 27.3 21.8

30.7 42.3 48.3 49.2 51.9 52.1 49.6 48.7 43.3 31.9

35.6 51.0 58.0 57.9 62.1 62.5 58.4 58.6 52.3 37.1

30.5 41.9 47.8 48.8 51.7 52.1 49.7 48.8 43.4 32.0

20.8 26.3 30.0 31.7 33.1 34.2 33.5 31.8 28.2 22.2

13.6 16.5 18.5 19.5 16.9

D a te

C o m m e n ts

Revisions

D a te

:4 /2

/2

D ra w n B y

M

A C

H O

R D

C h e c k e d B y

S

P E

R K

IN

S

S c a le

N

O T

T O

S C

A L E

H U

D /O

IG

E

M

Luminaire Schedule Project: Project_1 Symbol Qty

Calculation Summary Label

LLF Tag Lum. Watts Lum. Lumens

Avg Max Min Avg/Min Max/Min

400_ENTRY 8.30 14.1 2.5 3.32

0.467 C 24.9 3469

5.64

401_OPEN OFFICE 6.26 11.7 0.7 8.94 16.71

402_OPEN OFFICE 7.31 11.7 0.7 10.44 16.71

7 0.401

409_BREAKROOM 6.01 12.9 1.4 4.29

A 34.2 4035

9.21

View_1:Plan Rotated 0 Tilted 0 Not to Scale

C

C

A

A

A

A A

A

A

10.9 12.1 10.8

12.7 14.1 12.5

11.8 13.1 11.7

8.9 9.8 8.8

5.9 6.4 5.8

3.7 4.0 3.7

2.5 2.7 2.5

1.4 1.6 1.6 1.6 1.4

1.8 2.1 2.2 2.1 1.9

2.7 3.1 3.3 3.2 2.8

4.0 4.8 5.2 5.0 4.3

5.8 7.3 8.1 7.7 6.3

7.6 10.0 11.3 10.6 8.4

8.4 11.2 12.9 12.0 9.3

7.3 9.9 11.3 10.5 8.2

9.6 10.2 8.9 6.8 4.7 3.2 2.3 1.8

11.0 11.7 10.2 7.7 5.3 3.8 2.5 2.0

10.3 10.8 9.5 7.4 5.4 4.1 3.2 2.1

8.0 8.4 7.6 6.3 5.0 4.2 3.9 4.1

5.5 5.9 5.6 5.1 4.6 4.3 4.3 4.9 6.2 8.0 9.6 10.0 9.0 7.2

3.8 4.2 4.4 4.4 4.5 4.6 5.0 5.8 7.2 9.1 11.0 11.5 10.2 8.0

3.0 3.4 3.8 4.4 4.9 5.5 6.1 6.7 7.7 9.1 10.5 10.9 9.6 7.3

2.6 3.1 3.8 4.8 6.0 7.1 7.8 8.0 8.1 8.4 8.8 8.7 7.7

2.4 2.9 3.9 5.4 7.3 9.1 10.0 9.5 8.5 7.5 7.0 6.4 5.7

2.2 2.8 3.9 5.8 8.1 10.4 11.3 10.4 8.4 6.8 5.6 4.8 4.1

2.0 2.5 3.7 5.5 7.6 9.8 10.5 9.5 7.7 5.9 4.6 3.7 3.2

1.7 2.1 0.7 5.0 6.4 7.7 8.3 7.6 6.2 4.8 3.7 3.0 2.5

5.8 6.5

7.7 9.1 9.5 8.4 6.9 5.4 4.6 4.2 4.4 5.1 6.5 8.1 9.5 9.7 8.5

9.2 11.1 11.4 10.0 8.1 6.4 5.4 5.0 5.2 5.9 7.5 9.5 11.4 11.7 10.1

9.1 11.0 11.4 10.2 8.6 7.2 6.5 6.2 6.2 6.7 7.9 9.6 11.3 11.5 9.8

7.6 9.0 9.5 9.1 8.5 8.1 8.0 7.8 7.5 7.3 7.7 8.5 9.4 9.4 8.0

5.7 6.6 7.2 7.7 8.3 9.2 10.0 10.0 9.1 8.0 7.3 7.1 7.2 6.7 5.9

4.1 4.8 5.5 6.5 8.0 9.9 11.5 11.7 10.3 8.4 6.9 6.1 5.7 4.8 4.3

3.0 3.6 4.3 5.4 7.3 9.4 11.2 11.5 10.0 8.1 6.5 5.5 4.9

2.3 2.7 3.4 4.5 5.9 7.7 9.2 9.4 8.5 7.3 6.2 5.4 4.8

1.7 2.0 7.0 6.9 6.6 6.3 6.0 5.6

0.9 0.8 5.3 5.9 6.5 7.1 7.5 7.2

0.7 0.7 4.5 5.5 6.9 8.5 9.7 9.7

4.1 5.3 7.2 9.5 11.5 11.7

3.7 5.0 6.9 9.3 11.4 11.6

4.4 5.9 7.8 9.3 9.4

100% Design Narrative
Table of Contents
Section 1: Project Introduction
1.1 Overview
1.1.1 Project Background
1.1.2 Project Description
1.1.3 Project Location
Section 2: Discipline Narratives
2.1 Architectural
2.1.1 Design Requirements
2.1.2 Existing Conditions
2.1.3 Demolition
2.1.4 New Work
2.1.5 Architectural Finishes
2.2 Interior Design
2.2.1 Design Requirements
2.2.2 Existing Conditions
2.2.3 Demolition
2.2.4 New Work
2.2.5 Furniture Fixtures and Equipment (FF&E)
2.3 Mechanical
2.3.1 Overview
2.3.2 Design Criteria
2.3.3 Existing Conditions
2.3.4 Demolition
2.3.5 New Work
2.4 Electrical
2.4.1 Design Requirements
2.4.2 Demolition
2.4.3 New Work
2.5 Communications
2.5.1 Design Requirements
2.5.2 Demolition
2.5.3 New Work
2.6 Fire Protection
2.6.1 Design Standards
2.6.2 Life Safety Analysis
2.6.3 Fire Alarm
2.6.4 Fire Supporession
Appendix A: Lighting Calculations
Lighting Calculations
Emergency Lighting Calculations

File details come from the government source that posted it. Updated .