Amendment 0003 SF30 with attachments.pdf

PDF 2 MB Posted

Attached to
GSA Hanley 14th Floor GSA Space Relocation Federal contract opportunity
Solicitation number
47PC1120R0010Solicitation
Issued by
General Services Administration Public Buildings Service Region 2

About this file

This document consists of a federal contract solicitation and opportunity summary for the GSA Hanley 14th Floor Space Relocation project. The solicitation seeks proposals from contractors to renovate approximately 4,400 square feet on the 14th floor of the James M. Hanley Federal Building in Syracuse, New York for the General Services Administration. Base work includes demolition, construction of walls and ceilings, HVAC modifications, installation of finishes, doors, casework, plumbing, electrical, and relocation of employees. Proposals are due by May 26, 2020 with award expected using lowest price technically acceptable procedures. The opportunity is set aside for total small business and involves site visits on May 4th and 6th. Interested parties must complete a security notice to receive plans and specifications for this firm fixed price construction contract.

View the file

Other files for this federal contract opportunity

Other files attached to GSA Hanley 14th Floor GSA Space Relocation, newest first.
File Type Posted
47PC1120R0010 Form1442.pdf PDF
Attachment A - Experience on Similar Projects Offeror Form.pdf PDF
SF24 BidBond.pdf PDF
Attachment B PBS PastPerformanceQuestionnaire.pdf PDF
Amendment 0004 SF30 surfaces and QandA.pdf PDF
Reps Certs for 47PC1120R0010.pdf PDF
GSA527 form.pdf PDF
Attachment C Key Personnel Resume.pdf PDF
Amendment 0002 SF30 signinsheet questionaanswers.pdf PDF
Amendment 0001 SF30.pdf PDF
Solicitation Package GSAHanleySpaceRelocation.pdf PDF
DocumentSecurityStatement 47PC1120R0010.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2PQAU

Katherine S. Wheeler

HANLEY GSA SPACE RELOCATION SOLICITATION AMENDMENT 0003

This amendment incorporates into the solicitation changes in the specifications and drawings (see attached changes). This amendment also changes the proposal due date from May 26, 2020 to June 2, 2020 (4:00pm Eastern Time)

Contractor's proposing on this project, must include a signed copy of this SF-30 in their proposal package.

U.S. General Services Administration 100 S. Clinton Street, Rm 1350 Syracuse, NY 13261

EQ2PSEU-19-0017

47PC1120R0010

05/21/2020

04/24/2020

05/21/2020

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

Project: GSA Space Reallocation Project James M. Hanley Federal Office Bldg. & Courthouse 100 S. Clinton Street Syracuse, NY 13261

Date of Issue: May 20, 2020

The following additions, deletions, and/or changes or clarifications to the drawings, specifications, and bidding documents for this project, shall become and are hereby made part of the Contract Documents.

They change the original documents only in the manner and to the extent stated. Each bidder shall acknowledge receipt of this AMENDMENT in the appropriate location on the bid proposal form.

This AMENDMENT consists of two (2) pages, plus two (2) drawing sheet attachments for a total of four (4) pages. All requirements of the original Specifications and Drawings and previous Amendments, if applicable, shall remain in force except as noted by this AMENDMENT.

THE PURPOSE OF THIS AMENDMENT IS TO CHANGE THE FOLLOWING ITEMS:

1.0 DRAWINGS

1.1 AE301 – INTERIOR ELEVATIONS

a. ADD notes to Detail #5 as follows:

“Stainless steel GSA logo signage size to be 30” x 30””

b. DELETE “CT” note on Details #1, 2 and 4

1.2 AE501 - DETAILS

a. Detail #1; CHANGE “Plastic Laminate” to “Quartz”

b. Detail #2; DELETE “CT” note; CHANGE “Plastic Laminate” note to “Quartz”

c. Detail #3; ADD notes as follows:

“Replace approximately twelve (12) missing/ damaged or destroyed Sleeve Gaskets. Material shall be supplied by the PTAC manufacturer.”

d. Detail #4; CHANGE “Plastic Laminate” note to “Quartz”; CHANGE “Cabinet Grade Plywood” to “Marine Grade Plywood”.

e. Detail #7; ADD notes as follows:

“Approx. 90 linear feet of cabinet requires new insulation. Locations are between the existing PTAC units.”

1.3 AE601 – SCHEDULES

a. REVISE Door Schedule Notes as follows:

1) “ALUM/GLAZ” indicates aluminum doors with full glass as indicated as Type FG Detail 1.

“PNT” finish indicates they are to be pre-finished with coating as specified.

2) Doors 1453, 14555, 1456, 1458, 1459, 1460, 1461 should be listed as “ALUM” not “HM”.

b. REVISE Finish Legend as follows:

1) CPT1 Manufacturer/Series/Model & Color = Space Worx Collection / Storm Cloud

2) LVT1 Manufacturer/Series/Model & Color = Patcraft / Set In Concrete/ Aggregate / Sediment

3) PLAM1 Manufacturer/Series/Model & Color = Wilsonart / Linearity Finish / Xanadu 7945K-18

4) PNT1 Color = Accessible Beige SW7036

5) PNT2 Color = Rockwood SW2735

6) PNT3 Color = Foothills SW7514

c. ADD new finish: “Quartz / Countertop / Wilsonart / Quartz / Isselburg Q4013”

1.4 AI100 – FURNITURE & FINISH PLAN

a. ADD notes to Interior Message Schedule as follows:

“S1 and S2 based on existing building standard sizes; S3 = 6” x 6” minimum; S4 = 6” x 18” minimum.”

1.5 MD-101 – HVAC REMOVALS PLAN

a. REPLACE drawing sheet with the ATTACHED drawing sheet with revision date 04/22/20.

1.6 MH602 – HVAC SCHEDULES & SYMBOLS LIST

a. REPLACE drawing sheet with the ATTACHED drawing sheet with revision date 04/22/20.

RAM-TECH

E N G I N E E R S phone: 315-463-7716 fax: 315-463-7758 www. ramtechengineers.com

Buffalo, NY Philadelphia, PA Rochester, NY of Syracuse, P.C.

RAM-TECH Engineers

Syracuse, NY copyright C RAM-TECH Engineers, P.C.

RENOVATION

KAREN SHONBORN

SHEET SIZE: 30 X 42

DRAWING NO.

CHECKED BY

DRAWN BY

FLOOR NO.

FILE NAME

DRAWING TITLE

SUB. DATE

SUBMISSION

GSA PM

PROJECT NO.

PROJECT

DESCRIPTION

PROJECT

TITLE

FACILITY CODE

OTHER

BUILDING NOs.

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

CONSTR. FIRM

SUB A/E

PRIME A/E

A/E CON. NO.

D R

A W

I N

G P

R O

J E

C T

B U

I L

D I N

G C

O N

T R

A C

T O

R S

G R

A P

H I C

S C

A L

E

R E

V I S

I O

N

N

O T

E S

C E

R T

I F

I C

A T

I O

N S

MARK DATE DESCRIPTION

SHEET OF

NK BHANDARI ARCHITECTURE

RAM TECH ENGINEERS

GS-02P-10-PW-D-0013

JAMES M. HANLEY FEDERAL

100 S. CLINTON STREET

SYRACUSE, NY 13261

NY0281ZZ

K E

Y

P

L A

N

SENSITIVE BUT UNCLASSIFIED (SBU) PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.

DATE:

1 2 3 4 5 6

E

D

C

B

A

1 2 3 4 5 6

SUB A/E

CONSTR. CON.

NYS EDUCATION LAW, SECTION 7209 AND 69.5(B)

PROHIBITS ANY PERSON TO ALTER THESE DRAWINGS

OTHER THAN A LICENSED ARCHITECT OR THE DESIGN

ENGINEER. INFORMATION ON THESE DRAWINGS FOR

GSA ONLY, AND CAN BE UTILIZED BY GSA AS THEY

DEEM NECESSARY.

1005 W. Fayette Street, Suite 4A

Syracuse, NY 13204

Phone

Fax www.nkbpc.com

315.428.1177

315.428.9822

PRIMARY WORK AREA

DN

UP

DN

NKBN. .

ARCHITECTURE & ENGINEERING, PC..

KBHANDARI

GENERAL SERVICES ADMINISTRATION

PUBLIC BUILDING SERVICE

PROPERTY MANAGEMENT DIVISION

UPSTATE NY SERVICE CENTER

HANLEY GSA SPACE

REALLOCATION PROJECT

04/30/2019

RNY12525

4/30/2019

CONSTRUCTION DOCUMENTS

0 2' 4' 8'

HVAC SCHEDULES & SYMBOL

LIST

TAM

DNL

MH602

XXX

XXX

XX

X

X

VAV BOX SCHEDULE

VAV BOX NO. AREA SERVED

ASSOCIATED

EXISTING AHU

VAV BOX TYPE

PRIMARY AIRFLOW

DESIGN COOLING

AIRFLOW

TOTAL UNIT HEATING

AIRFLOW

HOT WATER COIL FAN DATA

INLET

DIA.

RADIATED

NC

DISCHARGE

NC

HWS&R

RUN OUT

SIZE

NOTES

MAX

(CFM)

MIN

(CFM)

MAX

(CFM)

MIN

(CFM)

MAX

(CFM)

MIN

(CFM)

LAT

°F

CFM

EAT

°F

LAT

°F

EWT

°F

LWT

°F

GPM MBH

MAX

APD (IN)

WC

MAX

WPD

(FT)

HD

CFM

ESP

(IN)

WC

HP VOLTS PHASE

(IN) (IN)

VAV-14-1 OPEN OFFICE 1455 S-1 FAN-POWERED 500 280 500 280 680 680 112.6 680 55 90 160 120 1.3 25.7 5 0.5 400 0.25 0.12 277 1 10 14 15 3/4

VAV-14-2 OPEN OFFICE 1462 S-1 FAN-POWERED 200 200 200 200 760 760 104.5 760 55 90 160 120 1.4 28.7 5 0.5 560 0.25 0.12 277 1 6 14 15 3/4

VAV-14-3 OPEN OFFICE 1462 S-1 FAN-POWERED 200 200 200 200 560 560 109.6 560 55 90 160 120 1.1 21.2 5 0.5 360 0.25 0.12 277 1 6 14 15 3/4

VAV-14-4 OPEN OFFICE 1462 S-1 SINGLE DUCT 1000 700 1000 700 700 700 80.0 700 55 80 160 120 0.9 18.9 5 0.5 --- --- --- --- --- 12 14 15 3/4

VAV-14-5

1457, 1458, 1459, 1460, 1461

S-1 SINGLE DUCT 800 600 800 600 600 600 80.0 600 55 80 160 120 0.8 16.2 5 0.5 --- --- --- --- --- 10 14 15 3/4

VAV-14-6 WEST LOBBY S-1 SINGLE DUCT 300 200 300 200 200 200 80.0 200 55 80 160 120 0.3 5.4 5 0.5 --- --- --- --- --- 6 14 15 3/4

VAV-14-7 CONFERENCE RM. 1456 S-1 SINGLE DUCT 800 500 800 500 500 500 80.0 500 55 80 160 120 0.7 13.5 5 0.5 --- --- --- --- --- 10 14 15 3/4 1

VAV-14-8

1452, 1453, 1454

S-1 SINGLE DUCT 540 320 540 320 320 320 80.0 320 55 80 160 120 0.4 8.6 5 0.5 --- --- --- --- --- 10 14 15 3/4 1

VAV-14-9 NORTHWEST AREA S-1 SINGLE DUCT 825 825 825 825 825 825 80.0 825 55 80 160 120 1.1 22.3 5 0.5 --- --- --- --- --- 10 14 15 3/4

VAV-14-10 CONFERENCE RM. S-1 SINGLE DUCT 1000 500 1000 500 500 500 80.0 500 55 80 160 120 0.7 13.5 5 0.5 --- --- --- --- --- 12 14 15 3/4

VAV-14-11 SOUTHEAST OFFICE/EAST LOBBY S-1 SINGLE DUCT 450 300 450 300 300 300 80.0 300 55 80 160 120 0.4 8.1 5 0.5 --- --- --- --- --- 8 14 15 3/4

GENERAL NOTES:

A. PROVIDE SOUND ATTENUATOR WITH AN INSERTION LOSS OF 16dB @ 250 Hz ON THE VAV BOX OUTLET.

B. RE-BALANCE EXISTING AHU BRANCH DUCTS AT DUCT RISER AS REQUIRED TO PROVIDE AIRFLOWS INDICATED.

C. BASIS OF DESIGN: TITUS

NOTES:

1. INTERLOCK OCCUPIED/UNOCCUPIED MODE WITH CEILING MOUNTED OCCUPANCY SENSORS.

TEXT

IDENTIFIER

TYPE CONSTRUCTION FEATURES

MFR/MODEL

(BASIS OF DESIGN)

NOTES

24"x24" OR 12"x12" (AS SHOWN)

MULTI-CORE FACE DIFFUSER

SUPPLY AIR

STEEL FLUSH STAMPED

MULTI-CORE

DAMPERS OPERABLE FROM FACE

4-WAY ADJUSTABLE PATTERN

CONTROL.

TITUS/TMSA

LINEAR SLOT DIFFUSER 48"

LONG, 5-13/16" WIDE

(4)-1/2"SLOTS

EXTRUDED ALUMINUM WITH

INSULATED STEEL PLENUM TO BE

INSTALLED IN ARMSTRONG

CEILING

FULLY ADJUSTABLE PATTERN

CONTROLLERS,

CEILING HANGERS, TYPE 3

BORDER

TITUS ML-37/MPI-39-SP

A 24"x24" OR 12"x12" (AS SHOWN)

PERFORATED FACE DIFFUSER

RETURN AIR

STEEL FLUSH PERFORATED FACE

WITH 3/16" HOLES ON 1/4"

STAGGERED CENTERS

UN-LATCHABLE FACE

WITHOUT DAMPER OR PATTERN

CONTROL

FOR LAY-IN CEILING

TITUS/PAR

EXHAUST FAN SCHEDULE

UNIT NO. SERVICE LOCATION TYPE DRIVE

PERFORMANCE DATA FAN MOTOR DATA

CONTROL MFR/MODEL NOTESCFM

TOTAL SP

(IN.)

FAN RPM BHP

(%) SE

MHP

ELECTRICAL DATA

VOLTS PHASE HZ

EF-A BREAK RM BREAK CEILING DIRECT 200 0.375 1100 86 W 35 0.04 115 1 60 DDC COOK/GC-186 1

KEYED NOTES:

1. PROVIDE INTEGRAL DISCONNECTING MEANS

UNIT NO.

LOCATION (5TH

FLOOR)

CFM

(HIGH)

CFM

(LOW)

OA

CFM

MCA MOCP VOLT PHASE

COOLING

EER

HEATING

MFR /MODEL (BASIS OF

DESIGN)

NOTES

MBHT MBHS EAT. DB. °F EAT. WB. °F

LDB °F

(HIGH

SPEED)

LWB °F

(HIGH

SPEED)

LDB °F

(LOW

SPEED)

LWB °F

(LOW

SPEED)

AMPS WATTS

PTAC-1 OPEN OFFICE 1455 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

1-4

PTAC-2 OPEN OFFICE 1455 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

1-4

PTAC-3 OPEN OFFICE 1462 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

1-4

PTAC-4 OPEN OFFICE 1462 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

1-4

PTAC-5 OPEN OFFICE 1462 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

1-4

PTAC-6 OPEN OFFICE 1462 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

1-4

PTAC-7 OPEN OFFICE 1462 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

1-4

PTAC-8 OPEN OFFICE 1462 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

1-4

PTAC-9 OPEN OFFICE 1462 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

1-4

PTAC-10 OPEN OFFICE 1462 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

1-4

PTAC-11 OPEN OFFICE 1462 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

1-4

PTAC-12 OPEN OFFICE 1462 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

1-4

PTAC-13 EX EAST OFFICE 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

PTAC-14 EX SOUTHEAST OFFICE 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

PTAC-15 EX SOUTHEAST OFFICE 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

PTAC-16 EX SOUTHEAST OFFICE 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

PTAC-17 EX SOUTH OFFICE 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

PTAC-18 EX SOUTH OFFICE 400 280 0 15.40 20 277 1 9.5 6 80 67 66.1 64.0 60.2 59.5 10.05 12.1 3200

ISLANDAIRE/EZ09A2KFC1_14AA

NOTES:

1. PROVIDE FACTORY INSTALLED INTEGRAL DISCONNECT SWITCH AT INDOOR UNIT.

2. PROVIDE SINGLE POINT POWER CONNECTION.

3. LOW-AMBIENT KIT: CONTROL SHALL REGULATE FAN-MOTOR CYCLES IN RESPONSE TO SATURATED CONDENSING TEMPERATURE OF THE UNIT.

4. PROVIDE WIRING HARNESS/WHIP TO ALLOW REMOTE CONTROL OF PTAC BY THE DDC CONTROLLER.

5. PTAC UNIT FURNISHED BY OWNER (GSA), INSTALLED BY CONTRACTOR.

987 10

G

F

E

X X X X X X X X X X X X

X X X X X X X X X X X X

X X

X X

X X

X X

X X

XX

X X

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X

XX

X X

X

X X

X X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXX

XXXXXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

X X

XX

X

X

X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

XXXXXX

XXXXXX

XX

X

X X X

X

X X X

X

X X X

X

X X X

X

X X X

X

X X X

X

X X

XX

X X

XX

X X

XX

X X

XX

X X

XX

X X

XX

X X

XX

X X

XX

X X

XX

X X

XX

X X

XX

X X

XX

X X

X X

X X

X X

X X X

X X XX X X

X X

X

X X X

X

X

X

X X

X

X

X X

XX

X

XX

X

X

X

XX

X

X

XX

X X

XX

X X

X

X

X

X

X

XX

X X

X

XX

X X

X

X

X X

X

XX

X X

X

XX

X X

X

X

X X

X

XX

X X

X

XX

X X

X

X

X X

X

XX

X X

X

XX

X X

X

X

X X

X

XX

X X

X

XXXXXX

XXXXXX

X

X X X X X X X X X

X X X X X X X X X X

X

X X

X X X

X X X X

X

X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X

X X X

X

X

X

X

X

X

X

X X

X X

XX

X

X

X X

X X X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X

X X

X

X X

X

X

X X

X

X

X X

X

X XX

X

X

XX

X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X

X X

X

X X

X

XX

X

X

X X

X X

X

X

XX

X X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X

X X X

X

X

X

X X

X

X

X X

X XX X

X

X X X

X

X

X

X X

X

X

X X

X X

X

X XX

X X

X X

XX

X X

X

X

X X

X

XX

X X

X

X X

X X

X X

X X

X

X X X

X X

X

X X

X

X

X X

XX

X X

X

X X X

X X

X

X X

X

X

X X

XX

X X

X

XXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXX

X XX X XX

X

XX

X

X

X X X X X X X X X

X X X X X X X X X

X X

X

X X

X

X

X

XX

X X

X

XX

X

X

XX

X X

X X X

X

X

X

X X

X

X

X X

XX

X X

X

X X

X

X X

X

X

X

X

X

X X X

X X

X

X X

X

X

X X

XX

X

XX

X

X

X

XX

X

X

XX

X X

X X

X X

X X

X X

X X

X X

XXXXX

XXXXXX

X X

X

XX

X

XX

X

X X

X X

X X

X X

X

X

X

X

X

1/8" = 1'-0"

HVAC REMOVALS PLAN

HVAC REMOVALS PLAN

TAM

EGC

MD101

MD101

RAM-TECH

E N G I N E E R S phone: 315-463-7716 fax: 315-463-7758 www. ramtechengineers.com

Buffalo, NY Philadelphia, PA Rochester, NY of Syracuse, P.C.

RAM-TECH Engineers

Syracuse, NY copyright C RAM-TECH Engineers, P.C.

RENOVATION

KAREN SHONBORN

SHEET SIZE: 30 X 42

DRAWING NO.

CHECKED BY

DRAWN BY

FLOOR NO.

FILE NAME

DRAWING TITLE

SUB. DATE

SUBMISSION

GSA PM

PROJECT NO.

PROJECT

DESCRIPTION

PROJECT

TITLE

FACILITY CODE

OTHER

BUILDING NOs.

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

CONSTR. FIRM

SUB A/E

PRIME A/E

A/E CON. NO.

D R

A W

I N

G P

R O

J E

C T

B U

I L

D I N

G C

O N

T R

A C

T O

R S

G R

A P

H I C

S C

A L

E

R E

V I S

I O

N

N

O T

E S

C E

R T

I F

I C

A T

I O

N S

MARK DATE DESCRIPTION

SHEET OF

NK BHANDARI ARCHITECTURE

RAM TECH ENGINEERS

GS-02P-10-PW-D-0013

JAMES M. HANLEY FEDERAL

100 S. CLINTON STREET

SYRACUSE, NY 13261

NY0281ZZ

K E

Y

P

L A

N

SENSITIVE BUT UNCLASSIFIED (SBU) PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.

DATE:

1 2 3 4 5 6

E

D

C

B

A

1 2 3 4 5 6

SUB A/E

CONSTR. CON.

NYS EDUCATION LAW, SECTION 7209 AND 69.5(B)

PROHIBITS ANY PERSON TO ALTER THESE DRAWINGS

OTHER THAN A LICENSED ARCHITECT OR THE DESIGN

ENGINEER. INFORMATION ON THESE DRAWINGS FOR

GSA ONLY, AND CAN BE UTILIZED BY GSA AS THEY

DEEM NECESSARY.

1005 W. Fayette Street, Suite 4A

Syracuse, NY 13204

Phone

Fax www.nkbpc.com

315.428.1177

315.428.9822

PRIMARY WORK AREA

DN

UP

DN

NKBN. .

ARCHITECTURE & ENGINEERING, PC..

KBHANDARI

GENERAL SERVICES ADMINISTRATION

PUBLIC BUILDING SERVICE

PROPERTY MANAGEMENT DIVISION

UPSTATE NY SERVICE CENTER

HANLEY GSA SPACE

REALLOCATION PROJECT

04/30/2019

RNY12525

4/30/2019

CONSTRUCTION DOCUMENTS

0 2' 4' 8'

04/22/201 PLAN REVISION

File details come from the government source that posted it. Updated .