47PB0020R0028 Tab 10 Attachment D Past Performance Questionnaire.pdf

PDF 851 KB Posted

Attached to
O'Neill Hydronic Piping III Federal contract opportunity
Solicitation number
47PB0020R0028
Issued by
General Services Administration Public Buildings Service Region 1

About this file

This document contains a past performance questionnaire related to a federal solicitation for hydronic piping repair and replacement services. The General Services Administration Public Buildings Service Region 1 is seeking proposals for the O'Neill Hydronic Piping III project located in Boston, MA. The aged and deteriorating hydronic piping at the O'Neill Federal Building requires repair and replacement, with a focus on the north side piping and HVAC system. The project scope includes items such as piping risers, fan coil branch piping, valving, insulation, furniture moving and firestopping. The estimated price range is $750,000 to $1.5 million. The NAICS code is 238220 with a small business size standard of $16.5 million. The 100% small business set-aside solicitation will be released on June 30th, 2020 with a proposal due date of August 13th, 2020. A pre-proposal conference is scheduled for July 13th and a pre-proposal site visit is scheduled for July 14th. Technical documents will be available through beta.sam.gov and offerors must monitor the site for RFP amendments and updates. The past performance questionnaire is part of the RFP and requests client references to evaluate offerors' performance on similar past projects.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

SECTION 1: CONTRACTOR INFORMATION

Contractor Name: Point of Contact:

Address: Phone Number:

Email Address:

Unique Entity Identifier Number (e.g. DUNS):

SECTION 2: CONTRACT INFORMATION

Contract No.:

Delivery/Task Order Number (if applicable):

Project Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy): Actual Completion Date (mm/dd/yy):

Explain Differences (limited to 500 characters):

Original Contract Price: Final Contract Price (to include all modifications):

Explain Differences (limited to 500 characters):

Provide a brief description of the project to support the extent to which the submitted example of past performance meets the definition of Similar Project (see solicitation). The project description is limited to no more than 500 words (may attach as a separate page).

GSA Solicitation No. 47PB0020R0028 General Services Administration, Public Buildings Service Region 1

Building, 10 Causeway Street, Boston, MA Thomas P. O’Neill United States Federal Project: Hydronic Piping III past performance of the offeroras the prime contractor on similar projects (refer to solicitation for definition of similar project).

limited to no more than 500 characters (with spaces) unless otherwise specified. The past performance evaluation will include the should refer to page 5 to mark the technical complexity of work in Section 4. Any requested explanations in Sections 1 – 4 must be contact, and request the client reference complete Section 4 and the past performance questionnaire (pages 3 – 4). Client references INSTRUCTIONS: The offeror must complete Section 1, 2, and 3 on this form, contact their clients, forward this form to the client point of

FOR OFFICIAL USE ONLY, SOURCE SELECTION INFORMATION (FAR 3.104)

Building, Boston, MA GSA Solicitation No. 47PB0020R0028 Hydronic Piping III Project at the O'Neill Federal Request for Proposal Attachment : Offeror’s Past Performance Questionnaire for

2 | P a g e

SECTION 3: CLIENT INFORMATION

Reference Name and Title:

Reference Phone Number:

Reference Email Address:

SECTION 4: PROJECT DETAILS

Technical Complexity of Work

(Refer to page 5 to verify the indicated technical complexity of work):

Do you concur with the information and project description provided by the offeror (sec. 1 – sec. 3) for the selected project

Explanation of any discrepancy (as needed):

Describe how the referenced project adhered to the baseline schedule. Describe any reasons for schedule deviations in the offeror’s past performance sample project(s) and what the team did in order to meet the schedule. Were there any change orders either customer driven or contractor driven and how was any impact solidified in the schedule?

Describe any reasons for deviation from the original proposed price. Identify any measures that either saved the project money or resulted in cost overruns. For instance, these metrics may be in the numbers of RFI’s adverted, change orders averted, value engineering employed, and or cost/claim items.

Does the project use a design-build delivery method?

Did the offeror perform work as the prime contractor?

High Medium Low submitted for the offeror’s past performance? Yes No (If no, please give a brief explanation of the discrepancy).

Yes

Yes

No

No

3 | P a g e

QUALITY: E VG S M U N

The overall perceived quality of the services and product.

Effectiveness of identification of issues in quality of work and correction of deficient work.

Effectiveness of independent technical reviews and ability to address and review comments.

Ability to develop a design within stated specifications, requirements, and the scope of work and deliver a final product in accordance with the plans and drawings.

Note: If applicable, provide an explanation of resolution measures. Describe any evident measures attributed to the quality rating.

SCHEDULE/TIMELINESS OF PERFORMANCE: E VG S M U N

Compliance with delivery/completion schedules including any significant intermediate milestones, including the completion of punch list items.

Timeliness responding to questions, comments, and requests for changes as well as incorporation of comments into the development of final product.

Timeliness in completion of administrative activities such as invoices, security clearances, furnishing of any O&M manuals, an

Note: Describe transparency of project schedule and any other processes or tools utilized to ensure timeliness of overall project delivery.

Describe any issues in timeliness and whether the contractor adequately implemented corrective action to maintain or improve the schedule.

additional space is necessary, the blocks for explanations may be expanded or page(s) may be attached to the PPQ.

schedule/timeliness of performance, management, customer satisfaction, and general) are limited to 24,000 characters. If space. Refer to page 6 for the definitions of adjectival ratings. Narrative responses for each rating factor (quality, may attach pages or increase the row height to any fields that request a written response if the box does not provide sufficient INSTRUCTIONS: Please mark the adjective rating which best reflects your evaluation of the contractor’s performance. The client submit the completed PPQ directly to Adam Katzman at adam.katzman@gsa.gov).

47PB0020R0028 and the indicated client reference should sign the PPQ. If requested by the offeror, then the client may complete Section 4 on page 2. The PPQ should be returned to the offeror to be submitted in response to GSA Solicitation No.

Offeror’s Relevant Experience Attachment (to ensure contractor completed information is correct). Clients are also requested to INSTRUCTIONS: Clients should complete past performance questionnaire (PPQ) (pages 3 and 4 of this attachment) and review mailto:dylan.white@gsa.gov mailto:miriam.babcok@gsa.gov

4 | P a g e

MANAGEMENT: E VG S M U N

Effectiveness of management and coordination of activities to ensure incorporation of input from all stakeholders and produce a solution aligned with requirements, scope, and specifications.

Effectiveness in the management solution with overall constructability1.

Effectiveness of business relationship with the design firm

Effectiveness of quality control/quality assurance processes to produce a product of stated quality or better while successfully controlling costs/price.

Note: Describe efforts taken by contractor to manage the overall quality of the product. Describe how contractor’s efforts to integrate and coordinate activities contributed to achievement of project goals and objectives.

OVERALL PAST PERFORMANCE: E VG S M U N

Provide a rating of the overall customer satisfaction with the project.

GENERAL PAST PERFORMANCE INFORMATION:

Would you hire or work with this firm again? Yes

Were liquidated damages assessed? Yes

Provide any additional remarks with specific events or actions to justify whether or not the firm would (or would not) be recommended.

“Constructability” means “…the effective and timely integration of construction knowledge into the conceptual planning, design, construction, and field operations of a project to achieve the overall project objectives in the best possible time and accuracy at the most cost-effective levels.” (Source: Construction Management Institute, Constructability (Best Practice) RT003-Topic Summary)

No

No

5 | P a g e

INFORMATION: Use the following to describe or verify the technical complexity of the project.

Rating Definition Examples

Low The contract requires mature, proven technology or services of a non-complex nature, such as the production of simple items, or performance of simple operations. Contract requirements are simple, and efforts are routine. Highly skilled labor is not required in order to meet contract requirements. The contract may be for a follow-on, repetitive type, or commercial acquisition. Contract requirements can be accomplished with a low degree of management effort, and routine services may be performed with minimal supervision.

commercial-off-the-shelf supplies or parts (such as transistors) commercial services (such as grounds keeping)

Medium The contract requires mature, proven technology or services of a moderately complex nature. While the technology may be moderately complex, and the services require skilled labor, no new technology is being developed, and the technology is being used for proven applications only. No new applications of technology are being performed. Contract specifications have moderate tolerances, and may have a routine delivery schedule. A moderate degree of management oversight is required to ensure accomplishment of contract requirements.

night vision googles design and construction services for repairs and alterations to real property financial support services

High The contract requires new technology or services, or a new application of existing technology or services, with a high degree of technical uncertainty. Performance requires state-of-the-art machinery, or highly skilled personnel. Contract specifications include stringent tolerance limits, and services must be performed to exacting standards. The contract may have an accelerated delivery schedule. A high degree of management effort is required to ensure accomplishment of contract requirements.

development of new aircraft development of new weapon system

6 | P a g e

INFORMATION: Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.

Rating Definition Note

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government’s/Owner’s benefit. The contractual performance on the element or sub-element being evaluated was accomplished with few minor problems for which corrective action taken by the contractor was highly effective.

An Exceptional rating is appropriate when the contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective action taken by the Contractor were effective.

A Very Good rating is appropriate when the contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear, or were, satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements.

The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective, or were not fully implemented.

A Marginal rating is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract. Rating will be neither positive nor negative.

Untitled

Section 1 Contractor Address Text Field:
Section 1 Contractor Name Text Field:
Section 1 UEI Text Field:
Section 1 Contractor POC Text Field:
Section 1 Contractor Phone Text Field:
Section 1 Contract Email Text Field:
Section 2 Contract No Text Field:
Section 2 Project Title Text Field:
Section 2 Delivery or TO Num Text Field:
Section 2 Contract Loction Text Field:
Section 2 Award Date Text Field:
Section 2 Completion Date Text Field:
Section 2 Actual Completion Text Field:
Section 2 Original Contract Price Text Field:
Section 2 Final Contract Price Text Field:
Section 2 Free Form Explanation Contract Price Text Field:
Section 2 Free Form Project Description Text Field:
Section 2 Free Form Explanation Completion Date Text Field:
Section 2 Free Form Project Description Text Field Continuation:
Section 3 Client Name & Title Text Field:
Section 3 Client Phone Number Text Field:
Section 3 Client Email Address Text Field:
Section 4 Free Form Discrepancy Explanation Text Field:
Section 4 Project Baseline Schedule Text Field:
Seciton 4 Deviation from Original Price Text Field:
Section 4 Quality Free Response Text Field:
Section 4 General Comments Free Response Text Field:
Section 4 Management Free Response Text Field:
Section 4 Schedule Free Response Text Field:
Tech Complex High Checkbox: Off
Tech Complex Medium Checkbox: Off
Tech Complex Low Checkbox: Off
Concurrence Project Description Yest Checkbox: Off
Concurrence Proejct Description No Checkbox: Off
DB Yes Checkbox: Off
DB No Checkbox: Off
Prime Yes Checkbox: Off
Prime No Checkbox: Off
Quality Q1 E Checkbox: Off
Quality Q1 Checkbox VG: Off
Quality Q1 Checkbox S: Off
Quality Q1 Checkbox M: Off
Quality Q1 Checkbox U: Off
Quality Q1 Checkbox N: Off
Quality Q2 Checkbox E: Off
Quality Q2 Checkbox VG: Off
Quality Q2 Checkbox S: Off
Quality Q2 Checkbox M: Off
Quality Q2 Checkbox U: Off
Quality Q2 Checkbox N: Off
Quality Q3 Checkbox E: Off
Quality Q3 Checkbox VG: Off
Quality Q3 Checkbox S: Off
Quality Q3 Checkbox M: Off
Quality Q3 Checkbox U: Off
Quality Q3 Checkbox N: Off
Quality Q4 Checkbox E: Off
Quality Q4 Checkbox VG: Off
Quality Q4 Checkbox S: Off
Quality Q4 Checkbox M: Off
Quality Q4 Checkbox U: Off
Quality Q4 Checkbox N: Off
Schedule Q1 Checkbox E: Off
Schedule Q1 Checkbox VG: Off
Schedule Q1 Checkbox S: Off
Schedule Q1 Checkbox M: Off
Schedule Q1 Checkbox U: Off
Schedule Q1 Checkbox N: Off
Schedule Q2 Checkbox VG: Off
Schedule Q2 Checkbox S: Off
Schedule Q2 Checkbox M: Off
Schedule Q2 Checkbox E: Off
Schedule Q2 Checkbox U: Off
Schedule Q2 Checkbox N: Off
Schedule Q3 Checkbox E: Off
Schedule Q3 Checkbox VG: Off
Schedule Q3 Checkbox M: Off
Schedule Q3 Checkbox S: Off
Schedule Q3 Checkbox N: Off
Mgmt Q1 Checkbox E: Off
Mgmt Q1 Checkbox VG: Off
Mgmt Q1 Checkbox S: Off
Mgmt Q1 Checkbox M: Off
Mgmt Q1 Checkbox U: Off
Mgmt Q1 Checkbox N: Off
Mgmt Q2 Checkbox E: Off
Mgmt Q2 Checkbox VG: Off
Mgmt Q2 Checkbox S: Off
Mgmt Q2 Checkbox M: Off
Mgmt Q2 Checkbox U: Off
Mgmt Q2 Checkbox N: Off
Mgmt Q3 Checkbox E: Off
Mgmt Q3 Checkbox VG: Off
Mgmt Q3 Checkbox S: Off
Mgmt Q3 Checkbox M: Off
Mgmt Q3 Checkbox U: Off
Mgmt Q3 Checkbox N: Off
Mgmt Q4 Checkbox E: Off
Mgmt Q4 Checkbox VG: Off
Mgmt Q4 Checkbox S: Off
Mgmt Q4 Checkbox M: Off
Mgmt Q4 Checkbox U: Off
Overall Checkbox E: Off
Overall Checkbox VG: Off
Overall Checkbox S: Off
Overall Checkbox M: Off
Overall Checkbox U: Off
Overall Checkbox N: Off
Work Again Yes Checkbox: Off
Work Again Checkbox No: Off
LDs Yes Checkbox: Off
LDs No Checkbox: Off

File details come from the government source that posted it. Updated .